Loading...
HomeMy WebLinkAboutConditions of Permit1) 2) co NDITIONS OF PERMIT BLRE-10 -23-8409 CHELSEY & KYLE TESKY SINGLE-FAMILY DWELLING WITH ATTACHED GARAGE 57 Garden Cir, New Castle Gilead Gardens, Lot 4 - 218107303004 ALL WORK SHALL COI\4PLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.)AND 201B INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITËMS ON THIS LIST. 3) ELECTRICAL pERMtTTtNc AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-lN APPROVAL IS REQUIRED AT FRAME INSPECTION, ELECTRICAL FINAL APPROVAL IS REQUìRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) WtLDFtRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE l\4lTlGAT|ON AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMN/UNITY DEVELOPMENT WEBSITE FOR ADDITIONAL INFORMATION. 5) SËE AÍTACHED OPEN HOLE SOTLS REPORT DATED NOVEMBER 16,2023. MUST CALL FOR FOOTING INSPECTION BY GARFIELD COUNTY BUILDING INSPECTOR PR/OR TO ANY CONCRETE POUR. FOOTINGS MUST BE FREE OF FROSTAND FROZEN SOILS. ENSURE MINIMUM 3ó INCHES FROST DEPTH & BLANKETS /TENTING / EXCAVATED AREA IS WEATHER PROTECTED. 1,500 PSF I\44X. SOIL BEARING (SPECIFIED BY STRUCTURAL ENGINEER ON F1) ó) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGINEERING FOR INSPECTOR AT FRAME INSPECTION, FIELD VERIFY DELIVERED TRUSSES COMPLY WITH ROOF SNOWLOAD Pf:40 PSF' 7) SEPTTC SYSTEM REVIEW / APPROVALS: PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY PROVIDE FINAL APPROVAL / SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPT B) BLOWER DOOR TEST IS REOUIRED. MUST SUBMIT BLOWER DOOR TEST REPORTTO GARFIELD COUNry COMMUNITY DEVELOPMENT DEPT, OFFICE PRIOR TO SCHEDULING FINAT BUILDING INSPECTION / C.O. FINAL. 9) pRESCR|pTtVË PATH USTNG TABLE R402.1.2 lS THE CHOSEN ENERGY COMPLIANCE APPROACH FOR THIS HOME DESIGN. WRIGHTSOFT LOAD CALCULATIONS ATTACHED FOR REFERENCE. ALL NEW HOMES r\/UST HAVE WHoLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE M1507.3.3(1)AND (2) PER STAMP ON ARCHITECT'S COVER SHEET) 10) RADON TESTTNG AND REPORT tS REOUTRED PURSUANT RECORDED PLAT. SEE GEOTECH NOTE "C" ON ATTACHED PLAT, WHERE RADON IS FOUND, MUST MITIGATE PRIOR TO ISSUANCE OF THE CERTIFICATE OF OCCUPANCY / BUILDING FINAL INSPECTION. 1 1) HON/E S|TE TO BE SERVED By PROPANE. MECHANICAL EOUìPMENT lS PROPOSED FOR INSTALLATION lN A PIT LOCATION AND MUST BE MITIGATED. VERIFY INSTALLATION IN CRAWL SPACE UNDERNEATH THE LAUNDRY ROOM. OWNER BUILDER, CONTRACTOR, MECHANìCAL EOUIPMENT INSTALLER AND/OR LICENSED PLUMBER MUST COMPLY WITH ALL GARFIELD COUNTY LOCALLY ADOPTED AMENDIVIENTS AND NFPA 58. SEE ATTACHED AMENDMENTS FOR tPG APPLIANCES INSTALLED IN A PIT LOCATìON. SEE NFPA 58 FOR PROPANE TANK LOCATION REOUIREMENTS. 12) ROOFMUSTBEDESIGNEDTOPREVENTACCUNIULATIONOFSNOWFROMSHEDDINGABOVEORINFRONTOF PROPANE PIPES AT BUILDING EXTERIOR. FIELD VERIFY WHERE PROPANE ENTERS BUILDING. 1 3) THERMAL BARRIER AT ICF FOUNDATìON: PROVIDE THERMAL BARRIER AT INSIDE FACE OF ICF FOUNDATION WALLS PER IRC SECTION R31ó. ARCHITECTURAL PLANS AND OWNER'S CORRESPONDENCE INDICATE I\tECHAN¡CAL APPLIANCES WILL BE INSTALLED lN THE CRAWL SPACE. ( lT lS ANTICIPATED THAT FOAM PLASTIC WILL NEED TO BE COVERED TO PROTECT FROM HIGHLY TOXIC ËVENT IF IN CONTACT WITH FLAIV]ES ). a)..-lr s3 ù. N 5