HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLRE-1 0-23-83ó0
DEANNE DOUDY & ANDREA HUGHSON
1,83ó sq ft OUONSET HUT
proposed for Ag ricultural Purposes
3241 CR 237 , SILT
Sec. 24,fwns 05, R92 - 212724300389
1) ALL WORK SHALL COMply W|TH THE 2015 INTERNATTONAL RESIDENTIAL CODE (l.R.C.)
AND 2O1B INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.)
2) PROPOSED TMPROVEMENTS ARE SUBJECT TO ALL APPLTCABLE ITEMS CONTAINED lN THE
ATTACHED "GARFIELD COUNry BI.III DING RFOIIIRFMFNTS". NIJMBFR RFFFRFNCFS
NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL pERM|TTTNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD.
ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL
FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
4) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE
MITIGATION AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST
SERVICE AND LOCAL FIRE DISTRICT. SEE GARFIELD COUNTY COMMUNITY DEVELOPMENT
DEPARTMENT WEBSITE FOR FURTHER INFORMATION.
s) ALL HtcH STRENGTH BOLTTNG AND FrELD WELDTNG REOUIRES SPECIAL INSPECTOR.
PROVIDE APPROVAL REPORT AT FRAMING INSPECTION.
6) THE BUILDING STRUCTURE HAS BEEN REVIEWED AS A PRIVATE USE AGRICULTURAL BARN
STRUCTURE ONLY ACCESSORY TO THE FUTURE RESIDENCE. ANY FUTURE CHANGE IN
BUILDING OCCUPANCY OR USE, WILL FIRST BE SUBJECT TO A NEW BUILDING PERMIT
APPLICATION AND REVIEW FOR COMPLIANCE WITH ZONING REGULATIONS, LAND USE &
BUILDING CODES IN EFFECT AT TIME OF FUTURE WORK.
l) SUBMITTED DESCRIPTION OF WORK: OUONSET HUT, STEEL ON MONOLYTHIC SLAB. BARN
WITH NO WATER, HEAT, OR SEPTIC SYSTEM CONNECTIONS. INTENDED FOR ANIMAL USE.
(END WALLS TO BE ADDED AT A LATER DATE MAY BE SUBJECT TO A SEPARATE BULDING
PERMIT REVIEW).
B) S|TE ELEVATTON tS LTSTED AT ó,343 FT. ENGINEERED FOUNDATION DESIGN FOR THE
AGRICULTURAL BUILDING DOES NOT APPEAR TO BE ADEOUATELY FROST PROTECTED
FOR THE SITE ELEVATION -- OWNER'S PROCEED AT OWN RISK AS ADVISEMENT IS MADE
THE PROPOSED STRUCTURE MAY BE SUBJECTTO FROST HEAVE / MOVEMENT. TO
ENSURE ADEOUATE PROTECTION FROM FROST, MINIMMUM 3ó INCHES FOUNDATION
DEPTH IS RECOMMENDED.