Loading...
HomeMy WebLinkAboutObservation of Excavation 10.17.2023Vasser pad Location: Performed by: Comments:Upon scheduled visit the excavator was not delivered yet and waited for it. Excavation Contractor:Cody PeacockWillow Creek Companies Name Company On-Site Notifications Jeff Hollingshead Willow Creek Companies Dale Wood Williams Geotechnical Report Geotechnical Engineer:N/A Report Date:N/A Anticipated Condition:Native Undisturbed Encountered Conditions Excavation Condition:We observed the excavation for the proposed thickened edge slab, as noted in photo below, and found dense, clayey to silty sands. Based upon our experience and on the IBC presumed soil load bearing pressures in Table 1806.2, this soil type, at the elevations and time of our observations, likely meets or exceeds the presumed allowable bearing pressure used in the design. However, the presence of weaker subsurface soil layers resulting in allowable bearing pressure of less than 2,000 psf cannot be ruled out by surface observations only. Quantitatively verifying soil bearing capacity generally requires access to subsurface information and Standard Penetration test data. If this is desired, we recommend drilling and data collection be performed. Conformance Excavation Conditions: Conforms Does Not Conform Not Applicable Not Observed No project geotechnical report has been prepared for this area. Project structural drawings indicate design based on a maximum assumed allowable bearing pressure of 2,000 psf. Additional Comments: Report No.:N/A Willow Creek Companies 28485 Highway 6, Unit 4 Rifle, CO 81650 Steve Brackett Williams Field Services - Piceance Basin Client: Excavation / Open Hole Observations Work Order No.:Oct 17, 2023 23-6582.Excavation-OpenHole.0003; ver: 1Report Date: Work Order Date:Oct 16, 2023 Reviewed By:Chris Hutto Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced, except in full, without the written permission of GROUND Engineering Consultants, Inc. 41 Inverness Drive East, Englewood, Colorado www.groundeng.com 303-289-1989 Englewood | Commerce City | Loveland | Granby | Gypsum | Colorado Springs Page 1 of 2 Photos Willow Creek Companies 28485 Highway 6, Unit 4 Rifle, CO 81650 Steve Brackett Williams Field Services - Piceance Basin Client: Excavation / Open Hole Observations Work Order No.:Oct 17, 2023 23-6582.Excavation-OpenHole.0003; ver: 1Report Date: Work Order Date:Oct 16, 2023 Reviewed By:Chris Hutto Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced, except in full, without the written permission of GROUND Engineering Consultants, Inc. 41 Inverness Drive East, Englewood, Colorado www.groundeng.com 303-289-1989 Englewood | Commerce City | Loveland | Granby | Gypsum | Colorado Springs Page 2 of 2