Existing Drainage and Flood Hazard
Report
SPRING VALLEY RANCH PUD
January 18, 2023
Spring Valley - Drainage Exhibit December 2022
2022-22
TableofContents
1.0General ................................................................................................................................. 2
1.1Preliminary Plan Drainage Report ................................................................................... 2
1.2FEMA FIRMette .............................................................................................................. 2
2.0Hydrology ............................................................................................................................ 3
2.1Drainage Basin Areas ....................................................................................................... 3
2.2Rainfall ............................................................................................................................. 3
2.3Hydrologic Curve Numbers ............................................................................................. 3
2.4Times of Concentration .................................................................................................... 3
2.5Peak Discharges ............................................................................................................... 3
3.0Pre-Development Hydrologic Results ................................................................................. 3
4.0Hopkins Dam Analysis ........................................................................................................ 4
Appendix A – Pre-Development Drainage Map ............................................................................. 6
Appendix B – Precipitation Data .................................................................................................... 7
Appendix C –Pre-Development Drainage Results ......................................................................... 8
Appendix D – Prior Studies and Dam Certifications ...................................................................... 9
2022-22
1.0 General
The Spring Valley P.U.D site is located approximately 5 miles east of the City of Glenwood
Springs, with drainage basins covering roughly 6,245 acres. The major tributary of the property
is the Roaring Fork River basin. A small portion of the property along the northern boundary is
tributary to the Colorado River through Glenwood Canyon. The property is accessed via Garfield
County Road 114. Much of the northern boundary of the property borders the White River
National Forest, and a majority of the western boundary of the property borders Bureau of Land
Management (BLM) property. The site is bordered by private lands along the southern and
eastern boundaries. The majority of the site is currently vacant and undeveloped.
The purpose of this report is to quantify existing drainage flows of the 100-year storm event
scenario for the Spring Valley Ranch P.U.D.
1.1 PreliminaryPlanDrainageReport
Gamba & Associates, Inc. (G&A) previously prepared a drainage study for this property, dated
December 21, 2000. The study was prepared for the PUD/Subdivision development plan
currently approved for the property. An updated drainage study was done by G&A, dated March
9, 2007, to reflect proposed development plan revisions.
1.2 FEMAFIRMette
A search for Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map
(FIRM) was conducted. Tiles 0802051460B and 0802051500B dated 1977 had no data and cover
most of our site. Tile 0802051470B dated 1986 shows the southern boundary of our site but
defines the zone as undetermined but possible flood hazard.
Figure 1: Vicinity Map (Spring Valley P.U.D. in yellow)
2022-22
2.0 Hydrology
The drainage basin areas were analyzed for the 100-year storm events in the predeveloped
conditions. Peak flows for all 18 predeveloped drainage basins were calculated for the 100-year
storm event using the Soil Conservation Service (SCS) TR55 tool and the Autodesk Hydraflow
Hydrographs program. Table 1 below summarizes the factors affecting peak flows for each
individual basin.
2.1 DrainageBasinAreas
For our analysis, 18 separate primary tributary drainage basins were delineated using existing
ground topography and AutoCAD flowline tools. The pre-development drainage basins
developed and analyzed are shown on the Pre-Development Drainage Map (Appendix A).
2.2 Rainfall
Rainfall intensities were derived from the NOAA Atlas 14 Point Precipitation Frequency
Estimates for the site location, included in Appendix B.
2.3 HydrologicCurveNumbers
Curve Numbers (CN) are a measure of how easily water flows over the surface of a given
material. The higher the CN, the more easily water flows over that surface. The previous
predevelopment drainage report done for this site included detailed information on curve number
calculations – detailing surface conditions, areas, and appropriated weighting used to calculate
the CNs in their study. For the purposes of analyzing the pre-development conditions, the curve
numbers derived in this previous study were utilized.
2.4 TimesofConcentration
The time of concentration for each basin is calculated based on the type of flow, and the length,
grade, roughness, and geometry of the flow path of the overland flow from the hydraulically
most distant point in the basin to the outfall point. To determine time of concentration for each
basin, first each basins’ flowline path was defined using existing ground topography and
categorizing each flow path into three types of flow – sheet flow, shallow concentrated flow, and
channel flow. Once each basins' flowlines were defined, they were input into TR55 which
calculates time of concentration. Time of concentration calculations for all basins are included in
Appendix C.
2.5 PeakDischarges
Peak flows were calculated for the 100-year storm event in the undeveloped condition of the site
by use of the SCS Runoff Curve Number method, the TR55 program and the Autodesk
Hydraflow Hydrographs program. Once times of concentration were calculated by use of TR55,
they are input to Hydraflow to calculate time to peak, and peak flow rate. Time to peak, peak
flow rates, and hydrograph reports for all basins are included in Appendix C.
3.0 PreǦDevelopmentHydrologicResults
The Auto CAD Civil 3D Hydraflow, Hydrograph and Hydrological tools were used along with
the SCS method to determine the peak flows. Curve Numbers and TR55 tools were used to
account for the effect on drainage from different landscaping and building materials.
2022-22
Table 1 outlines the inputs and outputs of our analyses. Additionally, a comprehensive report of
our analyses can be found in Appendix C.
Basin Area (Acres) SCS Curve
Number
TR55 Time of
Concentration (min)
Time to Peak
(hours)
Peak Flow (cfs)
A 1616.75 64 62.7 12.67 214.18
B 167.09 63 36.4 12.33 27.82
C 65.22 68 23.3 12.13 28.86
D 104.8 69 33.8 12.30 37.18
E 198.4 61 38.2 12.40 22.44
F 80 57 20.3 12.30 5.05
G 302.5 59 23.8 12.23 29.28
H 209.12 69 26.6 12.17 93.15
I 117.17 69 33.9 12.30 41.57
J-1 1648 66 105.8 13.20 194.19
J-2 678.15 67 57.2 12.53 140.70
K 87 62 38 12.37 11.69
L 193.07 68 44.2 12.40 51.69
M 292 70 64.5 12.60 73.68
N 94.09 68 31.2 12.27 32.29
O 108.07 67 48.9 12.43 24.59
P-1 228.65 62 30.3 12.30 34.83
P-2 54.57 63 16.9 12.13 13.95
Table 3: 100-year Peak Flow Calculations for each drainage basin
Existing basins peak flow were calculated for the 100-year event while all future infrastructure,
including pipes, culverts, and detention structures, will be sized to safely convey the 25-year
storm event away from the proposed homes and other structures.
4.0 HopkinsDamAnalysis
The property has a dam and reservoir that was recently improved in 2019-2020. The reservoir is
called Hopkins Reservoir. In June 2021, the Division of Water Resources performed a Dam
Safety Inspection on the Hopkins Reservoir Dam (Appendix D). They inspected a variety of
components of the dam to determine the conditions and safe storage levels. All components
2022-22
inspected were determined to be in good condition, and the overall determination of the dam’s
condition was found to be satisfactory. This reservoir overflows into Landis Creek that flow
through the property.
Wright Water Engineers, Inc. (WWE) performed a Dam Break Analysis October of 2007 for the
Hopkins Reservoir Dam (Appendix D). WWE assessed the effects of dam failure with respect to
the proposed development and its effect on drainage on the site. The potential hazard area
resulting from the failure of Hopkins Dam, WWE determined, is limited to three distinguishable
reaches between Hopkins Reservoir and Spring Valley: 1) The existing natural channel,
approximately 700 feet long between Hopkins Reservoir and its junction on the left bank of
Landis Creek. This is a steep, relatively undefined intermittent drainage channel. 2) The
approximately 3-mile-long reach of Landis Creek beginning at the terminus of Reach 1 and
ending at County Road 115. A steep, incised channel characterizes this portion of Landis Creek.
3) The area between County Road 115 and the Spring Valley bottom. This reach represents the
alluvial fan created by Landis Creek as it merges with Spring Valley.
WWE evaluated a "sunny day" scenario as the failure event of the Hopkins Dam, which assumes
a sudden breach of the dam embankment and does not add additional flows resulting from
extreme precipitation events to the dam breach hydrograph. For the purposes of their study,
WWE assumed "worst case" scenarios for the development of the dam breach hydrograph: 1)
The failure mechanism is breaching of the dam embankment. 2) The final breach height extends
downward from the crest to the toe of the dam embankment, effectively draining the entire
reservoir storage volume. 3) The reservoir stage is at full capacity at the time the breach begins
to form. The inundation areas from this report have been added to the drainage exhibit
(Appendix A).
February of 2022, Zancanella & Associates prepared a Dam Inundation Inspection Impact
Review of the previous study done by WWE (Appendix D). They found that the flood inundation
wave is not anticipated to impact current structures significantly more than current conditions,
nor get to the point of potential for loss of life with the improvements, but the emergency access
road (High Grange Pass Rd) will be impacted to the point of possible failure. No structure that is
habitable should be located within the inundation boundary unless additional review and analysis
has taken place to ensure no loss of life or significant property damage will occur during a sunny
day dam break. Additionally, the Hopkins Dam Certificate of Acceptance for the recent dam
reconstruction project is included for reference in the report (Appendix D).
2022-22
AppendixA – Pre-Development Drainage Map
11
CH
E
C
K
E
D
B
Y
:
#DESCRIPTIONDRAWN BY CO
N
S
T
R
U
C
T
I
O
N
DR
A
W
N
B
Y
:
JO
B
#
2
0
2
1
-
0
4
NO
T
F
O
R
ROARING FORK ENGINEERING
592 HIGHWAY 133
CARBONDALE, CO 81623
PH: (970) 340-4130 DC
S
RV
S
SPRING VALLEY RANCH
GARFIELD COUNTY, COLORADO
2022-22
AppendixB– Precipitation Data
x NOAA Atlas 14 Data
2022-22
AppendixC –Pre-Development Drainage Results
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 12 / 14 / 2022
Hyd. No. 1
Pre - Dev Basin A
Hydrograph type = SCS Runoff Peak discharge = 214.18 cfs
Storm frequency = 100 yrs Time to peak = 12.67 hrs
Time interval = 2 min Hyd. volume = 2,294,455 cuft
Drainage area = 1616.750 ac Curve number = 64
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 62.70 min
Total precip. = 2.81 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
1
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
30.00 30.00
60.00 60.00
90.00 90.00
120.00 120.00
150.00 150.00
180.00 180.00
210.00 210.00
240.00 240.00
Q (cfs)
Time (hrs)
Pre - Dev Basin A
Hyd. No. 1 -- 100 Year
Hyd No. 1
TR55 Tc Worksheet 2
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 1
Pre - Dev Basin A
Description A B C Totals
Sheet Flow
Manning's n-value = 0.400 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 1.32 0.00 0.00
Land slope (%) = 1.80 0.00 0.00
Travel Time (min) = 34.87 + 0.00 + 0.00 = 34.87
Shallow Concentrated Flow
Flow length (ft) = 6814.00 0.00 0.00
Watercourse slope (%) = 21.70 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =7.52 0.00 0.00
Travel Time (min) = 15.11 + 0.00 + 0.00 = 15.11
Channel Flow
X sectional flow area (sqft) = 4.00 0.00 0.00
Wetted perimeter (ft) = 5.66 0.00 0.00
Channel slope (%) = 7.80 0.00 0.00
Manning's n-value = 0.030 0.015 0.015
Velocity (ft/s) =10.99
0.00
0.00
Flow length (ft) ({0})8400.0 0.0 0.0
Travel Time (min) = 12.74 + 0.00 + 0.00 = 12.74
Total Travel Time, Tc .............................................................................. 62.70 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 12 / 14 / 2022
Hyd. No. 2
Pre - Dev Basin B
Hydrograph type = SCS Runoff Peak discharge = 27.82 cfs
Storm frequency = 100 yrs Time to peak = 12.33 hrs
Time interval = 2 min Hyd. volume = 213,465 cuft
Drainage area = 167.090 ac Curve number = 63
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 36.40 min
Total precip. = 2.81 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
3
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
4.00 4.00
8.00 8.00
12.00 12.00
16.00 16.00
20.00 20.00
24.00 24.00
28.00 28.00
Q (cfs)
Time (hrs)
Pre - Dev Basin B
Hyd. No. 2 -- 100 Year
Hyd No. 2
TR55 Tc Worksheet 4
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 2
Pre - Dev Basin B
Description A B C Totals
Sheet Flow
Manning's n-value = 0.400 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 1.32 0.00 0.00
Land slope (%) = 6.20 0.00 0.00
Travel Time (min) = 21.26 + 0.00 + 0.00 = 21.26
Shallow Concentrated Flow
Flow length (ft) = 2405.00 0.00 0.00
Watercourse slope (%) = 22.30 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =7.62 0.00 0.00
Travel Time (min) = 5.26 + 0.00 + 0.00 = 5.26
Channel Flow
X sectional flow area (sqft) = 0.25 0.00 0.00
Wetted perimeter (ft) = 1.15 0.00 0.00
Channel slope (%) = 12.50 0.00 0.00
Manning's n-value = 0.030 0.015 0.015
Velocity (ft/s) =6.32
0.00
0.00
Flow length (ft) ({0})3760.0 0.0 0.0
Travel Time (min) = 9.92 + 0.00 + 0.00 = 9.92
Total Travel Time, Tc .............................................................................. 36.40 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 12 / 14 / 2022
Hyd. No. 3
Pre - Dev Basin C
Hydrograph type = SCS Runoff Peak discharge = 28.86 cfs
Storm frequency = 100 yrs Time to peak = 12.13 hrs
Time interval = 2 min Hyd. volume = 128,007 cuft
Drainage area = 65.220 ac Curve number = 68
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 23.30 min
Total precip. = 2.81 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
5
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00
20.00 20.00
25.00 25.00
30.00 30.00
Q (cfs)
Time (hrs)
Pre - Dev Basin C
Hyd. No. 3 -- 100 Year
Hyd No. 3
TR55 Tc Worksheet 6
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 3
Pre - Dev Basin C
Description A B C Totals
Sheet Flow
Manning's n-value = 0.400 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 1.32 0.00 0.00
Land slope (%) = 16.00 0.00 0.00
Travel Time (min) = 14.55 + 0.00 + 0.00 = 14.55
Shallow Concentrated Flow
Flow length (ft) = 2385.00 0.00 0.00
Watercourse slope (%) = 22.20 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =7.60 0.00 0.00
Travel Time (min) = 5.23 + 0.00 + 0.00 = 5.23
Channel Flow
X sectional flow area (sqft) = 0.30 0.00 0.00
Wetted perimeter (ft) = 1.60 0.00 0.00
Channel slope (%) = 8.20 0.00 0.00
Manning's n-value = 0.030 0.015 0.015
Velocity (ft/s) =4.63
0.00
0.00
Flow length (ft) ({0})977.0 0.0 0.0
Travel Time (min) = 3.51 + 0.00 + 0.00 = 3.51
Total Travel Time, Tc .............................................................................. 23.30 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 12 / 14 / 2022
Hyd. No. 4
Pre - Dev Basin D
Hydrograph type = SCS Runoff Peak discharge = 37.18 cfs
Storm frequency = 100 yrs Time to peak = 12.30 hrs
Time interval = 2 min Hyd. volume = 214,568 cuft
Drainage area = 104.800 ac Curve number = 69
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 33.80 min
Total precip. = 2.81 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
7
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
Q (cfs)
Time (hrs)
Pre - Dev Basin D
Hyd. No. 4 -- 100 Year
Hyd No. 4
TR55 Tc Worksheet 8
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 4
Pre - Dev Basin D
Description A B C Totals
Sheet Flow
Manning's n-value = 0.400 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 1.32 0.00 0.00
Land slope (%) = 5.10 0.00 0.00
Travel Time (min) = 22.99 + 0.00 + 0.00 = 22.99
Shallow Concentrated Flow
Flow length (ft) = 3181.00 0.00 0.00
Watercourse slope (%) = 13.10 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =5.84 0.00 0.00
Travel Time (min) = 9.08 + 0.00 + 0.00 = 9.08
Channel Flow
X sectional flow area (sqft) = 0.56 0.00 0.00
Wetted perimeter (ft) = 2.12 0.00 0.00
Channel slope (%) = 16.20 0.00 0.00
Manning's n-value = 0.030 0.015 0.015
Velocity (ft/s) =8.19
0.00
0.00
Flow length (ft) ({0})866.0 0.0 0.0
Travel Time (min) = 1.76 + 0.00 + 0.00 = 1.76
Total Travel Time, Tc .............................................................................. 33.80 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 12 / 14 / 2022
Hyd. No. 5
Pre - Dev Basin E
Hydrograph type = SCS Runoff Peak discharge = 22.44 cfs
Storm frequency = 100 yrs Time to peak = 12.40 hrs
Time interval = 2 min Hyd. volume = 212,928 cuft
Drainage area = 198.400 ac Curve number = 61
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 38.20 min
Total precip. = 2.81 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
9
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
4.00 4.00
8.00 8.00
12.00 12.00
16.00 16.00
20.00 20.00
24.00 24.00
Q (cfs)
Time (hrs)
Pre - Dev Basin E
Hyd. No. 5 -- 100 Year
Hyd No. 5
TR55 Tc Worksheet 10
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 5
Pre - Dev Basin E
Description A B C Totals
Sheet Flow
Manning's n-value = 0.240 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 1.32 0.00 0.00
Land slope (%) = 2.00 0.00 0.00
Travel Time (min) = 22.22 + 0.00 + 0.00 = 22.22
Shallow Concentrated Flow
Flow length (ft) = 2982.00 0.00 0.00
Watercourse slope (%) = 6.00 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =3.95 0.00 0.00
Travel Time (min) = 12.58 + 0.00 + 0.00 = 12.58
Channel Flow
X sectional flow area (sqft) = 8.70 0.00 0.00
Wetted perimeter (ft) = 8.70 0.00 0.00
Channel slope (%) = 3.70 0.00 0.00
Manning's n-value = 0.030 0.015 0.015
Velocity (ft/s) =9.55
0.00
0.00
Flow length (ft) ({0})1963.0 0.0 0.0
Travel Time (min) = 3.42 + 0.00 + 0.00 = 3.42
Total Travel Time, Tc .............................................................................. 38.20 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 12 / 14 / 2022
Hyd. No. 6
Pre - Dev Basin F
Hydrograph type = SCS Runoff Peak discharge = 5.046 cfs
Storm frequency = 100 yrs Time to peak = 12.30 hrs
Time interval = 2 min Hyd. volume = 56,430 cuft
Drainage area = 80.000 ac Curve number = 57
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 20.30 min
Total precip. = 2.81 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
11
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
6.00 6.00
Q (cfs)
Time (hrs)
Pre - Dev Basin F
Hyd. No. 6 -- 100 Year
Hyd No. 6
TR55 Tc Worksheet 12
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 6
Pre - Dev Basin F
Description A B C Totals
Sheet Flow
Manning's n-value = 0.400 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 1.32 0.00 0.00
Land slope (%) = 10.20 0.00 0.00
Travel Time (min) = 17.42 + 0.00 + 0.00 = 17.42
Shallow Concentrated Flow
Flow length (ft) = 1355.00 0.00 0.00
Watercourse slope (%) = 24.00 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =7.90 0.00 0.00
Travel Time (min) = 2.86 + 0.00 + 0.00 = 2.86
Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter (ft) = 0.00 0.00 0.00
Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.030 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time, Tc .............................................................................. 20.30 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 12 / 14 / 2022
Hyd. No. 7
Pre - Dev Basin G
Hydrograph type = SCS Runoff Peak discharge = 29.28 cfs
Storm frequency = 100 yrs Time to peak = 12.23 hrs
Time interval = 2 min Hyd. volume = 259,989 cuft
Drainage area = 302.500 ac Curve number = 59
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 23.80 min
Total precip. = 2.81 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
13
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00
20.00 20.00
25.00 25.00
30.00 30.00
Q (cfs)
Time (hrs)
Pre - Dev Basin G
Hyd. No. 7 -- 100 Year
Hyd No. 7
TR55 Tc Worksheet 14
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 7
Pre - Dev Basin G
Description A B C Totals
Sheet Flow
Manning's n-value = 0.400 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 1.32 0.00 0.00
Land slope (%) = 15.40 0.00 0.00
Travel Time (min) = 14.78 + 0.00 + 0.00 = 14.78
Shallow Concentrated Flow
Flow length (ft) = 2969.00 0.00 0.00
Watercourse slope (%) = 27.80 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =8.51 0.00 0.00
Travel Time (min) = 5.82 + 0.00 + 0.00 = 5.82
Channel Flow
X sectional flow area (sqft) = 11.40 0.00 0.00
Wetted perimeter (ft) = 11.70 0.00 0.00
Channel slope (%) = 12.10 0.00 0.00
Manning's n-value = 0.030 0.015 0.015
Velocity (ft/s) =16.98
0.00
0.00
Flow length (ft) ({0})3298.0 0.0 0.0
Travel Time (min) = 3.24 + 0.00 + 0.00 = 3.24
Total Travel Time, Tc .............................................................................. 23.80 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 12 / 14 / 2022
Hyd. No. 8
Pre - Dev Basin H
Hydrograph type = SCS Runoff Peak discharge = 93.15 cfs
Storm frequency = 100 yrs Time to peak = 12.17 hrs
Time interval = 2 min Hyd. volume = 426,308 cuft
Drainage area = 209.120 ac Curve number = 69
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 26.60 min
Total precip. = 2.81 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
15
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
80.00 80.00
90.00 90.00
100.00 100.00
Q (cfs)
Time (hrs)
Pre - Dev Basin H
Hyd. No. 8 -- 100 Year
Hyd No. 8
TR55 Tc Worksheet 16
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 8
Pre - Dev Basin H
Description A B C Totals
Sheet Flow
Manning's n-value = 0.400 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 1.32 0.00 0.00
Land slope (%) = 25.00 0.00 0.00
Travel Time (min) = 12.17 + 0.00 + 0.00 = 12.17
Shallow Concentrated Flow
Flow length (ft) = 4754.00 0.00 0.00
Watercourse slope (%) = 15.80 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =6.41 0.00 0.00
Travel Time (min) = 12.35 + 0.00 + 0.00 = 12.35
Channel Flow
X sectional flow area (sqft) = 0.56 0.00 0.00
Wetted perimeter (ft) = 2.12 0.00 0.00
Channel slope (%) = 10.80 0.00 0.00
Manning's n-value = 0.030 0.015 0.015
Velocity (ft/s) =6.69
0.00
0.00
Flow length (ft) ({0})831.0 0.0 0.0
Travel Time (min) = 2.07 + 0.00 + 0.00 = 2.07
Total Travel Time, Tc .............................................................................. 26.60 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 12 / 14 / 2022
Hyd. No. 9
Pre - Dev Basin I
Hydrograph type = SCS Runoff Peak discharge = 41.57 cfs
Storm frequency = 100 yrs Time to peak = 12.30 hrs
Time interval = 2 min Hyd. volume = 239,894 cuft
Drainage area = 117.170 ac Curve number = 69
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 33.90 min
Total precip. = 2.81 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
17
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
Q (cfs)
Time (hrs)
Pre - Dev Basin I
Hyd. No. 9 -- 100 Year
Hyd No. 9
TR55 Tc Worksheet 18
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 9
Pre - Dev Basin I
Description A B C Totals
Sheet Flow
Manning's n-value = 0.240 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 1.32 0.00 0.00
Land slope (%) = 0.91 0.00 0.00
Travel Time (min) = 30.44 + 0.00 + 0.00 = 30.44
Shallow Concentrated Flow
Flow length (ft) = 1567.00 0.00 0.00
Watercourse slope (%) = 22.50 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =7.65 0.00 0.00
Travel Time (min) = 3.41 + 0.00 + 0.00 = 3.41
Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter (ft) = 0.00 0.00 0.00
Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time, Tc .............................................................................. 33.90 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 12 / 14 / 2022
Hyd. No. 10
Pre - Dev Basin J1
Hydrograph type = SCS Runoff Peak discharge = 194.19 cfs
Storm frequency = 100 yrs Time to peak = 13.20 hrs
Time interval = 2 min Hyd. volume = 2,722,290 cuft
Drainage area = 1648.000 ac Curve number = 66
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 105.80 min
Total precip. = 2.81 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
19
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28
Q (cfs)
0.00 0.00
30.00 30.00
60.00 60.00
90.00 90.00
120.00 120.00
150.00 150.00
180.00 180.00
210.00 210.00
Q (cfs)
Time (hrs)
Pre - Dev Basin J1
Hyd. No. 10 -- 100 Year
Hyd No. 10
TR55 Tc Worksheet 20
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 10
Pre - Dev Basin J1
Description A B C Totals
Sheet Flow
Manning's n-value = 0.400 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 1.32 0.00 0.00
Land slope (%) = 1.00 0.00 0.00
Travel Time (min) = 44.12 + 0.00 + 0.00 = 44.12
Shallow Concentrated Flow
Flow length (ft) = 3206.00 0.00 0.00
Watercourse slope (%) = 1.80 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =2.16 0.00 0.00
Travel Time (min) = 24.68 + 0.00 + 0.00 = 24.68
Channel Flow
X sectional flow area (sqft) = 4.30 0.00 0.00
Wetted perimeter (ft) = 10.00 0.00 0.00
Channel slope (%) = 10.70 0.00 0.00
Manning's n-value = 0.030 0.015 0.015
Velocity (ft/s) =9.23
0.00
0.00
Flow length (ft) ({0})20476.0 0.0 0.0
Travel Time (min) = 36.98 + 0.00 + 0.00 = 36.98
Total Travel Time, Tc .............................................................................. 105.80 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 12 / 14 / 2022
Hyd. No. 11
Pre - Dev Basin J2
Hydrograph type = SCS Runoff Peak discharge = 140.70 cfs
Storm frequency = 100 yrs Time to peak = 12.53 hrs
Time interval = 2 min Hyd. volume = 1,205,520 cuft
Drainage area = 678.150 ac Curve number = 67
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 57.20 min
Total precip. = 2.81 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
21
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
20.00 20.00
40.00 40.00
60.00 60.00
80.00 80.00
100.00 100.00
120.00 120.00
140.00 140.00
160.00 160.00
Q (cfs)
Time (hrs)
Pre - Dev Basin J2
Hyd. No. 11 -- 100 Year
Hyd No. 11
TR55 Tc Worksheet 22
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 11
Pre - Dev Basin J2
Description A B C Totals
Sheet Flow
Manning's n-value = 0.400 0.011 0.011
Flow length (ft) = 88.0 0.0 0.0
Two-year 24-hr precip. (in) = 1.32 0.00 0.00
Land slope (%) = 2.20 0.00 0.00
Travel Time (min) = 29.06 + 0.00 + 0.00 = 29.06
Shallow Concentrated Flow
Flow length (ft) = 3122.00 0.00 0.00
Watercourse slope (%) = 22.20 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =7.60 0.00 0.00
Travel Time (min) = 6.84 + 0.00 + 0.00 = 6.84
Channel Flow
X sectional flow area (sqft) = 2.00 0.00 0.00
Wetted perimeter (ft) = 6.30 0.00 0.00
Channel slope (%) = 11.20 0.00 0.00
Manning's n-value = 0.030 0.015 0.015
Velocity (ft/s) =7.71
0.00
0.00
Flow length (ft) ({0})9863.0 0.0 0.0
Travel Time (min) = 21.33 + 0.00 + 0.00 = 21.33
Total Travel Time, Tc .............................................................................. 57.20 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 12 / 14 / 2022
Hyd. No. 12
Pre - Dev Basin K
Hydrograph type = SCS Runoff Peak discharge = 11.69 cfs
Storm frequency = 100 yrs Time to peak = 12.37 hrs
Time interval = 2 min Hyd. volume = 102,744 cuft
Drainage area = 87.000 ac Curve number = 62
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 38.00 min
Total precip. = 2.81 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
23
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
10.00 10.00
12.00 12.00
Q (cfs)
Time (hrs)
Pre - Dev Basin K
Hyd. No. 12 -- 100 Year
Hyd No. 12
TR55 Tc Worksheet 24
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 12
Pre - Dev Basin K
Description A B C Totals
Sheet Flow
Manning's n-value = 0.400 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 1.32 0.00 0.00
Land slope (%) = 2.00 0.00 0.00
Travel Time (min) = 33.43 + 0.00 + 0.00 = 33.43
Shallow Concentrated Flow
Flow length (ft) = 2139.00 0.00 0.00
Watercourse slope (%) = 23.50 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =7.82 0.00 0.00
Travel Time (min) = 4.56 + 0.00 + 0.00 = 4.56
Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter (ft) = 0.00 0.00 0.00
Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time, Tc .............................................................................. 38.00 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 12 / 14 / 2022
Hyd. No. 13
Pre - Dev Basin L
Hydrograph type = SCS Runoff Peak discharge = 51.69 cfs
Storm frequency = 100 yrs Time to peak = 12.40 hrs
Time interval = 2 min Hyd. volume = 368,966 cuft
Drainage area = 193.070 ac Curve number = 68
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 44.20 min
Total precip. = 2.81 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
25
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
Q (cfs)
Time (hrs)
Pre - Dev Basin L
Hyd. No. 13 -- 100 Year
Hyd No. 13
TR55 Tc Worksheet 26
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 13
Pre - Dev Basin L
Description A B C Totals
Sheet Flow
Manning's n-value = 0.400 0.011 0.011
Flow length (ft) = 104.0 0.0 0.0
Two-year 24-hr precip. (in) = 1.32 0.00 0.00
Land slope (%) = 2.00 0.00 0.00
Travel Time (min) = 34.50 + 0.00 + 0.00 = 34.50
Shallow Concentrated Flow
Flow length (ft) = 257.00 0.00 0.00
Watercourse slope (%) = 6.10 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =3.98 0.00 0.00
Travel Time (min) = 1.07 + 0.00 + 0.00 = 1.07
Channel Flow
X sectional flow area (sqft) = 9.00 6.50 0.00
Wetted perimeter (ft) = 12.50 13.00 0.00
Channel slope (%) = 12.34 11.14 0.00
Manning's n-value = 0.030 0.030 0.015
Velocity (ft/s) =14.00
10.42
0.00
Flow length (ft) ({0})1620.0 4204.0 0.0
Travel Time (min) = 1.93 + 6.73 + 0.00 = 8.65
Total Travel Time, Tc .............................................................................. 44.20 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 12 / 14 / 2022
Hyd. No. 14
Pre - Dev Basin M
Hydrograph type = SCS Runoff Peak discharge = 73.68 cfs
Storm frequency = 100 yrs Time to peak = 12.60 hrs
Time interval = 2 min Hyd. volume = 643,900 cuft
Drainage area = 292.000 ac Curve number = 70
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 64.50 min
Total precip. = 2.81 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
27
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
80.00 80.00
Q (cfs)
Time (hrs)
Pre - Dev Basin M
Hyd. No. 14 -- 100 Year
Hyd No. 14
TR55 Tc Worksheet 28
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 14
Pre - Dev Basin M
Description A B C Totals
Sheet Flow
Manning's n-value = 0.400 0.011 0.011
Flow length (ft) = 94.0 0.0 0.0
Two-year 24-hr precip. (in) = 1.32 0.00 0.00
Land slope (%) = 1.00 0.00 0.00
Travel Time (min) = 41.99 + 0.00 + 0.00 = 41.99
Shallow Concentrated Flow
Flow length (ft) = 1062.00 0.00 0.00
Watercourse slope (%) = 8.40 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =4.68 0.00 0.00
Travel Time (min) = 3.79 + 0.00 + 0.00 = 3.79
Channel Flow
X sectional flow area (sqft) = 1.60 0.00 0.00
Wetted perimeter (ft) = 20.70 0.00 0.00
Channel slope (%) = 14.90 0.00 0.00
Manning's n-value = 0.030 0.015 0.015
Velocity (ft/s) =3.45
0.00
0.00
Flow length (ft) ({0})3885.0 0.0 0.0
Travel Time (min) = 18.77 + 0.00 + 0.00 = 18.77
Total Travel Time, Tc .............................................................................. 64.50 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 12 / 14 / 2022
Hyd. No. 15
Pre - Dev Basin N
Hydrograph type = SCS Runoff Peak discharge = 32.29 cfs
Storm frequency = 100 yrs Time to peak = 12.27 hrs
Time interval = 2 min Hyd. volume = 183,698 cuft
Drainage area = 94.090 ac Curve number = 68
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 31.20 min
Total precip. = 2.81 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
29
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00
20.00 20.00
25.00 25.00
30.00 30.00
35.00 35.00
Q (cfs)
Time (hrs)
Pre - Dev Basin N
Hyd. No. 15 -- 100 Year
Hyd No. 15
TR55 Tc Worksheet 30
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 15
Pre - Dev Basin N
Description A B C Totals
Sheet Flow
Manning's n-value = 0.400 0.011 0.011
Flow length (ft) = 98.0 0.0 0.0
Two-year 24-hr precip. (in) = 1.32 0.00 0.00
Land slope (%) = 5.30 0.00 0.00
Travel Time (min) = 22.28 + 0.00 + 0.00 = 22.28
Shallow Concentrated Flow
Flow length (ft) = 1084.00 1290.00 0.00
Watercourse slope (%) = 3.00 30.00 0.00
Surface description = Unpaved Unpaved Paved
Average velocity (ft/s) =2.79 8.84 0.00
Travel Time (min) = 6.46 + 2.43 + 0.00 = 8.90
Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter (ft) = 0.00 0.00 0.00
Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time, Tc .............................................................................. 31.20 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 12 / 14 / 2022
Hyd. No. 16
Pre - Dev Basin O
Hydrograph type = SCS Runoff Peak discharge = 24.59 cfs
Storm frequency = 100 yrs Time to peak = 12.43 hrs
Time interval = 2 min Hyd. volume = 193,535 cuft
Drainage area = 108.070 ac Curve number = 67
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 48.90 min
Total precip. = 2.81 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
31
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
4.00 4.00
8.00 8.00
12.00 12.00
16.00 16.00
20.00 20.00
24.00 24.00
28.00 28.00
Q (cfs)
Time (hrs)
Pre - Dev Basin O
Hyd. No. 16 -- 100 Year
Hyd No. 16
TR55 Tc Worksheet 32
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 16
Pre - Dev Basin O
Description A B C Totals
Sheet Flow
Manning's n-value = 0.400 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 1.32 0.00 0.00
Land slope (%) = 1.36 0.00 0.00
Travel Time (min) = 39.01 + 0.00 + 0.00 = 39.01
Shallow Concentrated Flow
Flow length (ft) = 2180.00 0.00 0.00
Watercourse slope (%) = 8.34 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =4.66 0.00 0.00
Travel Time (min) = 7.80 + 0.00 + 0.00 = 7.80
Channel Flow
X sectional flow area (sqft) = 1.00 0.00 0.00
Wetted perimeter (ft) = 3.00 0.00 0.00
Channel slope (%) = 16.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =19.03
0.00
0.00
Flow length (ft) ({0})2340.0 0.0 0.0
Travel Time (min) = 2.05 + 0.00 + 0.00 = 2.05
Total Travel Time, Tc .............................................................................. 48.90 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 12 / 14 / 2022
Hyd. No. 17
Pre - Dev Basin P1
Hydrograph type = SCS Runoff Peak discharge = 34.83 cfs
Storm frequency = 100 yrs Time to peak = 12.30 hrs
Time interval = 2 min Hyd. volume = 273,402 cuft
Drainage area = 228.650 ac Curve number = 62
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 30.30 min
Total precip. = 2.81 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
33
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00
20.00 20.00
25.00 25.00
30.00 30.00
35.00 35.00
Q (cfs)
Time (hrs)
Pre - Dev Basin P1
Hyd. No. 17 -- 100 Year
Hyd No. 17
TR55 Tc Worksheet 34
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 17
Pre - Dev Basin P1
Description A B C Totals
Sheet Flow
Manning's n-value = 0.400 0.011 0.011
Flow length (ft) = 85.0 0.0 0.0
Two-year 24-hr precip. (in) = 1.32 0.00 0.00
Land slope (%) = 22.20 0.00 0.00
Travel Time (min) = 11.21 + 0.00 + 0.00 = 11.21
Shallow Concentrated Flow
Flow length (ft) = 524.00 0.00 0.00
Watercourse slope (%) = 17.30 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =6.71 0.00 0.00
Travel Time (min) = 1.30 + 0.00 + 0.00 = 1.30
Channel Flow
X sectional flow area (sqft) = 1.10 0.00 0.00
Wetted perimeter (ft) = 4.70 0.00 0.00
Channel slope (%) = 8.88 0.00 0.00
Manning's n-value = 0.030 0.015 0.015
Velocity (ft/s) =5.59
0.00
0.00
Flow length (ft) ({0})5978.0 0.0 0.0
Travel Time (min) = 17.81 + 0.00 + 0.00 = 17.81
Total Travel Time, Tc .............................................................................. 30.30 min
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 12 / 14 / 2022
Hyd. No. 18
Pre - Dev Basin P2
Hydrograph type = SCS Runoff Peak discharge = 13.95 cfs
Storm frequency = 100 yrs Time to peak = 12.13 hrs
Time interval = 2 min Hyd. volume = 70,517 cuft
Drainage area = 54.570 ac Curve number = 63
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 16.90 min
Total precip. = 2.81 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
35
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
10.00 10.00
12.00 12.00
14.00 14.00
Q (cfs)
Time (hrs)
Pre - Dev Basin P2
Hyd. No. 18 -- 100 Year
Hyd No. 18
TR55 Tc Worksheet 36
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 18
Pre - Dev Basin P2
Description A B C Totals
Sheet Flow
Manning's n-value = 0.150 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 1.32 0.00 0.00
Land slope (%) = 8.70 0.00 0.00
Travel Time (min) = 8.47 + 0.00 + 0.00 = 8.47
Shallow Concentrated Flow
Flow length (ft) = 2405.00 0.00 0.00
Watercourse slope (%) = 8.70 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =4.76 0.00 0.00
Travel Time (min) = 8.42 + 0.00 + 0.00 = 8.42
Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter (ft) = 0.00 0.00 0.00
Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time, Tc .............................................................................. 16.90 min
2022-22
AppendixD – Prior Studies and Dam Certifications
x Final Acceptance of Construction, Colorado DWR, 2022
x Engineer's Inspection Report, Colorado DWR, 2021
x Hopkins Dam Inundation Mapping, Zancanella & Associates, 2022
x Hopkins Reservoir Dam Break Analysis, Wright Water Engineers, 2007
Dam Safety Branch
1313 Sherman Street, Room 821, Denver, CO 80203 P 303.866.3581 https://dwr.colorado.gov/
Jared S. Polis, Governor | Dan Gibbs, DNR Executive Director | Kevin G. Rein, Director/State Engineer
January 18, 2022
SUBJECT:Final Acceptance of Construction
Dear Mr. Van Ardenne,
Our office performed a final construction inspection of the newly constructed Hopkins Dam on October
7, 2020. Rule 8 of the Rules and Regulations for Dam Safety and Dam Construction (the Rules) requires
that your design engineer, Zancanella & Associates, prepare as-constructed plans, a completion report
documenting all aspects of construction, and their professional certification stating that the project
was completed in accordance with the approved plans and specifications. Zancanella & Associates
submitted completion documents on April 2, 2021. Our office provided final comments on April 30,
2021 which were satisfactorily addressed on January 12, 2022.
This project involved construction of a new, Significant Hazard dam at the site of a previously
breached structure. Based on observations during construction inspections, oversight and certification
by your engineer, and our review of the construction completion documents, we believe the project
has been satisfactorily completed in general accordance with the approved plans and specifications.
Therefore the project is accepted for full storage when water is physically and legally available,
and in accordance with your engineer’s monitoring plan.
The structure has a dam height of 25 feet and crest length of 700 feet. The reservoir created by the
dam covers approximately 12 acres and has full storage capacity of 113 acre-feet at the emergency
spillway crest elevation.
The State Engineer, by providing this construction acceptance does not assume responsibility for any
unsafe condition of the subject dam. The sole responsibility for the safety of this dam rests with the
reservoir owner and operator, who should take every step necessary to prevent damages caused by
leakage or overflow of waters from the reservoir or floods resulting from a failure of the dam.
Therefore, it is in the owner’s best interest to operate and maintain the facility in a manner such that
the safety of the dam and the general public are not jeopardized.
We are enclosing a copy of Rules 11 and 13 of the Rules for your reference and use. These rules
pertain to general maintenance items and the owner’s responsibilities, respectively.
We would like to recognize the efforts of Seligman Group, Zancanella & Associates, and Mueller
Construction, and all other parties who worked to complete this dam construction project. Thanks to
all for minding the safety of those who live below this dam and the resiliency of those served by it.
If you have any questions, please contact me at 719.227.5294 or Dam Safety Engineer Jackie Blumberg
at 303.505.6469.
Mr. Martin Van Ardenne
Seligman Group
600 Montgomery St.
40th Floor
San Francisco, CA 94111
via email: mvanardenne@seligmangroup.com
When replying, please refer to:
HOPKINS DAM, DAMID 380113
Water Division 5, Water District 38
Construction File No. C-0090C
Mr. Van Ardenne
Hopkins Dam – Final Project acceptance Letter
DAMID 380113, C-0090C
January 18, 2022
Page 2 of 2
Sincerely,
John Hunyadi, P.E.
Chief, Colorado Dam Safety Branch
Enc. Copy of Rules 11 and 13 of the “Rules and Regulations for Dam Safety and Dam Construction”
ec: James Heath, Division Engineer, Water Division 5
Heather Ramsey, WD 38 Water Commissioner
Jackie Blumberg, Dam Safety Engineer
Jeremy Franz, Design Review Engineer
Jason Ward, Design Review Engineer
Matt Weisbrod, Zancanella & Associates,MWeisbrod@za-engineering.com
Dam Safety Branch
202 Center Drive, Glenwood Springs, CO 81601 P 303.518.1829 https://dwr.colorado.gov
Jared S. Polis, Governor | Dan Gibbs, DNR Executive Director | Kevin G. Rein, Director/State Engineer
June 22, 2021
SUBJECT:2021 Engineer’s Inspection Report
Dear Mr. Van Ardenne,
On June 21, 2021, representatives from our dam safety office completed inspection of
Hopkins Dam in accordance with Section 37-87-107 of the Colorado Revised Statutes; which
assigns to the State Engineer’s Office (SEO) responsibility for determining safe storage levels
for all reservoirs in the State of Colorado. I would like to thank Mr. Matt Weisbrod of
Zancanella & Associates for taking time to participate in the 2021 inspection.
Enclosed is a copy of the Engineer’s Inspection Report (EIR) and field photographs of the
referenced dam for your files. Please sign the signature block on page 4 of the EIR to
acknowledge your receipt of the report and return a copy to our office via electronic or regular
mail. If you have any questions regarding this EIR or require assistance with dam safety related
issues, please feel free to contact me on my cell phone at (303) 518-1829.
Sincerely,
Korey J. Kadrmas, P.E.,
Division 5 Dam Safety Engineer
Enc. a/s
ec: Bill McCormick, Chief, Dam Safety Branch
Heather Ramsey, Water Commissioner
James Heath, Division Engineer, Division 5
Matt Weisbrod, Zancanella & Associates; mweisbrod@za-engineering.com
Doreen Herriott, Spring Valley Holdings; daherriott@gmail.com
Mr. Martin Van Ardenne
Seligman Group
500 Montgomery St., 40th Floor
San Francisco, California 94111
via email: mvanardenne@seligmangroup.com
When replying, please refer to:
HOPKINS DAM, DAMID 380113
Water Division 5, Water District 38
Sincerely,
Korey J. Kadrmas, P.E.,
Division 5 Dam Safety Engin
(1*,1((5
6,163(&7,215(3257
2)),&(2)7+(67$7((1*,1((5',9,6,212):$7(55(6285&(6'$06$)(7<%5$1&+6+(50$1675((75220'(19(5&2
,163(&7,213$57<
FIELD
CONDITIONS
OBSERVED
WATER LEVEL:
GROUND MOISTURE CONDITION:
BELOW DAM CREST FT. FT. GAGE ROD READING
DRY WET SNOWCOVER OTHER
',5(&7,2160$5.$1;)25&21',7,216)281'$1'81'(5/,1(:25'67+$7$33/<
DAM NAME:HOPKINS
DAM ID:380113
&855(175(675,&7,21121(
DAM HEIGHT(FT):25.0
DAM LENGTH(FT):700.0
CRESTWIDTH(FT):15.0
CLASS:Significant hazard
EAP:11/10/2019
DATE OF INSPECTION:6/21/2021
DIV:5 WD:38
15060S0880W
0DWW:HLVEURG +HDWKHU5DPVH\ .RUH\.DGUPDV
SPILLWAY WIDTH(FT):20.0
FREEBOARD (FT):6.0
T:
OWNER:6(/,*0$1*5283
ADDRESS:0217*20(5<67CONTACT NAME:'25((1+(55,277
CONTACT PHONE:;
YRCompl:2020
S:R: COUNTY:GARFIELD
CRESTELEV(FT):9001.0
SPILLWAY CAPACITY(CFS):700.0
DRAINAGE AREA (AC.):350.0
NORMAL STORAGE (AF):113.0
SURFACE AREA(AC):12.0
OUTLET INSPECTED:8/27/2020
6$1)5$1&,6&2 &$
5(35(6(17,1*=DQFDQHOOD $VVRFLDWHV2ZQHU5HS :DWHU&RPPLVVLRQHU &2'DP6DIHW\%UDQFK
Below Spillway
INSPECTOR:.-.
5/28/2008PREVIOUS INSPECTION:
OWNER REP.:0$57,19$1$5'(11(
PROBLEMS NOTED:121( 5,35$3 :$9((526,21
&5$&.6 6,1.+2/( $33($5672267((3 6/,'(6
&21&5(7()$&,1* 27+(5
2%6(59$7,216
7KHXSVWUHDPVORSHLVLQJRRGFRQGLWLRQZLWKXQLIRUPULSUDSFRYHUDJH/RFDOO\VRXUFHGULSUDSLVZHOOJUDGHGZLWKODUJHUERXOGHUVSODFHGDWWRH
WRNH\LQULSUDSRQVORSH0LQRUDUHDVRIREVHUYHGULSUDSEHGGLQJJUDYHOEHORZURFN1RREVHUYHGDUHDVRIVXUIDFHULOOLQJRUHURVLRQDORQJWKH
JURLQVRUWRHDUHDKRZHYHUUHVHUYRLUOHYHOLVORZDQGGLGQRWDFKLHYHWKHILUVWKROGHOHYDWLRQIRUWKHILUVWILOOSODQ
5(48,5('$&7,216
1RQH
5HIHUWR3KRWRVWR
0,66,1* 63$56( ',63/$&(' :($7+(5(':,7+6&$536
:,7+',63/$&(0(17 '(35(66,216 25 %8/*(6
+2/(6 &5$&.6 ',63/$&(' 81'(50,1('
83675($06/23(
3RRU$FFHSWDEOH*RRG;&21',7,2162%6(59('
PROBLEMS NOTED:121( (526,21 &5$&.6 6,1.+2/(6
127:,'((128*+ /2:$5($ 0,6$/,*10(17 ,03523(5685)$&('5$,1$*( 27+(5
2%6(59$7,216
7KHGDPFUHVWLVLQJRRGFRQGLWLRQZLWKHYHQEDVHFRXUVHDFURVVWKHIXOOH[WHQWWRWKHFUHVW&UHVWKDVSRVLWLYHGUDLQDJHWRZDUGWKHUHVHUYRLU
5(48,5('$&7,216
1RQH
5HIHUWR3KRWRVDQG
5876 25 38''/(6 :,7+',63/$&(0(17
&5(67
3RRU$FFHSWDEOH*RRG;&21',7,2162%6(59('
PROBLEMS NOTED:121( /,9(672&.'$0$*( &5$&.6 6,1.+2/(
$33($5672267((3 6/,'( 62)7$5($6 27+(5
2%6(59$7,216
7KHGRZQVWUHDPVORSHLVLQJRRGFRQGLWLRQZLWKXQLIRUPVORSHDQGVORZO\GHYHORSLQJJUDVVFRYHUDJH&XUUHQWO\VRPHQDWLYHJUDVVHVKDYH
HVWDEOLVKHGRQWKHVORSHEXW(QJLQHHUQRWHGWKDWVHHGLQJRFFXUUHGLQ)DOODQGPD\WDNHWRVHDVRQVWRHVWDEOLVKHGDGHTXDWH
FRYHUDJH7KLVLWHPLVXQGHUFRQVWUXFWLRQZDUUDQW\DQGZLOOEHHYDOXDWHGDJDLQLQ1RREVHUYHGDUHDVRIHURVLRQRUULOOLQJDORQJWKH
VORSH6ORSHDSSHDUVWREHVWDEOH$ORZO\LQJDUHDDWWKHGRZQVWUHDPWRHDORQJWKHVSLOOZD\FKDQQHOULJKWEHUPZDVREVHUYHGWRKDYHD
WKLFNHUHVWDEOLVKPHQWRIJUDVVHV%DVHGRQORZUHVHUYRLUOHYHOVJUDVVHVLQWKLVDUHDOLNHO\WKLFNHUVLQFHEDFNILOOKDGDKLJKTXDQWLW\RIFOD\DQG
WKLVDUHDZDVJUDGHGDVDERZOIHDWXUHDQGOLNHO\UHWDLQVZDWHUORZHUWKDQRWKHUSRUWLRQRIWKHUHVHHGHGDUHDV
5(48,5('$&7,216
1RQH
5HIHUWR3KRWRVWR
(526,21 25 *8//,(6 :,7+',63/$&(0(17
'(35(66,216 25 %8/*(6
'2:1675($06/23(
3RRU$FFHSWDEOH*RRG;&21',7,2162%6(59('
3DJHRI
ENGINEER'S INSPECTION REPORT '$7(
'$01$0(+23.,16 '$0,'
PROBLEMS NOTED:121( 6$785$7('(0%$1.0(17$5($
27+(5
6((3$*((;,7621(0%$1.0(17
6((3$*((;,76$732,176285&( 6((3$*($5($$772( )/2:$'-$&(1772287/(7 6((3$*(
)/2: '5$,1
DRAIN OUTFALLS SEEN 1R <HV
Show location of drains on sketch and indicate
amount and quality of discharge.
2%6(59$7,21
7KH(QJLQHHUHVWLPDWHVWKHUHVHUYRLUUHDFKHGDPD[LPXPSRRORIDERXW(OIHHWWKLVVHDVRQFRUUHVSRQGLQJWRDVWDJHRIDERXWIHHW
IRRWPD[7KLVSRROOHYHOZDVEHORZWKHILUVWKROGOHYHO(OUHTXLUHGLQWKH,QLWLDO)LOODQG0RQLWRULQJ3ODQGDWHG0DUFK1R
VHHSDJHGLVFKDUJHDVREVHUYHGIURPWKHGUDLQRXWIDOOVGXULQJWKLVLQVSHFWLRQRUSUHYLRXVVLWHYLVLWVE\WKH(QJLQHHU7KHLQLWLDOILOODQG
PRQLWRULQJSODQVKRXOGFRQWLQXHWREHIROORZHGGXULQJWKHILOOVHDVRQ7KHORZO\LQJDUHDQHDUWKHULJKWVSLOOZD\EHUPZ LWKWKLFNHUJUDVV
FRYHUDJHQRWHGLQWKH'2:1675($06/23(VHFWLRQVKRXOGEHPRQLWRUHGGXULQJKLJKHUUHVHUYRLUOHYHOVIRUSRVVLEOHVHHSDJH
5(48,5('$&7,216
0RQLWRUORZO\LQJDUHDZLWKWKLFNHUJUDVVFRYHUDJHDWWKHGRZQVWUHDPWRHDORQJWKHVSLOOZD\ULJKWEHUPIRUSRVVLEOHVHHSDJH
5HIHUWR3KRWR
,1&5($6('08''<
,1&5($6('08''< '5<2%6758&7('
6((3$*(
3RRU$FFHSWDEOH*RRG;&21',7,2162%6(59('
PROBLEMS NOTED:121(
27+(5
12287/(7)281' 322523(5$7,1*$&&(66 ,123(5$%/(
287/(723(5$7(''85,1*,163(&7,21
12 <(6 &21'8,7 -2,176',63/$&(' 9$/9(/($.$*(INTERIOR INSPECTED
12<(6
5LSUDSPRXQGHGGVRIRXWIDOO0LQRUEDQNHURVLRQ
2%6(59$7,21
7KHRXWOHWZRUNVFRQVLVWVRIDFRQFUHWHHQFDVHGLQFKGLDPHWHU+'3(SLSHZLWKLQWDNHVWUXFWXUHDQGRXWIDOOLPSDFWEDVLQ7KHYLVLEOH
SRUWLRQVRIWKHRXWOHWZHUHJHQHUDOO\LQJRRGFRQGLWLRQZLWKQHJOLJLEOHJDWHOHDNDJH7KHJDWHKDVEHHQRSHUDWHGVHYHUDOWLPHVWKLV\HDUZLWKQR
LVVXHV7KHJDWHZDVVXFFHVVIXOO\H[HUFLVHGGXULQJWKLVVLWHYLVLW7KHJDWHRSHUDWRUDQGFRQFUHWHEORFNZHUHLQJRRGRSHUDWLQJFRQGLWLRQ
5LSUDSGRZQVWUHDPRIWKHRXWIDOOVWUXFWXUHZDVPRXQGHGEH\RQGWKHHQGVLOOUHVXOWLQJLQGHIOHFWLRQRIWKHIORZDWKLJKHUUDWHVWRWKHVLGHVRI
WKHULSUDSDSURQ(QJLQHHUQRWHGWKDWDVZDOHLHEHOO\ZLOOEHJUDGHGLQWKHULSUDSIURPWKHRXWIDOOWRLPSURYHFRQYH\LQJRIIORZVGRZQVWUHDP
RIWKHVWUXFWXUH7KHUHDSSHDUVWREHPLQRUEDQNHURVLRQZLWKLQWKHEDFNZDWHUSRROWRWKHULJKWRIWKHRXWIDOOVWUXFWXUH
5(48,5('$&7,216
3URYLGHDVZDOHRUORZIORZFKDQQHOZLWKLQWKHULSUDSDSURQGRZQVWUHDPRIWKHRXWOHWVWUXFWXUH3URYLGHULSUDSDORQJWKHWRHRIWKHGDPLQ
WKHYLFLQLW\RIWKHRXWIDOOVWUXFWXUHWRPLWLJDWHDQ\EDQNHURVLRQGXHWRRXWOHWGLVFKDUJHHJDUPRUEDQNZLWKLQWKHEDFNZDWHUSRROWRWKHULJKW
RIWKHRXWOHW
5HIHUWR3KRWRVWR
6758&785('(7(5,25$7('83675($0 25 '2:1675($0
'(7(5,25$7('25 &2//$36('
287/(7
3RRU$FFHSWDEOH*RRG;&21',7,2162%6(59('
PROBLEMS NOTED:121(
27+(5
12(0(5*(1&<63,//:$<)281' (526,21 &5$&.
$33($5672%(6758&785$//<,1$'(48$7( $33($5672260$// ,1$'(48$7()5((%2$5' )/2:2%6758&7('
&21&5(7(
2%6(59$7,216
7KHHPHUJHQF\VSLOOZD\FRQVLVWVRIDULSUDSOLQHGFKDQQHOZLWKEXULHGFRQFUHWHFRQWUROFUHVWURFNOLQHGFKXWHZLWKDORZHUFRQFUHWHFXWRII
ZDOODQGDVPDOOURFNSOXQJHSRRO&RQFUHWHVWUXFWXUHZHUHLQJRRGFRQGLWLRQZLWKQRREVHUYHGFUDFNV6SLOOZD\KDVQRWRSHUDWHG
5(48,5('$&7,216
1RQH
5HIHUWR3KRWRVWR
:,7+%$&.&877,1*:,7+',63/$&(0(17
'(7(5,25$7('81'(50,1('
63,//:$<
3RRU$FFHSWDEOH*RRG;&21',7,2162%6(59('
3DJHRI
ENGINEER'S INSPECTION REPORT '$7(
'$01$0(+23.,16 '$0,'
(;,67,1*,167580(17$7,21)281' 121( *$*(52' 3,(=20(7(56 6((3$*(
6859(<02180(176 27+(5
12021,725,1*2),167580(17$7,21 3(5,2',&,163(&7,216%< 2:1(5<(6 (1*,1((5
6WDWLRQ0DUNHUV
2%6(59$7,216
0RQLWRULQJLQVWUXPHQWVFRQVLVWRIDUHVHUYRLUVWDIIJDJHLQWHJUDOWRWKHDLUYHQWJDWHVWHPHQFDVHPHQWIRXUSLH]RPHWHUVHPEDQNPHQW
PRYHPHQWVHWWOHPHQWPRQXPHQWVRQHVDQGEODQNHWRXWOHWILOWHUGLDSKUDJPGUDLQWRHGUDLQVRQERWKVLGHVRIWKHRXWOHWSLSHDQGVWDWLRQ
PDUNHUVHYHU\IHHW
7KHUHVHUYRLUVWDIIJDJHLVLQWHJUDOWRWKHDLUYHQWJDWHVWHPFRQFUHWHHQFDVHPHQWDORQJWKHXSVWUHDPVORSHDQGFRQVLVWVRIHPEHGGHGVWHHO
SODWHVZLWKHOHYDWLRQPDUNLQJV7KHSLH]RPHWHUVLQFOXGHWKUHHORFDWHGDORQJWKHGDPFUHVWDQGRQHORFDWHGDORQJWKHPD[LPXPVHFWLRQQHDU
PLGGRZQVWUHDPVORSH7KHWRHGUDLQRXWIDOOVDUHLQWHJUDWHGLQWRWKHRXWOHWRXWIDOOVWUXFWXUH7KHRXWOHWILOWHUGLDSKUDJPRXWIDOOLVORFDWHGWRWKH
ULJKWRIWKHRXWIDOOVWUXFWXUHDQGGD\OLJKWVIURPWKHGRZQVWUHDPWRHRIWKHGDPQRKHDGZDOO
2ZQHU(QJLQHHUWRSURYLGHDQDQQXDOPRQLWRULQJUHSRUWZLWKDQXSGDWHRQWKHVWDWXVRIWKHLQLWLDOILOOSHUDSSURYHGSODQVDWWKHHQGRIWKH
LUULJDWLRQVHDVRQIRURXURIILFHWRUHYLHZ(QJLQHHUFROOHFWVPRQLWRULQJGDWDGXULQJHDFKWULSWRWKHGDPDERXWWLPHVSHUPRQWKZKLFKLVLQ
FRQIRUPDQFHZLWK5XOH+RZHYHUGXHWRORZUHVHUYRLUOHYHODQGODFNRIZDWHUDYDLODELOLW\WKLVVHDVRQRXURIILFHDJUHHGZLWKWKH
(QJLQHHUWKDWRQO\PRQWKO\PRQLWRULQJLVUHTXLUHGIRUUHPDLQGHURIWKLVVHDVRQXQOHVVWKHUHVHUYRLUILOOVIURPDODUJHSUHFLSLWDWLRQHYHQW
0RYHPHQWPRQXPHQWVDUHWREHVXUYH\HGDQQXDOO\IRUWKHILUVW\HDUVDIWHUFRQVWUXFWLRQLQDFFRUGDQFHZLWK5XOH(QJLQHHUSODQVWR
VFKHGXOHVXUYH\ODWHUWKLVVXPPHU5HVHUYRLUQRWOLNHO\WRILOOWKLVVHDVRQEDULQJDODUJHUDLQIDOOHYHQWGXHWRGUDLQLQJLQ6SULQJIRU
PDLQWHQDQFHDQGHDUO\UXQRIIVHDVRQ$OVRUHVHUYRLUPD[ILOOOHYHOXQGHUDSSURYHG,QLWLDO)LOODQG0RQLWRULQJ3ODQ3ODQKDVEHHQDURXQG(O
7KHPRQLWRUHGLQLWLDOILOORIWKHUHVHUYRLUZLOOFRQWLQXHQH[W6SULQJ
5(48,5('$&7,216
&RQWLQXHWRIROORZPRQLWRULQJDQGUHSRUWLQJUHTXLUHPHQWVDVGRFXPHQWHGLQWKH,QLWLDO)LOODQG0RQLWRULQJ3ODQDQGDJUHHGXSRQE\6(2
DQGRZQHU6XEPLWFROOHFWHGPRQLWRULQJGDWDLQDQDQQXDOPRQLWRULQJUHSRUWWRRXURIILFHDWWKHHQGRIWKHLUULJDWLRQVHDVRQ,QFOXGHPRQXPHQW
VXUYH\LQWKHDQQXDOPRQLWRULQJUHSRUW
5HIHUWR3KRWRVWR
:(,56 )/80(6
021,725,1*
3RRU$FFHSWDEOH*RRG;&21',7,2162%6(59('
PROBLEMS NOTED:
'(7(5,25$7('&21&5(7(
27+(5
121( /,9(672&.'$0$*(
%586+21
$&&(6652$'1(('60$,17(1$1&(
75((621
52'(17$&7,9,7<21
*$7($1'23(5$7,1*0(&+$1,601(('0$,17(1$1&(
2%6(59$7,216
+RSNLQV'DPZDVUHFHQWO\UHFRQVWUXFWHGDQGYHJHWDWHGFRYHUDJHLVHVWDEOLVKLQJLQDQHIIHFWLYHPDQQHURQWKHGRZQVWUHDPVORSHDQG
WRHDUHDV7KHGDPFUHVWLVZHOOJUDGHG&XUUHQWO\WKHUHLVQRQHHGIRUYHJHWDWLRQFRQWURORUDQLPDODEDWHPHQWSODQVKRZHYHURXURIILFH
HQFRXUDJHVWKHRZQHUWRVWDUWSODQQLQJIRUZRRG\YHJHWDWLRQUHPRYDOYLDFXWRUVSUD\DQGDGGUHVVLQJDQLPDOEXUURZVZKHQSUHVHQWDVWKHVH
DUHDQQXDOPDLQWHQDQFHLWHPVDUHW\SLFDOIRUPRVWGDPV7KHRZ QHULVFRPPHQGHGRQUHFRQVWUXFWLQJWKHGDPDQGSURYLGLQJWKHQHFHVVDU\
2 0DQG(QJLQHHULQJRYHUVLJKW
5(48,5('$&7,216
1RQHDWWKLVWLPHKRZHYHURXURIILFHUHFRPPHQGVWRVWDUWSODQQLQJIRUDQQXDOYHJHWDWLRQFRQWUROLHZRRG\SODQWUHPRYDODQGDQLPDO
DEDWHPHQWLHILOOLQJDQLPDOEXUURZV
83675($06/23( &5(67 '2:1675($06/23( 72(83675($06/23( &5(67 '2:1675($06/23( 72(
83675($06/23( &5(67 '2:1675($06/23( 72()$&,1* 287/(7 63,//:$<
0$,17(1$1&($1'5(3$,56
3RRU$FFHSWDEOH;*RRG&21',7,2162%6(59('
Go to next page for Overall Conditions and Items Requiring Actions
3DJHRI
ENGINEER'S INSPECTION REPORT '$7(
'$01$0(+23.,16 '$0,'
%DVHGRQWKLV6DIHW\,QVSHFWLRQDQGUHFHQWILOHUHYLHZWKHRYHUDOOFRQGLWLRQLVGHWHUPLQHGWREH
6$7,6)$&725<&21',7,21$//<6$7,6)$&725<816$7,6)$&725<
+RSNLQV'DPLVDVVLJQHGD6$7,6)$&725<UDWLQJRQWKHEDVLVWKDWWKHGDPKDVSHUIRUPHGZHOOXQGHULQLWLDOILOOLQJKRZHYHUUHTXLUHV
FRQWLQXHGLQVSHFWLRQDQGPRQLWRULQJLQDFFRUGDQFHZLWKWKHDSSURYHG,QLWLDO)LOODQG0RQLWRULQJ3ODQXQWLOIXOOVWRUDJHLVDFKLHYHGWRPDLQWDLQ
DVDWLVIDFWRU\UDWLQJ7KHRZQHULVFRPPHQGHGIRULWVHIIRUWVWRUHKDELOLWDWHWKHGDPDQGFRQWLQXHGPRQLWRULQJRIWKLVGDP0RQLWRULQJGDWD
FROOHFWHGE\WKHRZQHU(QJLQHHUXQGHUWKHUHTXLUHPHQWVRIWKH,QLWLDO)LOODQG0RQLWRULQJ3ODQVKRXOGEHVXEPLWWDODVDQDQQXDOUHSRUWWRRXU
RIILFHIRUUHFRUGSXUSRVHV3HUIRUPDQDQQXDOUHYLHZRIWKH($3DQGXSGDWHGDFFRUGLQJO\2XURIILFHZLOOSURYLGHUHFHQW($3FRQWDFWXSGDWHV
WRWKH(QJLQHHUDVDUHGOLQH3')7KH(QJLQHHUWRXSGDWHWKH($3GRFXPHQWDQGGLVWULEXWHWKHUHYLVHG($3WRDOOSODQKROGHUV3OHDVHQRWH
WKDWHPDLOGLVWULEXWLRQRIWKH($3LVDFFHSWDEOH2XURIILFHZRXOGEHKDSS\WRDVVLVWZLWKWKLVHIIRUWVRSOHDVHGRQ
WKHVLWDWHWRFRQWDFWXV
29(5$//&21',7,216
)8//6725$*(
&21',7,21$/)8//6725$*(
5(&200(1'('5(675,&7,21Î {)7%(/2:'$0&5(67
)7%(/2:63,//:$<&5(67
)7*$*(+(,*+7
126725$*(0$,17$,1287/(7)8//<23(1
ACTIONS REQUIRED FOR CONDITIONAL FULL STORAGE OR CONTINUED STORAGE AT THE RESTRICTED LEVEL:
(QJLQHHU
V
6LJQDWXUH ,163(&7('%<
2ZQHU
V
6LJQDWXUH 2:1(52:1(5
65(35(6(17$7,9('$7(
&RQWLQXHGLQVSHFWLRQDQGPRQLWRULQJLQDFFRUGDQFHZLWKWKHDSSURYHG,QLWLDO)LOODQG0RQLWRULQJ3ODQXQWLOIXOOVWRUDJHLVDFKLHYHGDQGSHUIRUPDQFH
RIWKHGDPGHHPHGWREHDFFHSWDEOH
&217,18((;,67,1*5(675,&7,21
5($621)255(675,&7,21
,7(065(48,5,1*$&7,21%<2:1(572,03529(7+(6$)(7<2)7+('$0
6$)(6725$*(/(9(/5(&200(1'('$6$5(68/72)7+,6,163(&7,21
7KH6WDWH(QJLQHHUE\SURYLGLQJWKLVGDPVDIHW\LQVSHFWLRQUHSRUWGRHVQRWDVVXPHUHVSRQVLELOLW\IRUDQ\XQVDIHFRQGLWLRQRIWKHVXEMHFWGDP7KHVROH
UHVSRQVLELOLW\IRUWKHVDIHW\RIWKLVGDPUHVWVZLWKWKHUHVHUYRLURZQHURURSHUDWRUZKRVKRXOGWDNHHYHU\VWHSQHFHVVDU\WRSUHYHQWGDPDJHVFDXVHGE\
OHDNDJHRURYHUIORZRIZDWHUVIURPWKHUHVHUYRLURUIORRGVUHVXOWLQJIURPDIDLOXUHRIWKHGDP
0$,17(1$1&(25',1$5<5(3$,5021,725,1*
(;(5&,6(7+(287/(7*$7(7+528*+$)8//&<&/(21$1$118$/%$6,6
/8%5,&$7($1'23(5$7(287/(7*$7(67+528*+)8//&<&/(
021,725)25:22'<9(*(7$7,2121$//$63(&762)7+('$0$1'5(029(9,$&87635$<2538//
:+(12%6(59('/,./(<$1$18$//<0$,17(1$1&(,7(0&855(17/<126,*12):22'<9(*(7$7,21
&/($575((6$1'25%586+)520
021,725$1,0$/%8552:$&7,9,7<$1',03/(0(17$1$%$7(0(17352*5$0,)&21',7,216:256(1
&855(17/<12$&7,9,7<:$62%6(59('
,1,7,$7(52'(17&21752/352*5$0$1'3523(5/<%$&.),//(;,67,1*+2/(6
021,725/2:/<,1*$5($:,7+7+,&.(5*5$66&29(5$*($77+('2:1675($072($/21*7+(
63,//:$<5,*+7%(50)253266,%/(6((3$*(
021,725
021,725(526,215,//,1*21$//$63(&762)7+('$0$6*5$66&29(5$*(,6(67$%/,6+,1*,)
&21',7,216:256(13/$&(&203$&7('),//$1'6(('725(9(*(7$7(7+(%$5($5($6
021,725
&217,18(72)2//2:021,725,1*$1'5(3257,1*5(48,5(0(176$6'2&80(17(',17+(,1,7,$/),//
$1'021,725,1*3/$1$1'$*5(('8321%<6(2$1'2:1(568%0,7&2//(&7('021,725,1*'$7$,1
$1$118$/021,725,1*5(3257722852)),&($77+((1'2)7+(,55,*$7,216($621,1&/8'(
02180(176859(<,17+($118$/021,725,1*5(3257
021,725
3529,'($6:$/(25/2:)/2:&+$11(/:,7+,17+(5,35$3$3521'2:1675($02)7+(287/(7
6758&785(3529,'(5,35$3$/21*7+(72(2)7+('$0,17+(9,&,1,7<2)7+(287)$//6758&785(72
0,7,*$7($1<%$1.(526,21'8(72287/(7',6&+$5*((*$5025%$1.:,7+,17+(%$&.:$7(5322/
727+(5,*+72)7+(287/(7
27+(5
(0(5*(1&<$&7,213/$1
(1*,1((5723(5)250$118$/5(9,(:$1'83'$7(2)7+(($3$1'',675,%87(72$//3/$1+2/'(56
83'$7((;,67,1*(0(5*(1&<$&7,213/$1
3DJHRI
,163(&7('%<
HDFFHSWDEOH
2:1(52:1(07 07 21
ENGINEER'S INSPECTION REPORT '$7(
'$01$0(+23.,16 '$0,'
*8,'(/,1(6)25'(7(50,1,1*&21',7,216
&21',7,2162%6(59('$33/,(67283675($06/23(&5(67'2:1675($06/23(287/(763,//:$<
*22'
,QJHQHUDOWKLVSDUWRIWKHVWUXFWXUHKDVDQHDUQHZ
DSSHDUDQFHDQGFRQGLWLRQVREVHUYHGLQWKLVDUHDGRQRW
DSSHDUWRWKUHDWHQWKHVDIHW\RIWKHGDP
$&&(37$%/(
$OWKRXJKJHQHUDOFURVVVHFWLRQLVPDLQWDLQHGVXUIDFHV
PD\EHLUUHJXODUHURGHGUXWWHGVSDOOHGRURWKHUZLVHQRW
LQQHZFRQGLWLRQ&RQGLWLRQVLQWKLVDUHDGRQRWFXUUHQWO\
DSSHDUWRWKUHDWHQWKHVDIHW\RIWKHGDP
3225
&RQGLWLRQVREVHUYHGLQWKLVDUHDDSSHDUWRWKUHDWHQWKH
VDIHW\RIWKHGDP
&21',7,2162%6(59('$33/,(6726((3$*(
*22'
1RHYLGHQFHRIXQFRQWUROOHGVHHSDJH1RXQH[SODLQHG
LQFUHDVHLQIORZVIURPGHVLJQHGGUDLQV$OOVHHSDJHLV
FOHDU6HHSDJHFRQGLWLRQVGRQRWDSSHDUWRWKUHDWHQWKH
VDIHW\RIWKHGDP
$&&(37$%/(
6RPHVHHSDJHH[LVWVDWDUHDVRWKHUWKDQWKHGUDLQ
RXWIDOOVRURWKHUGHVLJQHGGUDLQV1RXQH[SODLQHG
LQFUHDVHLQVHHSDJH$OOVHHSDJHLVFOHDU6HHSDJH
FRQGLWLRQVREVHUYHGGRQRWFXUUHQWO\DSSHDUWRWKUHDWHQ
WKHVDIHW\RIWKHGDP
3225
6HHSDJHFRQGLWLRQVREVHUYHGDSSHDUWRWKUHDWHQWKH
VDIHW\RIWKHGDP([DPSOHV
'HVLJQHGGUDLQRUVHHSDJHIORZVKDYHLQFUHDVHG
ZLWKRXWLQFUHDVHLQUHVHUYRLUOHYHO
'UDLQRUVHHSDJHIORZVFRQWDLQVHGLPHQWLHPXGG\
ZDWHURUSDUWLFOHVLQMDUVDPSOHV
:LGHVSUHDGVHHSDJHFRQFHQWUDWHGVHHSDJHRU
SRQGLQJDSSHDUVWRWKUHDWHQWKHVDIHW\RIWKHGDP
&21',7,2162%6(59('$33/,(672021,725,1*
*22'
0RQLWRULQJLQFOXGHVPRYHPHQWVXUYH\VDQGOHDNDJH
PHDVXUHPHQWVIRUDOOGDPVDQGSLH]RPHWHUUHDGLQJVIRU
+LJKKD]DUGGDPV,QVWUXPHQWDWLRQLVLQUHOLDEOHZRUNLQJ
FRQGLWLRQ$SODQIRUPRQLWRULQJWKHLQVWUXPHQWDWLRQDQG
DQDO\]LQJUHVXOWVE\WKHRZQHU
VHQJLQHHULVLQHIIHFW
3HULRGLFLQVSHFWLRQVE\RZQHU
VHQJLQHHU
$&&(37$%/(
0RQLWRULQJLQFOXGHVPRYHPHQWVXUYH\VDQGOHDNDJH
PHDVXUHPHQWVIRU+LJKDQG6LJQLILFDQWKD]DUGGDPV
OHDNDJHPHDVXUHPHQWVIRU/RZKD]DUGGDPV
,QVWUXPHQWDWLRQLVLQVHUYLFHDEOHFRQGLWLRQ$SODQIRU
PRQLWRULQJLQVWUXPHQWDWLRQLVLQHIIHFWE\RZQHU3HULRGLF
LQVSHFWLRQVE\RZQHURUUHSUHVHQWDWLYH2512
021,725,1*5(48,5('
3225
$OOLQVWUXPHQWDWLRQDQGPRQLWRULQJGHVFULEHGXQGHU
$&&(37$%/(KHUHIRUHDFKFODVVRIGDPDUHQRW
SURYLGHGRUUHTXLUHGSHULRGLFUHDGLQJVDUHQRWEHLQJ
PDGHRUXQH[SODLQHGFKDQJHVLQUHDGLQJVDUHQRWUHDFWHG
WRE\WKHRZQHU
&21',7,2162%6(59('$33/,(6720$,17(1$1&($1'5(3$,5
*22'
'DPDSSHDUVWRUHFHLYHHIIHFWLYHRQJRLQJPDLQWHQDQFH
DQGUHSDLUDQGRQO\DIHZPLQRULWHPVPD\QHHGWREH
DGGUHVVHG
$&&(37$%/(
'DPDSSHDUVWRUHFHLYHPDLQWHQDQFHEXWVRPH
PDLQWHQDQFHLWHPVQHHGWREHDGGUHVVHG1RPDMRU
UHSDLUVDUHUHTXLUHFO
3225
'DPGRHVQRWDSSHDUWRUHFHLYHDGHTXDWHPDLQWHQDQFH
2QHRUPRUHLWHPVQHHGLQJPDLQWHQDQFHRUUHSDLUKDV
EHJXQWRWKUHDWHQWKHVDIHW\RIWKHGDP
29(5$//&21',7,216
6$7,6)$&725<
7KHVDIHW\LQVSHFWLRQLQGLFDWHVQRFRQGLWLRQVWKDWDSSHDU
WRWKUHDWHQWKHVDIHW\RIWKHGDPDQGWKHGDPLVH[SHFWHG
WRSHUIRUPVDWLVIDFWRULO\XQGHUDOOGHVLJQORDGLQJ
FRQGLWLRQV0RVWRIWKHUHTXLUHGPRQLWRULQJLVEHLQJ
SHUIRUPHG
816$7,6)$&725<
7KHVDIHW\LQVSHFWLRQLQGLFDWHVGHILQLWHVLJQVRIVWUXFWXUDO
GLVWUHVVH[FHVVLYHVHHSDJHFUDFNVVOLGHVVLQNKROHV
VHYHUHGHWHULRUDWLRQHWFZKLFKFRXOGOHDGWRWKHIDLOXUH
RIWKHGDPLIWKHUHVHUYRLULVXVHGWRIXOOFDSDFLW\7KH
GDPLVMXGJHGXQVDIHIRUIXOOVWRUDJHRIZDWHU
6$)(6725$*(/(9(/
)8//6725$*(
'DPPD\EHXVHGWRIXOOFDSDFLW\ZLWKQRFRQGLWLRQV
DWWDFKHG
&21',7,21$/)8//6725$*(
'DPPD\EHXVHGWRIXOOVWRUDJHLIFHUWDLQPRQLWRULQJ
PDLQWHQDQFHRURSHUDWLRQDOFRQGLWLRQVDUHPHW
5(675,&7,21
'DPPD\QRWEHXVHGWRIXOOFDSDFLW\EXWPXVWEH
RSHUDWHGDWVRPHUHGXFHGOHYHOLQWKHLQWHUHVWRISXEOLF
VDIHW\
+$=$5'&/$66,),&$7,212)'$06
+LJKKD]DUG
/RVVRIKXPDQOLIHLVH[SHFWHGLQWKHHYHQWRIIDLOXUHRI
WKHGDPZKLOHWKHUHVHUYRLULVDWWKHKLJKZDWHUOLQH
6LJQLILFDQWKD]DUG
6LJQLILFDQWGDPDJHWRLPSURYHGSURSHUW\LVH[SHFWHGLQ
WKHHYHQWRIIDLOXUHRIWKHGDPZKLOHWKHUHVHUYRLULVDWWKH
KLJKZDWHUOLQHEXWQRORVVRIKXPDQOLIHLVH[SHFWHG
/RZKD]DUG
/RVVRIKXPDQOLIHLVQRWH[SHFWHGDQGGDPDJHWR
LPSURYHGSURSHUW\LVH[SHFWHGWREHVPDOOLQWKHHYHQW
RIIDLOXUHRIWKHGDPZKLOHWKHUHVHUYRLULVDWKLJKZDWHU
ILQH
13+KD]DUG1RORVVRIOLIHRUGDPDJHWRLPSURYHGSURSHUW\RUORVVRIGRZQVWUHDPUHVRXUFHLVH[SHFWHGLQWKHHYHQWRIIDLOXUH
RIWKHGDPZKLOHWKHUHVHUYRLULVDWWKHKLJKZDWHUOLQH
&21',7,21$//<6$7,6)$&725<
7KHVDIHW\LQVSHFWLRQLQGLFDWHVV\PSWRPVRIVWUXFWXUDO
GLVWUHVVVHHSDJHHYLGHQFHRIPLQRUGLVSODFHPHQWVHWF
ZKLFKLIFRQGLWLRQVZRUVHQFRXOGOHDGWRWKHIDLOXUHRIWKH
GDP(VVHQWLDOPRQLWRULQJLQVSHFWLRQDQGPDLQWHQDQFH
PXVWEHSHUIRUPHGDVDUHTXLUHPHQWIRUFRQWLQXHGIXOO
VWRUDJHLQWKHUHVHUYRLU
3DJHRI
ENGINEER’S INSPECTION REPORT DATE: 06.21.2021
DAM NAME: HOPKINS DAM KJK DAMID: 380113, C-0090C
202 Center Drive, Glenwood Springs, CO 81601 P 303.518.1829 https://dwr.colorado.gov
Jared S. Polis, Governor | Dan Gibbs, DNR Executive Director | Kevin G. Rein, Director/State Engineer
PHOTOGRAPHS
Upstream Slope
Photo 1. View from left abutment of the
upstream slope. Reservoir filled to
about stage 4.5 feet and most of the
upstream slope was exposed all season.
Upstream Slope
Photo 2. View looking right along the
upstream slope from near Sta. 3+00.
Slope is uniform with well graded riprap
rock that is angular and interlocked. No
areas of exposed riprap bedding.
Upstream Slope
Photo 3. View of shoring wall pile
installation from the spillway stilling
basin. Precast concrete shoring wall
panels to be installed from downstream
end up as the CMP is being installed.
ENGINEER’S INSPECTION REPORT DATE: 06.21.2021
DAM NAME: HOPKINS DAM KJK DAMID: 380113, C-0090C
2 of 9
PHOTOGRAPHS
Upstream Slope
Photo 4. View from the right abutment
of the upstream slope. Large riprap and
boulders placed along the right
abutment to protect against possible
erosion.
CREST
Photo 5. View of the dam crest from
the right abutment with the Landis
Ditch diversion in the foreground.
CREST
Photo 6. Dam crest is in good condition
with positive drainage toward the
reservoir. Gravel surfacing on road is
uniform with no observed rutting.
ENGINEER’S INSPECTION REPORT DATE: 06.21.2021
DAM NAME: HOPKINS DAM KJK DAMID: 380113, C-0090C
3 of 9
PHOTOGRAPHS
Downstream Slope
Photo 7. Looking east along the
downstream toe of the dam. Toe area
graded to avoid surface water along the
toe area.
Downstream Slope
Photo 8. Looking west (right) along the
downstream slope from about Sta. 2+00.
Slope is uniform with native grass
establishment in process. Engineer
noted that this item is under 2 year
warranty and likely will take 2 seasons
to establish native grasses.
Downstream Slope
Photo 9. A low lying area at the
downstream toe along the spillway
channel was observed to have a thicker
establishment of grasses. Based on low
reservoir levels, grasses in this area
likely thicker since fill had a high
quantity of clay and this area was
graded as a bowl feature and likely
retains water lower than other portion
of the reseeded areas.
ENGINEER’S INSPECTION REPORT DATE: 06.21.2021
DAM NAME: HOPKINS DAM KJK DAMID: 380113, C-0090C
4 of 9
PHOTOGRAPHS
Downstream Slope
Photo 10. Looking east along the
downstream slope from the right
abutment. Slope is uniform and stable.
Seepage
Photo 11. No signs of seepage or drain
activity was observed on the dam.
Drains were dry during the inspection
and Engineer has not observed any drain
discharge to date.
Outlet
Photo 12. Intake structure on the
outlet was submerged. Trashrack
observed in place on the intake
structure.
ENGINEER’S INSPECTION REPORT DATE: 06.21.2021
DAM NAME: HOPKINS DAM KJK DAMID: 380113, C-0090C
5 of 9
PHOTOGRAPHS
Outlet
Photo 13. View of the outlet manual
operator at the dam crest. Engineer
successfully exercised the gate.
Outlet
Photo 14. Looking downstream at the
outlet outfall structure currently in
operation.
Outlet
Photo 15. Looking upstream at the
outfall structure from the discharge
channel. Riprap downstream of the
structure was mounded at the structure
outfall resulting in deflection of the
flow with higher rates along the sides of
the riprap apron. Engineer noted that a
swale (i.e., belly) will be graded in the
riprap from the outfall to improve
conveying of flows downstream of the
structure.
ENGINEER’S INSPECTION REPORT DATE: 06.21.2021
DAM NAME: HOPKINS DAM KJK DAMID: 380113, C-0090C
6 of 9
PHOTOGRAPHS
Outlet
Photo 16. Profile view of the outlet
discharge. Note the deflected water
spilling along the riprap apron and
backwater pool to the right side of the
outfall channel.
Outlet
Photo 17. View of the outlet outfall
pool area prior to operation of the
outlet. Minor bank erosion noted along
the right side of the backwater pool
area..
Outlet
Photo 18. Looking downstream at the
outlet discharge channel from the
riprap apron below the outfall
structure. Apron consists of gap graded
riprap with infilled rock to stabilize the
rock fill.
ENGINEER’S INSPECTION REPORT DATE: 06.21.2021
DAM NAME: HOPKINS DAM KJK DAMID: 380113, C-0090C
7 of 9
PHOTOGRAPHS
Spillway
Photo 19. Looking west along the dam
axis with the emergency spillway
control structure in the foreground.
The concrete control sill was in good
condition with no observed cracks.
Spillway
Photo 20. Looking downstream at the
spillway discharge channel from the left
abutment area. Spillway control
structure (i.e., buried cutoff sill) in the
foreground.
Spillway
Photo 21. View along the lower spillway
cutoff wall Concrete in good condition
with no observed cracks.
ENGINEER’S INSPECTION REPORT DATE: 06.21.2021
DAM NAME: HOPKINS DAM KJK DAMID: 380113, C-0090C
8 of 9
PHOTOGRAPHS
Spillway
Photo 22. Looking upstream at the
spillway discharge channel from end of
riprap lining about 200 feet downstream
of the control sill.
Monitoring
Photo 23. Typical view of the reservoir
staff gauge/concrete grade beam with
1-foot elevation steel plates. Maximum
reservoir level this season appears to be
about El. 8980.5 (~stage 4.5 feet).
Monitoring
Photo 24. View of typical piezometer
with lockable steel casing. Engineer
measures piezometer levels during each
ENGINEER’S INSPECTION REPORT DATE: 06.21.2021
DAM NAME: HOPKINS DAM KJK DAMID: 380113, C-0090C
9 of 9
PHOTOGRAPHS
Monitoring
Photo 25. View of piezometer with
locking well cap (on left) and survey
monument with yellow marker lathe (on
right). Location shown near mid-
downstream slope along the maximum
section.
Diversion Structure
Photo 26. Intake end of the diversion
culvert on the Landis Ditch (location
along the dam axis just outside of the
dam embankment footprint.
Diversion Structure
Photo 27. Outfall end of the diversion
ditch culvert location about 50 feet
from the upstream toe of the dam at
the right abutment.
February 11, 2022
Martin Van Ardenne
The Seligman Group
600 Montgomery St, 40th floor
San Francisco, CA 94111
415-658-2889
RE: Review of the Hopkins Dam Inundation Mapping on Proposed Phase Development of Spring
Valley Ranch and the future development.
Dear Martin:
Garfield County has a requirement for a dam break analysis of Hopkins Dam and the impacts it
has on the proposed emergency access road and future phases of the development. This report is
intended to respond to Condition No. 8.0 of the Preliminary Plan Approval (Reception No.
747016), which states:
The dam break failure analysis for an enlarged Hopkins Reservoir must be incorporated into the
drainage plan and subdivision improvements agreement for phase 2 and incorporated into
subsequent phases as applicable in a manner adequate to prevent damage or potential loss of life
or structures within the subdivision.
Zancanella & Associates has reviewed the sunny day dam break as defined by Colorado Dam
Safety from the Dam Reconstruction Project that was recently completed including the inundation
flood boundaries from said break. This project consisted of removing the existing dam and
rebuilding it to current Dam Safety Standards.
The flood wave is confined to the Landis Creek drainage and currently does not severely impact
existing structures. It does impact the existing access road and County Road 115. With the
construction of the emergency access road (future High Grange Pass Rd) which involves
improving the existing road and raising the grades, the flood inundation wave will be affected as
will the impacts on the infrastructure.
After the flood wave impacts County Road 115, it diffuses and spreads out to have minimal
impacts on future development. The proposed improvements to the emergency access road is not
anticipated to change this. An attached map is included with this analysis that includes the flood
inundation wave boundaries, the proposed future phase lots, and other information pertinent to this
analysis.
The flood inundation wave is not anticipated to impact current structures significantly more than
current conditions, nor get to the point of potential for loss of life with the improvements, but the
emergency access road (High Grange Pass Rd) will be impacted to the point of possible failure.
=DQFDQHOOD $VVRFLDWHV,QF
)HEUXDU\
KWWSV]DQGDVKDUHSRLQWFRP]GULYHVSULQJYDOOH\UDQFKFRXQW\SHUPLWWLQJLQQXQGDWLRQ
PDSSLQJLQXQGDWLRQPDSSLQJOHWWHUGRF[
3DJH
As there are alternative egress routes on the property, we do not anticipate this to be a deterrence
to the development of the property. Additionally, access to the site from Highway 82 can be
achieved by either using County Road 115 from the North or Spring Valley Road and County
Road 115 from the South.
With the construction of the emergency access road, the dam should still maintain the Significant
Hazard Classification which is defined from Colorado Dam Safety as potential for loss of property
but not loss of life.
No structure that is habitable should be located within the inundation boundary unless additional
review and analysis has taken place to ensure no loss of life or significant property damage will
occur during a sunny day dam break.
Included in this report is the full dam break and inundation study performed as part of the Hopkins
Reservoir approval documents. Additionally, the Hopkins Dam Certificate of Acceptance for the
recent dam reconstruction project is included for reference in this report.
Should you have any questions or need additional information, please feel free to contact us to
discuss the additional
Very truly yours,
Zancanella & Associates, Inc.
__________________________
Matthew V Weisbrod, PE
Attachments: Inundation Map.