HomeMy WebLinkAboutInstallation Observation Letter 12.12.2023
December 14, 2023
AS-BUILT CERTIFICATE OF INSPECTION & ACCEPTANCE
Onsite Wastewater Treatment System
2-BR Living Space Plumbed Shop
897 CR 231
Silt, CO 81652
The referenced onsite wastewater treatment system (OWTS) was inspected April 20 and
December 12, 2023. At the time of inspections, the OWTS was installed in general conformance
with the OWTS design plans prepared November 2022. Please contact WestWater Engineering
for any additional information regarding engineered-design OWTS for referenced address.
Respectfully,
Dean R. Goebel, MS Hydrogeologist, PG
WestWater Engineering
Reviewed By:
Keith Mendenhall, P.E.