Loading...
HomeMy WebLinkAboutOWTS Plan Spec SheetS S S S SS SS SS SS S S C/O > > > > > > > > > > > > > > > E E E E E E E E E E E E E E E E E > >>>>>>> > > > > > > > > > > > > >>> > >> > > > > > > >>> >>> > > > >> EXISTING 1250 GALLON SEPTIC TANK TO REMAIN. INSTALL AN EFFLUENT FILTER IN THE VERTICAL OUTLET TEE. INSTALL 22 QUICK 4 I N F I L T R A T O R UNITS IN A NEW TRE N C H ( 8 8 L F ) 6 ' M I N HARMONY WAY EXISTING 4 BEDROOM RESIDENCE INSTALL A TWO-WAY CLEANOUT APPROX. EX. BURIED ELECTRIC (811 LOCATE) RELOCATE THE EX. DRY DRAINAGE (18"DEEP x 36" WIDE, MIN.) EX. 4"Ø SDR35 PVC TO REMAIN INSTALL 22 QUICK 4 I N F I L T R A T O R UNITS IN A NEW TRE N C H ( 8 8 L F ) REPLACE ANY DAMAGED END UNITS AND/OR END PLATES REMOVE EX. MANIFOLD AND INSTALL A NEW 4-WAY DISTRIBUTION BOX, EXTEND THE COVER TO THE SURFACE EXISTING LEACH FIEL D ( P E R M I T N O . 4 1 4 9 ) 39 QUICK 4 INFILTRA T O R U N I T S I N T W O ( 2 ) T R E N C H E S 25 ' M I N . 2 5 ' M I N . EX. DRY DRAINAGE EXISTING OUTBUILDING EXISTING OUTBUILDING EXISTING GREEN- HOUSE ADD 5 UNITS TO THE END OF THE EX. SYSTEM (22 TOTAL PER TRENCH, 88 LF) INSTALL AN INSPECTION PORT AT THE BEGINNING AND THE END OF EACH EACH TRENCH, TYP. EX. WELL TO THE WEST (>100') INSTALL 4"Ø SDR35 OR SCH.40 PVC @ 2% MIN., TYP. 489 Harmony Way Lot 20 - Sierra Vista Sub County of Garfield, State of Colorado Parcel No: 2179-221-01-020 Silt 37110DERIC J O N WA L T E R COL O R A D O LICE N S E D P R O F E SSIONA L E N G INEER 01/02/24 NORTH By Re v i s i o n No . Da t e 923 Cooper Avenue Suite 201 Glenwood Springs, CO 81601 tele: 970.945.5252 fax: 970.384.2833 Engineer or Surveyor Seal Sheet Client Information: PROJECT NO. FILE NAME: Designer: Drafter: Date: N: \ P r o j e c t s \ 2 0 2 3 \ 2 3 0 4 0 - W i l l i a m s O W T S \ d w g \ 2 3 0 4 0 - V - T o p o . d w g 1/ 2 / 2 0 2 4 3 : 2 8 P M 9.8.7.6.5.4.3.2. 01/02/24 DJW DJW 23040-v-topo.dwg 23040 719.371.4805 Silt, CO 81652 489 Harmony Way Kenneth Williams GA R F I E L D C O U N T Y , C O L O R A D O 1. On s i t e W a s t e w a t e r T r e a t m e n t S y s t e m ( O W T S ) 48 9 H a r m o n y W a y C.1 00 20'40' Scale: 1" = 20' SITE EVALUATION 1.SITE AND SOIL EVALUATIONS WERE PERFORMED BY: DERIC J. WALTER, PE KEVIN DYE, PE BOUNDARIES UNLIMITED INC.FREE RANGE ENGINEERING 923 COOPER AVE., STE. 201 817 CEDAR DRIVE GLENWOOD SPRINGS, CO 81601 RIFLE, COLORADO 81650 970.945.5252 970.318.6784 2.EVALUATION DATE(S): JANUARY 2006/DECEMBER 2023. 3.SETBACK REQUIREMENTS FOR A TREATMENT LEVEL 1 STA TRENCH/BED, UNLINED SAND FILTER OR SEEPAGE PIT (PER TABLE 7-1) AND AN ADWF=525 GPD: 3.A.SPRING, WELL OR POTABLE CISTERN=100' 3.B.POTABLE WATER SUPPLY LINE=25' 3.C.STRUCTURE W/ BASEMENT/CRAWL SPACE=20' 3.D.STRUCTURE W/O BASEMENT/CRAWL SPACE=10' 3.E.PROPERTY LINE, PIPE OR LINED IRRIGATION DITCH=10' 3.F.INTERMITTENT IRRIGATION LATERAL, INFILTRATION STRUCTURE=25' 3.G.LAKE, WATER COURSE, IRRIGATION DITCH, STREAM OR WETLAND=50' 3.H.DRY GULCH, CUT BANK OR FILL AREA=25' 3.I.SEPTIC TANK=5' 3.J.RESTRICTIVE LAYER OR GROUNDWATER (VERTICAL): 4' (TREATMENT LEVEL 1, GRAVITY FEED) 3.SETBACK REQUIREMENTS FOR THE SEPTIC TANK SHALL BE (PER TABLE 7-1): 3.A.SPRING, WELL OR POTABLE CISTERN=50' 3.B.POTABLE WATER SUPPLY LINE=10' 3.C.STRUCTURE W/ BASEMENT/CRAWL SPACE=5' 3.D.STRUCTURE W/O BASEMENT/CRAWL SPACE=5' 3.E.PROPERTY LINE, PIPE OR LINED IRRIGATION DITCH=10' 3.F.INTERMITTENT IRRIGATION LATERAL, INFILTRATION STRUCTURE=10' 3.G.LAKE WATER COURSE, IRRIGATION DITCH, STREAM OR WETLAND=50' 3.H.DRY GULCH, CUT BANK OR FILL AREA=10' 3.I.STA TRENCH/BED, UNLINED SAND FILTER OR SEEPAGE PIT=5' SURFACE 7. 5 ' Scale: N.T.S. Site & Soils Evaluation SOIL EVALUATION 1.SOIL WAS CLASSIFIED BY THE GEOTECHNICAL ENGINEER (FREE RANGE ENGINEERING (PROJECT #23-05, DECEMBER 26, 2023) AS USDA SANDY LOAM, LOAM, SILT LOAM; TYPE 2; AND AN LTAR OF 0.60 GPD/SF. 2.THE EXISTING SYSTEM SOILS WERE CLASSIFIED BY ANOTHER GEOTECHNICAL ENGINEER (HEPWORTH-PAWLAK GEOTECHNICAL, INC, JOB NO. 106 0090, JANUARY 16, 2006) AS SANDY SILTY CLAY WITH A PERCOLATION RATE OF 60 MPI. 3.BASED ON SITE OBSERVATIONS OF SOIL SMEARING ALONG TRENCH WALLS, AN LTAR OF 0.35 IS PROPOSED (SANDY CLAY LOAM). 3' SYSTEM DESIGN & CONSTRUCTION NOTES: 1.THIS DESIGN IS FOR A SYSTEM ALTERATION. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CDPHE REGULATION 43 ONSITE WASTEWATER TREATMENT SYSTEM (OWTS) REGULATION, MOST CURRENT EDITION AND LOCAL AGENCY REQUIREMENTS WHICH MAY OR MAY NOT SPECIFICALLY BE NOTED ON THE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR KNOWING AND CONFORMING TO SUCH SPECIFIC DETAILS AS ARE REFERRED TO IN THE ABOVE MENTIONED REGULATIONS. THIS DRAWING DOES NOT CONSTITUTE AN OWTS PERMIT. A PERMIT MUST BE OBTAINED FROM APPROPRIATE LOCAL AGENCY. THE CONTRACTOR MUST CONTACT THE LOCAL AGENCY HEALTH DEPARTMENT AND THE PROJECT ENGINEER FOR INSPECTIONS OF THE CONSTRUCTED SYSTEM BEFORE BACKFILL. A REQUEST FOR INSPECTION BY THE PROJECT ENGINEER AND THE COUNTY ENVIRONMENTAL HEALTH OFFICER MUST BE MADE AT LEAST 48-HOURS PRIOR TO THE EXPECTED TIME OF BACKFILLING. 2.DEMAND CALCULATIONS (SEC.43.6.A.2.h) 2.A.FOUR (4) BEDROOM RESIDENCE USING TREATMENT LEVEL 1 (TL1). 2.B.AVERAGE DAILY WASTEWATER FLOW (ADWF) AND ORGANIC LOAD RATE (BOD5): 2.B.1.SINGLE FAMILY DWELLING: 75 gpdc & 0.20 BOD5 lbs/day 2.B.2.ADWF = 75 gpd * (3 BEDROOMS * 2 PERSONS/BEDROOM + 1 BEDROOM * 1 PERSONS/BEDROOM) =525 gpd 2.B.3.BOD5 = 0.20 lbs/day * (3 BEDROOMS * 2 PERSONS/BEDROOM + 1 BEDROOM * 1 PERSONS/BEDROOM) = 1.40 lbs/day BOD5 mg/L = BOD5*1,000,000 = 1.40 lbs/day*1,000,000 = 319.74 mg/L ADWF*8.34 525 gpd*8.34 2.B.4.CBOD5 = BOD5 * 0.85 = 272 mg/L 3.SEPTIC TANK (SEC.43.9.B.2.a): 3.A.1,250-GALLON STANDARD STORAGE TWO-COMPARTMENT TANK (PER TABLE 9-1) WITH AN EFFLUENT FILTER. EXISTING TANK IS 1,250-GALLONS. 3.B.THE TANK IS NOT SUBJECT TO BUOYANCY. 4.ABSORPTION AREA CALCULATIONS: 4.A.THE ABSORPTION AREA SLOPES MODERATELY 4.B.LONG TERM ACCEPTANCE RATE (LTAR) FOR TREATMENT LEVEL 1 (TL1) OF 0.35 gpd/SF (SEE SITE & SOILS EVALUATION NOTES/DETAIL). 4.C.MINIMUM SOIL TREATMENT AREA, A: A = ADWF = 525 = 1,500 S.F. LTAR 0.35 gpd/S.F. 4.D.SIZE ADJUSTMENT FACTORS: GRAVITY TRENCH = 1.0; CHAMBER TRENCH = 0.70 (TABLE 10-1A). 4.D.1.A,adj = 1,500 SF * 1.0 * 0.7 = 1050 SF 4.E.GRAVELLESS CHAMBER TRENCH SYSTEM: 4.E.1.INFILTRATOR QUICK4: 1,050 SF / 12 SF/UNIT = 88 UNITS IN A TRENCH CONFIGURATION. 39 EXISTING UNITS. THEREFORE, ADD 49 UNITS IN FOUR (4) EQUAL TRENCHES. 5.THIS SYSTEM IS SIZED FOR TYPICAL DOMESTIC WASTES ONLY. BACKWASH OR FLUSHING FLOWS FOR REVERSE OSMOSIS UNITS OR WATER SOFTENERS AND/OR FILTERS SHOULD NOT BE INTRODUCED INTO THIS SYSTEM. 6.CLEAN OUTS ARE REQUIRED AT THE HOUSE AND AT ALL BENDS AND AT LEAST EVERY 100-FEET BETWEEN THE HOUSE AND THE SEPTIC TANK. 7.THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING ALL WATER TIGHT COMPONENTS THROUGHOUT THE SYSTEM TO PREVENT INFILTRATION. 8.INSTALL RISERS AS NECESSARY TO BRING ALL ACCESS PORTS TO FINAL GRADE. PORTS SHALL BE MARKED IF CAPS ARE TO BE BURIED. 9.INSTALL 3-INCHES OF BLUEBOARD INSULATION, 3-FEET WIDE, OVER SEWER AND EFFLUENT PIPE WHEREVER DEPTH IS LESS THAN 3-FEET. UNDER NO CIRCUMSTANCES SHALL COVER BE LESS THAN 2-FEET. 10.SITE PLAN INFORMATION FROM OTHERS. LOCATIONS OF ALL COMPONENTS MAY BE VARIED AS NECESSARY AS LONG AS ALL MINIMUM DISTANCES AND SLOPES MEET THOSE REQUIRED. NO R T H To New Castle I-70 SITE Vicinity Map 10 . 5 ' MAINTENANCE NOTES 1.TO ENCOURAGE THE HEALTH AND LONGEVITY OF THE OWTS SYSTEM, THE OWNER SHALL CONSIDER THE FOLLOWING: 1.A.MINIMIZE THE AMOUNT OF WATER THAT GOES DOWN THE DRAIN, THE BETTER YOUR SYSTEM WILL WORK. 1.B.MINIMIZE SOLIDS GOING DOWN THE DRAIN. 1.C.ELIMINATE GARBAGE DISPOSALS OR KEEP THE USE OF GARBAGE DISPOSALS TO A MINIMUM. 1.D.MINIMIZE GREASE AND OILS THAT GO DOWN THE DRAIN. 1.E.USE LINT FILTERS ON LAUNDRY MACHINE DRAINS. 1.F.KEEP SAND AND DIRT OUT OF THE BUILDING DRAIN. 1.G.AVOID FLUSHING SANITARY NAPKINS OR PAPER PRODUCTS OTHER THAN TOILET PAPER. 1.H.DO NOT USE LYE-BASED DRAIN UNCLOGGER CHEMICALS SUCH AS DRAINO, OVEN-OFF, OR OTHER STRONG CLEANING AGENTS. 1.I.DO NOT PUT ANY “ROOT DETERRENTS” DOWN THE DRAIN. 1.J.DO NOT POUR PAINT THINNER, PESTICIDES, PAINTS OR PHOTO LAB CHEMICALS DOWN THE DRAIN 1.K.MINIMIZE USE OF CHLORINE BLEACH AND TOILET ADDITIVES. 2.THE OWNER SHALL CONTRACT WITH A SEPTIC TANK INSPECTOR TO INSPECT THE TANK ANNUALLY FOR GREASE AND SEDIMENT ACCUMULATION. THE INSPECTOR SHALL REMOVED AND PROPERLY DISPOSED OF ACCUMULATED GREASE AND SEDIMENT AS NEEDED TO ENSURE PROPER FUNCTION OF THE SYSTEM. GENERAL ABSORPTION AREA NOTES 1.INSTALL CHAMBER UNITS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. 2.ABSORPTION TRENCHES SHALL BE 3' WIDE OR LESS AND PARALLEL THE GROUND SURFACE CONTOURS. PARALLELING TRENCHES SHALL BE SEPARATED BY A DISTANCE OF 6' MIN. 3.THE BOTTOM OF THE ABSORPTION TRENCHES SHALL BE LEVEL AND THE BOTTOM AND SIDEWALLS MUST BE RAKED TO REMOVE ANY SOIL SMEARS INCURRED DURING THE EXCAVATION. FAILURE TO DO SO MAY REQUIRE THE CONTRACTOR TO REPLACE THE ABSORPTION FIELD AT HIS/HER OWN EXPENSE. 4.DRAINAGE SWALES ARE TO BE PROVIDED ABOVE AND AROUND THE FIELD, AS NECESSARY, TO PREVENT SURFACE RUNOFF FROM ENTERING ABSORPTION AREA. 5.NO EXCAVATION OF THE ABSORPTION FIELD IS TO BE DONE DURING WET WEATHER AND USE OF RUBBER TIRE VEHICLES OVER THE ABSORPTION AREA IS STRICTLY PROHIBITED. 6.UNSUITABLE MATERIAL EXISTING WITHIN THE FIELD SHALL BE EXCAVATED AND BACKFILL SHALL CONSIST OF IMPORTED LOAMY SAND OR SANDY GRAVEL. THE ENGINEER SHALL BE CONTACTED IF BEDROCK OR GROUNDWATER IS ENCOUNTERED IN THE OVER-EXCAVATION. 7.TOPSOIL COVER MAY BE VARIED (1-FOOT MINIMUM, 2-FOOT MAXIMUM) TO ALLOW FOR LANDSCAPING. 36" MAX. UNDISTURBED NATIVE SOILS 6' (MIN.) EX. GRA D E 1% MIN 3:1 M A X G R A D E 3:1 M A X G R A D E 18 " M I N 1' MIN 2' MAX 1% MIN To Rifle SAND, SILT, CLAY. SAND IS FINE TO COARSE, MEDIUM GRAIN SIZE, MOIST, LOW PLASTICITY, BROWN. SAND WEAKLY CEMENTED SANDSTONE PIECES, SILT, MOIST, NON-PLASTIC, TAN BOTTOM TO BE LEVEL AND FLAT OVER ENTIRE AREA TO WITHIN 0.05'±. (TYP.) REMOVE ANY ENCOUNTERED BOULDERS AND BACKFILL WITH LOAMY SAND OR SANDY GRAVELS. DO NOT USE COMPACTED MATERIALS. DO NOT WALK ON OR COMPACT BOTTOM OF TRENCH. FINISHED GROUND - MAINTAIN POSITIVE SLOPE AWAY FROM TOP SURFACE OF THE CHAMBER TRENCHES. PVC COUPLING FOR SUPPORT STANDARD INSPECTION PORT, TYP. (4"Ø PVC SOLID PIPE CUT TO FIT. LOCATE PER PLAN VIEW. ATTACH REMOVABLE CAP OR THREADED CLEANOUT ASSEMBLY. DRILL EIGHT (8) 1/2"Ø HOLES IN THE STANDPIPE SECTION THAT IS INSIDE THE CHAMBER UNIT. INFLOW AND OVERFLOW PIPES SHALL ENTER THE UPPER KNOCKOUTS GRAVELLESS CHAMBER SYSTEM: INFILTRATOR QUICK 4, ADVANCED DRAINAGE SYSTEMS BIODIFFUSER (STANDARD), OR ENGINEER APPROVED EQUAL.FILL CIRCULAR IRRIGATION-STYLE VALVE BOX & COVER - LID COLOR PURPLE OR GREEN - LABEL "SEWER"FILL EXPOSED INSPECTION PORT (OPTION #2) PVC COUPLING FOR SUPPORT