HomeMy WebLinkAboutApplicationGarfield County
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
(970194s-82L2
wvìrw.ga rfield-countv.com
BUILDING PERMIT
APPLICATION
WPEOf
Irfvow€D PARÍIES
DemolitionCommercial Self StorageCommercial/Multi-Fam
Manufactured Home (Single or Multi-Level)
ReroofResidentialor TownhomeD
Accessory Dwelling Unit (ADU) - MAXIMUM SIZE OF 1,200 SQUARE FEET
FreeUp Storage Silt, LLC
17301 W Colfax Ave Unit 120, Golden, CO 80401
Ema it Address: zach@spartanbuilt.com
phone:(719 )310-0323Property Owner:
Mailing Address:
17301 W Colfax Ave Unit 120, Golden, CO 80401
Contractor Spartan Construction Management, LLC
Email Address:zach@spartanbu ilt. com
phone:(719 )310-0323
Mailing Address:
635-3346Architect: Asher Architects + Engineers Phone:
Email Addrer' david@asherarch.com
720
Mailing Address: 512 sth St. Berthoud CO 80513
359 Historic Columbia River Highway Troutdale, OR 97060
Firwood Design Group; KelliA. Grover, P.E phone: ( 503 ¡ 668-3737 x1 '13
Engineer:
Emait Addrerr. kg@firwooddesign.com
Mailing Address:
\
The Freeup Storage facil¡ty expansion consists of the construct¡on of 4 addjtional storage buildìngs adding 238 units w¡th 3B,000 Gross Sq Fl
Phone: (_)
Describe Work
JobAddress. 357 S 16th St. Silt, CO 81652
2179101 0001 I
8.949 acres
Lot
12.5ft on High Eave # of Floors
Block
Email Address
Sq. Ft. of Building:38,900 (Between 4 Blds)Height:
Property Size (Sq. Ft. or Acres):
Manufactured Home lnstaller:
Mailing Address
Owner's Valuation of Work: S $3,825,640.83
Assessor's Parcel Number
Sub.
J/RemodeUAlteration
PROJECT DETAIIS
Class of Work:Addition
Garage:Attached Detached
rFSeptic:
OtherPropane_l t ElectricType of Heat:
Permit fDriveway
Permit:
PRO'ECT ls coillliluED
Community
Natural Gas
toncE
Author¡ty. ThisapplicationforaBuildingPermitmustbesignedbytheOwnerof theproperty,describeda bove,
or an authorized agent. ll the signature below is not that of the Owner, a separate letter of aulhority, signed by
the Owner, must be provided with this Application.
Lesal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other permits. Multiple separate perntits ntay be required: (1) State Electrical Pernrit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.8. State or County Highway/ Road Access
or a State Wastewater Discharge Permit.
Void permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days
of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement'
ctRTlFtcÂTloI{
I hereby certify that I have read th is Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other data
submitted by me or on my behalf (submittals), based upon my certificat¡on as to accuracy. Assuming completeness
of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as
Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. ln
consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any
federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and
applicable land use regulations (County Regulation(s)). All County development requiring a permit, except for
residential uses are subject to Article 7 of the Land Use and Development Code. I acknowledge that the Building
permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the
structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other
applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
her acknowledge that the issuance of the Building Permit does not prevent the Building Officialfrom: (1) requiring
the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the
structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this
Application, including submittals, and inspections of the work by the Building Division do not constitute an
acceptance of responsibility or liability by the County of errors, omissions, or discrepancies. As the Owner, I
acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with
me and my authorized agents, including without limitation my architect designer, engineer and/ or builder.
I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have
provided
Zech Gumær
the required information which is correct and accurate to the best of my knowledge.
3t?'3_v.å:?1'itã:::^',itrÍ, --
Za ch G u m Per i¡i"3í1å::ì!:':å:I^il:ii"'
é¡u lız¡roòszr szoæcoø 1011012023
Property Owner Print and Sign Date
%'-{ c-r-\t1-\4.1a.OFFICIAL USE ONIY
Special Conditions
d\76ø1,ó5
Perm¡t Fee Manu. Home Fee:Plan Check Fee:
4Sâo;ø8'
Adiusted Valuation:
fr H1r,5 z(.c5
BP No:
KrÕ-83+\
OWTS No:
35Ev'-T.tb?<5
Total Fees:
\\,55t ,17
Const, Type:Eß Zonins:Cà
trce Due:Fees Pald:
OCC Group:
SS 8Ç
acks:
l.t--27-ÕBUTTDTNG / PIANNING DlVlSlON :
roval Date
NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf
determined by the Building Official that additional information is necessary to review the application
and/or plans for compliance, the application may be placed on hold until the required information is
provided. Work may not proceed without the issuance of a permit.
The Building Division will collect a Plan Review fee at time of application submittal. The Permit Fee, as
well as any Road lmpact fees will be collected when the permit is issued.
The permit application must be signed by the owner or by a person having written authority from the
owner to act as their representative.
I hereby acknowledge I have read, understand, and will abide with the requirements of this
checklist.
Zach Gumper
I dgll¡lly s€n.d by Zach cumF¡
I oN: @uS. E=æch@sPadanbuillcom
Za ch G u m OÞffiß+*r**:"':Y;:'r,w"10t1012023
Property Owner Print and Sign Date
Gørfteld County
BUILDINo DEPARTMENT
108 Eighth Street, Suite 407, Glenwood Springs, CO 81601
Tel: (970) 945-8212
PLAN REVIEW CHECKLIST
Permit No:þuco - { o - B- I 371
Building lssues Planning/Zoning lssues
(ál,rTts.,Cr
Engineered Foundation
Driveway Permit
Surveyed Site Plan
Septic Permit and Setbacks
Grade/ Topography 30%
Attach List of Required lnspections
Subdivision Plat Notes
Fire Department Review
Va luation Determination/ Fees
Red Line Plans/ Stamps/ Sticker
Attach Conditions
Application Signed
Energy Compliance Path/Plan Received
Plan Reviewer to Sign Application
Parcel/schedule No.
40# Snowload Letter - Manuf. Homes
Soils Report
'^ l'jlA 35 ft. stream setbacks
f'ä*+ãc4odPrain
1/ Property Line Setbacks
Building Height
Zoning Sign-Off
Road lmpact Fees
Grade/ Topography 40%
.t*{Cq4tanning tssues
pl,t Subdivision Plat
Description & Summarv:
+5 CÔg .-(5
^r[Á
\/
24 t415 ú lt-t[øs
27,1+5 x ä"8.97 r 1,4(t ,5zl.C5
5' , Lo B.?5 Ñ- n't-lT
^l
rLt{c^r
3.6 &€¡.qt kSgrlr*./¿ ttæo
lqZxA.ì$ = t3lZ.3o
p[+
x
7*"n (7æ ôÞ
{ 455 o.68 flaru @eueus