Loading...
HomeMy WebLinkAboutConditions of PermitcoNDrTlo NS OF PERMIT B LRE-09-23-8308 SCIB LLC New Single-family dwelling w/ attached garage 15 Blue Heron Dr, GWS lronbridge PUD, Lot ó0 1 ) ALL WORK SHALL COMPLY WITH THE 201 5 INTERNATIONAL RESIDENTIAL CODE (I.R.C,) AND 2018 I NTERNATIONAL EN ERGY CONSERVATION CODE (I,E.C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLYWITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPI\4ENT WEBSITE FOR ADDITIONAL I NFORMATION. 5) OPEN HOLE SOTLS REPORT tS REOUTRED AT FOOTTNG TNSPECTION AND PRIOR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 1,500 PSF / 3,OOO PSF AS SPECIFIED BY THE GEOTECH. ó) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGINEERING FOR BUILDING INSPECTOR AT TIME OF FRAME INSPECTION. 7) BLOWER DOOR TEST tS REOU|RED. MUST SUBMIT BLOWER DOOR TEST REPORT TO GARFIELD COUNTY COMMUNITY DEVELOPN/ENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL. 8) PRESCRIPTIVE PATH HAS BEEN CHOSEN FOR ENERGY COMPLIANCE OF THE HOME DESIGN. BS-1, AD-1 , AD-2, EL-1 AND ZEPHYR DESIGN LOAD CALCULATIONS ATTACHED FOR REFERENCE. ALL NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m1507.3.3(1) AND (2) SHOWN ON SHEET A-1)