HomeMy WebLinkAboutCondition of Permit1)
2)
4)
s)
e)
ó)
7)
8)
CONDITION S OF PERMIT
BLRE-O 8.23_8268
PAUL BARTSCH
SINGLE-FAMILY DWELLING WITH ATTACHED GARAGE
553 Hidden Valley Dr, GWS
Springridge Reserve PUD, Ph.4, Lot ó3
ALL WORK SHALL COMPLY WITH THE 2015 TNTERNATTONAL RESIDENTIAL CODE (t.R.C.) AND 2018
TNTERNATTONAL ENERGY CONSERVATTON CODE (t.E.C.C.)
PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE
ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON
PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS
REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD CON/PLY WITH WILDFIRE N/lTlcATlON AND
DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY CON/MUNIry DEVELOPMENT WEBSITE FOR
ADDITIONAL I N FORMATION.
OPEN HOLE SOILS REPORT IS REOUIRED AT FOOTING INSPECTION AND PRIOR TO ANY CONCRETE
POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR.
1,500 PSF AS SPECIFIED BY THE GEOTECH.
PRE-ENGINEERED ROOF TRUSSES. HAVE ENGINEERING FOR BUILDING INSPECTOR AT TIME OF
FRAME INSPECTION.
ALTERNATE METHODS: 2 HOUR FIRE WALL DETAILS PROVIDED ON SHEETS 42.1 THROUGH 42.3
(PROPOSED rN LrEU OF TNSTALLING A FtRE-SpRtNKLER SYSTEM PLAT NOTE ó)
BLOWER DOOR TEST IS REOUIRED. MUST SUBIVIIT BLOWER DOOR TEST REPORT TO GARFIELD
COUNTY COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING
INSPECTION / C.O. FINAL.
PRESCRIPTIVE PATH HAS BEEN CHOSEN FOR ENERGY COMPLIANCE OF THE HOIVIE DESIGN.
WRIGHTSOFT LOAD CALCULATIONS ATTACHED FOR REFERENCE. SEE ALSO COVER SHEET 2018
IECC GENERAL NOTES AND REFERENCED PAGES. ALL NEW HOMES TO HAVE WHOLE-HOUSE
MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m1507.3.3(1)AND (2) PROVIDED
oN sHEET A4.1 )