HomeMy WebLinkAboutCorrespondence-Work Scope&awesvæNeæ
ëMrok
Sene
To:
Cc:
Colleen W¡rth
F¡onr:
Attaclunents:
Follow Up Flag:
Flry Status:
Jeff Johnson <jeff@jjarchitectu ral.com >
Thursday, October 12,2023 4:37 PM
Col leen Wirth; garrickfrontel la@gmail.com
garricKrontel la@g mail.com
RE: GRAHAM interior remodel 3426 CR 301 Parachute is now UNDER REVIEW
2023Ð220 -1 629{3ipg, 230 1 E- 1 0- 1 2-23 -Roof imp rovement.pdf
Follow up
Flagged
Suhiece
Good afternoon Colleen,
I have answered your questions in BLUE below'
Please let us know if you have further questions or comments'
Thank you,
Jeff
Jeff Johnson Architectural, PC
L36 East Third Street
Rifle, CO 81650
970-62s-0580
Frum: Co I lee n Wi rth <cwirth @ garfie ld-co u nty.co m >
Sent: Thursday, Octobe r L2, 2023 7 :41 AM
To: Jeff Johnson <jEff@ijarc+itectura{.cam>; gerr'lckfrofitel{€@g{æai{.cot'lß
Subiect RE: GRAHAM interior remodel 3425 CR 30L Parachute is now UNDER REVIEW
For Jeff and Garrick,
Thanks for help on GRAHAM oroject.
As l,m reviewing the home under residential "alterations" section of the newly adopted 2018 lnternational Energy
Conseruation Code (l ECC) :
I am assuming that this renovation would be considered Alteration Level 2
1. RE: the supplemental insulation on upper level, do you know what insulation material, R-values are proposed
yet? And if the home hasexisting roof ventilation and baffles?
The upper fìoor is a combination of sloped rafters and side walls (photo attached)
I have included a pDF showing the existing sloped roof and the proposed improvement'
Since this is an alteration to the rool and not new construction, I understand that we do not have to comply with the
established roof R-value of 2018 IECC
1
lheprCIposedtmprovementwrll rncreasethethermal pertornralrceol theslopedrootby //u/o,fromaneshrnatedK-l1 to
R-19.
'lhe roof detail improvement is full cavity filled, therefore venting in this areas is not necessarv.
The roofs other than at the u¡r¡,rer flc,ror lrave flat t-rr-rttr-un r:hords with attic cavities.
Garrett has confirmed that these cavities are vented by a ridge vents installed in 2011.
Since the flat ceiling roofs will be untouched, we do not intencJ to verify or install air baffles.
2" llillll any of the building heating system be replaced?
No
Wi'll exìsting heatitg system remain üntoüch€d?
Yes, although some supply grllls may be reposltloned
3. Âre you installing any new permânent lighting?
Due to the age of the building, Garrett will have the whole building rewired under a separate State permit
He is aware that 90% of iighting fixtures must have high-efficacy lamps
Thankg
Colleen
Colleer¡ Wirtt¡
SuildingPlams Emminer
Garfield County f.omnnunity Devel¡opmrent
108 8th Street, Suite 401
{974} 945-1377 ext X61O
cwi rth (Ðga rfield-cou ntv. co nr
FromJeffJot¡nson<jeff@iiarchitectu >
Ser¡h Wednesdal¡, tctober LL, 2t23 3:2û FM
To: eolþ-en Wi¡th <cwirth@earfie|cl- >; garrickfronteI|a@gmai!.com
S{¡bt€c* Rf: Gfiå*ååM inf€risr r€n*odeã 34?6 Cß 38å Farå{¡?ute is now UfiÐfß frfVinry
tli Colleen,
! consr¡lted w,ith Ga¿T ick and have answered ycur ques$ens in Bt-U E belo+ry
Please let us know if you have further questions or co¡nrnents.
Thank you,
Jeff
Jeff Johnson Arcfiitectural, 'PC
15b tast I nrrd åï.eet
Rìfle, CO 81650
97+62æ580
2
ru
Frun: Co{fleen Wirth <cw¡rth@Earfield-c >
Sent: Wednesday, October LL,202312:50 PM
To: Jeff Johnson <jeff@iiarchitec >; sarrickfrontella@smail.com
Subiecü GRAHAM interior remodel 3426 CR 301 Parachute is now UNDER REVIEW
BLRE-09 -23-8329 Graham remodel 3426 CR 301 Parachute
Hello Jeff and Garrick:
l'm starting review for the GRAHAM remodel.
Double checking to be sure I understand clearly the building permit application request.
QUESTIOI$:
t. Will all of the work scope shown on sheet 421 renovated main and upper floors, be completed as part of this
issued building Permit?
Yes, limited work @ upper floor, windows and supplemental insulation
2. Has any of the scope been stricken or deleted from current project scope?
The plans submitted will be full scope, pending availability and pricing remains the same
3. please confirm the upper level loft floor /wall / roof framing was existing and shall remain same, save for the
new windows?
Yes
4. please confirm if the upper floor was previously finished and already within the existing heated envelope?
Yes
5. please confirm if stair is existing, to be attered l'replaced, or neüt installation?
Stair is existing
6. please identify the planned use(s) of upper level: LOFT and unlabeled room with door to be used as
and ?
As owners are elderly, the upper floor will be limited to storage only in both rooms'
7. As we understand the home is served by an existing septic system, please confirm total number of existing
bedrooms jn the house now? And how many total bedroom proposed when home renovations are completed?
Two existing bedrooms and one half bath (Powder Room) will be added.
please send your written email replies directly to me at Colleen W¡rth, Plans Examiner, cwirth@garfield-countv.com.
Thanks for your time and attention to this project, I look forward to seeing this move forward,
Colleen W¡rth
Euilding Plans Examiner
Garfield County f-ommunity Development
108 8th Street, Suite 401
(970) 945-1377 ext 1610
cwirth @ga rfield-cou ntv.com
3
\t
(e) o$pholtic shingles
(e) 3ôfl building poper
(e) I x 4 rough cut shêothing
(e)2x4roughcutrofter
closed cell sproy foom, 1' rninimum tl'ickness, R-7
bloçn in bott insulotion, full covity fill, R-12
2 x 4 nomÌnol furring pl.rrliir GD 24" o.c.
6 mil poly vopor borrier
5/8'gypsum boord
s
ospholtic shingles
30# btrilding poper
f x 4 rough cut sheothing
2 x 4 rough cut rofter
shredded newsooper cellulose Ìnsulotion,
settled thickneòs'5" to 3 'l/2", R-11
(e) 1/2" dry*oll (removed)
(")
(")
(")
(")
(")
REVISED ROOF_ R- 1 9
EXISTING ROOF_ R- 1 1