Loading...
HomeMy WebLinkAbout1.19 Engineering PlansWW W C000 COVER FINAL PUBLIC IMPROVEMENTSSPRING VALLEY RANCHPHASE 2GARFIELD COUNTY, CO VICINITY MAP CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C001 GENERAL CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S WW W C002 OVERALL SITE N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C100 OVERALL DRAINAGE N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C101 BASIN-A RETENTION POND N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C102 STORM DETAILS CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C103 OFFSITE CULVERTS 1, 2 & 3 N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C104 OFFSITE CULVERTS 3 & 4 N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C105 HIGHGRANGE CULVERTS1&2 N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C106 HIGHGRANGE CULVERTS3&4 N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C107 HIGHGRANGE CULVERTS5&6 N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C108 HIGHGRANGE CULVERTS 7,8 & 9 N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C109 E. CHIPETA CULVERTS 1&2 N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C110 MARCY POINT CULVERTS1&2 N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C111 MINOR ROAD CULVERTS N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C200 ROAD SECTIONS CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C201 HIGHGRANGE GEOMETRYSTA. 100+00 T0 202+00 N W E S C202 HIGHGRANGE GEOMETRYSTA 200+00 TO 298+50 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C203 HIGHGRANGE GEOMETRYSTA 298+50 TO 352+66.18 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C204 HIGHGRANGESTA.100+00.00 TOSTA.117+80.00 N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C205 HIGHGRANGESTA.117+80.00 TOSTA.135+60.00 N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C206 HIGHGRANGESTA.135+60.00 TOSTA.153+40.00 N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C207 HIGHGRANGESTA.153+40.00 TOSTA.171+20.00 N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C208 HIGHGRANGESTA.171+20.00 TOSTA.189+00.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C209 HIGHGRANGESTA.189+00.00 TOSTA.202+00.00 N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C210 HIGHGRANGESTA.200+00.00 TOSTA.218+00.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C211 HIGHGRANGESTA.218+00.00 TOSTA.236+00.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C212 HIGHGRANGESTA.236+00.00 TOSTA.254+00.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N WE S C213 HIGHGRANGESTA.254+00.00 TOSTA.272+00.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C214 HIGHGRANGESTA.272+00.00 TOSTA.290+00.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C215 HIGHGRANGESTA.290+00.00 TOSTA.308+00.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C216 HIGHGRANGESTA.298+50.00 TOSTA.316+50.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C217 HIGHGRANGESTA.316+50.00 TOSTA.334+50.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S STOP C218 HIGHGRANGESTA.334+50.00 TOSTA.352+50.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C219 E. CHIPETA RUN GEOMETRYPLAN CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C220 E. CHIPETA RUNSTA.28+00.00 TOSTA.33+01.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C221 E. CHIPETA RUNSTA.33+01.00 TOSTA.38+02.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C222 E. CHIPETA RUNSTA.38+02.00 TOSTA.43+03.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C223 E. CHIPETA RUNSTA.43+03.00 TOSTA.47+00.85 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S E1 7 N W E S C224 VELTUS DR. CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C225 W.CHIPETA RUNGEOMETRY PLAN N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C226 W. CHIPETA RUNSTA.48+00.00 TOSTA.53+01.00 N WE S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C227 W. CHIPETA RUNSTA.53+01.00 TOSTA.58+02.00 N W E S C228 W. CHIPETA RUNSTA.58+02.00 TOSTA.63+03.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C229 W. CHIPETA RUNSTA.63+03.00 TOSTA.68+04.00 N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C230 W. CHIPETA RUNSTA.68+04.00 TOSTA.69+86.45 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C231 MARCY POINT N WE S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C232 OURAY TRAIL N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C233 SHAVANO TRACE N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C234 LUPINE TRACE N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C235 OPUNTIA TRACE N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C236 LIVE BUCK RUN N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C237 CR 114 DETAILS & TYPSECTIONS 1 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C238 CR 114 DETAILS & TYPSECTIONS 2 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C239 CR 114 & 115 GEOMETRYPLAN CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C240 CR 114 P&PSTA.7+80.00-15+75.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C241 CR114 P&PSTA.15+75.00-24+25.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C242 CR 114 P&PSTA.24+25.00-32+35.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C243 CR 114 P&PSTA.32+35.00-40+50.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C244 CR 114 P&PSTA.40+50.00-48+70.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C245 CR 114 P&PSTA.48+70.00-56+80.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C246 CR 114 P&PSTA.56+80.00-65+15.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C247 CR 114 P&PSTA.65+15.00-73+15.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C248 CR 114 P&PSTA.37+15.00-81+50.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C249 CR 114 P&PSTA.81+50.00-89+50.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C250 CR 115 P&PSTA.89+50.00-92+13.57 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S STOP C251 CR 115 INTERSECTION P&P CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C300 SEWER DETAILS CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C301 HIGHGRANGE SEWERGEOMETRY N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C302 HIGHGRANGE SEWERSTA.0+00.00 TOSTA.17+25.00 N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C303 HIGHGRANGE SEWERSTA.17+25.00 TOSTA.34+50.00 N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C304 HIGHGRANGE SEWERSTA.34+50.00 TOSTA.51+75.00 N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C305 HIGHGRANGE SEWERSTA.51+75.00 TOSTA.69+00.00 N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C306 HIGHGRANGE & OPUNTIASTA.69+00 TO STA.78+05 N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C307 LIVEBUCK RUN SEWERGEOMETRY CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C308 LIVEBUCK RUN SEWERSTA.0+00.00 TOSTA.17+25.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C309 LIVEBUCK RUN SEWERSTA.17+25.00 TOSTA.34+50.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C310 LIVEBUCK RUN SEWERSTA.34+50.00 TOSTA.40+08.09 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C311 E. CHIPETA GEOMETRYPLAN CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C312 E. CHIPETA SEWERSTA.0+00.00 TOSTA.17+25.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C313 E. CHIPETA SEWERSTA.17+25.00 TOSTA.23+25.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C314 SHAVANO TO OURAYSEWER STA.0+00.00 TOSTA.18+05.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C315 W. CHIPETA STA.0+00.00TO STA.16+98.72 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C316 MARCY POINT SEWERSTA.0+00.00 TOSTA.9+30.67 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N WE S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C317 PHASE 6 SEWER GEOMETRY N W E S C318 HIGHGRANGE SEWERCONNECTION STA.0+00.00TO STA.17+25.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C319 HIGHGRANGE SEWERCONNECTION STA.17+25.00TO STA.34+50.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C320 HIGHGRANGE SEWERCONNECTION STA.34+50.00TO STA.51+75.00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C321 HIGHGRANGE SEWERCONNECTION STA.51+75.00TO STA.52+83.15 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C400 HIGHGRANGE WMGEOMETRY CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C401 HIGHGRANGE WM P&P STA.600+00 TO 618+00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C402 HIGHGRANGE WM P&PSTA. 618+00 TO 636+00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C403 HIGHGRANGE WM P&PSTA. 636+00 TO 654+00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C404 HIGHGRANGE WM P&PSTA. 654+00 TO 672+00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C405 HIGHGRANGE WM P&PSTA. 672+00 TO 690+50 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C406 HIGHGRANGE WM P&PSTA. 690+50 TO 708+00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C407 HIGHGRANGE WM P&PSTA. 708+00 TO 726+00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C408 HIGHGRANGE WM P&PSTA. 726+00 TO 744+00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C409 HIGHGRANGE WM P&PSTA. 744+00 TO 762+00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C410 HIGHGRANGE WM TOWELL #16 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C411 TANK ACCESS P&P CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S N W E S C420 EAST CHIPETA WMGEOMETRY CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C421 CHIPETA EAST WM P&PSTA. 800+00 TO 811+50 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S N W E S C422 CHIPETA EAST WM P&PSTA. 811+50 TO 818+00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C423 CHIPETA WEST WMGEOMETRY CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C424 CHIPETA WEST WM P&PSTA. 820+00 TO 838+00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C425 CHIPETA WEST WM P&PSTA. 838+00 TO 841+80 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C426 MARCY WM GEOMETRY CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C427 MARCY WM P&P STA.850+00 TO 858+80 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C430 OURAY WM GEOMETRY CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C431 OURAY WM P&P STA.860+00 TO 866+30 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C432 OURAY WM P&P STA.866+30 TO 878+60 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C433 SHAVANO WM GEOMETRY CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C434 SHAVANO WM P&P STA.880+00 TO 885+60 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C435 SHAVANO WM LOOPGEOMETRY CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C436 SHAVANO WM LOOP P&PSTA. 900+00 TO 909+80 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C440 OPUNTIA WM GEOMETRY CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C441 OPUNTIA WM P&P STA.890+00 TO 894+20 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S N W E S C450 LIVEBUCK WEST WMGEOMETRY CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C451 LIVEBUCK WEST WM P&PSTA. 895+00 TO 904+60 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C452 LIVEBUCK EAST WMGEOMETRY CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C453 LIVEBUCK EAST WM P&PSTA. 950+00 TO 968+00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C454 LIVEBUCK EAST WM P&PSTA. 968+00 TO 986+00 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C455 LIVEBUCK EAST WM P&PSTA. 986+00 TO 987+60 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C470 WELL 16 WATERTREATMENT LAYOUT N W E S N W E S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C471 WELL 20 WATERTREATMENT LAYOUT N W E S N W E S 5CHLORINE FEED SYSTEM NTS 1CHLORINE INJECTOR NTS 8SAMPLING TAP NTS 2FLOOR PIPE SUPPORT NTS 4UNISTRUT WALL PIPE SUPPORT NTS 3WALL PENETRATION WITH CORE HOLE NTS 7FLOOR DRAIN DETAIL NTS6GRATING SUPPORT DETAIL NTS 9AIR RELEASE VALVE ASSEMBLY NTS 10PRESSURE TRANSDUCER ASSEMBLY NTS CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C472 WATER TREATMENTDETAILS C473 WATERMAIN DETAILS CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S STEP 1 STEP 2 STEP 3 C474 WATERMAIN DETAILS CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C500 SHALLOW UTIL.OVERVIEW C501 SHALLOW UTIL. DETAILS CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S C502 SHALLOW UTIL. SHEET-1 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C503 SHALLOW UTIL. SHEET-2 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C504 SHALLOW UTIL. SHEET-3 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C505 SHALLOW UTIL. SHEET-4 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C506 SHALLOW UTIL. SHEET-5 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C507 SHALLOW UTIL. SHEET-6 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C508 SHALLOW UTIL. SHEET-7 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C509 SHALLOW UTIL. SHEET-8 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C510 SHALLOW UTIL. SHEET-9 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C511 SHALLOW UTIL. SHEET-10 CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S N W E S C601 SWMP CHECKED BY: # DE S C R I P T I O N DA T E D R A W N B Y CONSTRUCTION DRAWN BY: JOB #: SP R I N G V A L L E Y R A N C H GA R F I E L D C O U N T Y CO L R O A D O 2021-08 FOR ADW DCS RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E , C O 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 1 FI N A L P L A T 2- 2 4 - 2 0 2 2 T R S “” Fence (plastic) shall be placed in combination with erosion logs to prevent encroachment of construction traffic and sediment into state waters prior to start of construction disturbances. Fence (plastic) shall be placed adjacent to the wetlands; erosion logs shall be placed between the plastic fence and disturbance area. Logs shall be placed to direct flows away from or filter water running into wetlands from disturbance areas. Placed in ditches immediately upon completion of ditch grading to reduce velocity of runoff in ditch. For existing ditches, place prior to start of construction disturbances. Placed at mouth of culvert inlets and over top of culvert at inlet and outlet where disturbance may be occurring adjacent to pipe to prevent sediment laden water from entering pipe or drainage. Place prior to the start of construction disturbances. Placed around inlet grate or slope and ditch paving to prevent sediment from entering inlet. Place prior to the start of construction disturbances. Placed prior to construction commencing to address potential run-on water from off site, and to divert around disturbed area. *Can be used to stockpile topsoil for salvage. Prior to any site disturbance work commencing, existing topsoil shall be scraped to a depth six inches or as specified, and placed in stockpiles or windrows. Upon completion of final grading, topsoil shall be evenly distributed over embankment to a depth of six inches or as specified. Temporary stabilization of disturbance and to minimize wind and erosion. Not to be used in areas of concentrated flows, i.e. ditch lines. To be for either Interim or Permanent Stabilization placed as a surface cover for erosion control. May be used as surface cover when work is temporarily halted and as approved by the Engineer for stockpiles. Permanent Stabilization of disturbance and to reduce runoff and control erosion on disturbed areas. Permanent Stabilization of disturbance and to reduce runoff and control erosion on disturbed areas.