HomeMy WebLinkAbout9.13 Annual Review 12.11.2023TER
ENERGY PARTh1ERS
December 11, 2023
Garfield County Building and Planning
Attn: Glenn Hartmann
108 81h Street, Suite 401
Glenwood Springs, CO 81601
TEP Rocky Mountain LLC
1058 County Road 215
Parachute, CO 81635
RE: Land Use Change under Major Impact Revie`v — Resolution 2010-08
2023 Annual Report - GV 82-5 pad location
Township 7 South, Range 95 West, 61h P.M.
Section 5: NWl/4SE1/4
Garfield County, Colorado
Dear Mr. Hartmann:
Per the conditions of approval listed in the Resolution 2010-08 associated with the GV 82-5 pad
location:
9. The Applicant shall be required to submit a report annually, until sztch time as the ivell pact is
released from the COGCC reclamation bond, of the extraction and processing operation, for staff
review. Upon review of any deficiencies pursuant to conditions of approval or other local, state, or
federal permits, Staff fmay forward the report to the County Commissioners forfidl review of the
Special Use Permit.
On the GV 82-5 location, normal operations occurred this year which include the following:
• 04/19/2023 GV 82-5 Pad Pre-emergent/bare ground Treatment
• 06/07/2023 GV 82-5 Pad Noxious Weed Treatment (Russian Knapweed
and Hotindstongue)
• 08/23/2023 GV 82-5 Pad
and Houndstongue)
Noxious Weed Treatment (Russian Knapweed
There was no reclamation or workover activity on this pad for 2023. TEP personnel and contractors
continually monitor and maintain production equipment, water removal, and production as needed.
TEP has reviewed the conditions set forth in the Major Impact Review and remains compliant under
the conditions of the resolution listed above.
After review of this annual report, please call me at (970) 263-2754 (0) or (970) 361-2006 (C) if any
additional information is needed.
Sincerely,
TEP Rocky Mountain C
Bryan S . Ho
Surface Team Lead — Piceance Basin