Loading...
HomeMy WebLinkAbout9.13 Annual Review 12.11.2023TER ENERGY PARTh1ERS December 11, 2023 Garfield County Building and Planning Attn: Glenn Hartmann 108 81h Street, Suite 401 Glenwood Springs, CO 81601 TEP Rocky Mountain LLC 1058 County Road 215 Parachute, CO 81635 RE: Land Use Change under Major Impact Revie`v — Resolution 2010-08 2023 Annual Report - GV 82-5 pad location Township 7 South, Range 95 West, 61h P.M. Section 5: NWl/4SE1/4 Garfield County, Colorado Dear Mr. Hartmann: Per the conditions of approval listed in the Resolution 2010-08 associated with the GV 82-5 pad location: 9. The Applicant shall be required to submit a report annually, until sztch time as the ivell pact is released from the COGCC reclamation bond, of the extraction and processing operation, for staff review. Upon review of any deficiencies pursuant to conditions of approval or other local, state, or federal permits, Staff fmay forward the report to the County Commissioners forfidl review of the Special Use Permit. On the GV 82-5 location, normal operations occurred this year which include the following: • 04/19/2023 GV 82-5 Pad Pre-emergent/bare ground Treatment • 06/07/2023 GV 82-5 Pad Noxious Weed Treatment (Russian Knapweed and Hotindstongue) • 08/23/2023 GV 82-5 Pad and Houndstongue) Noxious Weed Treatment (Russian Knapweed There was no reclamation or workover activity on this pad for 2023. TEP personnel and contractors continually monitor and maintain production equipment, water removal, and production as needed. TEP has reviewed the conditions set forth in the Major Impact Review and remains compliant under the conditions of the resolution listed above. After review of this annual report, please call me at (970) 263-2754 (0) or (970) 361-2006 (C) if any additional information is needed. Sincerely, TEP Rocky Mountain C Bryan S . Ho Surface Team Lead — Piceance Basin