Loading...
HomeMy WebLinkAboutAsbestos Report Property Address 500 Holgate Mesa Carbondale, CO 81623 Element Environmental Project#: Kuersten 090123 Client Job Name Holgate Mesa TABLE OF CONTENTS 1.0 - Scope of Work 2.0 - Sampling Requirements 3.0 - Sampling Methodology 4.0 - Laboratory 5.0 - Suspect Materials Sampled 6.0 - Table of Results 7.0 - Description of Sampling Area 8.0 - Conclusion 9.0 - Lab Report 10.0 - Certificates Asbestos Samples Analyzed: 45 Positive Asbestos Samples: 0 ___________________________________________________ AS B E S T O S L E A D HA Z M A T RE S T O R A T I O N ww w . e l e m e n t co n s u l t s .c o m Asbestos Sampling Report Date: 09/13/2023 Date of Inspection: 09/01/2023 Client: Kuersten Construction PO Box 1530 Rifle, CO 81650 Attn: John Kuersten Building Inspector: Joshua Johnson CDPHE #18401 189 County Rd. 135 Glenwood Springs, CO 81601 josh@elementconsults.com (970) 274-3139 Project #-Kuersten 091123 Holgate 2 1.0- This was an inspection for suspect ACM (Asbestos Containing Material) for a complete demolition. Element Environmental conducted an inspection for materials that would be impacted during the demolition. This inspection was a full inspection for demolition of the house. If other suspect materials become visible/apparent during demolition or construction activities, work in that area should be halted and more sampling/testing must take place, per Colorado regulations. Any suspect materials that were not tested are to be assumed to contain asbestos. 2.0- A limited bulk sampling of from all suspect materials was conducted in accordance with Colorado State Requirements. The minimum number of samples per homogenous areas are as follows: 2.1- Surfacing Materials- <1,000 sq.ft.- Minimum of 3 samples 1,000 sq.ft.- 5,000sq.ft.- Minimum of 5 samples >5,000 sq.ft. Minimum of 7 samples 2.2- Miscellaneous materials- Minimum of 2 samples 2.3- Thermal Systems Insulation (TSI)- Minimum of 3 samples 3.0- The purpose of the inspection is to identify materials that are homogenous. A homogeneous area is defined as one which shares suspect material, texture, color, location, and/or apparent time of construction. The materials are touched to determine friability. Friable ACM is material that can be crushed or reduced to powder by hand pressure. The friable materials are segregated into separate homogenous areas. The size of the sampling area is determined. Samples are taken according to a random numerical sequence of the subareas, following guidelines per the EPA Pink Book: Asbestos in Buildings: Simplified Sampling Scheme for Friable Surfacing Materials. 4.0- Josh Johnson, a Colorado Department of Public Health & Environment certified building inspector, certification number: 18401, performed the inspection. Samples taken were sent to CEI Labs in Cary, North Carolina. The samples were analyzed by PLM (Polarized Light Microscopy) analysis. Per the CDPHE Regulation any sample that is found by a lab to be trace, or <1% asbestos, is considered to be ACM material. This material would still be a regulated material by CDPHE. The sample must have an additional “point count” performed to be considered less than 1% and not be regulated by the CDPHE. The lab’s documents with analyses and findings are found below. Project #-Kuersten 091123 Holgate 3 5.0- SUSPECT MATERIALS SAMPLES • Texture • Drywall • Tape • Joint Compound • Carpet and Pad • Roofing Membrane • Roofing Tar • HVAC Tape • Tile Grout • Sheet Vinyl and Mastic 6.0- TABLE OF RESULTS HOMOGENOUS AREA DESCRIPTION OF AREA ACM CATEGORY NUMBER OF SAMPLES APPROXIMATE SQ.FT.* ACM ASSESSMENT CATEGORIES % AND TYPE OF ASBESTOS FOUND (A) Skip Trowel Texture Throughout Surfacing 5 ~1.500 sq.ft. Friable Non-ACM No Asbestos Detected (B) Smooth Texture Throughout Surfacing 7 ~2,500 sq.ft. Friable Non-ACM No Asbestos Detected (C) Drywall System of the Skip Trowel Texture Miscellaneous 2 ~1,500 sq.ft. Friable Non-ACM No Asbestos Detected (D) Drywall Texture of the Smooth Texture Miscellaneous 2 ~2,500 sq.ft. Friable Non-ACM No Asbestos Detected (E) Sheet Vinyl in Bath Miscellaneous 2 ~100 sq.ft. Friable Non-ACM No Asbestos Detected (F) Tile Grout in Bath Miscellaneous 5 ~100 sq.ft. Friable Non-ACM No Asbestos Detected (G) Sheet Vinyl in the Kitchen Miscellaneous 2 ~300 sq.ft. Friable Non-ACM No Asbestos Detected (H) Tile Grout in Addition Miscellaneous 2 ~1, sq.ft. Friable Non-ACM No Asbestos Detected (I) Carpet in Addition Miscellaneous 2 ~1,000 sq.ft. Non-Friable Non-ACM No Asbestos Detected (J) Carpet Pad in Addition Miscellaneous 2 ~1,000 sq.ft. Non-Friable Non-ACM No Asbestos Detected (K) Blue Carpet in Addition Miscellaneous 2 ~200 sq.ft. Non-Friable Non-ACM No Asbestos Detected (L) Carpet Pad in Addition Miscellaneous 2 ~200 sq.ft. Non-Friable Non-ACM No Asbestos Detected Project #-Kuersten 091123 Holgate 4 (M) Carpet Miscellaneous 2 ~200 sq.ft. Non-Friable Non-ACM . No Asbestos Detected (N) Carpet Miscellaneous 2 ~100 sq.ft. Non-Friable Non-ACM No Asbestos Detected (O) Carpet Pad Miscellaneous 2 ~300 sq.ft. Non-Friable Non-ACM No Asbestos Detected (P) HVAC Vent Tape TSI 2 ~2 sq.ft. Friable Non-ACM No Asbestos Detected (Q) Roof Membrane Miscellaneous 2 ~2,500 sq.ft. Non-Friable Non-ACM No Asbestos Detected (R) Roof Tar Miscellaneous 2 ~2,500 sq.ft. Non-Friable Non-ACM No Asbestos Detected Key: ACM Assessment Categories: 1- Damaged or significantly damaged Thermal Systems Insulation (TSI) ACM 2- Damaged friable surfacing ACM 3- Significantly damaged friable Surfacing ACM 4- Damaged or significantly damaged friable Miscellaneous ACM 5- ACM with potential for damage 6- ACM with potential for significant damage 7- Friable ACM with low potential for damage Other- ACM not classified in the above Assessment Categories N/A- Not Applicable * Square footage is estimated and not for bidding purposes 7.0- DESCRIPTION OF SAMPLING AREA The house was inspected for complete demolition. All suspect ACM materials were sampled including: • Skip Trowel Texture and Drywall System • Smooth Texture and Drywall System • Sheet Vinyl and Mastic in the bathrooms • Tile Grout in the bathrooms and kitchen • Carpet and Pad in each area • HVAC Vent Tape • Roofing Membrane • Roofing Tar Project #-Kuersten 091123 Holgate 5 Sampling Locations N Project #-Kuersten 091123 Holgate 6 Addition NTS Project #-Kuersten 091123 Holgate 7 8.0- CONCLUSION No asbestos was detected in any of the samples taken. Sincerely, Josh Johnson Project #-Kuersten 091123 Holgate 8 9.0- LAB REPORT Project #-Kuersten 091123 Holgate 9 Project #-Kuersten 091123 Holgate 10 Project #-Kuersten 091123 Holgate 11 Project #-Kuersten 091123 Holgate 12 Project #-Kuersten 091123 Holgate 13 Project #-Kuersten 091123 Holgate 14 Project #-Kuersten 091123 Holgate 15 Project #-Kuersten 091123 Holgate 16 Project #-Kuersten 091123 Holgate 17 Project #-Kuersten 091123 Holgate 18 Project #-Kuersten 091123 Holgate 19 Project #-Kuersten 091123 Holgate 20 Project #-Kuersten 091123 Holgate 21 10.0- CERTIFICATES Project #-Kuersten 091123 Holgate 22