Loading...
HomeMy WebLinkAboutConditions of PermitcoNDtilo NS OF PERMIT BLRE-1 1-23-8417 LUIS VARGAS HERRERA New Single-family dwelling w/ attached garage 543 Ponderosa Cir, Parachute Monument Creek Village Sec 1, Blk 9, LotT 1 ) ALL WORK SHALL COMpLy W|TH THE 201s INTERNATTONAL RESIDENTIAL CODE (l.R.C.)AND 2018 I NTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAI\4E INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE N/ITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR ADDITIONAL I NFORMATION. 5) OPEN HOLE SOTLS REPORT tS REOUTRED AT FOOTING INSPECTION AND PRIOR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 1,500 PSF soil bearìng. ó) pRE-ENGTNEERED ROOF TRUSSES. HAVE ENCINEERTNG FOR BUILDING INSPECTOR AT TIME OF FRAME INSPECTION. 7) BLOWER DOOR TEST tS REOUTRED. MUST SUBMIT BLOWER DOOR TEST REPORT TO GARFIELD COUNTY COMMUNITY DEVELOPN/ENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL. 8) PRESCRIPTIVE PATH USING ATTACHED RESCHECK REPORT HAS BEEN CHOSEN FOR ENERGY COMPLIANCE OF THIS HOME DESIGN. N/ANUAL J REPORT ALSO ATTACHED FOR REFERENCE. ALL NEW HON/IES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m1507,3.3(1)AND (2) SHOWN ON SHEET 1. AIR HANDLER UNIT DEPICTED ON SHEETS I AND 9. BUILDER AND MECHANICAL INSTALLERS / SUB CONTRACTORS TO NOTE A DUCT LEAKAGE TEST IS REOUIRED. 9) A LOT TMPROVEMENT CERT|F|CATE, SEALED BY A COLORADO LICENSED SURVEYOR, lS REOUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE - INCLUDING ROOF OVERHANGS, DECKS AND OTHER PROJECTIONS _ IS IN COMPLIANCE WITH N/IINIMUM SETBACKS AND/OR BUILDING ENVELOPE REOUIREMENTS.