EXISTING 1250 GALLON
SEPTIC TANK TO REMAIN.
INSTALL AN EFFLUENT
FILTER IN THE VERTICAL
OUTLET TEE.
INSTALL 22 QUICK 4
I
N
F
I
L
T
R
A
T
O
R
UNITS IN A NEW TRE
N
C
H
(
8
8
L
F
)
6
'
M
I
N
HARMONY WAY
EXISTING
4 BEDROOM
RESIDENCE
INSTALL A
TWO-WAY
CLEANOUT
APPROX. EX. BURIED
ELECTRIC (811 LOCATE)
RELOCATE THE EX. DRY DRAINAGE
(18"DEEP x 36" WIDE, MIN.)
EX. 4"Ø SDR35
PVC TO REMAIN
INSTALL 22 QUICK 4
I
N
F
I
L
T
R
A
T
O
R
UNITS IN A NEW TRE
N
C
H
(
8
8
L
F
)
REPLACE ANY
DAMAGED END UNITS
AND/OR END PLATES
REMOVE EX. MANIFOLD AND INSTALL A
NEW 4-WAY DISTRIBUTION BOX,
EXTEND THE COVER TO THE SURFACE
EXISTING LEACH FIEL
D
(
P
E
R
M
I
T
N
O
.
4
1
4
9
)
39 QUICK 4 INFILTRA
T
O
R
U
N
I
T
S
I
N
T
W
O
(
2
)
T
R
E
N
C
H
E
S
25
'
M
I
N
.
2
5
'
M
I
N
.
EX. DRY DRAINAGE
EXISTING
OUTBUILDING
EXISTING
OUTBUILDING
EXISTING
GREEN-
HOUSE
ADD 5 UNITS TO THE END
OF THE EX. SYSTEM
(22 TOTAL PER TRENCH, 88 LF)
INSTALL AN INSPECTION
PORT AT THE BEGINNING
AND THE END OF EACH
EACH TRENCH, TYP.
EX. WELL TO THE
WEST (>100')
INSTALL 4"Ø SDR35
OR SCH.40 PVC @
2% MIN., TYP.
489 Harmony Way
Lot 20 - Sierra Vista Sub
County of Garfield,
State of Colorado
Parcel No: 2179-221-01-020
Silt
37110DERIC J O N WA
L
T
E
R
COL O R A D O LICE
N
S
E
D
P
R
O
F
E
SSIONA L E N G INEER
01/02/24
NORTH
By
Re
v
i
s
i
o
n
No
.
Da
t
e
923 Cooper Avenue
Suite 201
Glenwood Springs, CO 81601
tele: 970.945.5252
fax: 970.384.2833
Engineer or Surveyor Seal
Sheet
Client Information:
PROJECT NO.
FILE NAME:
Designer:
Drafter:
Date:
N:
\
P
r
o
j
e
c
t
s
\
2
0
2
3
\
2
3
0
4
0
-
W
i
l
l
i
a
m
s
O
W
T
S
\
d
w
g
\
2
3
0
4
0
-
V
-
T
o
p
o
.
d
w
g
1/
2
/
2
0
2
4
3
:
2
8
P
M
9.8.7.6.5.4.3.2.
01/02/24
DJW
DJW
23040-v-topo.dwg
23040
719.371.4805
Silt, CO 81652
489 Harmony Way
Kenneth Williams
GA
R
F
I
E
L
D
C
O
U
N
T
Y
,
C
O
L
O
R
A
D
O
1.
On
s
i
t
e
W
a
s
t
e
w
a
t
e
r
T
r
e
a
t
m
e
n
t
S
y
s
t
e
m
(
O
W
T
S
)
48
9
H
a
r
m
o
n
y
W
a
y
C.1
00 20'40'
Scale: 1" = 20'
SITE EVALUATION
1.SITE AND SOIL EVALUATIONS WERE PERFORMED BY:
DERIC J. WALTER, PE KEVIN DYE, PE
BOUNDARIES UNLIMITED INC.FREE RANGE ENGINEERING
923 COOPER AVE., STE. 201 817 CEDAR DRIVE
GLENWOOD SPRINGS, CO 81601 RIFLE, COLORADO 81650
970.945.5252 970.318.6784
2.EVALUATION DATE(S): JANUARY 2006/DECEMBER 2023.
3.SETBACK REQUIREMENTS FOR A TREATMENT LEVEL 1 STA TRENCH/BED, UNLINED
SAND FILTER OR SEEPAGE PIT (PER TABLE 7-1) AND AN ADWF=525 GPD:
3.A.SPRING, WELL OR POTABLE CISTERN=100'
3.B.POTABLE WATER SUPPLY LINE=25'
3.C.STRUCTURE W/ BASEMENT/CRAWL SPACE=20'
3.D.STRUCTURE W/O BASEMENT/CRAWL SPACE=10'
3.E.PROPERTY LINE, PIPE OR LINED IRRIGATION DITCH=10'
3.F.INTERMITTENT IRRIGATION LATERAL, INFILTRATION STRUCTURE=25'
3.G.LAKE, WATER COURSE, IRRIGATION DITCH, STREAM OR WETLAND=50'
3.H.DRY GULCH, CUT BANK OR FILL AREA=25'
3.I.SEPTIC TANK=5'
3.J.RESTRICTIVE LAYER OR GROUNDWATER (VERTICAL): 4' (TREATMENT LEVEL 1,
GRAVITY FEED)
3.SETBACK REQUIREMENTS FOR THE SEPTIC TANK SHALL BE (PER TABLE 7-1):
3.A.SPRING, WELL OR POTABLE CISTERN=50'
3.B.POTABLE WATER SUPPLY LINE=10'
3.C.STRUCTURE W/ BASEMENT/CRAWL SPACE=5'
3.D.STRUCTURE W/O BASEMENT/CRAWL SPACE=5'
3.E.PROPERTY LINE, PIPE OR LINED IRRIGATION DITCH=10'
3.F.INTERMITTENT IRRIGATION LATERAL, INFILTRATION STRUCTURE=10'
3.G.LAKE WATER COURSE, IRRIGATION DITCH, STREAM OR WETLAND=50'
3.H.DRY GULCH, CUT BANK OR FILL AREA=10'
3.I.STA TRENCH/BED, UNLINED SAND FILTER OR SEEPAGE PIT=5'
SURFACE
7.
5
'
Scale: N.T.S.
Site & Soils Evaluation
SOIL EVALUATION
1.SOIL WAS CLASSIFIED BY THE GEOTECHNICAL ENGINEER
(FREE RANGE ENGINEERING (PROJECT #23-05,
DECEMBER 26, 2023) AS USDA SANDY LOAM, LOAM, SILT
LOAM; TYPE 2; AND AN LTAR OF 0.60 GPD/SF.
2.THE EXISTING SYSTEM SOILS WERE CLASSIFIED BY
ANOTHER GEOTECHNICAL ENGINEER
(HEPWORTH-PAWLAK GEOTECHNICAL, INC, JOB NO. 106
0090, JANUARY 16, 2006) AS SANDY SILTY CLAY WITH A
PERCOLATION RATE OF 60 MPI.
3.BASED ON SITE OBSERVATIONS OF SOIL SMEARING
ALONG TRENCH WALLS, AN LTAR OF 0.35 IS PROPOSED
(SANDY CLAY LOAM).
3'
SYSTEM DESIGN & CONSTRUCTION NOTES:
1.THIS DESIGN IS FOR A SYSTEM ALTERATION. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CDPHE REGULATION 43 ONSITE WASTEWATER TREATMENT
SYSTEM (OWTS) REGULATION, MOST CURRENT EDITION AND LOCAL AGENCY REQUIREMENTS WHICH MAY OR MAY NOT SPECIFICALLY BE NOTED ON THE
DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR KNOWING AND CONFORMING TO SUCH SPECIFIC DETAILS AS ARE REFERRED TO IN THE ABOVE
MENTIONED REGULATIONS. THIS DRAWING DOES NOT CONSTITUTE AN OWTS PERMIT. A PERMIT MUST BE OBTAINED FROM APPROPRIATE LOCAL AGENCY. THE
CONTRACTOR MUST CONTACT THE LOCAL AGENCY HEALTH DEPARTMENT AND THE PROJECT ENGINEER FOR INSPECTIONS OF THE CONSTRUCTED SYSTEM
BEFORE BACKFILL. A REQUEST FOR INSPECTION BY THE PROJECT ENGINEER AND THE COUNTY ENVIRONMENTAL HEALTH OFFICER MUST BE MADE AT LEAST
48-HOURS PRIOR TO THE EXPECTED TIME OF BACKFILLING.
2.DEMAND CALCULATIONS (SEC.43.6.A.2.h)
2.A.FOUR (4) BEDROOM RESIDENCE USING TREATMENT LEVEL 1 (TL1).
2.B.AVERAGE DAILY WASTEWATER FLOW (ADWF) AND ORGANIC LOAD RATE (BOD5):
2.B.1.SINGLE FAMILY DWELLING: 75 gpdc & 0.20 BOD5 lbs/day
2.B.2.ADWF = 75 gpd * (3 BEDROOMS * 2 PERSONS/BEDROOM + 1 BEDROOM * 1 PERSONS/BEDROOM) =525 gpd
2.B.3.BOD5 = 0.20 lbs/day * (3 BEDROOMS * 2 PERSONS/BEDROOM + 1 BEDROOM * 1 PERSONS/BEDROOM) = 1.40 lbs/day
BOD5 mg/L = BOD5*1,000,000 = 1.40 lbs/day*1,000,000 = 319.74 mg/L
ADWF*8.34 525 gpd*8.34
2.B.4.CBOD5 = BOD5 * 0.85 = 272 mg/L
3.SEPTIC TANK (SEC.43.9.B.2.a):
3.A.1,250-GALLON STANDARD STORAGE TWO-COMPARTMENT TANK (PER TABLE 9-1) WITH AN EFFLUENT FILTER. EXISTING TANK IS 1,250-GALLONS.
3.B.THE TANK IS NOT SUBJECT TO BUOYANCY.
4.ABSORPTION AREA CALCULATIONS:
4.A.THE ABSORPTION AREA SLOPES MODERATELY
4.B.LONG TERM ACCEPTANCE RATE (LTAR) FOR TREATMENT LEVEL 1 (TL1) OF 0.35 gpd/SF (SEE SITE & SOILS EVALUATION NOTES/DETAIL).
4.C.MINIMUM SOIL TREATMENT AREA, A:
A = ADWF = 525 = 1,500 S.F.
LTAR 0.35 gpd/S.F.
4.D.SIZE ADJUSTMENT FACTORS: GRAVITY TRENCH = 1.0; CHAMBER TRENCH = 0.70 (TABLE 10-1A).
4.D.1.A,adj = 1,500 SF * 1.0 * 0.7 = 1050 SF
4.E.GRAVELLESS CHAMBER TRENCH SYSTEM:
4.E.1.INFILTRATOR QUICK4: 1,050 SF / 12 SF/UNIT = 88 UNITS IN A TRENCH CONFIGURATION. 39 EXISTING UNITS. THEREFORE, ADD 49 UNITS IN FOUR (4)
EQUAL TRENCHES.
5.THIS SYSTEM IS SIZED FOR TYPICAL DOMESTIC WASTES ONLY. BACKWASH OR FLUSHING FLOWS FOR REVERSE OSMOSIS UNITS OR WATER SOFTENERS
AND/OR FILTERS SHOULD NOT BE INTRODUCED INTO THIS SYSTEM.
6.CLEAN OUTS ARE REQUIRED AT THE HOUSE AND AT ALL BENDS AND AT LEAST EVERY 100-FEET BETWEEN THE HOUSE AND THE SEPTIC TANK.
7.THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING ALL WATER TIGHT COMPONENTS THROUGHOUT THE SYSTEM TO PREVENT INFILTRATION.
8.INSTALL RISERS AS NECESSARY TO BRING ALL ACCESS PORTS TO FINAL GRADE. PORTS SHALL BE MARKED IF CAPS ARE TO BE BURIED.
9.INSTALL 3-INCHES OF BLUEBOARD INSULATION, 3-FEET WIDE, OVER SEWER AND EFFLUENT PIPE WHEREVER DEPTH IS LESS THAN 3-FEET. UNDER NO
CIRCUMSTANCES SHALL COVER BE LESS THAN 2-FEET.
10.SITE PLAN INFORMATION FROM OTHERS. LOCATIONS OF ALL COMPONENTS MAY BE VARIED AS NECESSARY AS LONG AS ALL MINIMUM DISTANCES AND
SLOPES MEET THOSE REQUIRED.
NO
R
T
H
To New Castle
I-70
SITE
Vicinity Map
10
.
5
'
MAINTENANCE NOTES
1.TO ENCOURAGE THE HEALTH AND LONGEVITY OF THE OWTS SYSTEM, THE OWNER SHALL CONSIDER THE FOLLOWING:
1.A.MINIMIZE THE AMOUNT OF WATER THAT GOES DOWN THE DRAIN, THE BETTER YOUR SYSTEM WILL WORK.
1.B.MINIMIZE SOLIDS GOING DOWN THE DRAIN.
1.C.ELIMINATE GARBAGE DISPOSALS OR KEEP THE USE OF GARBAGE DISPOSALS TO A MINIMUM.
1.D.MINIMIZE GREASE AND OILS THAT GO DOWN THE DRAIN.
1.E.USE LINT FILTERS ON LAUNDRY MACHINE DRAINS.
1.F.KEEP SAND AND DIRT OUT OF THE BUILDING DRAIN.
1.G.AVOID FLUSHING SANITARY NAPKINS OR PAPER PRODUCTS OTHER THAN TOILET PAPER.
1.H.DO NOT USE LYE-BASED DRAIN UNCLOGGER CHEMICALS SUCH AS DRAINO, OVEN-OFF, OR OTHER STRONG
CLEANING AGENTS.
1.I.DO NOT PUT ANY “ROOT DETERRENTS” DOWN THE DRAIN.
1.J.DO NOT POUR PAINT THINNER, PESTICIDES, PAINTS OR PHOTO LAB CHEMICALS DOWN THE DRAIN
1.K.MINIMIZE USE OF CHLORINE BLEACH AND TOILET ADDITIVES.
2.THE OWNER SHALL CONTRACT WITH A SEPTIC TANK INSPECTOR TO INSPECT THE TANK ANNUALLY FOR GREASE AND
SEDIMENT ACCUMULATION. THE INSPECTOR SHALL REMOVED AND PROPERLY DISPOSED OF ACCUMULATED GREASE
AND SEDIMENT AS NEEDED TO ENSURE PROPER FUNCTION OF THE SYSTEM.
GENERAL ABSORPTION AREA NOTES
1.INSTALL CHAMBER UNITS IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS.
2.ABSORPTION TRENCHES SHALL BE 3' WIDE OR LESS
AND PARALLEL THE GROUND SURFACE CONTOURS.
PARALLELING TRENCHES SHALL BE SEPARATED BY
A DISTANCE OF 6' MIN.
3.THE BOTTOM OF THE ABSORPTION TRENCHES
SHALL BE LEVEL AND THE BOTTOM AND
SIDEWALLS MUST BE RAKED TO REMOVE ANY SOIL
SMEARS INCURRED DURING THE EXCAVATION.
FAILURE TO DO SO MAY REQUIRE THE CONTRACTOR
TO REPLACE THE ABSORPTION FIELD AT HIS/HER
OWN EXPENSE.
4.DRAINAGE SWALES ARE TO BE PROVIDED ABOVE
AND AROUND THE FIELD, AS NECESSARY, TO
PREVENT SURFACE RUNOFF FROM ENTERING
ABSORPTION AREA.
5.NO EXCAVATION OF THE ABSORPTION FIELD IS TO
BE DONE DURING WET WEATHER AND USE OF
RUBBER TIRE VEHICLES OVER THE ABSORPTION
AREA IS STRICTLY PROHIBITED.
6.UNSUITABLE MATERIAL EXISTING WITHIN THE FIELD
SHALL BE EXCAVATED AND BACKFILL SHALL
CONSIST OF IMPORTED LOAMY SAND OR SANDY
GRAVEL. THE ENGINEER SHALL BE CONTACTED IF
BEDROCK OR GROUNDWATER IS ENCOUNTERED IN
THE OVER-EXCAVATION.
7.TOPSOIL COVER MAY BE VARIED (1-FOOT MINIMUM,
2-FOOT MAXIMUM) TO ALLOW FOR LANDSCAPING.
36" MAX.
UNDISTURBED NATIVE SOILS
6' (MIN.)
EX. GRA
D
E
1% MIN
3:1 M
A
X
G
R
A
D
E
3:1
M
A
X
G
R
A
D
E
18
"
M
I
N
1' MIN
2' MAX
1% MIN
To Rifle
SAND, SILT, CLAY.
SAND IS FINE TO COARSE,
MEDIUM GRAIN SIZE, MOIST,
LOW PLASTICITY, BROWN.
SAND
WEAKLY CEMENTED
SANDSTONE PIECES, SILT,
MOIST, NON-PLASTIC, TAN
BOTTOM TO BE LEVEL AND FLAT OVER
ENTIRE AREA TO WITHIN 0.05'±. (TYP.)
REMOVE ANY ENCOUNTERED
BOULDERS AND BACKFILL WITH LOAMY
SAND OR SANDY GRAVELS. DO NOT
USE COMPACTED MATERIALS.
DO NOT WALK ON OR COMPACT
BOTTOM OF TRENCH.
FINISHED GROUND - MAINTAIN POSITIVE
SLOPE AWAY FROM TOP SURFACE OF
THE CHAMBER TRENCHES.
PVC COUPLING FOR SUPPORT
STANDARD INSPECTION PORT, TYP. (4"Ø PVC
SOLID PIPE CUT TO FIT. LOCATE PER PLAN
VIEW. ATTACH REMOVABLE CAP OR THREADED
CLEANOUT ASSEMBLY. DRILL EIGHT (8) 1/2"Ø
HOLES IN THE STANDPIPE SECTION THAT IS
INSIDE THE CHAMBER UNIT.
INFLOW AND OVERFLOW
PIPES SHALL ENTER THE
UPPER KNOCKOUTS
GRAVELLESS CHAMBER SYSTEM:
INFILTRATOR QUICK 4, ADVANCED
DRAINAGE SYSTEMS BIODIFFUSER
(STANDARD), OR ENGINEER
APPROVED EQUAL.FILL
CIRCULAR IRRIGATION-STYLE VALVE
BOX & COVER - LID COLOR PURPLE OR
GREEN - LABEL "SEWER"FILL
EXPOSED INSPECTION
PORT (OPTION #2)
PVC COUPLING FOR SUPPORT