Loading...
HomeMy WebLinkAboutInstallation Observation Letter 12.12.2023 December 14, 2023 AS-BUILT CERTIFICATE OF INSPECTION & ACCEPTANCE Onsite Wastewater Treatment System 2-BR Living Space Plumbed Shop 897 CR 231 Silt, CO 81652 The referenced onsite wastewater treatment system (OWTS) was inspected April 20 and December 12, 2023. At the time of inspections, the OWTS was installed in general conformance with the OWTS design plans prepared November 2022. Please contact WestWater Engineering for any additional information regarding engineered-design OWTS for referenced address. Respectfully, Dean R. Goebel, MS Hydrogeologist, PG WestWater Engineering Reviewed By: Keith Mendenhall, P.E.