Loading...
HomeMy WebLinkAboutEngineer's Foundation RevisionTHIS DOCUMENT SHALL NOT BE REPRODUCED, TRANSMITTED, DISCLOSED OR USED IN WHOLE OR IN PART WITHOUT WRITTEN CONSENT BY STUDIO M ENGINEERS, LLC. SCALE: AS SHOWN STUDIO M 7.8.2023 15 2 R U S T Y S P U R T R A I L GA R F I E L D C O U N T Y , C O : : R I F L E , C O L O R A D O : : :: S T U D I O M E N G I N E E R S , L L C : : 9 7 0 - 3 6 6 - 8 6 9 0 : : A FDN PLAN, DETAILS AND NOTES S2.0 NOTES: 1. MAINTAIN MIN. GRADE SLOPE AWAY FROM FDN PER GEOTECH. 2. CONCRETE WALLS ARE 8" THICK, U.N.O. 3. COORDINATE BLOCK OUT LOCATIONS FOR VENTILATION AND MECHANICAL REQUIREMENTS WITH ARCHITECTURAL DWGS AND IRC 2015 . 4. REFER TO SHEET S1.0 FOR ABBREVIATIONS, LEGEND, CONCRETE AND FOUNDATION NOTES. 5. BTM OF FTG SHALL EXTEND TO SOILS APPROVED BY GEOTECH. NOTIFY ENGR OF FINAL FOOTING ELEVATIONS PRIOR TO FURTHER CONST. 6. LOCATE AND CAST IN PLACE ALL APPLICABLE SW AND ABWP (SEE SHT S7) AND SHEAR BOLT HARDWARE. 7.IF FIELD CONDITIONS DICTATE THAT THE TOP OF FOOTING ELEVATIONS SHOWN ON THESE PLANS VARY FROM WHAT IS SHOWN, PLEASE NOTIFY THE ENGINEER OF THE PROPOSED FOOTING ELEVATIONS BEFORE PROCEEDING WITH FTG CONSTRUCTION. FOUNDATION PLAN 1/4" = 1'-0" PAD FOOTING SCHEDULE BBBB REINFSIZE 3'-0" SQ. x 11 in.5-#5 EA. WAY A S2.1 C S2.1 B S2.1 D S2.1 E S2.1 F S2.1 TYP. B B T.O.F 90'-10. 1/4" T.O.F 90'-10. 1/4" T.O.F 90'-10. 1/4" T.O.F 90'-6. 1/4" T.O.W 98'-9. 7/8" T.O.W 94'-0. 3/4 " 64'-0" 30 ' - 0 " 9' - 3 1 / 4 " 20'-8 1/4"18'-6 1/2" T.O.F 96'-2" T.O.F 96'-2. 5/8" T.O.F 88'-2"T.O.F 88'-2" T.O.F 88'-2" T.O.W 90'-6. 1/4" T.O.W 90'-10. 1/4" PLAN NORTH 24'-2 1/4"6'-3" JS2.1 ES2.1 T.O.W 90'-10. 1/4" T.O.W 90'-10. 1/4" T.O.W 94'-9. 7/8" SITE WALL BY OTHERS SITE WALL BY OTHERS SITE WALL BY OTHERS 100'-0" PLAN = VIF SITE 7' - 0 " 15 ' - 0 " STEP T.O.F. 15 ' - 0 " 9' - 1 / 2 " STEP T.O.F. 5' - 1 1 1 / 2 " 8' - 0 " 13'-9 3/4"13'-3 1/2"13'-5 1/4"10'-10 1/2" H S2.1 H S2.1 14 ' - 3 " 6" 2" 2" 6" 6" 2" BBBC 4'-0" SQ. x 11 in.5-#5 EA. WAY A A A A REPLACE EXIST'G 4 FT PAD W/ 2'-0" SQ. X 10" THICK CONC. PAD 4 THUS B S2.0 T.O.F 90'-10. 1/4" REMOVE 4 FT PAD SLAB PATCH AND PAD ARE POURED INTEGRAL 3" CL R NEW 2'-0" SQ. X 10" CONC. PAD W/ 3-#4 EA. WAY 6X6 POST W/ ABU66 T.O.SLAB 90'-10. 1/4" NOTES: 1. HAND TAMP BACKFILL. REINFORC SLAB WITH A WELDED WIRE FABRIC MESH (6X6 W1.4 X W1.4). CONCRETE SHOULD BE 4000 PSI MIN. ALL CONTACT EDGES SHOULD BE CLEANED AND COATED WITH A CONCRETE BONDING AGENT TO HELP PREVENT SHRINKAGE CRACKS. A 6 MIL PIECE OF WATERPROOF MEMBRANE SHOULD BE TUCKED UNDER THE BORDERING (EXIST'G) SLAB AS TIGHT AS POSSIBLE AND EXTEND UNDER THE NEW CONCRETE SLAB POUR (NOT BELOW THE NEW FOOTING) 2. PAD MAY BE UNFORMED; TAKE CARE TO NOT OVER EXTEND PAD SIZE x x x x x 1. ALL CONCRETE SHALL ATTAIN 4,000 PSI COMPRESSION STRENGTH WITHIN 28 DAYS UNLESS NOTED. 2. PRE-MIXED BAG USE IS PERIMITTED ON THIS PROJECT. 3. FOLLOW BAG-MIX MANUF. RECOMMENDATIONS EXACTLY. DO NOT OVERSATURATE CONCRETE MIX WITH WATER. 4.REINFORCED STEEL SHALL CONFORM TO ASTM A615: #4 AND LARGER ....GRADE 60 5. PROVIDE ACCESSORIES NECESSARY TO PROPERLY SUPPORT REINFORCING AT THE POSITION SHOWN ON THE DOCUMENT. 6. CALCIUM CHLORIDE OR ADMIXTURES CONTAINING MORE THAN 0.05% CHLORIDE IONS OR THIOCYANATES ARE NOT PERMITTED. 7.KEEP SURFACES IN CONTACT WITH CONCRETE FREE OF ICE AND SNOW AND AT A TEMPERATURE ABOVE FREEZING PRIOR TO PLACEMENT. 8.PLACE CONC. AT LOWEST PRACTICAL SLUMP. 9.PROTECT CONCRETE FROM FREEZING AND THAWING CYCLES UNTIL IT HAS REACHED ADEQUATE STRENGTH (3000 PSI). SACK MIX CONCRETE SECTION DETAIL 3/4"= 1'-0"B BBBA 2'-0" SQ. x 11 in.3-#4 EA. WAY INSTALLED 4 IN. THICK CAST IN PLACE CONC. SLAB 1. CODES AND STANDARDS USED IN DESIGN: A. INTERNATIONAL CODES (IBC & IRC) 2015 B. ASCE 7-16 C. ACI 318-15 D. AISC 15TH EDITION E. NDS 2018 2. SEISMIC LOADS : SEE S7.0 3. WIND LOADS STRUCTURE CATEGORY: WIND IMPORTANCE FACTOR: 1.0 BASIC WIND SPEED (3 - SECOND GUST WIND SPEED): 115 MPH EXPOSURE CATEGORY:B 4. SNOW LOADS FLAT ROOF SNOW LOAD: 40 PSF GROUND SNOW LOAD:57.1 PSF SNOW EXPOSURE FACTOR, Ce: 1.0 SLOPE FACTOR, Cs: - non sliding areas: 1.0 - sliding areas:1.0 THERMAL FACTOR, Ct:1.2 TO 1.0 SNOW LOAD IMPORTANCE FACTOR :1.0 SNOW DENSITY;25 PCF SNOW DRIFTING PER ASCE 7-10 SEC 7.7. SLIDING SNOW PER ASCE 7-10 SEC 7.9. 5. LIVE LOADS - ROOF (NON CONCURRENT):20 PSF - FLOORS:40 PSF 6. DEAD LOADS - ROOF: - truss:15 PSF TOP CHORD, 5 PSF BTM - FLOORS:15 PSF 7. LATERAL LOAD RESISTING SYSTEM : - BRACED WALL PANELS 8. FOUNDATION - GEOTECH: KUMAR + ASSOC. - REPORT: NO. 21-7-306 - DATE: 5/4/2021 - MAX BRG: 4000 PSF OVER 3 FT OF COMPACTED STRUCTURAL FILL - MIN BRG: 1,000 PSF OVER 3 FT OF COMPACTED STRUCTURAL FILL - MIN PAD WIDTH: 24 INCHES ASSUMED - MIN FTG WIDTH: 16 INCHES ASSUMED - UNSUPPORTED SPAN: 14 FT ASSUMED - FROST: 36" - ELFP = 55 PSF DESIGN PARAMETERS PREVIOUSLY INSTALLED 3 FT STRUCTURAL FILL (INSPECTED BY KUMAR) A D 1 2 3 DCBA 2 1 T.O. PIER 98'-2. 3/4" T.O. PIER 98'-2. 3/4"