HomeMy WebLinkAbout1.19 Engineering PlansWW
W
C000
COVER
FINAL PUBLIC IMPROVEMENTSSPRING VALLEY RANCHPHASE 2GARFIELD COUNTY, CO
VICINITY MAP
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C001
GENERAL
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
WW
W
C002
OVERALL SITE
N
W E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C100
OVERALL DRAINAGE
N
W E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C101
BASIN-A RETENTION POND
N
W E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C102
STORM DETAILS
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C103
OFFSITE CULVERTS 1, 2 & 3
N
W
E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C104
OFFSITE CULVERTS 3 & 4
N
W
E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C105
HIGHGRANGE CULVERTS1&2
N
W E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C106
HIGHGRANGE CULVERTS3&4
N
W E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C107
HIGHGRANGE CULVERTS5&6
N
W E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C108
HIGHGRANGE CULVERTS 7,8 & 9
N
W E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C109
E. CHIPETA CULVERTS 1&2
N
W E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C110
MARCY POINT CULVERTS1&2
N
W E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C111
MINOR ROAD CULVERTS
N
W E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C200
ROAD SECTIONS
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C201
HIGHGRANGE GEOMETRYSTA. 100+00 T0 202+00
N
W E
S
C202
HIGHGRANGE GEOMETRYSTA 200+00 TO 298+50
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C203
HIGHGRANGE GEOMETRYSTA 298+50 TO 352+66.18
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C204
HIGHGRANGESTA.100+00.00 TOSTA.117+80.00
N
W
E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C205
HIGHGRANGESTA.117+80.00 TOSTA.135+60.00
N
W
E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C206
HIGHGRANGESTA.135+60.00 TOSTA.153+40.00
N
W
E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C207
HIGHGRANGESTA.153+40.00 TOSTA.171+20.00
N
W
E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C208
HIGHGRANGESTA.171+20.00 TOSTA.189+00.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C209
HIGHGRANGESTA.189+00.00 TOSTA.202+00.00
N
W
E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C210
HIGHGRANGESTA.200+00.00 TOSTA.218+00.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C211
HIGHGRANGESTA.218+00.00 TOSTA.236+00.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C212
HIGHGRANGESTA.236+00.00 TOSTA.254+00.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
WE
S
C213
HIGHGRANGESTA.254+00.00 TOSTA.272+00.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C214
HIGHGRANGESTA.272+00.00 TOSTA.290+00.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C215
HIGHGRANGESTA.290+00.00 TOSTA.308+00.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C216
HIGHGRANGESTA.298+50.00 TOSTA.316+50.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C217
HIGHGRANGESTA.316+50.00 TOSTA.334+50.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
STOP
C218
HIGHGRANGESTA.334+50.00 TOSTA.352+50.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C219
E. CHIPETA RUN GEOMETRYPLAN
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C220
E. CHIPETA RUNSTA.28+00.00 TOSTA.33+01.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C221
E. CHIPETA RUNSTA.33+01.00 TOSTA.38+02.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C222
E. CHIPETA RUNSTA.38+02.00 TOSTA.43+03.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C223
E. CHIPETA RUNSTA.43+03.00 TOSTA.47+00.85
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
E1
7
N
W
E
S
C224
VELTUS DR.
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C225
W.CHIPETA RUNGEOMETRY PLAN
N
W E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C226
W. CHIPETA RUNSTA.48+00.00 TOSTA.53+01.00
N
WE
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C227
W. CHIPETA RUNSTA.53+01.00 TOSTA.58+02.00
N
W E
S
C228
W. CHIPETA RUNSTA.58+02.00 TOSTA.63+03.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C229
W. CHIPETA RUNSTA.63+03.00 TOSTA.68+04.00
N
W
E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C230
W. CHIPETA RUNSTA.68+04.00 TOSTA.69+86.45
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C231
MARCY POINT
N
WE
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C232
OURAY TRAIL
N
W E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C233
SHAVANO TRACE
N
W E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C234
LUPINE TRACE
N
W E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C235
OPUNTIA TRACE
N
W
E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C236
LIVE BUCK RUN
N
W
E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C237
CR 114 DETAILS & TYPSECTIONS 1
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C238
CR 114 DETAILS & TYPSECTIONS 2
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C239
CR 114 & 115 GEOMETRYPLAN
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C240
CR 114 P&PSTA.7+80.00-15+75.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C241
CR114 P&PSTA.15+75.00-24+25.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C242
CR 114 P&PSTA.24+25.00-32+35.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C243
CR 114 P&PSTA.32+35.00-40+50.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C244
CR 114 P&PSTA.40+50.00-48+70.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C245
CR 114 P&PSTA.48+70.00-56+80.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C246
CR 114 P&PSTA.56+80.00-65+15.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C247
CR 114 P&PSTA.65+15.00-73+15.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C248
CR 114 P&PSTA.37+15.00-81+50.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C249
CR 114 P&PSTA.81+50.00-89+50.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C250
CR 115 P&PSTA.89+50.00-92+13.57
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
STOP
C251
CR 115 INTERSECTION P&P
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C300
SEWER DETAILS
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C301
HIGHGRANGE SEWERGEOMETRY
N
W E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C302
HIGHGRANGE SEWERSTA.0+00.00 TOSTA.17+25.00
N
W
E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C303
HIGHGRANGE SEWERSTA.17+25.00 TOSTA.34+50.00
N
W
E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C304
HIGHGRANGE SEWERSTA.34+50.00 TOSTA.51+75.00
N
W
E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C305
HIGHGRANGE SEWERSTA.51+75.00 TOSTA.69+00.00
N
W
E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C306
HIGHGRANGE & OPUNTIASTA.69+00 TO STA.78+05
N
W
E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C307
LIVEBUCK RUN SEWERGEOMETRY
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C308
LIVEBUCK RUN SEWERSTA.0+00.00 TOSTA.17+25.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C309
LIVEBUCK RUN SEWERSTA.17+25.00 TOSTA.34+50.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C310
LIVEBUCK RUN SEWERSTA.34+50.00 TOSTA.40+08.09
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C311
E. CHIPETA GEOMETRYPLAN
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C312
E. CHIPETA SEWERSTA.0+00.00 TOSTA.17+25.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C313
E. CHIPETA SEWERSTA.17+25.00 TOSTA.23+25.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C314
SHAVANO TO OURAYSEWER STA.0+00.00 TOSTA.18+05.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C315
W. CHIPETA STA.0+00.00TO STA.16+98.72
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C316
MARCY POINT SEWERSTA.0+00.00 TOSTA.9+30.67
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
WE
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C317
PHASE 6 SEWER GEOMETRY
N
W E
S
C318
HIGHGRANGE SEWERCONNECTION STA.0+00.00TO STA.17+25.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C319
HIGHGRANGE SEWERCONNECTION STA.17+25.00TO STA.34+50.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C320
HIGHGRANGE SEWERCONNECTION STA.34+50.00TO STA.51+75.00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C321
HIGHGRANGE SEWERCONNECTION STA.51+75.00TO STA.52+83.15
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C400
HIGHGRANGE WMGEOMETRY
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C401
HIGHGRANGE WM P&P STA.600+00 TO 618+00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C402
HIGHGRANGE WM P&PSTA. 618+00 TO 636+00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C403
HIGHGRANGE WM P&PSTA. 636+00 TO 654+00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C404
HIGHGRANGE WM P&PSTA. 654+00 TO 672+00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C405
HIGHGRANGE WM P&PSTA. 672+00 TO 690+50
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C406
HIGHGRANGE WM P&PSTA. 690+50 TO 708+00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C407
HIGHGRANGE WM P&PSTA. 708+00 TO 726+00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C408
HIGHGRANGE WM P&PSTA. 726+00 TO 744+00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C409
HIGHGRANGE WM P&PSTA. 744+00 TO 762+00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C410
HIGHGRANGE WM TOWELL #16
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C411
TANK ACCESS P&P
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
N
W E
S
C420
EAST CHIPETA WMGEOMETRY
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C421
CHIPETA EAST WM P&PSTA. 800+00 TO 811+50
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
N
W
E
S
C422
CHIPETA EAST WM P&PSTA. 811+50 TO 818+00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C423
CHIPETA WEST WMGEOMETRY
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C424
CHIPETA WEST WM P&PSTA. 820+00 TO 838+00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C425
CHIPETA WEST WM P&PSTA. 838+00 TO 841+80
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C426
MARCY WM GEOMETRY
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C427
MARCY WM P&P STA.850+00 TO 858+80
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C430
OURAY WM GEOMETRY
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C431
OURAY WM P&P STA.860+00 TO 866+30
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C432
OURAY WM P&P STA.866+30 TO 878+60
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C433
SHAVANO WM GEOMETRY
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C434
SHAVANO WM P&P STA.880+00 TO 885+60
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C435
SHAVANO WM LOOPGEOMETRY
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C436
SHAVANO WM LOOP P&PSTA. 900+00 TO 909+80
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C440
OPUNTIA WM GEOMETRY
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C441
OPUNTIA WM P&P STA.890+00 TO 894+20
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
N
W E
S
C450
LIVEBUCK WEST WMGEOMETRY
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C451
LIVEBUCK WEST WM P&PSTA. 895+00 TO 904+60
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C452
LIVEBUCK EAST WMGEOMETRY
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C453
LIVEBUCK EAST WM P&PSTA. 950+00 TO 968+00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C454
LIVEBUCK EAST WM P&PSTA. 968+00 TO 986+00
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
C455
LIVEBUCK EAST WM P&PSTA. 986+00 TO 987+60
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W
E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C470
WELL 16 WATERTREATMENT LAYOUT
N
W
E
S
N
W
E
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C471
WELL 20 WATERTREATMENT LAYOUT
N
W
E
S
N
W
E
S
5CHLORINE FEED SYSTEM
NTS
1CHLORINE INJECTOR
NTS
8SAMPLING TAP
NTS
2FLOOR PIPE SUPPORT
NTS
4UNISTRUT WALL PIPE SUPPORT
NTS
3WALL PENETRATION WITH CORE HOLE
NTS
7FLOOR DRAIN DETAIL
NTS6GRATING SUPPORT DETAIL
NTS
9AIR RELEASE VALVE ASSEMBLY
NTS
10PRESSURE TRANSDUCER ASSEMBLY
NTS
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C472
WATER TREATMENTDETAILS
C473
WATERMAIN DETAILS
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
STEP 1
STEP 2
STEP 3
C474
WATERMAIN DETAILS
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C500
SHALLOW UTIL.OVERVIEW
C501
SHALLOW UTIL. DETAILS
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
C502
SHALLOW UTIL. SHEET-1
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C503
SHALLOW UTIL. SHEET-2
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C504
SHALLOW UTIL. SHEET-3
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C505
SHALLOW UTIL. SHEET-4
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C506
SHALLOW UTIL. SHEET-5
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C507
SHALLOW UTIL. SHEET-6
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C508
SHALLOW UTIL. SHEET-7
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C509
SHALLOW UTIL. SHEET-8
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C510
SHALLOW UTIL. SHEET-9
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C511
SHALLOW UTIL. SHEET-10
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
N
W E
S
C601
SWMP
CHECKED BY:
#
DE
S
C
R
I
P
T
I
O
N
DA
T
E
D
R
A
W
N
B
Y
CONSTRUCTION
DRAWN BY:
JOB #:
SP
R
I
N
G
V
A
L
L
E
Y
R
A
N
C
H
GA
R
F
I
E
L
D
C
O
U
N
T
Y
CO
L
R
O
A
D
O
2021-08
FOR
ADW
DCS
RO
A
R
I
N
G
F
O
R
K
E
N
G
I
N
E
E
R
I
N
G
59
2
H
I
G
H
W
A
Y
1
3
3
CA
R
B
O
N
D
A
L
E
,
C
O
8
1
6
2
3
PH
:
(
9
7
0
)
3
4
0
-
4
1
3
0
1
FI
N
A
L
P
L
A
T
2-
2
4
-
2
0
2
2
T
R
S
“”
Fence (plastic) shall be placed in combination with erosion logs to prevent
encroachment of construction traffic and sediment into state waters prior to
start of construction disturbances. Fence (plastic) shall be placed adjacent
to the wetlands; erosion logs shall be placed between the plastic fence and
disturbance area. Logs shall be placed to direct flows away from or filter
water running into wetlands from disturbance areas.
Placed in ditches immediately upon completion of ditch grading to reduce
velocity of runoff in ditch. For existing ditches, place prior to start of
construction disturbances.
Placed at mouth of culvert inlets and over top of culvert at inlet and outlet
where disturbance may be occurring adjacent to pipe to prevent sediment
laden water from entering pipe or drainage. Place prior to the start of
construction disturbances.
Placed around inlet grate or slope and ditch paving to prevent sediment
from entering inlet. Place prior to the start of construction disturbances.
Placed prior to construction commencing to address potential run-on water
from off site, and to divert around disturbed area. *Can be used to stockpile
topsoil for salvage.
Prior to any site disturbance work commencing, existing topsoil shall be
scraped to a depth six inches or as specified, and placed in stockpiles or
windrows. Upon completion of final grading, topsoil shall be evenly
distributed over embankment to a depth of six inches or as specified.
Temporary stabilization of disturbance and to minimize wind and erosion.
Not to be used in areas of concentrated flows, i.e. ditch lines. To be for either
Interim or Permanent Stabilization placed as a surface cover for erosion
control. May be used as surface cover when work is temporarily halted and
as approved by the Engineer for stockpiles.
Permanent Stabilization of disturbance and to reduce runoff and control
erosion on disturbed areas.
Permanent Stabilization of disturbance and to reduce runoff and control
erosion on disturbed areas.