HomeMy WebLinkAboutApplicationGarJield Couttty
R E C mru$rnity Development Department
108 8th Street, Suite 401,l ' ' i Glenwood Springs, CO 81601
1 ì ír i{ F I Ër -ü e $ [¡NT#e7? s.4.s-82t2
, : al¡!4tÉi J rulIY p¡yç¡.6W
WPE OF CONSTRUCTION
Commercial/Multi-Family
Manufaclyred Home (Single or IVlulti-Level)
Residential (SF, Duplex or Townhome)
Accessory Dwelling Unit (ADU) - MAXIMUM SIZE OF 1,200 SQUARE
Property Owner:
Mailing Address:
,f-lDemolition
il_l Reroof
FEETlB Goaaqe lsuuø Ux] INVOLVED PARTIES
Phone:CI
Email Address:
Contractor:So ¡\A6 b.<,NanuE Phone: (_)
, Mâiling Address
' Email Address:
; Arch¡tect:Phone:
I Ma¡l¡ng Address:
Email Address:
Engineer:Phone Þe9-t AT bL+?
Mailing c 7
cı
L7¿
Email Address:
Manufactured Home Installer:Phone:
Mailing Address
i Email Address:
i PROJECT DETAITS
Describe Work:
Job Address:
i Assessor's Parcel Number:
, Sub,Iot
Owner's Valuation of Work: $
o5-
5q. Ft. of Building:\"00b Height:2U,
rty size (sq. Ft. or Acres): 3 s, ttl ,no c .
L
CI-b
Block
Class of Work:
Garage:
New
Attached
Loo
Remodel/Alteration
#of
Detached
PROJECT DETAILS CONTINUED
Type of Heat:Natural Gas
Septic
Propane
Community
Electric
Permit #:
Other
Driveway
Permit:
NOTICE
Authoritv. This application for a Building Permit must be signed by the Owner of the property, described above,
or an authprized agent. lf the s¡gnature below is not that of the Owner, a separate letter of authority, signed by
the Owner, must be provided with this Application.
Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Mult¡ple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access
or a State Wastewater Discharge Permit.
Void Permit. A Building Perm¡t becomes null and void if the work authorized is not commenced within 180 days
of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERTIFICATION
I hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other data
submitted by me or on my behalf (submittals), based upon my certìficat¡on as to accuracy. Assuming completeness
of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as
Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. ln
consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any
federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and
applicable land use regulations (County Regulation(s)). A,ll County development requiring a permit, except for
residential uses, are subject to Article 7 of the Land Use and Development Code. I acknowledge that the Building
Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the
structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other
applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to ¡nspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring
the correction of errors in the submittals, ifany, discovered after issuance; or (2) stopping construction or use ofthe
structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this
Application, including submittals, and inspections of the work by the Bu¡lding Division do not constitute an
acceptance of responsibility or liability by the County of errors, omissions, or discrepancies. As the Owner, I
acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with
me and my authorized agents, including without limitation my architect designer, engineer and/ or builder.
I hereby acknowledge that I have read and understand the Notice and Certificatíon above, as well as, have
the information which is correct and accurate to the best of my knowledge.
rty Owner Print and Sign Date
flExemnt
0
OFFICIAL USE ONLY
Special Conditions
ffi"s5tion,'fc;:-{u Permít Fee: -t2-40.15 Manu, Home Fee:Misc. Fees:
Total Fees:
2o4Ç.'15
Fees Paidrffi\r.\a Balance Due:(L1Ò.15 Ëffi tr ,{ób11 OWTS No:
Setbacksl OCC Group:û Const. Type:V6 7o¡¡ìpg:.
ï(
TOBUITDING / PLANNING DIVISION :
Date
-7o-L3
ENERGY COMPLIANCE SHEET REQUIREMENTS:
Effective June 30, 2023 Please provide details showing how building complies / meets Garfield County's
adopted 2018 IECC and Climate Zone 5.
Depict and show outline the structure's building thermal envelope. Outline should clearly show portions
of the building to be conditioned inside the envelope (and labelor otherwise identify any areas remaining
unconditioned outside this envelope)
Energy Compliance Plan should further include:
Chosen Energy Compliance Path¡ Prescriptive: Cross Sections of insulated assemblies including the selected materiall R-Value
and U-Values to comply with IRC Table R402.1.2
¡ U-Factor Alternative: Provide a ResCheck Report
o Total U-Factor Alternative: Provide software generated submittal design reports and inspection
checklist for any RESNET ERI index or other performance path designs
Air sealing details around openings, pipes, penetrations, joints
Fenestration U-factors
Provide mechanical system design details including proposed efficiency rates, types of equipment, fuel
types, locations
Energy efficient lighting specifications - 90% to be high-efficacy (LED complies)
Manual J Report required for new building structures and new equipment installations.
STRUCTURAL PLANS: Please provide the following information on the structural plans.
o SOILS REPORT - lf the project is located in a subdivision with a final plat requiring site specific
soils investigation report or if Structural plans make a specific reference to a soils report, then a
copy of the soils report is required to submit a building permit application.
. Design specifications to include roof and deck snow load, wind and seismic design and frost
depth.o Foundation plan showing complete footing and foundation dimensions.
o Footing and foundation details specifying reinforcement and referenced on plans.
r Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses
specified. Pre-manufactured structures require the engineers stamp, signature and date.
o Framing /connection details, braced wall lines, shear wall schedule, location and hold downs.
NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf
determined by the Building Official that additional information is necessary to review the application
and/or plans for compliance, the application may be placed on hold until the required information is
provided. Work may not proceed without the issuance of a permit.
The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as
well as any Road lmpact fees will be collected when the permit is issued.
The permit application must be signed by the owner or by person having written authority from the owner
to act as their representative.
Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a
CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO
inspection requirements will be attached to your approved field set of plans.)
I hereby acknowledge I have read, understand and will abide by the requirements of this
checklist.
owner pr¡nr ÙEAil Bn.l>*¡Sign outu, ro [¡zlzs