HomeMy WebLinkAboutOWTS Design InvoiceInvoice
JOHN BUCKSBAUM
71 SOUTH WACKER DRIVE, SUITE 2130
CHICAGO, IL 60606
Invoice Date:November 15, 2022
Invoice No:2016-285.002 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004
Project 2016-285.002 Willoughby Pond Lots 6 & 7 - Civil
Waterline package updates, permit questions
E-mail invoice to: John@Bucksbaumrp.com
For Professional Services through November 12, 2022
Phase 01 Project Management and Meeting
Professional Labor
Hours Rate Amount
QA/QC Review
Barth, Rick Senior Engineer II .50 172.00 86.00
Totals .50 86.00
Total Labor 86.00
Unit Billing
Mileage
10/11/2022 85.0 Miles @ 0.625 53.13
Total Unit Billing 1.0 times 53.13 53.13
$139.13Phase Total
$139.13Invoice Total
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
12:31:06 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2016-285.002 Willoughby Pond Lots 6 & 7 - Civil
Phase 01 Project Management and Meeting
Professional Labor
Hours Rate Amount
QA/QC Review
Senior Engineer II
QA/QC Review
491 - 752 - Barth, Rick 11/3/2022 .50 172.00 86.00
call on CD finalization process
Totals .50 86.00
Total Labor 86.00
Unit Billing
Mileage
10/11/2022 85.0 Miles @ 0.625 53.13
Total Unit Billing 1.0 times 53.13 53.13
Phase Total $139.13
$139.13Project Total
$139.13Total this Report
Page 2
Project 2016-285.002 - <Draft>2016-285.002 InvoiceSGM
Invoice
JOHN BUCKSBAUM
71 SOUTH WACKER DRIVE, SUITE 2130
CHICAGO, IL 60606
Invoice Date:November 15, 2022
Invoice No:2016-285.003 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004 Fax (970) 945-5948
Project 2016-285.003 Willoughby Ponds (Lot 6) Site
WL re-engagement with J Curtis and team and some minor site updates for barn initiation.
E-mail invoice to: John@Bucksbaumrp.com
For Professional Services through November 12, 2022
Phase 004 Water Main Loop
Task 03 Water Main Loop CD
Professional Labor
Hours Rate Amount
Project Management
Barth, Rick Senior Engineer II .50 172.00 86.00
10/24/2022 permit docs to City
Barth, Rick Senior Engineer II .50 172.00 86.00
10/27/2022 call with JC, permit docs to Aspen
Project Review
Brandeberry, Robert Survey Manager 1.00 160.00 160.00
10/26/2022 Review easement request with Jim. Set up for drafint.gf
Brandeberry, Robert Survey Manager .50 160.00 80.00
10/27/2022 Review
Existing Conditions Mapping
Winkley, Mary Survey Technician 3.25 96.00 312.00
10/27/2022 easement description & exhibit
Winkley, Mary Survey Technician .50 96.00 48.00
10/28/2022 redlines
Winkley, Mary Survey Technician .25 96.00 24.00
10/31/2022 easement redlines
Totals 6.50 796.00
Total Labor 796.00
$796.00Total this Task
$796.00Phase Total
Phase 005 General Project Management
Professional Labor
Hours Rate Amount
Meet w/Design Team
Essenburg, Maxwell Engineer II 1.00 112.00 112.00
11/3/2022 discussing CD's with design team
CADD Design
Essenburg, Maxwell Engineer I 1.00 96.00 96.00
10/26/2022 confirming utilities can be rerouted per contractors
request
Essenburg, Maxwell Engineer I 5.00 96.00 480.00
10/28/2022 rebuilding driveway surface for excavation team per
Rutgers request
Essenburg, Maxwell Engineer I 1.50 96.00 144.00
11/4/2022 analyzing drainage scheme from CCY for meeting on
Tuesday
Totals 8.50 832.00
Total Labor 832.00
$832.00Phase Total
Phase 006 Construction Admin
Professional Labor
Hours Rate Amount
Site Visit(s)
Barth, Rick Senior Engineer II 3.00 172.00 516.00
11/2/2022 site visit, travel, report on initial road cut, wl layout,
culvert for WW
Totals 3.00 516.00
Total Labor 516.00
Unit Billing
Mileage
11/2/2022 85.0 Miles @ 0.625 53.13
Total Unit Billing 1.0 times 53.13 53.13
$569.13Phase Total
Page 2
Project 2016-285.003 - <Draft>2016-285.003 InvoiceSGM
Budget Summary Current Prior To-Date
Total Billings 2,197.13 54,820.58 57,017.71
Budget 115,700.00
Budget Remaining 58,682.29
$2,197.13Invoice Total
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
Page 3
Project 2016-285.003 - <Draft>2016-285.003 InvoiceSGM
12:31:33 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2016-285.003 Willoughby Ponds (Lot 6) Site
Phase 004 Water Main Loop
Task 03 Water Main Loop CD
Professional Labor
Hours Rate Amount
Project Management
Senior Engineer II
Project Management
303 - 752 - Barth, Rick 10/24/2022 .50 172.00 86.00
permit docs to City
303 - 752 - Barth, Rick 10/27/2022 .50 172.00 86.00
call with JC, permit docs to Aspen
Project Review
Survey Manager
Project Review
703 - 900 - Brandeberry, Robert 10/26/2022 1.00 160.00 160.00
Review easement request with Jim. Set up for drafint.gf
703 - 900 - Brandeberry, Robert 10/27/2022 .50 160.00 80.00
Review
Existing Conditions Mapping
Survey Technician
Existing Conditions Mapping
730 - 850 - Winkley, Mary 10/27/2022 3.25 96.00 312.00
easement description & exhibit
730 - 850 - Winkley, Mary 10/28/2022 .50 96.00 48.00
redlines
730 - 850 - Winkley, Mary 10/31/2022 .25 96.00 24.00
easement redlines
Totals 6.50 796.00
Total Labor 796.00
$796.00Total this Task
Phase Total $796.00
Phase 005 General Project Management
Professional Labor
Hours Rate Amount
Meet w/Design Team
Engineer II
Meet w/Design Team
321 - 500 - Essenburg, Maxwell 11/3/2022 1.00 112.00 112.00
discussing CD's with design team
Page 4
Project 2016-285.003 - <Draft>2016-285.003 InvoiceSGM
CADD Design
Engineer I
CADD Design
501 - 499 - Essenburg, Maxwell 10/26/2022 1.00 96.00 96.00
confirming utilities can be rerouted per contractors request
501 - 499 - Essenburg, Maxwell 10/28/2022 5.00 96.00 480.00
rebuilding driveway surface for excavation team per Rutgers
request
501 - 499 - Essenburg, Maxwell 11/4/2022 1.50 96.00 144.00
analyzing drainage scheme from CCY for meeting on Tuesday
Totals 8.50 832.00
Total Labor 832.00
Phase Total $832.00
Phase 006 Construction Admin
Professional Labor
Hours Rate Amount
Site Visit(s)
Senior Engineer II
Site Visit(s)
330 - 752 - Barth, Rick 11/2/2022 3.00 172.00 516.00
site visit, travel, report on initial road cut, wl layout, culvert for WW
Totals 3.00 516.00
Total Labor 516.00
Unit Billing
Mileage
11/2/2022 85.0 Miles @ 0.625 53.13
Total Unit Billing 1.0 times 53.13 53.13
Phase Total $569.13
$2,197.13Project Total
$2,197.13Total this Report
Page 5
Project 2016-285.003 - <Draft>2016-285.003 InvoiceSGM
Invoice
Robert Kaufmann
Kaufmann Consultant
435 East Jody Road
Basalt, CO 81621
Invoice Date:November 15, 2022
Invoice No:2017-147.002 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004
Project 2017-147.002 River Park Repair
Continuing record information and affirmation work.
Email invoices to: rkauf88302@aol.com
For Professional Services through November 12, 2022
Phase M7 Construction Administration - MEP
Professional Labor
Hours Rate Amount
Electrical Design
Haymes, Amber Engineer IV 3.75 142.00 532.50
Totals 3.75 532.50
Total Labor 532.50
$532.50Phase Total
$532.50Invoice Total
Outstanding Invoices
Number Date Balance
47 11/10/2022 -3,911.50
Total -3,911.50
Total Now
Outstanding
-$3,379.00
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
12:31:46 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2017-147.002 River Park Repair
Phase M7 Construction Administration - MEP
Professional Labor
Hours Rate Amount
Electrical Design
Engineer IV
Electrical Design
941 - 504 - Haymes, Amber 8/15/2022 .75 142.00 106.50
discussion re: outstanding elec issues
941 - 504 - Haymes, Amber 8/19/2022 3.00 142.00 426.00
discussion re: outstanding elec issues
Totals 3.75 532.50
Total Labor 532.50
Phase Total $532.50
$532.50Project Total
$532.50Total this Report
Page 2
Project 2017-147.002 - <Draft>2017-147.002 InvoiceSGM
Invoice
Rob Morey
MC McLain Flats LLC
1765 McLain Flats Rd
Aspen, CO 81611
Invoice Date:November 15, 2022
Invoice No:2017-438.002 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004
Project 2017-438.002 1765 McLain Flats Road
All water rights time, which is on-call / TM, is on this invoice under the 002 phase. This will be the last
invoice under that phase. From here on out, all work, civil, water rights, survey, etc., will be under the
005 phase so hopefully more trackable and single sourced.
Email invoices to: Rob Morey rob@idscolorado.com; Alfred Lafave alfred@idscolorado.com
Cc: lyla@clauregroup.com
For Professional Services through November 12, 2022
Phase 12 Water Rights - On Call Support
Professional Labor
Hours Rate Amount
Water Rights
Leppek, Bailey Engineer IV .50 142.00 71.00
10/27/2022 Coordinate on setting up a larger meeting with the team
to discuss complications with dividing the property into
two parcels.
Leppek, Bailey Engineer IV .25 142.00 35.50
10/31/2022 Coordinate with Patrick Miller Noto and Rick on water
rights meeting.
Leppek, Bailey Engineer IV 2.25 142.00 319.50
11/1/2022 Water Rights Meeting with Patrick Miller Noto, Max G,
SGM, Rob M. Prep for meeting, outline water rights
issues and options for discussion. Take notes and send
meeting notes to be a start for water rights option memo
for PMN to write.
Totals 3.00 426.00
Total Labor 426.00
$426.00Phase Total
$426.00Invoice Total
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
Page 2
Project 2017-438.002 - <Draft>2017-438.002 InvoiceSGM
12:31:52 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2017-438.002 1765 McLain Flats Road
Phase 12 Water Rights - On Call Support
Professional Labor
Hours Rate Amount
Water Rights
Engineer IV
Water Rights
961 - 504 - Leppek, Bailey 10/27/2022 .50 142.00 71.00
Coordinate on setting up a larger meeting with the team to discuss
complications with dividing the property into two parcels.
961 - 504 - Leppek, Bailey 10/31/2022 .25 142.00 35.50
Coordinate with Patrick Miller Noto and Rick on water rights
meeting.
961 - 504 - Leppek, Bailey 11/1/2022 2.25 142.00 319.50
Water Rights Meeting with Patrick Miller Noto, Max G, SGM, Rob
M. Prep for meeting, outline water rights issues and options for
discussion. Take notes and send meeting notes to be a start for
water rights option memo for PMN to write.
Totals 3.00 426.00
Total Labor 426.00
Phase Total $426.00
$426.00Project Total
$426.00Total this Report
Page 3
Project 2017-438.002 - <Draft>2017-438.002 InvoiceSGM
Invoice
Rob Morey
MC McLain Flats LLC
1765 McLain Flats Rd
Aspen, CO 81611
Invoice Date:November 15, 2022
Invoice No:2017-438.005 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004
Project 2017-438.005 1765 McLain Flats Road
Site time for LU redo set, very near readiness pending final team approval.
Email invoices to: Rob Morey rob@idscolorado.com; Alfred Lafave alfred@idscolorado.com
Cc: lyla@clauregroup.com
For Professional Services through November 12, 2022
Phase 03 Land Use Design Civil Set
Professional Labor
Hours Rate Amount
Meet w/Design Team
Essenburg, Maxwell Engineer II 1.00 112.00 112.00
11/1/2022 water team meeting
Totals 1.00 112.00
Total Labor 112.00
$112.00Phase Total
Phase 12 Water Rights - On Call Support
Professional Labor
Hours Rate Amount
Project Management
Barth, Rick Senior Engineer II 1.00 172.00 172.00
11/1/2022 group call on WR direction
Totals 1.00 172.00
Total Labor 172.00
$172.00Phase Total
$284.00Invoice Total
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
Page 2
Project 2017-438.005 - <Draft>2017-438.005 InvoiceSGM
12:31:56 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2017-438.005 1765 McLain Flats Road
Phase 03 Land Use Design Civil Set
Professional Labor
Hours Rate Amount
Meet w/Design Team
Engineer II
Meet w/Design Team
321 - 500 - Essenburg, Maxwell 11/1/2022 1.00 112.00 112.00
water team meeting
Totals 1.00 112.00
Total Labor 112.00
Phase Total $112.00
Phase 12 Water Rights - On Call Support
Professional Labor
Hours Rate Amount
Project Management
Senior Engineer II
Project Management
303 - 752 - Barth, Rick 11/1/2022 1.00 172.00 172.00
group call on WR direction
Totals 1.00 172.00
Total Labor 172.00
Phase Total $172.00
$284.00Project Total
$284.00Total this Report
Page 3
Project 2017-438.005 - <Draft>2017-438.005 InvoiceSGM
Invoice
MAK KEELING
ASPEN SKI CO
P.O. BOX 1248
ASPEN, CO 81612
Invoice Date:November 15, 2022
Invoice No:2018-149.003 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004
Project 2018-149.003 Midnight Mine Road-AJAX Mountain
Email invoices to: mkeeling@aspensnowmass.com
For Professional Services through November 12, 2022
Phase 01 Conceptual Engineering
Professional Labor
Hours Rate Amount
CADD Design
Sillery, Tyson CADD/GIS III 1.50 121.00 181.50
Totals 1.50 181.50
Total Labor 181.50
$181.50Phase Total
$181.50Invoice Total
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
12:32:00 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2018-149.003 Midnight Mine Road-AJAX Mountain
Phase 01 Conceptual Engineering
Professional Labor
Hours Rate Amount
CADD Design
CADD/GIS III
CADD Design
501 - 700 - Sillery, Tyson 10/31/2022 .50 121.00 60.50
Packaged up Civil linework and basemaps, Sent to Z group Arch
for their use
501 - 700 - Sillery, Tyson 11/2/2022 1.00 121.00 121.00
Talked with Shawn B about Survey Info to send if needed.
Repackaged Civil Surfaces and .xml files and sent to Z Group per
their request.
Totals 1.50 181.50
Total Labor 181.50
Phase Total $181.50
$181.50Project Total
$181.50Total this Report
Page 2
Project 2018-149.003 - <Draft>2018-149.003 InvoiceSGM
Invoice
Cameron Richards
Aspen Ridge V HOA
275 Monroe St
Denver, CO 80206
Invoice Date:November 15, 2022
Invoice No:2018-438.001 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004
Project 2018-438.001 Aspen Ridge V HOA
Trust all is going well! Good luck on the project.
Email invoices to: cameron.j.richards@gmail.com
For Professional Services through November 12, 2022
Professional Labor
Hours Rate Amount
Site Visit(s)
Barth, Rick Senior Engineer II 3.00 182.00 546.00
Totals 3.00 546.00
Total Labor 546.00
$546.00Invoice Total
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
12:32:10 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2018-438.001 Aspen Ridge V HOA
Professional Labor
Hours Rate Amount
Site Visit(s)
Senior Engineer II
Site Visit(s)
330 - 752 - Barth, Rick 6/8/2022 3.00 182.00 546.00
site visit per holmes, cam, bland
Totals 3.00 546.00
Total Labor 546.00
$546.00Project Total
$546.00Total this Report
Page 2
Project 2018-438.001 - <Draft>2018-438.001 InvoiceSGM
Invoice
Josh Gaube
HayMax Capital, LLC
605 W. Main Street
STE 2
Aspen, CO 81611
Invoice Date:November 15, 2022
Invoice No:2019-436.001 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004
Project 2019-436.001 Molly Gibson Lodge
Electrical affirmations
Email invoices to: accounting@haymax.com.ac.beanworks.ca
For Professional Services through November 12, 2022
Phase 99 Out of Scope
Professional Labor
Hours Rate Amount
Plan/Spec Preparation
Kehoe, Jordan Engineer II 1.00 107.00 107.00
Determining remaining items left for contractor Sending
Molly Gibson Invoices to client
Kehoe, Jordan Engineer II 1.00 107.00 107.00
RFI for conduits for comcast
Kehoe, Jordan Engineer II 1.00 107.00 107.00
RFI responses
Kehoe, Jordan Engineer II .50 107.00 53.50
Storm sewer existing check for proposed tie-in
Totals 3.50 374.50
Total Labor 374.50
$374.50Phase Total
$374.50Invoice Total
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
Page 2
Project 2019-436.001 - <Draft>2019-436.001 InvoiceSGM
12:32:22 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2019-436.001 Molly Gibson Lodge
Phase 99 Out of Scope
Professional Labor
Hours Rate Amount
Plan/Spec Preparation
Engineer II
Plan/Spec Preparation
210 - 500 - Kehoe, Jordan 10/19/2022 .50 107.00 53.50
Storm sewer existing check for proposed tie-in
210 - 500 - Kehoe, Jordan 10/20/2022 1.00 107.00 107.00
RFI responses
210 - 500 - Kehoe, Jordan 10/31/2022 .50 107.00 53.50
RFI for conduits for comcast
210 - 500 - Kehoe, Jordan 11/1/2022 .50 107.00 53.50
RFI for conduits for comcast
210 - 500 - Kehoe, Jordan 11/10/2022 1.00 107.00 107.00
Determining remaining items left for contractor Sending Molly
Gibson Invoices to client
Totals 3.50 374.50
Total Labor 374.50
Phase Total $374.50
$374.50Project Total
$374.50Total this Report
Page 3
Project 2019-436.001 - <Draft>2019-436.001 InvoiceSGM
Invoice
HayMax Capital, LLC
605 W. Main Street
STE 2
Aspen, CO 81611
Invoice Date:November 15, 2022
Invoice No:2019-436.003 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004 Fax (970) 945-5948
Project 2019-436.003 Molly Gibson Residence - SFR, City of Aspen
Minor site updates for window well.
Email invoices to: accounting@haymax.com.ac.beanworks.ca
For Professional Services through November 12, 2022
Professional Labor
Hours Rate Amount
Plan/Spec Preparation
Kehoe, Jordan Engineer II .50 119.00 59.50
11/9/2022 Drainage approach for condenser and window well weep
holes
Totals .50 59.50
Total Labor 59.50
Retainage
Current Retainage 5.95 (10.00 % of 59.50)-5.95
Prior Retainage 42.00
47.95
$53.55Invoice Total
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
12:32:25 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2019-436.003 Molly Gibson Residence - SFR, City of Aspen
Professional Labor
Hours Rate Amount
Plan/Spec Preparation
Engineer II
Plan/Spec Preparation
210 - 500 - Kehoe, Jordan 11/9/2022 .50 119.00 59.50
Drainage approach for condenser and window well weep holes
Totals .50 59.50
Total Labor 59.50
$59.50Project Total
$59.50Total this Report
Page 2
Project 2019-436.003 - <Draft>2019-436.003 InvoiceSGM
Invoice
Anthony Lamonia
Eagle County Land CO LLC
15700 W. 103rd St.
Lemont, IL 60439
Invoice Date:November 15, 2022
Invoice No:2020-414.002 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004 Fax (970) 945-5948
Project 2020-414.002 Tower Center-Gypsum - Site Development
Mix if survey wrap up and Max mainly going as far as he could on drainage.
Email invoices to: tlamonia@uirc.com
For Professional Services through November 12, 2022
Phase 01 Site Layout
Professional Labor
Hours Rate Amount
Site Visit(s)
Weiss, James Engineer I 107.00 95.00 10,165.00
Totals 107.00 10,165.00
Total Labor 10,165.00
Reimbursable Expenses
Engineering Supplies
11/1/2022 Weiss, James Tools for manhole
observation
33.06
Total Reimbursables 33.06 33.06
$10,198.06Phase Total
Phase 03 Design Drawings
Professional Labor
Hours Rate Amount
Project Management
Barth, Rick Senior Engineer II 1.50 169.00 253.50
Road/Street Design
Cokley, Daniel Principal Engineer .50 198.00 99.00
QA/QC Review
Weiss, James Engineer I 10.00 95.00 950.00
Cokley, Daniel Principal Engineer 9.50 198.00 1,881.00
CADD Design
Essenburg, Maxwell Engineer II 88.50 110.00 9,735.00
Totals 110.00 12,918.50
Total Labor 12,918.50
Unit Billing
Mileage
11/1/2022 58.0 Miles @ 0.625 36.25
Total Unit Billing 1.0 times 36.25 36.25
$12,954.75Phase Total
Phase 06 PM QA/QC
Professional Labor
Hours Rate Amount
Project Management
Barth, Rick Senior Engineer II 24.00 169.00 4,056.00
Totals 24.00 4,056.00
Total Labor 4,056.00
$4,056.00Phase Total
Phase 09 Survey
Task 02 Plat Work
Professional Labor
Hours Rate Amount
Existing Conditions Mapping
Howard, Matthew Survey Technician 1.50 95.00 142.50
Totals 1.50 142.50
Total Labor 142.50
$142.50Total this Task
Task 03 Out of Scope Survey
Professional Labor
Hours Rate Amount
Project Management
Hemmen, Scott Survey Project Manager 2.50 110.00 275.00
Page 2
Project 2020-414.002 - <Draft>2020-414.002 InvoiceSGM
Totals 2.50 275.00
Total Labor 275.00
$275.00Total this Task
Task 04 Site Topo
Professional Labor
Hours Rate Amount
Project Management
Hemmen, Scott Survey Project Manager 1.50 110.00 165.00
Existing Conditions Mapping
Howard, Matthew Survey Technician 2.00 95.00 190.00
Topo Survey
Englehart, Eric 1 Man Crew 3.00 150.00 450.00
Totals 6.50 805.00
Total Labor 805.00
$805.00Total this Task
$1,222.50Phase Total
Phase 99 Out of Scope - Extras
Professional Labor
Hours Rate Amount
Plan/Spec Preparation
Weiss, James Engineer I 2.50 95.00 237.50
Totals 2.50 237.50
Total Labor 237.50
$237.50Phase Total
$28,668.81Invoice Total
Outstanding Invoices
Number Date Balance
9 9/15/2022 2,923.50
10 10/31/2022 17,510.50
Total 20,434.00
Total Now
Outstanding
$49,102.81
If you have any questions regarding this bill, please call.
Page 3
Project 2020-414.002 - <Draft>2020-414.002 InvoiceSGM
Project Manager:
Rick Barth
Page 4
Project 2020-414.002 - <Draft>2020-414.002 InvoiceSGM
12:32:39 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2020-414.002 Tower Center-Gypsum - Site Development
Phase 01 Site Layout
Professional Labor
Hours Rate Amount
Site Visit(s)
Engineer I
Site Visit(s)
330 - 499 - Weiss, James 10/17/2022 4.50 95.00 427.50
roadway design
330 - 499 - Weiss, James 10/18/2022 7.25 95.00 688.75
roadway design and drainage design
330 - 499 - Weiss, James 10/19/2022 8.50 95.00 807.50
draiange design and storm pipe layout
330 - 499 - Weiss, James 10/21/2022 5.00 95.00 475.00
roadway updates and drainage plan updates for client
330 - 499 - Weiss, James 10/24/2022 8.50 95.00 807.50
roadway design
330 - 499 - Weiss, James 10/25/2022 8.00 95.00 760.00
roadway design and drainage design
330 - 499 - Weiss, James 10/26/2022 8.25 95.00 783.75
roadway design and drainage design
330 - 499 - Weiss, James 10/28/2022 2.50 95.00 237.50
drainage plan sheets development
330 - 499 - Weiss, James 10/31/2022 7.50 95.00 712.50
geometry and signage striping
330 - 499 - Weiss, James 11/1/2022 6.50 95.00 617.50
STRIPING AND GEOMTRY PLN FOR ROAD
330 - 499 - Weiss, James 11/2/2022 7.25 95.00 688.75
striping plan and overall sheet review
330 - 499 - Weiss, James 11/3/2022 7.50 95.00 712.50
roadway updates and speed table additions
330 - 499 - Weiss, James 11/4/2022 5.00 95.00 475.00
roadway reviews, drainage design updates
330 - 499 - Weiss, James 11/7/2022 10.75 95.00 1,021.25
DRAINAGE UPDATES FROM UPDATED ROAD PLAN
330 - 499 - Weiss, James 11/8/2022 6.00 95.00 570.00
STORM POND UPDATES
330 - 499 - Weiss, James 11/9/2022 4.00 95.00 380.00
SOTRM AND ROADWAY UPDATES AND REVIEW OF SEWER
AND WATER DESIGN
Totals 107.00 10,165.00
Total Labor 10,165.00
Page 5
Project 2020-414.002 - <Draft>2020-414.002 InvoiceSGM
Reimbursable Expenses
Engineering Supplies
EX 00000000950
3
11/1/2022 Weiss, James / Tools for manhole
observation
33.06
Total Reimbursables 33.06 33.06
Phase Total $10,198.06
Phase 03 Design Drawings
Professional Labor
Hours Rate Amount
Project Management
Senior Engineer II
Project Management
303 - 752 - Barth, Rick 10/29/2022 1.50 169.00 253.50
bim updates
Road/Street Design
Principal Engineer
Road/Street Design
421 - 650 - Cokley, Daniel 10/31/2022 .50 198.00 99.00
AASHTO min. radius guidance
QA/QC Review
Engineer I
QA/QC Review
491 - 499 - Weiss, James 11/8/2022 6.00 95.00 570.00
UPDATES TO STORM AND ROADWAY SHEETS
491 - 499 - Weiss, James 11/9/2022 4.00 95.00 380.00
SITE PLAN, ROADWAY AND STORM SHEET UPDATES
Principal Engineer
QA/QC Review
491 - 650 - Cokley, Daniel 11/10/2022 1.50 198.00 297.00
QC Review
491 - 650 - Cokley, Daniel 11/11/2022 8.00 198.00 1,584.00
QC review
CADD Design
Engineer II
CADD Design
501 - 500 - Essenburg, Maxwell 10/17/2022 5.00 110.00 550.00
Sanitary Sewer design
501 - 500 - Essenburg, Maxwell 10/18/2022 5.00 110.00 550.00
Sanitary Sewer line design
501 - 500 - Essenburg, Maxwell 10/19/2022 5.00 110.00 550.00
sanitary sewer line design
501 - 500 - Essenburg, Maxwell 10/21/2022 7.00 110.00 770.00
Finishing up sewer sheets, working on waterline sheets
501 - 500 - Essenburg, Maxwell 10/24/2022 2.00 110.00 220.00
redlining and correcting the sewer sheets
501 - 500 - Essenburg, Maxwell 10/25/2022 3.50 110.00 385.00
finishing sewer sheets and moving back to waterline design, with
survey data
Page 6
Project 2020-414.002 - <Draft>2020-414.002 InvoiceSGM
501 - 500 - Essenburg, Maxwell 10/27/2022 7.00 110.00 770.00
rebuilding waterline infrastructure
501 - 500 - Essenburg, Maxwell 10/31/2022 4.00 110.00 440.00
working on Waterline drawings
501 - 500 - Essenburg, Maxwell 11/1/2022 5.00 110.00 550.00
working on waterline and redlining my sewer set before sending to
Rick
501 - 500 - Essenburg, Maxwell 11/2/2022 5.00 110.00 550.00
relining my waterline drawings, finishing up sewer and sending
both sets to Rick for BIM update
501 - 500 - Essenburg, Maxwell 11/3/2022 3.00 110.00 330.00
fixing waterline labels and adding fitting information, sending to
Rick to update in BIIM
501 - 500 - Essenburg, Maxwell 11/7/2022 9.00 110.00 990.00
Working through sewer BIM comments, dry utility BIM comments,
incorporating 3 new sheets of Notes, starting on waterline
comments
501 - 500 - Essenburg, Maxwell 11/8/2022 11.00 110.00 1,210.00
working on review package
501 - 500 - Essenburg, Maxwell 11/9/2022 9.00 110.00 990.00
working on BIM comments and preparing sheet set for Dan review
501 - 500 - Essenburg, Maxwell 11/10/2022 4.00 110.00 440.00
Sanitary Sewer comments from Rick
501 - 500 - Essenburg, Maxwell 11/11/2022 4.00 110.00 440.00
sewer line edits
Totals 110.00 12,918.50
Total Labor 12,918.50
Unit Billing
Mileage
11/1/2022 58.0 Miles @ 0.625 36.25
Total Unit Billing 1.0 times 36.25 36.25
Phase Total $12,954.75
Phase 06 PM QA/QC
Professional Labor
Hours Rate Amount
Project Management
Senior Engineer II
Project Management
303 - 752 - Barth, Rick 10/25/2022 .50 169.00 84.50
revs and direction for mw on roads, field work
303 - 752 - Barth, Rick 10/27/2022 1.50 169.00 253.50
revs w MW
303 - 752 - Barth, Rick 10/31/2022 2.00 169.00 338.00
BIM
303 - 752 - Barth, Rick 11/1/2022 1.00 169.00 169.00
revs
303 - 752 - Barth, Rick 11/4/2022 2.00 169.00 338.00
bim
Page 7
Project 2020-414.002 - <Draft>2020-414.002 InvoiceSGM
303 - 752 - Barth, Rick 11/5/2022 3.50 169.00 591.50
BIM for both Max's
303 - 752 - Barth, Rick 11/7/2022 4.00 169.00 676.00
BIM
303 - 752 - Barth, Rick 11/8/2022 3.50 169.00 591.50
revs
303 - 752 - Barth, Rick 11/9/2022 4.00 169.00 676.00
wat sewer bims
303 - 752 - Barth, Rick 11/10/2022 1.00 169.00 169.00
BIM, setup, DJC
303 - 752 - Barth, Rick 11/11/2022 1.00 169.00 169.00
revs, email out to TL
Totals 24.00 4,056.00
Total Labor 4,056.00
Phase Total $4,056.00
Phase 09 Survey
Task 02 Plat Work
Professional Labor
Hours Rate Amount
Existing Conditions Mapping
Survey Technician
Existing Conditions Mapping
730 - 949 - Howard, Matthew 10/31/2022 1.50 95.00 142.50
Worked on updating manhole info and locating which ones need
more
Totals 1.50 142.50
Total Labor 142.50
$142.50Total this Task
Task 03 Out of Scope Survey
Professional Labor
Hours Rate Amount
Project Management
Survey Project Manager
Project Management
700 - 925 - Hemmen, Scott 10/24/2022 .50 110.00 55.00
review email inq. from AL and follow up with RB for more info.
700 - 925 - Hemmen, Scott 10/28/2022 .50 110.00 55.00
discuss ss mh w/ eric
700 - 925 - Hemmen, Scott 11/9/2022 .50 110.00 55.00
provide locator info to RB for his design data
700 - 925 - Hemmen, Scott 11/10/2022 1.00 110.00 110.00
import field data from ESE strom inlet chase. fwd wk scope to MH
Totals 2.50 275.00
Total Labor 275.00
Page 8
Project 2020-414.002 - <Draft>2020-414.002 InvoiceSGM
$275.00Total this Task
Task 04 Site Topo
Professional Labor
Hours Rate Amount
Project Management
Survey Project Manager
Project Management
700 - 925 - Hemmen, Scott 10/31/2022 1.50 110.00 165.00
discuss missing labels for storm and WMH w/ tech. send .pdf to
ESE to verify missing dips.
Existing Conditions Mapping
Survey Technician
Existing Conditions Mapping
730 - 949 - Howard, Matthew 11/10/2022 1.00 95.00 95.00
Imported points and updated map with info
730 - 949 - Howard, Matthew 11/11/2022 1.00 95.00 95.00
Updated and cleaned map
Topo Survey
1 Man Crew
Topo Survey
831 - 10 - Englehart, Eric 11/2/2022 3.00 150.00 450.00
Locate and dip MH's.
Totals 6.50 805.00
Total Labor 805.00
$805.00Total this Task
Phase Total $1,222.50
Phase 99 Out of Scope - Extras
Professional Labor
Hours Rate Amount
Plan/Spec Preparation
Engineer I
Plan/Spec Preparation
210 - 499 - Weiss, James 11/1/2022 2.50 95.00 237.50
SITE VIST FOR MANHOLE SPECS
Totals 2.50 237.50
Total Labor 237.50
Phase Total $237.50
$28,668.81Project Total
$28,668.81Total this Report
Page 9
Project 2020-414.002 - <Draft>2020-414.002 InvoiceSGM
Invoice
Alex Klumb
Doug and Erin Becker
111 Powder Bowl Lane
Aspen, CO 81611
Invoice Date:November 15, 2022
Invoice No:2020-497.002 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004
Project 2020-497.002 Lot 2 Stein Civil Engineering
Survey tasks.
Email invoices to: dbecker66@gmail.com
Cc: Daniel Hirsh <dhirsh@sterlingpartners.com>; aklumb@ccyarchitects.com and Gage Reese
<greese@ccyarchitects.com>
For Professional Services through November 12, 2022
Phase 02 Land Use Application
Professional Labor
Hours Rate Amount
Floodplain Hydrology
Weiss, James Engineer I 1.50 102.00 153.00
Totals 1.50 153.00
Total Labor 153.00
$153.00Phase Total
$153.00Invoice Total
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
12:32:52 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2020-497.002 Lot 2 Stein Civil Engineering
Phase 02 Land Use Application
Professional Labor
Hours Rate Amount
Floodplain Hydrology
Engineer I
Floodplain Hydrology
432 - 499 - Weiss, James 10/27/2022 1.50 102.00 153.00
flood analysis memo
Totals 1.50 153.00
Total Labor 153.00
Phase Total $153.00
$153.00Project Total
$153.00Total this Report
Page 2
Project 2020-497.002 - <Draft>2020-497.002 InvoiceSGM
Invoice
Jon Brooks
205 South Martel Avenue
Los Angeles, CA 90036
Invoice Date:November 15, 2022
Invoice No:2020-553.001 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004
Project 2020-553.001 239 Willoughby Way
Koru RFIs and SMS sheet alterations.
Email invoices to: Alfred Lafave <alfred@idscolorado.com>; Steve Kafka <steve@jmbcapital.com>;
Tiffany Vu <Tiffany@jmbcapital.com>
Cc: Rob Morey <rob@idscolorado.com>
For Professional Services through November 12, 2022
Phase 05 Project Management & Site Coordination
Professional Labor
Hours Rate Amount
Plan/Spec Preparation
Essenburg, Maxwell Engineer I 2.00 95.00 190.00
Totals 2.00 190.00
Total Labor 190.00
$190.00Phase Total
$190.00Invoice Total
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
12:32:59 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2020-553.001 239 Willoughby Way
Phase 05 Project Management & Site Coordination
Professional Labor
Hours Rate Amount
Plan/Spec Preparation
Engineer I
Plan/Spec Preparation
210 - 499 - Essenburg, Maxwell 11/4/2022 2.00 95.00 190.00
looking at recent RFI log and determining SGM scope and
responsibility, briefly met with team <15 minutes
Totals 2.00 190.00
Total Labor 190.00
Phase Total $190.00
$190.00Project Total
$190.00Total this Report
Page 2
Project 2020-553.001 - <Draft>2020-553.001 InvoiceSGM
Invoice
Richard Wax
Richard Wax and Associates
PO Box 7699
Aspen, CO 81612
Invoice Date:November 15, 2022
Invoice No:2021-159.001 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004 Fax (970) 945-5948
Project 2021-159.001 2670 MFR
Minor but kicking off re-starting project with Wheeler's new layout.
Email invoices to: wheeler@rwaspen.com
For Professional Services through November 12, 2022
Phase 001 Land Use Site Information
Task 01 Existing Conditions
Professional Labor
Hours Rate Amount
Meet w/Design Team
Weiss, James Engineer I 1.00 96.00 96.00
9/20/2022 tennis court walkway design
Totals 1.00 96.00
Total Labor 96.00
$96.00Total this Task
$96.00Phase Total
Phase 003 Out of Scope
Professional Labor
Hours Rate Amount
Project Management
Hemmen, Scott Survey Project Manager 1.00 112.00 112.00
10/31/2022 coordinate fld wk begin set up fld work. NEED TO
CHANGE THIS BILLING CLIENT TO REALTOR
Hemmen, Scott Survey Project Manager 3.50 112.00 392.00
11/1/2022 set up project JAF and LoA research down load and
reviewTC and record docs.
Hemmen, Scott Survey Project Manager 4.00 112.00 448.00
11/2/2022 line out crew verify site location and address. finish edits
to title
Hemmen, Scott Survey Project Manager 1.50 112.00 168.00
11/3/2022 Inq. w/ crew to confirm no changes, red line suggestions
final review.
Totals 10.00 1,120.00
Total Labor 1,120.00
$1,120.00Phase Total
$1,216.00Invoice Total
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
Page 2
Project 2021-159.001 - <Draft>2021-159.001 InvoiceSGM
12:33:15 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2021-159.001 2670 MFR
Phase 001 Land Use Site Information
Task 01 Existing Conditions
Professional Labor
Hours Rate Amount
Meet w/Design Team
Engineer I
Meet w/Design Team
321 - 499 - Weiss, James 9/20/2022 1.00 96.00 96.00
tennis court walkway design
Totals 1.00 96.00
Total Labor 96.00
$96.00Total this Task
Phase Total $96.00
Phase 003 Out of Scope
Professional Labor
Hours Rate Amount
Project Management
Survey Project Manager
Project Management
700 - 925 - Hemmen, Scott 10/31/2022 1.00 112.00 112.00
coordinate fld wk begin set up fld work. NEED TO CHANGE THIS
BILLING CLIENT TO REALTOR
700 - 925 - Hemmen, Scott 11/1/2022 3.50 112.00 392.00
set up project JAF and LoA research down load and reviewTC and
record docs.
700 - 925 - Hemmen, Scott 11/2/2022 4.00 112.00 448.00
line out crew verify site location and address. finish edits to title
700 - 925 - Hemmen, Scott 11/3/2022 1.50 112.00 168.00
Inq. w/ crew to confirm no changes, red line suggestions final
review.
Totals 10.00 1,120.00
Total Labor 1,120.00
Phase Total $1,120.00
$1,216.00Project Total
$1,216.00Total this Report
Page 3
Project 2021-159.001 - <Draft>2021-159.001 InvoiceSGM
Invoice
Linda Norquay
LKM Canyons, LLC
537 W 600 S. Suite 800
Salt Lake City, UT 84101
Invoice Date:November 15, 2022
Invoice No:2021-623.001 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004 Fax (970) 945-5948
Project 2021-623.001 LKM Canyons
Various tasks, primarily flood review, road assessment, water rights, and environmental permitting
questions.
Email invoices to: kgoldean@freemangroup.net and jduva@freemangroup.net
For Professional Services through November 12, 2022
Phase 001 Phase 1
Task 01 Flood Analysis
Professional Labor
Hours Rate Amount
Drainage Facility Lay-out (CADD)
Weiss, James Engineer I 1.00 102.00 102.00
11/3/2022 update and review of most recent design from arch and
landscapers
Weiss, James Engineer I 1.00 102.00 102.00
11/4/2022 final project plan for time being
Totals 2.00 204.00
Total Labor 204.00
$204.00Total this Task
Task 03 Environmental Assessment
Professional Labor
Hours Rate Amount
Environmental
Nees, Alexander Senior Consultant I .50 146.00 73.00
10/17/2022 check on current project status re: bank stabilization,
road, construction
Nees, Alexander Senior Consultant I 2.00 146.00 292.00
10/25/2022 ENV/LU meeting, followup on several items (aquifers,
SWFL mitigation work
Nees, Alexander Senior Consultant I 1.00 146.00 146.00
10/26/2022 404 meeting and followup with USFWS
Nees, Alexander Senior Consultant I 1.00 146.00 146.00
11/2/2022 wrap-up for stop-work
Nees, Alexander Senior Consultant I 1.00 146.00 146.00
11/3/2022 wrap up for stop-work, and subcontractor coordination
Totals 5.50 803.00
Total Labor 803.00
$803.00Total this Task
Task 99 Out of Scope
Professional Labor
Hours Rate Amount
Project Management
Barth, Rick Senior Engineer II .50 182.00 91.00
10/19/2022 teams meeting
Barth, Rick Senior Engineer II 1.00 182.00 182.00
10/25/2022 online team meeting
Barth, Rick Senior Engineer II 1.00 182.00 182.00
11/4/2022 project pause communications
Totals 2.50 455.00
Total Labor 455.00
$455.00Total this Task
$1,462.00Phase Total
Phase 002 Water Resources
Task 01 Project Management and Coordination
Professional Labor
Hours Rate Amount
Project Management
Leppek, Bailey Engineer IV .25 153.00 38.25
10/31/2022 Discussion with Rick on needs for status summary of all
water rights tasks.
Page 2
Project 2021-623.001 - <Draft>2021-623.001 InvoiceSGM
Leppek, Bailey Engineer IV 1.50 153.00 229.50
11/1/2022 Summary to Rick of water rights tasks, billing type, work
included, status, and tasks remaining to complete (in
anticipation of picking up after pause).
Leppek, Bailey Engineer IV .25 153.00 38.25
11/3/2022 Finish and send summary of tasks remaining to
complete (in anticipation of picking up after pause).
Totals 2.00 306.00
Total Labor 306.00
$306.00Total this Task
Task 02 Quantify Water Demands and Compare to Legal Supply
Professional Labor
Hours Rate Amount
Water Rights
Leppek, Bailey Engineer IV 1.50 153.00 229.50
10/24/2022 Revise calculations and memo with new demand
information from SMS - revisions, cold plunge, & pool.
Totals 1.50 229.50
Total Labor 229.50
$229.50Total this Task
Task 03 File Change Application
Professional Labor
Hours Rate Amount
Water Rights Analysis
Straub-Heidke, Andrew Senior Consultant I 1.00 146.00 146.00
10/24/2022 Review memo for Bailey
Straub-Heidke, Andrew Senior Consultant I 1.00 146.00 146.00
10/25/2022 Review memo-2nd time
Water Rights
Leppek, Bailey Engineer IV 3.25 153.00 497.25
10/17/2022 Calls and emails with Scott Mitchell Studio to answer
questions about pool and cold plunge. Incorporate new
details into analysis. Revise report to incorporate
updates to demands from feedback from Scott Mitchell
Studios and Katheryn, plus pool and cold plunge.
Incorporate new approach per recent feedback on draft
application approach from Marc Stilson at UDWR.
Page 3
Project 2021-623.001 - <Draft>2021-623.001 InvoiceSGM
Leppek, Bailey Engineer IV 1.75 153.00 267.75
10/18/2022 Work on updates to memo, incorporating recent
revisions from design team. Follow up questions for
Marc Stilson at UDWR.
Leppek, Bailey Engineer IV 5.25 153.00 803.25
10/24/2022 Add to memo to streamline discussion of irrigation, and
outline plan for exactly how SGM recommends filing the
change application.
Leppek, Bailey Engineer IV 1.00 153.00 153.00
10/25/2022 Incorporate Andrew's edits and send revised draft to
Team along with outstanding questions.
Leppek, Bailey Engineer IV 1.50 153.00 229.50
10/26/2022 Work with David to answer various questions from the
Team on the draft memo and change process.
Recommend backup options in the event the
replacement well does not produce enough.
Leppek, Bailey Engineer IV 1.00 153.00 153.00
10/27/2022 Revisions to memo based on input, revisions, feedback
from team and new information from Marc Stilson at
UDWR
Totals 15.75 2,395.75
Total Labor 2,395.75
$2,395.75Total this Task
Task 04 Site Visit and Preliminary Physical Supply Assessment
Professional Labor
Hours Rate Amount
Water Rights
Leppek, Bailey Engineer IV 1.25 153.00 191.25
10/25/2022 Questions from Klaus about well capacity, information
from pump contractor, preliminary calculations about
pumping rate needed, etc. Review new information
about drawdown from Klaus from well contractor and
discuss recommendations.
Leppek, Bailey Engineer IV .75 153.00 114.75
10/26/2022 Coordinate with David on recommendations for well
siting and a well test, and questions on such from
Katheryn and Klaus.
Leppek, Bailey Engineer IV .25 153.00 38.25
10/31/2022 Coordinate with David regarding plan and needs and
scope for next site visit.
Page 4
Project 2021-623.001 - <Draft>2021-623.001 InvoiceSGM
Schiowitz, David Senior Consultant I 2.50 146.00 365.00
10/25/2022 Participate in consultant meeting. Prepare emails to
Klaus regarding aquifer test recommendations.
Schiowitz, David Senior Consultant I .50 146.00 73.00
10/26/2022 Call with Bailey to discuss response email. Redline email
and provide comments to bailey regarding water rights
and physical water supply.
Totals 5.25 782.25
Total Labor 782.25
$782.25Total this Task
Task 05 Meetings
Professional Labor
Hours Rate Amount
Water Rights
Leppek, Bailey Engineer IV 1.00 153.00 153.00
10/25/2022 Consultant team meeting, and debrief with Alex Nees.
Leppek, Bailey Engineer IV .25 153.00 38.25
10/28/2022 Call from Katheryn regarding next steps, aquifer test,
and timing.
Totals 1.25 191.25
Total Labor 191.25
$191.25Total this Task
$3,904.75Phase Total
Phase 004 Embankment Restoration
Professional Labor
Hours Rate Amount
General
Krch, Eric Senior Engineer III .25 194.00 48.50
10/17/2022 Respond to bendway weir info adn review mtg minutes
Krch, Eric Senior Engineer III .25 194.00 48.50
10/25/2022 Rick B. project status call
Krch, Eric Senior Engineer III .25 194.00 48.50
10/28/2022 Rick B. send narrative on active and proposed tasks
Totals .75 145.50
Total Labor 145.50
$145.50Phase Total
Page 5
Project 2021-623.001 - <Draft>2021-623.001 InvoiceSGM
$5,512.25Invoice Total
Outstanding Invoices
Number Date Balance
11 10/19/2022 15,053.50
Total 15,053.50
Total Now
Outstanding
$20,565.75
Billings to Date
Current Prior Total Received
Labor 5,512.25 94,501.25 100,013.50
Consultant 0.00 7,600.00 7,600.00
Expense 0.00 2,925.76 2,925.76
Unit 0.00 478.80 478.80
Totals 5,512.25 105,505.81 111,018.06 90,452.31
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
Page 6
Project 2021-623.001 - <Draft>2021-623.001 InvoiceSGM
12:33:31 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2021-623.001 LKM Canyons
Phase 001 Phase 1
Task 01 Flood Analysis
Professional Labor
Hours Rate Amount
Drainage Facility Lay-out (CADD)
Engineer I
Drainage Facility Lay-out (CADD)
530 - 499 - Weiss, James 11/3/2022 1.00 102.00 102.00
update and review of most recent design from arch and
landscapers
530 - 499 - Weiss, James 11/4/2022 1.00 102.00 102.00
final project plan for time being
Totals 2.00 204.00
Total Labor 204.00
$204.00Total this Task
Task 03 Environmental Assessment
Professional Labor
Hours Rate Amount
Environmental
Senior Consultant I
Environmental
968 - 825 - Nees, Alexander 10/17/2022 .50 146.00 73.00
check on current project status re: bank stabilization, road,
construction
968 - 825 - Nees, Alexander 10/25/2022 2.00 146.00 292.00
ENV/LU meeting, followup on several items (aquifers, SWFL
mitigation work
968 - 825 - Nees, Alexander 10/26/2022 1.00 146.00 146.00
404 meeting and followup with USFWS
968 - 825 - Nees, Alexander 11/2/2022 1.00 146.00 146.00
wrap-up for stop-work
968 - 825 - Nees, Alexander 11/3/2022 1.00 146.00 146.00
wrap up for stop-work, and subcontractor coordination
Totals 5.50 803.00
Total Labor 803.00
$803.00Total this Task
Task 99 Out of Scope
Page 7
Project 2021-623.001 - <Draft>2021-623.001 InvoiceSGM
Professional Labor
Hours Rate Amount
Project Management
Senior Engineer II
Project Management
303 - 752 - Barth, Rick 10/19/2022 .50 182.00 91.00
teams meeting
303 - 752 - Barth, Rick 10/25/2022 1.00 182.00 182.00
online team meeting
303 - 752 - Barth, Rick 11/4/2022 1.00 182.00 182.00
project pause communications
Totals 2.50 455.00
Total Labor 455.00
$455.00Total this Task
Phase Total $1,462.00
Phase 002 Water Resources
Task 01 Project Management and Coordination
Professional Labor
Hours Rate Amount
Project Management
Engineer IV
Project Management
303 - 504 - Leppek, Bailey 10/31/2022 .25 153.00 38.25
Discussion with Rick on needs for status summary of all water
rights tasks.
303 - 504 - Leppek, Bailey 11/1/2022 1.50 153.00 229.50
Summary to Rick of water rights tasks, billing type, work included,
status, and tasks remaining to complete (in anticipation of picking
up after pause).
303 - 504 - Leppek, Bailey 11/3/2022 .25 153.00 38.25
Finish and send summary of tasks remaining to complete (in
anticipation of picking up after pause).
Totals 2.00 306.00
Total Labor 306.00
$306.00Total this Task
Task 02 Quantify Water Demands and Compare to Legal Supply
Professional Labor
Hours Rate Amount
Water Rights
Engineer IV
Water Rights
961 - 504 - Leppek, Bailey 10/24/2022 1.50 153.00 229.50
Revise calculations and memo with new demand information from
SMS - revisions, cold plunge, & pool.
Totals 1.50 229.50
Total Labor 229.50
Page 8
Project 2021-623.001 - <Draft>2021-623.001 InvoiceSGM
$229.50Total this Task
Task 03 File Change Application
Professional Labor
Hours Rate Amount
Water Rights Analysis
Senior Consultant I
Water Rights Analysis
375 - 825 - Straub-Heidke,
Andrew
10/24/2022 1.00 146.00 146.00
Review memo for Bailey
375 - 825 - Straub-Heidke,
Andrew
10/25/2022 1.00 146.00 146.00
Review memo-2nd time
Water Rights
Engineer IV
Water Rights
961 - 504 - Leppek, Bailey 10/17/2022 3.25 153.00 497.25
Calls and emails with Scott Mitchell Studio to answer questions
about pool and cold plunge. Incorporate new details into analysis.
Revise report to incorporate updates to demands from feedback
from Scott Mitchell Studios and Katheryn, plus pool and cold
plunge. Incorporate new approach per recent feedback on draft
application approach from Marc Stilson at UDWR.
961 - 504 - Leppek, Bailey 10/18/2022 1.75 153.00 267.75
Work on updates to memo, incorporating recent revisions from
design team. Follow up questions for Marc Stilson at UDWR.
961 - 504 - Leppek, Bailey 10/24/2022 5.25 153.00 803.25
Add to memo to streamline discussion of irrigation, and outline
plan for exactly how SGM recommends filing the change
application.
961 - 504 - Leppek, Bailey 10/25/2022 1.00 153.00 153.00
Incorporate Andrew's edits and send revised draft to Team along
with outstanding questions.
961 - 504 - Leppek, Bailey 10/26/2022 1.50 153.00 229.50
Work with David to answer various questions from the Team on
the draft memo and change process. Recommend backup
options in the event the replacement well does not produce
enough.
961 - 504 - Leppek, Bailey 10/27/2022 1.00 153.00 153.00
Revisions to memo based on input, revisions, feedback from team
and new information from Marc Stilson at UDWR
Totals 15.75 2,395.75
Total Labor 2,395.75
$2,395.75Total this Task
Task 04 Site Visit and Preliminary Physical Supply Assessment
Page 9
Project 2021-623.001 - <Draft>2021-623.001 InvoiceSGM
Professional Labor
Hours Rate Amount
Water Rights
Engineer IV
Water Rights
961 - 504 - Leppek, Bailey 10/25/2022 1.25 153.00 191.25
Questions from Klaus about well capacity, information from pump
contractor, preliminary calculations about pumping rate needed,
etc. Review new information about drawdown from Klaus from well
contractor and discuss recommendations.
961 - 504 - Leppek, Bailey 10/26/2022 .75 153.00 114.75
Coordinate with David on recommendations for well siting and a
well test, and questions on such from Katheryn and Klaus.
961 - 504 - Leppek, Bailey 10/31/2022 .25 153.00 38.25
Coordinate with David regarding plan and needs and scope for
next site visit.
Senior Consultant I
Water Rights
961 - 825 - Schiowitz, David 10/25/2022 2.50 146.00 365.00
Participate in consultant meeting. Prepare emails to Klaus
regarding aquifer test recommendations.
961 - 825 - Schiowitz, David 10/26/2022 .50 146.00 73.00
Call with Bailey to discuss response email. Redline email and
provide comments to bailey regarding water rights and physical
water supply.
Totals 5.25 782.25
Total Labor 782.25
$782.25Total this Task
Task 05 Meetings
Professional Labor
Hours Rate Amount
Water Rights
Engineer IV
Water Rights
961 - 504 - Leppek, Bailey 10/25/2022 1.00 153.00 153.00
Consultant team meeting, and debrief with Alex Nees.
961 - 504 - Leppek, Bailey 10/28/2022 .25 153.00 38.25
Call from Katheryn regarding next steps, aquifer test, and timing.
Totals 1.25 191.25
Total Labor 191.25
$191.25Total this Task
Phase Total $3,904.75
Phase 004 Embankment Restoration
Page 10
Project 2021-623.001 - <Draft>2021-623.001 InvoiceSGM
Professional Labor
Hours Rate Amount
General
Senior Engineer III
General
000 - 753 - Krch, Eric 10/17/2022 .25 194.00 48.50
Respond to bendway weir info adn review mtg minutes
000 - 753 - Krch, Eric 10/25/2022 .25 194.00 48.50
Rick B. project status call
000 - 753 - Krch, Eric 10/28/2022 .25 194.00 48.50
Rick B. send narrative on active and proposed tasks
Totals .75 145.50
Total Labor 145.50
Phase Total $145.50
$5,512.25Project Total
$5,512.25Total this Report
Page 11
Project 2021-623.001 - <Draft>2021-623.001 InvoiceSGM
Invoice
Stephen Paul
478 Willoughby Way LLC
942 N Alpine Drive
Beverly Hills, CA 90210
Invoice Date:November 15, 2022
Invoice No:2021-653.001 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004 Fax (970) 945-5948
Project 2021-653.001 478 Willoughby Way SFR
Advancing permit set to readiness.
Cc: Chris Souki <s.souki@gmail.com>
For Professional Services through November 12, 2022
Phase 01 Civil Engineering - Land Use
Task 02 Plans and Calculations
Professional Labor
Hours Rate Amount
Plan/Spec Preparation
Weiss, James Engineer I 1.50 102.00 153.00
10/27/2022 updated site plan review from architecht
Weiss, James Engineer I 7.50 102.00 765.00
11/10/2022 NEW SITE PLAN UPDATES INORPORATED WITH
ARCH DESIGN
Weiss, James Engineer I 3.75 102.00 382.50
11/11/2022 SITE PLAN DESIGN UPDATES
Totals 12.75 1,300.50
Total Labor 1,300.50
$1,300.50Total this Task
$1,300.50Phase Total
$1,300.50Invoice Total
Outstanding Invoices
Number Date Balance
4 8/22/2022 153.00
5 9/15/2022 346.00
6 10/19/2022 5,373.00
Total 5,872.00
Total Now
Outstanding
$7,172.50
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
Page 2
Project 2021-653.001 - <Draft>2021-653.001 InvoiceSGM
12:33:37 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2021-653.001 478 Willoughby Way SFR
Phase 01 Civil Engineering - Land Use
Task 02 Plans and Calculations
Professional Labor
Hours Rate Amount
Plan/Spec Preparation
Engineer I
Plan/Spec Preparation
210 - 499 - Weiss, James 10/27/2022 1.50 102.00 153.00
updated site plan review from architecht
210 - 499 - Weiss, James 11/10/2022 7.50 102.00 765.00
NEW SITE PLAN UPDATES INORPORATED WITH ARCH
DESIGN
210 - 499 - Weiss, James 11/11/2022 3.75 102.00 382.50
SITE PLAN DESIGN UPDATES
Totals 12.75 1,300.50
Total Labor 1,300.50
$1,300.50Total this Task
Phase Total $1,300.50
$1,300.50Project Total
$1,300.50Total this Report
Page 3
Project 2021-653.001 - <Draft>2021-653.001 InvoiceSGM
Invoice
Alexander Kelloff
235 Puppy Smith Street
PO Box 3454
Aspen, CO 81612
Invoice Date:November 15, 2022
Invoice No:2021-700.001 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004 Fax (970) 945-5948
Project 2021-700.001 Fevaag Ranch
Various tasks, primarily the story pole work.
For Professional Services through November 12, 2022
Phase 001 Phase 1
Task 03 Civil/Site Planning
Professional Labor
Hours Rate Amount
Meet w/Design Team
Weiss, James Engineer I 1.25 102.00 127.50
10/17/2022 design layout for upper ditch for CAD team
Totals 1.25 127.50
Total Labor 127.50
$127.50Total this Task
Task 05 Water Resources
Professional Labor
Hours Rate Amount
Water Rights Analysis
Straub-Heidke, Andrew Senior Consultant I .25 146.00 36.50
10/27/2022 Check in/review contract BWCD
Totals .25 36.50
Total Labor 36.50
$36.50Total this Task
$164.00Phase Total
$164.00Invoice Total
Outstanding Invoices
Number Date Balance
9 8/22/2022 1,218.00
11 10/19/2022 6,001.00
Total 7,219.00
Total Now
Outstanding
$7,383.00
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
Page 2
Project 2021-700.001 - <Draft>2021-700.001 InvoiceSGM
12:33:39 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2021-700.001 Fevaag Ranch
Phase 001 Phase 1
Task 03 Civil/Site Planning
Professional Labor
Hours Rate Amount
Meet w/Design Team
Engineer I
Meet w/Design Team
321 - 499 - Weiss, James 10/17/2022 1.25 102.00 127.50
design layout for upper ditch for CAD team
Totals 1.25 127.50
Total Labor 127.50
$127.50Total this Task
Task 05 Water Resources
Professional Labor
Hours Rate Amount
Water Rights Analysis
Senior Consultant I
Water Rights Analysis
375 - 825 - Straub-Heidke,
Andrew
10/27/2022 .25 146.00 36.50
Check in/review contract BWCD
Totals .25 36.50
Total Labor 36.50
$36.50Total this Task
Phase Total $164.00
$164.00Project Total
$164.00Total this Report
Page 3
Project 2021-700.001 - <Draft>2021-700.001 InvoiceSGM
Invoice
Matthew Patel
10501 Success Lane
Dayton, OH 45458
Invoice Date:November 15, 2022
Invoice No:2022-108.001 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004
Project 2022-108.001 Black Rock Cabin
We went a little over on grading refinements and did the slope map which I understood was previously
done, but apparently that was the old topography. Let us know if this is OK.
Email invoices to: lbamberger@amdarchitects.com
Cc: jpuckett@amdarchitects.com
Include Pay App
For Professional Services through November 12, 2022
Phase 01 General Project Management
Professional Labor
Hours Rate Amount
Project Management
Barth, Rick Senior Engineer II .75 182.00 136.50
2/22/2022 revs for upd grading/ util
Barth, Rick Senior Engineer II .50 182.00 91.00
2/24/2022 amd mtg
Barth, Rick Senior Engineer II 2.00 182.00 364.00
3/2/2022 LU rep draft
Barth, Rick Senior Engineer II .50 182.00 91.00
3/7/2022 rpt
Barth, Rick Senior Engineer II 1.00 182.00 182.00
3/10/2022 rpt
Barth, Rick Senior Engineer II 1.00 182.00 182.00
3/14/2022 LU rpt, slopes review
Barth, Rick Senior Engineer II 2.00 182.00 364.00
3/15/2022 AESP, slopes and rpt
Totals 7.75 1,410.50
Total Labor 1,410.50
$1,410.50Phase Total
Phase 02 Grading and Drainage
Professional Labor
Hours Rate Amount
Plan/Spec Preparation
Weiss, James Engineer I 6.00 102.00 612.00
2/14/2022 updated grading to match new existing surface
Weiss, James Engineer I 7.00 102.00 714.00
2/21/2022 updated linework to match grading, and updated grading
to account for swales around structures
Weiss, James Engineer I 3.00 102.00 306.00
2/22/2022 redline updates to land use plan
Weiss, James Engineer I .50 102.00 51.00
3/14/2022 slope analysis map
Meet w/Design Team
Weiss, James Engineer I .50 102.00 51.00
2/24/2022 meeting with architecht to go over updated land use plan
Totals 17.00 1,734.00
Total Labor 1,734.00
$1,734.00Phase Total
$3,144.50Invoice Total
Outstanding Invoices
Number Date Balance
1 1/31/2022 573.50
2 3/1/2022 4,701.50
3 3/31/2022 425.00
Total 5,700.00
Total Now
Outstanding
$8,844.50
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
Page 2
Project 2022-108.001 - <Draft>2022-108.001 InvoiceSGM
12:33:42 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2022-108.001 Black Rock Cabin
Phase 01 General Project Management
Professional Labor
Hours Rate Amount
Project Management
Senior Engineer II
Project Management
303 - 752 - Barth, Rick 2/22/2022 .75 182.00 136.50
revs for upd grading/ util
303 - 752 - Barth, Rick 2/24/2022 .50 182.00 91.00
amd mtg
303 - 752 - Barth, Rick 3/2/2022 2.00 182.00 364.00
LU rep draft
303 - 752 - Barth, Rick 3/7/2022 .50 182.00 91.00
rpt
303 - 752 - Barth, Rick 3/10/2022 1.00 182.00 182.00
rpt
303 - 752 - Barth, Rick 3/14/2022 1.00 182.00 182.00
LU rpt, slopes review
303 - 752 - Barth, Rick 3/15/2022 2.00 182.00 364.00
AESP, slopes and rpt
Totals 7.75 1,410.50
Total Labor 1,410.50
Phase Total $1,410.50
Phase 02 Grading and Drainage
Professional Labor
Hours Rate Amount
Plan/Spec Preparation
Engineer I
Plan/Spec Preparation
210 - 499 - Weiss, James 2/14/2022 6.00 102.00 612.00
updated grading to match new existing surface
210 - 499 - Weiss, James 2/21/2022 .25 102.00 25.50
updated linework to match grading, and updated grading to
account for swales around structures
210 - 499 - Weiss, James 2/21/2022 6.75 102.00 688.50
updated linework to match grading, and updated grading to
account for swales around structures
210 - 499 - Weiss, James 2/22/2022 3.00 102.00 306.00
redline updates to land use plan
210 - 499 - Weiss, James 3/14/2022 .50 102.00 51.00
slope analysis map
Page 3
Project 2022-108.001 - <Draft>2022-108.001 InvoiceSGM
Meet w/Design Team
Engineer I
Meet w/Design Team
321 - 499 - Weiss, James 2/24/2022 .50 102.00 51.00
meeting with architecht to go over updated land use plan
Totals 17.00 1,734.00
Total Labor 1,734.00
Phase Total $1,734.00
$3,144.50Project Total
$3,144.50Total this Report
Page 4
Project 2022-108.001 - <Draft>2022-108.001 InvoiceSGM
Invoice
Scott Dillard, Intermountain
0189 Aspen Way
Glenwood Springs, CO 81601
Invoice Date:November 15, 2022
Invoice No:2022-275.001 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004
Project 2022-275.001 1010 Grand Avenue
Some late back and forth with City comments, cost estimate.
Email invoices to: Mark Noel <mark@mnarchitect.com>
For Professional Services through November 12, 2022
Phase 01 Grading / Drainage Plan and Calcs
Professional Labor
Hours Rate Amount
Legal Descriptions
Barnett, Timothy Land Surveyor 1.50 140.00 210.00
9/28/2022 Go over project with Austin, reviews and discussion with
Bob
Totals 1.50 210.00
Total Labor 210.00
$210.00Phase Total
$210.00Invoice Total
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
12:33:49 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2022-275.001 1010 Grand Avenue
Phase 01 Grading / Drainage Plan and Calcs
Professional Labor
Hours Rate Amount
Legal Descriptions
Land Surveyor
Legal Descriptions
712 - 600 - Barnett, Timothy 9/28/2022 1.50 140.00 210.00
Go over project with Austin, reviews and discussion with Bob
Totals 1.50 210.00
Total Labor 210.00
Phase Total $210.00
$210.00Project Total
$210.00Total this Report
Page 2
Project 2022-275.001 - <Draft>2022-275.001 InvoiceSGM
Invoice
Mark Friedland
Herecomessunshine LLC
312 AABC, Suite D
Aspen, CO 81611
Invoice Date:November 15, 2022
Invoice No:2022-306.001 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004
Project 2022-306.001 Lot 2 Mary B SFR
Minor ongoing updates on historic survey / site review with the team.
Email invoices to: jennifer.ramsey@rowlandbroughton.com
For Professional Services through November 12, 2022
Phase 01 Site Coordination & Project Management
Professional Labor
Hours Rate Amount
Project Management
Barth, Rick Senior Engineer II .50 182.00 91.00
11/4/2022 slopes review with Mt Daly, possible grading approaches
Totals .50 91.00
Total Labor 91.00
$91.00Phase Total
Phase 04 Meetings
Professional Labor
Hours Rate Amount
Meet w/Design Team
Weiss, James Engineer I .50 102.00 51.00
11/4/2022 meeting to discuss slope analysis
Weiss, James Engineer I 1.00 102.00 102.00
11/9/2022 MEETING WITH DESIGN TEAM
Site Visit(s)
Barth, Rick Senior Engineer II 1.00 182.00 182.00
10/26/2022 meeting on 3PH
Barth, Rick Senior Engineer II 1.00 182.00 182.00
11/9/2022 LU and slopes disc, task list
Totals 3.50 517.00
Total Labor 517.00
$517.00Phase Total
Phase 99 Miscellaneous Services
Professional Labor
Hours Rate Amount
Plan/Spec Preparation
Weiss, James Engineer I .75 102.00 76.50
10/26/2022 review of current slope analysis and sent to design team
Totals .75 76.50
Total Labor 76.50
$76.50Phase Total
$684.50Invoice Total
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
Page 2
Project 2022-306.001 - <Draft>2022-306.001 InvoiceSGM
12:33:54 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2022-306.001 Lot 2 Mary B SFR
Phase 01 Site Coordination & Project Management
Professional Labor
Hours Rate Amount
Project Management
Senior Engineer II
Project Management
303 - 752 - Barth, Rick 11/4/2022 .50 182.00 91.00
slopes review with Mt Daly, possible grading approaches
Totals .50 91.00
Total Labor 91.00
Phase Total $91.00
Phase 04 Meetings
Professional Labor
Hours Rate Amount
Meet w/Design Team
Engineer I
Meet w/Design Team
321 - 499 - Weiss, James 11/4/2022 .50 102.00 51.00
meeting to discuss slope analysis
321 - 499 - Weiss, James 11/9/2022 1.00 102.00 102.00
MEETING WITH DESIGN TEAM
Site Visit(s)
Senior Engineer II
Site Visit(s)
330 - 752 - Barth, Rick 10/26/2022 1.00 182.00 182.00
meeting on 3PH
330 - 752 - Barth, Rick 11/9/2022 1.00 182.00 182.00
LU and slopes disc, task list
Totals 3.50 517.00
Total Labor 517.00
Phase Total $517.00
Phase 99 Miscellaneous Services
Professional Labor
Hours Rate Amount
Plan/Spec Preparation
Engineer I
Plan/Spec Preparation
210 - 499 - Weiss, James 10/26/2022 .75 102.00 76.50
Page 3
Project 2022-306.001 - <Draft>2022-306.001 InvoiceSGM
review of current slope analysis and sent to design team
Totals .75 76.50
Total Labor 76.50
Phase Total $76.50
$684.50Project Total
$684.50Total this Report
Page 4
Project 2022-306.001 - <Draft>2022-306.001 InvoiceSGM
Invoice
Trevor Cannon
Loose Cannon LLC
PO Box 1717
Carbondale, CO 81623
Invoice Date:November 15, 2022
Invoice No:2022-356.001 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004
Project 2022-356.001 Umbrella Commercial Site
Progress for county permits set. Nearing readiness.
Email invoices to: trevor@umbrella-roofing.com
For Professional Services through November 12, 2022
Phase 01 Project Management
Professional Labor
Hours Rate Amount
Meet w/Design Team
Weiss, James Engineer I 1.00 102.00 102.00
10/17/2022 owts and drainage report updates
Weiss, James Engineer I 1.50 102.00 153.00
10/20/2022 owts plan updates
Weiss, James Engineer I 1.00 102.00 102.00
10/27/2022 rotated and adjusted septic field
QA/QC Review
Barth, Rick Senior Engineer II 1.50 182.00 273.00
10/17/2022 rev plans
Barth, Rick Senior Engineer II .50 182.00 91.00
10/18/2022 revs
Barth, Rick Senior Engineer II .50 182.00 91.00
10/19/2022 revs
Barth, Rick Senior Engineer II .50 182.00 91.00
10/26/2022 revs, email to client
Totals 6.50 903.00
Total Labor 903.00
$903.00Phase Total
Phase 02 Site Drawings
Professional Labor
Hours Rate Amount
Miscellaneous Utilities
Schoenbrunn, Karl Project Manager .50 141.00 70.50
10/21/2022 Performed UNCC 811 online search for respective utility
owners and provided utility owner contact info and
summarized in an internal email
CADD Drafting
Blackwelder, Frances CADD/GIS III .50 121.00 60.50
11/1/2022 Removed swale, changed date, and printed set.
CADD Design
Blackwelder, Frances CADD/GIS III 1.00 121.00 121.00
10/17/2022 reviewed and started redlines from Rick.
Blackwelder, Frances CADD/GIS III 4.00 121.00 484.00
10/18/2022 Finished redlines and printed new pdf.
Blackwelder, Frances CADD/GIS III 4.00 121.00 484.00
10/19/2022 Redlines from Tyson. Reviewed redlines with Rick.
Blackwelder, Frances CADD/GIS III 2.00 121.00 242.00
10/20/2022 Redlines
Blackwelder, Frances CADD/GIS III 1.00 121.00 121.00
10/21/2022 Finished redlines and printed pdf.
Sillery, Tyson CADD/GIS III .50 121.00 60.50
10/17/2022 Reviewed Ricks Redlines for Frances.
Sillery, Tyson CADD/GIS III 2.50 121.00 302.50
10/18/2022 Reviewed and redlined new Plan set from Frances. Sent
redlines to Frances and Max for completion.
Project Management
Binion, Shawn Land Surveyor .25 140.00 35.00
10/18/2022 project coordination and review with Frances for
changes to ExCon drawing
Totals 16.25 1,981.00
Total Labor 1,981.00
Page 2
Project 2022-356.001 - <Draft>2022-356.001 InvoiceSGM
$1,981.00Phase Total
$2,884.00Invoice Total
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
Page 3
Project 2022-356.001 - <Draft>2022-356.001 InvoiceSGM
12:33:58 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2022-356.001 Umbrella Commercial Site
Phase 01 Project Management
Professional Labor
Hours Rate Amount
Meet w/Design Team
Engineer I
Meet w/Design Team
321 - 499 - Weiss, James 10/17/2022 1.00 102.00 102.00
owts and drainage report updates
321 - 499 - Weiss, James 10/20/2022 1.50 102.00 153.00
owts plan updates
321 - 499 - Weiss, James 10/27/2022 1.00 102.00 102.00
rotated and adjusted septic field
QA/QC Review
Senior Engineer II
QA/QC Review
491 - 752 - Barth, Rick 10/17/2022 1.50 182.00 273.00
rev plans
491 - 752 - Barth, Rick 10/18/2022 .50 182.00 91.00
revs
491 - 752 - Barth, Rick 10/19/2022 .50 182.00 91.00
revs
491 - 752 - Barth, Rick 10/26/2022 .50 182.00 91.00
revs, email to client
Totals 6.50 903.00
Total Labor 903.00
Phase Total $903.00
Phase 02 Site Drawings
Professional Labor
Hours Rate Amount
Miscellaneous Utilities
Project Manager
Miscellaneous Utilities
460 - 675 - Schoenbrunn, Karl 10/21/2022 .50 141.00 70.50
Performed UNCC 811 online search for respective utility owners
and provided utility owner contact info and summarized in an
internal email
CADD Drafting
CADD/GIS III
CADD Drafting
500 - 340 - Blackwelder, Frances 11/1/2022 .50 121.00 60.50
Removed swale, changed date, and printed set.
Page 4
Project 2022-356.001 - <Draft>2022-356.001 InvoiceSGM
CADD Design
CADD/GIS III
CADD Design
501 - 340 - Blackwelder, Frances 10/17/2022 1.00 121.00 121.00
reviewed and started redlines from Rick.
501 - 340 - Blackwelder, Frances 10/18/2022 4.00 121.00 484.00
Finished redlines and printed new pdf.
501 - 340 - Blackwelder, Frances 10/19/2022 4.00 121.00 484.00
Redlines from Tyson. Reviewed redlines with Rick.
501 - 340 - Blackwelder, Frances 10/20/2022 2.00 121.00 242.00
Redlines
501 - 340 - Blackwelder, Frances 10/21/2022 1.00 121.00 121.00
Finished redlines and printed pdf.
CADD/GIS III
CADD Design
501 - 700 - Sillery, Tyson 10/17/2022 .50 121.00 60.50
Reviewed Ricks Redlines for Frances.
501 - 700 - Sillery, Tyson 10/18/2022 2.50 121.00 302.50
Reviewed and redlined new Plan set from Frances. Sent redlines
to Frances and Max for completion.
Project Management
Land Surveyor
Project Management
700 - 600 - Binion, Shawn 10/18/2022 .25 140.00 35.00
project coordination and review with Frances for changes to
ExCon drawing
Totals 16.25 1,981.00
Total Labor 1,981.00
Phase Total $1,981.00
$2,884.00Project Total
$2,884.00Total this Report
Page 5
Project 2022-356.001 - <Draft>2022-356.001 InvoiceSGM
Invoice
Jeb Bowden
1780 South Post Oak Lane
Houston, TX 77056
Invoice Date:November 15, 2022
Invoice No:2022-362.001 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004
Project 2022-362.001 303 Mariposa SFR LU
For Professional Services through November 12, 2022
Phase 01 Project Management and Site Visits
Professional Labor
Hours Rate Amount
Project Management
Barth, Rick Senior Engineer II 1.00 182.00 182.00
7/27/2022 project setup with MW, review files
Barth, Rick Senior Engineer II 1.00 182.00 182.00
9/27/2022 debris channel call, BA team
Totals 2.00 364.00
Total Labor 364.00
$364.00Phase Total
Phase 02 Grading / Drainage to Prelim, Hydro for debris flow
Professional Labor
Hours Rate Amount
Plan/Spec Preparation
Weiss, James Engineer I 1.00 102.00 102.00
8/4/2022 SHEET SETUP,DEBRIEFING
Weiss, James Engineer I .50 102.00 51.00
8/8/2022 streamstats flood model
Weiss, James Engineer I 2.00 102.00 204.00
8/26/2022 review of documents from arch and initial design setup
Weiss, James Engineer I .50 102.00 51.00
9/20/2022 surface updates from surveyor
Totals 4.00 408.00
Total Labor 408.00
$408.00Phase Total
$772.00Invoice Total
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
Page 2
Project 2022-362.001 - <Draft>2022-362.001 InvoiceSGM
12:34:01 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2022-362.001 303 Mariposa SFR LU
Phase 01 Project Management and Site Visits
Professional Labor
Hours Rate Amount
Project Management
Senior Engineer II
Project Management
303 - 752 - Barth, Rick 7/27/2022 1.00 182.00 182.00
project setup with MW, review files
303 - 752 - Barth, Rick 9/27/2022 1.00 182.00 182.00
debris channel call, BA team
Totals 2.00 364.00
Total Labor 364.00
Phase Total $364.00
Phase 02 Grading / Drainage to Prelim, Hydro for debris flow
Professional Labor
Hours Rate Amount
Plan/Spec Preparation
Engineer I
Plan/Spec Preparation
210 - 499 - Weiss, James 8/4/2022 1.00 102.00 102.00
SHEET SETUP,DEBRIEFING
210 - 499 - Weiss, James 8/8/2022 .50 102.00 51.00
streamstats flood model
210 - 499 - Weiss, James 8/26/2022 2.00 102.00 204.00
review of documents from arch and initial design setup
210 - 499 - Weiss, James 9/20/2022 .50 102.00 51.00
surface updates from surveyor
Totals 4.00 408.00
Total Labor 408.00
Phase Total $408.00
$772.00Project Total
$772.00Total this Report
Page 3
Project 2022-362.001 - <Draft>2022-362.001 InvoiceSGM
Invoice
Robert Leavitt
PO Box 4441
Basalt, CO 81621
Invoice Date:November 15, 2022
Invoice No:2022-432.001 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004
Project 2022-432.001 O'Sullivan OWTS
Start of OWTS design with the field data / soils gathering.
Email invoices to: crimsonconstruction@gmail.com
For Professional Services through November 12, 2022
Professional Labor
Hours Rate Amount
OWTS
Weiss, James Engineer I 3.25 102.00 331.50
10/17/2022 soil texture and type anaylsis
Weiss, James Engineer I 2.00 102.00 204.00
10/20/2022 owts report
Weiss, James Engineer I 4.75 102.00 484.50
10/27/2022 OWTS report
Weiss, James Engineer I 3.00 102.00 306.00
10/28/2022 OWTS report
Weiss, James Engineer I 1.00 102.00 102.00
11/11/2022 owts report updates
QA/QC Review
Barth, Rick Senior Engineer II 1.00 182.00 182.00
11/4/2022 OWTS report review
Totals 15.00 1,610.00
Total Labor 1,610.00
$1,610.00Invoice Total
Outstanding Invoices
Number Date Balance
1 10/19/2022 878.13
Total 878.13
Total Now
Outstanding
$2,488.13
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
Page 2
Project 2022-432.001 - <Draft>2022-432.001 InvoiceSGM
12:34:06 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2022-432.001 O'Sullivan OWTS
Professional Labor
Hours Rate Amount
OWTS
Engineer I
OWTS
452 - 499 - Weiss, James 10/17/2022 3.25 102.00 331.50
soil texture and type anaylsis
452 - 499 - Weiss, James 10/20/2022 2.00 102.00 204.00
owts report
452 - 499 - Weiss, James 10/27/2022 4.75 102.00 484.50
OWTS report
452 - 499 - Weiss, James 10/28/2022 3.00 102.00 306.00
OWTS report
452 - 499 - Weiss, James 11/11/2022 1.00 102.00 102.00
owts report updates
QA/QC Review
Senior Engineer II
QA/QC Review
491 - 752 - Barth, Rick 11/4/2022 1.00 182.00 182.00
OWTS report review
Totals 15.00 1,610.00
Total Labor 1,610.00
$1,610.00Project Total
$1,610.00Total this Report
Page 3
Project 2022-432.001 - <Draft>2022-432.001 InvoiceSGM
Invoice
Mike Wampold
4171 ESSEN LANE, SUITE 450
BATON ROUGE, LA 70809
Invoice Date:November 15, 2022
Invoice No:2022-493.001 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004
Project 2022-493.001 1053 Conundrum Creek Road
Email invoices to: Kurt Culbertson <kculbertson@designworkshop.com>
For Professional Services through November 12, 2022
Phase 01 Review DW set, comment
Professional Labor
Hours Rate Amount
QA/QC Review
Barth, Rick Senior Engineer II 4.00 191.00 764.00
11/3/2022 review DW info
Barth, Rick Senior Engineer II 1.00 191.00 191.00
11/9/2022 final revs for DW
Totals 5.00 955.00
Total Labor 955.00
$955.00Phase Total
$955.00Invoice Total
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
12:34:09 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2022-493.001 1053 Conundrum Creek Road
Phase 01 Review DW set, comment
Professional Labor
Hours Rate Amount
QA/QC Review
Senior Engineer II
QA/QC Review
491 - 752 - Barth, Rick 11/3/2022 4.00 191.00 764.00
review DW info
491 - 752 - Barth, Rick 11/9/2022 1.00 191.00 191.00
final revs for DW
Totals 5.00 955.00
Total Labor 955.00
Phase Total $955.00
$955.00Project Total
$955.00Total this Report
Page 2
Project 2022-493.001 - <Draft>2022-493.001 InvoiceSGM
Invoice
Ryan Warren
31336 Hwy 82
Aspen, CO 81611
Invoice Date:November 15, 2022
Invoice No:2022-503.001 - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004
Project 2022-503.001 Woody Creek Station OWTS
Email invoices to: rwarren@warrenaspenco.com
For Professional Services through November 12, 2022
Phase 01 OWTS Design
Professional Labor
Hours Rate Amount
Project Management
Barth, Rick Senior Engineer II 2.50 191.00 477.50
11/11/2022 site visit, doc rev with RW
Totals 2.50 477.50
Total Labor 477.50
$477.50Phase Total
$477.50Invoice Total
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
12:34:12 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 2022-503.001 Woody Creek Station OWTS
Phase 01 OWTS Design
Professional Labor
Hours Rate Amount
Project Management
Senior Engineer II
Project Management
303 - 752 - Barth, Rick 11/11/2022 2.50 191.00 477.50
site visit, doc rev with RW
Totals 2.50 477.50
Total Labor 477.50
Phase Total $477.50
$477.50Project Total
$477.50Total this Report
Page 2
Project 2022-503.001 - <Draft>2022-503.001 InvoiceSGM
Invoice
JIM CURTIS
CURTIS & ASSOCIATES
411 PEARL COURT
ASPEN, CO 81611
Invoice Date:November 15, 2022
Invoice No:96057U - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004
Project 96057U Bayer Center
Site visit for drainage approval. Still awaiting info from contractor if it exists (10/18/22).
Email invoices to: Jim Curtis <jcurtis@sopris.net>
For Professional Services through November 12, 2022
Phase 02 Civil
Professional Labor
Hours Rate Amount
Record Drawings
Barth, Rick Senior Engineer II 1.00 182.00 182.00
Totals 1.00 182.00
Total Labor 182.00
$182.00Phase Total
Phase 04 2020 Bayer-Boetcher As-Built Topo
Professional Labor
Hours Rate Amount
Existing Conditions Mapping
Howard, Matthew Survey Technician 1.00 100.00 100.00
Totals 1.00 100.00
Total Labor 100.00
$100.00Phase Total
$282.00Invoice Total
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
Page 2
Project 96057U - <Draft>96057U InvoiceSGM
12:34:18 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 96057U Bayer Center
Phase 02 Civil
Professional Labor
Hours Rate Amount
Record Drawings
Senior Engineer II
Record Drawings
630 - 752 - Barth, Rick 11/2/2022 1.00 182.00 182.00
ab affirmation
Totals 1.00 182.00
Total Labor 182.00
Phase Total $182.00
Phase 04 2020 Bayer-Boetcher As-Built Topo
Professional Labor
Hours Rate Amount
Existing Conditions Mapping
Survey Technician
Existing Conditions Mapping
730 - 949 - Howard, Matthew 10/18/2022 1.00 100.00 100.00
Updated redlines
Totals 1.00 100.00
Total Labor 100.00
Phase Total $100.00
$282.00Project Total
$282.00Total this Report
Page 3
Project 96057U - <Draft>96057U InvoiceSGM
Invoice
JIM CURTIS
CURTIS & ASSOCIATES
411 PEARL COURT
ASPEN, CO 81611
Invoice Date:November 15, 2022
Invoice No:96057V - <Draft>
SGM, Inc.
Schmueser Gordon Meyer, Inc. dba SGM, Inc.
118 West 6th Street, Suite 200
Glenwood Springs, CO 81601
(970) 945-1004
Project 96057V Maintenance Yrd Pole Barn / Storage Shed
Site survey for pole barn. Under review internally and at J Curtis for finalization.
Email invoices to: jcurtis@sopris.net
For Professional Services through November 12, 2022
Professional Labor
Hours Rate Amount
QA/QC
Hemmen, Scott Land Surveyor 1.00 140.00 140.00
Totals 1.00 140.00
Total Labor 140.00
$140.00Invoice Total
If you have any questions regarding this bill, please call.
Project Manager:
Rick Barth
12:34:26 PMInvoice <Draft> Dated 11/15/2022SGM, Inc.
Tuesday, November 15, 2022Billing Backup
Project 96057V Maintenance Yrd Pole Barn / Storage Shed
Professional Labor
Hours Rate Amount
QA/QC
Land Surveyor
QA/QC
708 - 600 - Hemmen, Scott 10/18/2022 1.00 140.00 140.00
redline and discuss with MW
Totals 1.00 140.00
Total Labor 140.00
$140.00Project Total
$140.00Total this Report
Page 2
Project 96057V - <Draft>96057V InvoiceSGM