Loading...
HomeMy WebLinkAbout1.49 Reclamation Plan NotesPage 1 of 2    North Hangs Reclamation Data:   44 New Tree Plantings (1‐1/2” to 2” Caliper Cottonwood or Similar Species)   5300 LF of Wetland Slope    CODE REQUREMENT – Planting Along Wetland Fringe  1 per 250’ of Wetland Fringe    [North Hangs Application: 1 per 120’ of Wetland Fringe, plantings to be clustered to provide better  growing conditions and environment for wildlife. Trees shown in image as “red”]    CODE REQUREMENT – Reclamation Slopes  Wetland Slopes shall be predominantly 5:1 or shallower, with at least 80% 5:1 and 20% 10:1 or  shallower. The percentage of Wetland Slope is calculated along the perimeter of the reclaimed lakes.  [North Hangs application: 23% of site to be graded to 10:1 as noted on diagram below, AREA “A”]    CODE REQUIREMENT‐ Peninsulas and Island requirements  Reclamation with multiple ponds or lakes shall provide islands or peninsulas that make up at least 20%  of total lake surface in order to break up the surface and provide undulation of shorelines in a natural‐ like appearance.  [North Hangs application: The code calls for this condition in the case of multiple ponds or lakes, this  application is for a single pond.  This application calls for a natural undulation of shoreline and features a  peninsula of wetlands to be constructed in the South East Corner (Area “A”), which represents close to  20% of the pond area.  Long Term, the applicant would like to have flexibility to add additional wetlands  areas depending on the availability of material for fill.]    Page 2 of 2      Area “A”