HomeMy WebLinkAbout1.49 Reclamation Plan NotesPage 1 of 2
North Hangs Reclamation Data:
44 New Tree Plantings (1‐1/2” to 2” Caliper Cottonwood or Similar Species)
5300 LF of Wetland Slope
CODE REQUREMENT – Planting Along Wetland Fringe
1 per 250’ of Wetland Fringe
[North Hangs Application: 1 per 120’ of Wetland Fringe, plantings to be clustered to provide better
growing conditions and environment for wildlife. Trees shown in image as “red”]
CODE REQUREMENT – Reclamation Slopes
Wetland Slopes shall be predominantly 5:1 or shallower, with at least 80% 5:1 and 20% 10:1 or
shallower. The percentage of Wetland Slope is calculated along the perimeter of the reclaimed lakes.
[North Hangs application: 23% of site to be graded to 10:1 as noted on diagram below, AREA “A”]
CODE REQUIREMENT‐ Peninsulas and Island requirements
Reclamation with multiple ponds or lakes shall provide islands or peninsulas that make up at least 20%
of total lake surface in order to break up the surface and provide undulation of shorelines in a natural‐
like appearance.
[North Hangs application: The code calls for this condition in the case of multiple ponds or lakes, this
application is for a single pond. This application calls for a natural undulation of shoreline and features a
peninsula of wetlands to be constructed in the South East Corner (Area “A”), which represents close to
20% of the pond area. Long Term, the applicant would like to have flexibility to add additional wetlands
areas depending on the availability of material for fill.]
Page 2 of 2
Area “A”