Loading...
HomeMy WebLinkAboutStructural Stair RevisionsSW GENERAL NOTES, LEGEND & SHEET INDEX SHEAR WALL DETAILS & SCHEDULE FOUNDATION & FLOOR FRAMING PLANS SECOND FLOOR FRAMING, LOWER & UPPER ROOF FRAMING PLANS FOUNDATION DETAILS FRAMING DETAILS S1.1 S1.2 S2.1 S2.2 S3.1 S4.1 P.A.F.POWDER ACTUATED FASTENER STEEL WIDE FLANGE COLUMN MOMENT CONNECTION STEEL PIPE COLUMN EDGE OF PLYWOOD SHEATHING BEAM FRAMING MEMBER WOOD FRAME BEARING WALL BELOW OVERFRAME AREA FLOOR ELEVATION TRANSITION ( ) T.O.S. TOP OF STEEL ELEV TOP OF SLAB ELEVATION TOP OF TIMBER (WALL PLATES OR BEAM NAILER)[ ] TUBE STEEL COLUMN - HSS 4X4X1/4 U.N.O. STEEL BUCKET FOR TIMBER BEAM HANGER FOR TIMBER MEMBER TOP OF FOOTING ELEVATIONT.O.F. TOP OF WALL ELEVATIONT.O.W. TOP OF PLYWOOD ELEVATIONT.O. PLY. SHEAR PANELING BELOW 2X6 @ 16 EXT / 2X4 @ 16 INT. U.N.O. UP(U) DOWN(D) THROUGH(T) (E)EXISTING (N)NEW U.N.O.UNLESS NOTED OTHERWISE WOOD FRAME BEARING WALL ABOVE 2X6 @ 16 EXT / 2X4 @ 16 INT. U.N.O. UNDERFRAME AREA TOP OF WALL STEP UP C.J.CONTROL JOINT CRIPPLE POST WITHIN FRAMING LEVEL (3) - 2x6 U.N.O. V.I.F.VERIFY IN FIELD ADHESIVEADH. FACE OF STUDF.O.S. ABOVEABV. CLEARCLR. STEEL FRAMING MEMBER STEEL TO STEEL SHEAR CONNECTION BOTTOM OF GRADE BEAM STEP UP BUILT-UP POST DOWN. WHERE SHOWN ISOLATED USE (3) 2X6 MIN AT ROOF PLAN AND (4) 2X6 MIN AT SECOND FLOOR PLAN U.N.O. MULTIPLE STUD PACK DOWN. USE (3) 2X6 MIN AT ROOF PLAN & (4) 2X6 MIN AT 2ND FLOOR PLAN U.N.O. WHERE SHOWN AT JAMBS, USE DBL 2X6 KING & SINGLE 2X6 TRIMMER U.N.O. BUIL T - U P MULTIPLE STUD PACK OR BUILT-UP POST UP AND DOWN (SEE ABOVE) - PACK OUT WITHIN FLOOR PLATE REINFORCINGREINF. FOOTINGFTG. BOTTOMBOT. HORIZONTALHORIZ. VERTICALVERT. CONTINUOUSCONT. AND SHEAR WALL DESIGNATION - SEE SCHEDULE DO.DITTO (Repeat above line or adjacent line) STD.STANDARD ARCHITECTARCH. FOOTING STEP DOWN PLY.PLYWOOD SHEAR PANELING ABOVE SHTG.SHEATHING BUILT-UP POST OR MULTIPLE STUD PACK UP (SEE ABOVE) - PACK OUT WITHIN FLOOR PLATE FRAMING DETAILSS4.2 TIMBER PRODUCTS 1.All studs for walls up to 12' height shall be Doug Fir (DF) or Hem Fir (HF) Grade No. 2 or better U.N.O. in plan . Studs for walls up to 18' high shall be Timberstrand 1.3E or Timberstrand 1.5E where 7-1/4" depth is required. Exterior studs shall be 2x6 @ 16 maximum spacing U.N.O. Interior studs shall be 2x4 @ 16 maximum spacing U.N.O.. Plates shall be DF or HF No. 1. Doubled top plates shall be lapped a minimum of 6 feet and the lap face nailed W/ (12) 16d or spliced W/ MSTA36 or CS14 straps U.N.O. 2.Typical Glue Laminated members shall be made of Douglas Fir-Larch with 12% MC. Simple span members shall conform to 24FV4 and multiple span or cantilevered members shall conform to 24FV8. Tops shall be clearly labeled. 3.Laminated Veneer Lumber (LVL) shall be Microllam 1.9E with flexural stress Fb = 2,600 psi or approved equal. When multiple LVL's are called out, use typical nailing and bolting as follows unless noted otherwise: 2 LVL's use 2 rows of 16d sinkers @ 12" O.C.; 3 LVL's use 3 rows of 16d sinkers @ 12" O.C.; 4 LVL's use ½" Dia through bolts 2 rows @ 24" O.C. staggered. 4.Laminated Strand Lumber (LSL) shall be Timberstrand 1.55E with flexural stress Fb=2,325 psi or approved equal. 5.Parallel Strand Lumber (PSL) shall be Parallam 2.0E with flexural stress Fb=2,900 psi or approved equal. PSL beams shall be provided solid width to dimension indicated on drawings. 6.Plywood and Oriented Strand Board. Flooring shall be 23/32" 48/24 rated T&G Plywood glued at joints and joists and nailed w/ 10d (x 2 1/4) at 6" O.C. at all framing U.N.O. Roof sheathing shall be 19/32" 40/20 rated nailed w/ 10d (x 2 1/4) at 6" O.C. at all framing with all edges supported by framing, clips or blocking and shall be oriented perpendicular to rafters U.N.O. Typical shear wall paneling shall be 7/16" Sheathing grade structural use panels oriented vertically or horizontally and nailed with 8d @ 4-12, all edges blocked (flat or vertical blocking OK) U.N.O. 7.At shear wall bottom plate anchor bolts, plate washers shall be provided U.N.O in shear wall schedule. Plate washers shall be a minimum of 1/4" thick x 3" square with diagonally slotted hole up to 1 3/4" in length OK. Plate washer must be installed so that plate edge is within 1/2" of the shear paneling. Simpson BP series plates may be used. 8.Wood trusses shall be designed to fulfill stress requirements and/or loads noted. At a minimum, design for 10 psf top chord DL and 10 psf bottom chord DL in addition to roof loads. Shop drawings shall include calculations bearing the stamp of a Registered Engineer and shall be submitted to the Engineer for approval prior to fabrication. A minimum of Simpson H2.5 clip shall be installed at each truss ply bearing with additional uplift anchorage provided where truss calculations indicate. Truss supplier shall indicate on layout where additional uplift anchorage is required. 9.Exterior headers shall be (2) 7 1/4" LVL W/ insulated core or inner layer U.N.O. and interior headers shall be (3) 2x10 U.N.O. Headers shall bear on single trimmer and double king stud U.N.O. Headers shall be end nailed through first king stud with 16d @ 2" O.C. at each lamination. Double King Studs shall be face nailed to each other W/ (2) rows 16d @ 8" O.C. Trimmers shall be face nailed into king studs W/ (2) rows 16d @ 12" O.C. EA ply. 10.Exposed timbers shall be DF No. 1 or better and appropriately treated. 11.Rafters and all built-up floor/roof sawn lumber members shall be DF or HF No. 1 U.N.O. 12.Joists shall be glued and nailed to hangers. 13.Studs of gable end walls may break at lateral supports such as ceiling lids provided temporary bracing is provided during construction. Otherwise, studs shall be continuous bottom plate to raked top plates. 14.Provide solid blocking (rim, 2X, or LVL) in floor framing between upper load bearing wall bottom plate and lower wall top plate when these run perpendicular to floor joists to prevent crushing of joists where load bearing wall also occurs below. 15.Provide double joist or perpendicular blocking at 24" o.c. minimum below non-load bearing partitions running parallel to floor joists. 16.Provide blocking between joists over all interior load bearing walls and beams and at 8 foot max centers along joist spans. 17.Provide blocking within floor and roof systems in conformance with IBC requirements and crush blocking below posts within floor systems or at floor edges for continuous bearing to foundations or support beams/posts below. 18.Lag bolts shall be lead drilled for threads for NDS standards and clearance drilled for unthreaded shank portion. 19.Provide adequate venting at crawl spaces, attics, and within rafters (Re: IRC and architectural details). 20.Unless noted otherwise, minimum nailing shall be in accordance with IBC Table 2304.9.1 - Fastening Schedule. 21.Steel connectors shall be manufactured by Simpson Company or approved equal. Unless noted otherwise, hangers to join rafters, joists or beams at flush conditions shall be U or HU designation of the full dimension of the framing member. 22.Isolated beam-to-post connections shall be made with Simpson CCQ or CC column caps unless detailed otherwise. Beams bearing on stud packs or posts within wall framing may bear directly on the wall top plates. 23.Isolated post base connections shall be made with Simpson ABW series post bases unless detailed otherwise. Posts or stud packs within wall framing may bear directly on the wall bottom plate. 24.The plies of multiple 2x stud packs shall be face nailed with 2 rows 16d nails @ 12" O.C. at each ply. 25.The plies of built-up 2x columns shall be attached together as follows: ·3 ply columns shall be nailed together with 2 rows of 16d nails @ 12" o.c. staggered each face( 6" total vertical spacing each face) starting 1" from the edge of the column on both faces of the column and staggered ·4 ply columns shall be screwed with 2 rows of SDS 1/4x6 @ 16" staggered each face (8" vertical spacing each face) starting 1 1/2" from edge of column on both faces of the column and staggered ·5 ply and 6 ply columns shall be through bolted with (2) rows 1/2" bolts at 8" o.c. (4" total vertical spacing) starting 1 1/2" from edge of column. ·Alternatively, a solid LSL or PSL post of equivalent cross sectional area to the built-up post may be provided. FOUNDATIONS & CONCRETE 1.Foundations have been designed using the values stated under the "General" section opposite based on the subsurface study by Kumar & Associates dated September 13, 2021 (job number 21-7-565) in which overexcavation and a minimum of 6 feet of compacted structural fill is required below all footings. Placement of fill is to be observed, tested and approved by the Geotechnical Engineer. Carry out all work in accordance with the recommendations in the Subsoil Study. The Contractor shall notify a representative of the Geotechnical Engineer upon initial excavation in order to certify the excavated conditions. If findings differ from the originally anticipated conditions and/or design modifications are required, the Engineer shall be promptly notified in order that any revisions may be made prior to proceeding with construction. All construction shall be in conformance with the recommendations of the soils report. 2.All bottom of footing elevations shall be a minimum of 36" below grade or local frost cover requirements if greater. Footing elevations referenced herein are for initial design based on anticipated conditions; final elevations to be determined by field conditions and Geotechnical Engineer determinations. If any foundations are to be constructed at elevations lower than indicated on these drawings, notify the structural engineer to perform any necessary re-design prior to placement of forms or reinforcement. 3.Backfill shall be compacted to a minimum of 95% standard proctor density against the sides of footings and in structural or paved areas. Backfill shall be compacted to a minimum of 90% standard proctor density in landscaped areas. 4.Prior to placement of structural reinforcement, the bottom of excavation shall be viewed by the Geotechnical Engineer to certify adequacy of subgrade for placement of concrete. 5.Contractor shall protect excavations and direct site drainage to avoid deterioration of substrates prior to concrete placement. 6.Concrete aggregate shall conform to the requirements of ASTM C-33. Maximum fly ash content in cementitious material shall be 20%. Maximum slump at the truck discharge point shall be 6". Air content shall be in accordance with local industry standard practice. Additional concrete properties shall be as follows: ·Footings compressive strength (F'c) at 28 days 3,000 psi, water cement ratio (W/C) 0.55 max ·Foundation walls and pedestals F'c 4,000 psi, W/C 0.50 max ·Interior slabs on grade F'c 4,500 psi, W/C 0.45 max ·Exterior slabs (site flatwork) F'c 4,500 psi (CDOT Class D) 7.Non-Shrink grout shall be Rapid Set, Masterflow # 928, or equal meeting ASTM C-1107 with prior approval of the engineer. 8.Adhesive anchors shall be Simpson AT-XP or Hilti HY 200. These shall be of the depth indicated and shall be installed in accordance with the manufacturer specifications. Special Inspection shall be provided unless noted otherwise. 9.Expansion Anchors shall be Hilti Kwik Bolt KB-TZ or Simpson Strong Bolt 2. These shall be of the depth indicated and shall be installed in accordance with the manufacturer specifications. Special Inspection shall be provided unless noted otherwise. 10.Reinforcing steel shall be high strength deformed bars in compliance with ASTM A-615. Yield strength (Fy) shall be 60 ksi. Welded wire reinforcement shall conform to ASTM A-185 and shall be lapped a minimum of one full mesh at ends and sides and tied together. 11.Steel shall be detailed and installed in accordance with the latest editions of ACI 318 and the ACI Detailing Manual. 12.All bars and embedded items must be secure prior to placement of concrete; placement of any items during the pour is not permitted without prior approval of the Engineer. 13.Unless noted otherwise, clear distance to reinforcement for placement against earth shall be 3" and clear distance to reinforcement for placement against forms shall be 2" for bars #6 and greater and 1-1/2" for bars #5 and smaller. 14.Splices in reinforcement shall not be made unless otherwise detailed herein or previously approved on the fabrication drawings. Unless noted otherwise or prohibited, lap length of reinforcement steel shall be 40 db (bar diameters). Continuous reinforcement in beams and walls shall be spliced at midspan for top bars and over supports for bottom bars. 15.Provide a minimum of 2-#5 bars at all jambs, heads, and sills of openings as well as all top and bottom of walls, and top and bottom of wall steps. 16.Wall concrete must be allowed to cure for a minimum of 7 days prior to backfill unless high early additives or other measures, such as partial backfill to facilitate other portions of the work, are specifically approved by the Engineer in advance. 17.Control joints shall be spaced at a maximum of 15' on slabs U.N.O. on plan. Cold joints or construction joints shall be as detailed herein or otherwise pre-approved by the Engineer. Slabs on grade may be poured continuously and sawcut within 12 hours at minimum 15' intervals 1/8" x 1" deep. Reinforce slabs on grade with welded plain wire mesh 6x6-W2.1xW2.1 ASTM A-1064 (Fy=65 ksi) U.N.O. on plan and pour over a 4 inch gravel drainage course U.N.O. on plan. 18.All exposed concrete edges shall have a minimum of 3/4" chamfer or 1/2" tooled round unless noted otherwise. 19.Reference Architectural drawings for non-structural concrete. 20.Care should be exercised in backfill. Heavy equipment should not be used in proximity of retaining walls or stem walls. When backfilling stem walls that have soil on both sides, backfill should be brought up evenly to avoid loading the walls in retention. 21.Reference Architectural and Civil drawings for waterproofing and drainage provisions. All walls are designed for backfill free from groundwater pressure and all footing subgrades shall be protected from excessive wetting - a reliable perimeter drain with adequate slope and suitable discharge must be installed per a Geotechnical Engineer's recommendations. 22.At sawcut edges or cold joints, unless specifically detailed otherwise, apply bonding agent. Use Dayton Superior PVA Bonding Agent J41 or equivalent with prior approval. GENERAL NOTES LEGEND AND SHEET INDEX AS NOTED 05/05/23 Permit/Construction 05/05/23 S1.1 These documents are intended for the exclusive use of the project specified below. The use of these documents for any other purpose is not authorized. Written authorization from Glenwood Structural and Civil must be obtained for any other use. This document is to be used within one year of the date of preparation. Use after that period is not authorized. Date Description Scale: Job Number Engineer Date 23705 AG STRUCTURAL & CIVIL, INC. E N G I N E E R S I C O N S T R U C T O R S G L E N W O O D 812 Pitkin Avenue, Glenwood Springs CO 81601 gsc@sopris.net I 970-928-0135 GALLEGOS RESIDENCE 157 Sage Meadow Rd. Glenwood Springs, CO Drafter/Designer KK/WG,AG GENERAL 1.DESIGN CRITERIA: a.Code: 2015 IRC & IBC where required b.ASCE 7 Building Occupancy Risk Category II c.Design Roof Snow Load Pf = 40psf (Pg = 57 psf; Ce = 1.0; Ct =1.0; Is = 1.0) with drift and/or sliding surcharges per ASCE 7, Chapter 7) d.Floor Live Loads 40 psf e.Seismic Design Category "C", Site Class "D", Basic Seismic Force Resisting System per ASCE 7 Table 12.2-1 is type A-15; Ie = 1.0; Ss = 0.336g, S1 = 0.084g, Sds = 0.343g, Sd1 = 0.134g, R = 6.5, Cs = 0.053, V = 7.4k (including 20% roof snow load). Designed by equivalent lateral force procedure (Section 12.8). f.Wind Ultimate Design Speed (3-second gust) Vult = 115 mph (Vasd = 90 mph), Exposure B, GCpi = 0.18 g.Allowable soil bearing 1,200 psf. See Foundations and Concrete Note 1. h.Active soil pressure 55 pcf for restrained condition; 45 pcf for free standing walls i.Passive soil pressure 325 pcf j.Coefficient of friction .35 2.Work shall be performed in accordance with regulations of all agencies having jurisdiction, including, but not limited to: Federal, State, County, and OSHA standards. 3.Dimensional information provided is only for general reference for interpretation of the structural design. Dimensional information is not intended to be relied upon for construction or fabrication. The Contractor shall independently arrive at all horizontal and vertical dimensioning, coordinate all dimensions with those provided among these documents and with the Architectural, verify all field conditions and site grades, and communicate any significant discrepancies to the Engineer. Any discrepancies encountered that may affect the work shall be communicated to the Engineer at the earliest prior to proceeding with any work that may be affected. 4.The Contractor is responsible for all bracing and shoring for vertical/wind/seismic/soil retention loads, shoring and protection of adjacent property, temporary construction, and means that may be required to carry out the work safely and appropriately. Field observations by the Engineer shall not encompass these considerations. 5.Shop drawings shall be reviewed in detail for quality and conformance to the construction documents by the General Contractor prior to submittal to the Engineer. Any deviations or requested substitutions from the construction documents must be clearly identified in the submittal. Drawings with obvious deficiencies or unidentified deviations from the construction documents will be returned to the General Contractor for proper review prior to the Engineer's review. Allow two weeks turnaround time for the Engineer's review of shop drawings. Shop drawings shall be submitted, at a minimum, for the following: ·Concrete Mix Design ·Trusses 6.Where discrepancies may be encountered in the construction documents, the more stringent requirement shall govern unless otherwise clarified by the Engineer. 7.Special lnspections are not required due to work of minor nature or as warranted by conditions in the jursdiction per IBC Section 1704.2 pending approval from the Building Official. 8.At a minimum of five working days prior to frame inspection, notify the engineer for observation of all work in place. Confirmation by the engineer in writing shall be obtained prior to applying any architectural covering over structural items and prior to building department sign off on framing. 9.Engineer's acceptance must be secured in advance for all structural deviations or substitutions. 10.These documents are intended to complement the Architectural documents and shall not be used independently thereof. 11.These documents are intended for the exclusive use of this project. The use of these documents for any other purpose is not authorized. Written authorization from Glenwood Structural and Civil, Inc. must be obtained for any other use. This document is to be used within one year of the date of preparation. Use after that period is not authorized. SCALE: = 1'-0" SHEAR WALL BASE CONNECTION @ FOUNDATION STEM WALL 1 S1.21" SCALE: = 1'-0" SHEAR WALL BASE CONNECTION @ FLOOR TO FOUNDATION CONDITION 3 S1.21" SCALE: = 1'-0" BASE CONNECTION @ FLOOR OVER FRAMED WALL CONDITION 4 S1.21" SCALE: = 1'-0" HOLDOWN DETAIL @ FOUNDATION STEM WALL 7 S1.21" SCALE: = 1'-0" HOLDOWN DETAIL ACROSS FLOOR 9 S1.21" SCALE: = 1'-0" TENSION STRAP DETAIL ACROSS FLOOR OR BEAM 10 S1.21" SCALE: = 1'-0" TYPICAL SHEAR WALL CORNERS 11 S1.21" SCALE: = 1'-0" HOLDOWN ACROSS FLOOR TO FOUNDATION 8 S1.21" SCALE: = 1'-0" SHEAR WALL BASE CONNECTION @ FLOOR TO FOUNDATION WALL 2 S1.21" SCALE: = 1'-0" SHEAR WALL TO FLOOR BEAM OR BLOCKING 6 S1.21" SCALE: = 1'-0" SHEAR WALL INTERIOR TRANSFER TO WALL BELOW 5 S1.21" Strap end length & nail quantity as listed in Simpson manual Strap end length & nail quantity as listed in Simpson manual Paneling & framing per schedule Shear wall panel edge nailing per schedule Anchor bolts per schedule Foundation wall per plan Paneling & framing per schedule Shear wall panel edge nailing per schedule Anchor bolts per schedule Foundation wall per plan Base plate to rim nailing per schedule LSL rim or blocking Rim to sill connection per schedule: typically toenails, or A35's interior side or LTP4's laid flat on exterior side Alternative: run shear paneling continuous from wall above down to mud sill Upper wall paneling & framing per schedule Panel edge nailing per schedule Base plate to rim nailing per schedule LSL rim or blocking Rim to Plate connection per schedule: typically toenails, shear blocking or A35's interior side or LTP4's laid flat on exterior side. Alternative: Run shear paneling continuous from wall above down to upper plate below Lower wall paneling & framing per schedule Panel edge nailing per schedule Double end studs to be faced nailed w/ (4)-16d per foot min. Holdown per schedule may be installed tight to plate or raised if anchor rod is extended Trim studs @ openings where occur Shear wall end post Typical (2)-2x6 min. full height HD embed per schedule typical post set allthread into adhesive or embedded anchor Simpson SSTB or SB series for higher tension applications Double end studs to be faced nailed w/ (4)-16d per foot min. Panel edge nailing per schedule Shear wall end post Typical (2)-2x6 min. full height Trim studs @ openings where occur Shear wall end post below or continuity studs for anchorage of wall above (2)-2x6 min.TypicalFaced nail post w/ (3)-16d per foot min. Holdown to match holdown above may be installed tight to plate or lower Threaded rod to connect holdowns Holdown per schedule may be installed tight to plate or raised Double end studs to be faced nailed w/ (4)-16d per foot min. Panel edge nailing per schedule Shear wall end post Typical (2)-2x6 min. full height Trim studs @ openings where occur Faced nail post w/ (4)-16d per foot min. Holdown or strap where required Single end stud to be faced nailed to double end stud w/ (4)-16d per foot min. Adjacent wall not specified as shear wall or specified as shear wall Holdown or strap where required Shear wall & paneling per schedule Face nail end stud to shear wall end post w/ (4)-16d per foot min. Adjacent wall not specified as shear wall or specified as shear wall Shear wall end post TYPICAL CORNER Foundation stem wall HD embed per schedule typical post set allthread into adhesive or embedded anchor simpson SSTB for higher tension applications Double end studs to be faced nailed w/ (4)-16d per foot min. Threaded rod to connect holdowns Holdown per schedule may be installed tight to plate or raised Panel edge nailing per schedule Shear wall end post Typical (2)-2x6 min. full height Trim studs @ openings where occur ALTERNATIVE CORNER Plate 1/4"x3" w/ standard 1/16" oversized hole (Shear Walls only) Plate 1/4"x3" w/ standard 1/16" oversized hole (Shear Walls only) Coupler nut okay to extend anchor rod through floor up to wall Shear wall & paneling per schedule Holdown where required 16d @ 6" O.C. (Full height stud) Facenail w/ (4)-16d per foot 16d @ 6" O.C. TEE CORNER Anchor bolts per schedule project through mud sill & countersink or cut off @ floor sheathing Foundation wall per plan Shear panel edge nailing per schedule Base plate to mud still nailing per schedule Upper wall paneling & framing per schedule Panel edge nailing per schedule Base plate to floor beam nailing per schedule Beam per plan or blocking Optional shear paneling Foundation mud sill & floor sheathing where occurs Foundation stem wall SHEAR BLOCKING OPTION Shear wall end tension strap per schedule. Typically coiled strap cut to length as needed install over shear wall paneling or below when noted in shear wall schedule Double end studs to be faced nailed w/ (4)-16d per foot min. WOOD BEAM CONDITION Beam per plan Interior shear paneling where occurs 16d @ 4" O.C. where interior shear paneling occurs Shear wall & paneling per schedule Interior shear paneling where occurs 16d @ 4" O.C. where interior shear paneling occurs Upper wall paneling & framing per schedule Upper wall paneling & framing per schedule Bottom plate to rim nailing per schedule Rim to plate connection per schedule: Typically shear blocking w/ nails per schedule LSL rim or blocking Shear wall end post below or continuity studs for anchorage of wall above (2)-2x6 min.Typical STEEL BEAM CONDITION Double end studs to be faced nailed w/ (4)-16d per foot min. WF Beam per plan w/ solid blocking SHEAR WALL NOT U S E D NOT U S E D NOT U S E D 1-G2 A-BC 1-G4 1-2 1-4 1-1F 1-E 1-D 1-1A 1-5 1-A 2-F2 2-F3 2-F4 2-2F 2-4 2-D 2-C 1-B3 1-B4 (3'-2") Post per plan @ West, King/Trimmer per plan @ East 10d @ 4-12 Block all Edges 15/32" OSB Sheathing 2x6 @ 16 N/A Rim or Sill to Top Plate Below N/A HTT4 #10x1 1/2 SD @ Both Ends (3) 1/2" Anchor Bolts (AB) SHEAR WALL LABELING CONVENTION: A- Refers to floor framing level supporting shear wall (1,2,Main, etc.) B- Refers to closest grid parallel to wall C- Refers to closest grid line perpendicular to wall (X'-Y) - Refers to minimum length of shear paneling 1, 7 and 11/S1.2 Plate washers required Bottom Plate to Rim/Beam/Sill NOTE: Details this sheet are intended to represent general shear transfer and anchorage concepts pertaining to shear walls. Refer to framing details for balance of information and specific conditions. NOTES: 1.Unless noted otherwise, nail sizes are "Common" designation - 8d nails are 0.131" Ø x 2 1/2", 10d nails are 0.148" Ø x 3 1/4" (2 1/4" OK for wall or floor sheathing), and 16d nails are 0.162" Ø x 3 1/2". 2.10d nails may be substituted for 8d nails except where spacing is 3" O.C. or less 3.All nails through shear paneling and insulated shear paneling must be of sufficient length to penetrate the wall frame studs and blocking 1 1/2" MIN. 4.Shear panel nailing convention example: 4-12 refers to 4" O.C. at panel edges and 12" O.C. at intermediate supports 5.Face nail each ply of shear wall end posts W/ (6) 10d per foot full height of double studs U.N.O. 6.Shear paneling may be run vertically or horizontally U.N.O. Vertically oriented panels may be used to eliminate intermediate blocking if all edges bear on studs or plates. 7.At bottom plate or sill connections where anchor bolts are required, these bolts are in addition to any embeds for holdown anchorage. The minimum number of bolts at sill or bottom plate shall be (2) located between any embeds required for holdown connections. 8.At shear wall bottom plate anchor bolts, plate washers shall be provided U.N.O. Plate washers shall be a minimum of 1/4" thick x 3" square with diagonally slotted hole up to 1 3/4" in length OK. These may be Simpson BP series. Plate washer must be installed so that plate edge is within 1/2" of the shear paneling. 9.Where 10d nail spacing is 3" O.C. or less at conditions noted with " * ", use double studs at panel joints (except plates). Face nail double stud W/ (6) 16d per foot full height of studs 10.Shear wall end or jamb straps for anchorage/ties to walls/beams below shall be installed over the shear paneling 11.Cardinal directions referenced in the shear wall schedule above refers to "Plan" cardinal directions. E.G. "North" in schedule above refers to "Plan North." Mark Paneling Nailing Frame Sill to concrete HD/Ties @ Ends/Jambs End post HD Embeds Details/Comments 5/8" Rod into adhesive 12" Min Embed @ Both Ends (3'-2") King/Trimmer per plan @ West, Post per plan @ East DO DO N/A N/A HTT4 #10x1 1/2 SD @ Both ends DO 1, 7 and 11/S1.2 Plate washers required 5/8" Rod into adhesive 12" Min Embed @ Both ends (17'-4") Post per plan @ South, (2) 2X6 Min @ North 7/16 OSB Sheathing DO N/A N/A NONE1/2" ABs @ 48" o.c. 1, 7 and 11/S1.2 Plate washers required NONE (25'-0") 8d @ 6-12 Unblocked DO DO N/A N/A NONEDO 1, 7 and 11/S1.2 Plate washers required NONE (12'-2") (2) 2X6 MIN8d @ 6-12 Block all Edges DO DO 10d @ 6" o.c. Bottom plate to Rim 10d toenails @ 6" o.c. Rim to Sill NONEDO 3 and 11/S1.2 Plate washers required NONE (22'-8") DO8d @ 6-12 Unblocked DO DO 10d @ 6" o.c. Bottom plate to Sill N/A NONEDO 2 and 11/S1.2 Plate washers required NONE (13'-6") DO8d @ 4-12 Block all Edges DO Per Plan 10d @ 6" o.c. Bottom plate to Beam N/A MSTC40 vertical strap to wrap around bottom of beam below @ West end only. See 10/S1.2 N/A 6, 10 and 11/S1.2NONE DO 8d @ 6-12 Block all Edges (35'-9") (2) 2x6 LSL MIN 8d @ 6-12 Unblocked DO Per Plan 10d @ 6" o.c. Bottom plate to Rim 3 and 11/S1.2 Plate washers required NONE10d toenails @ 6" o.c. Rim to Sill 1/2" ABs @ 48" o.c. NONE (25'-7") (2) 2x6 MINDODO2x6 @ 16 10d @ 6" o.c. Bottom plate to Sill 2 and 11/S1.2 Plate washers required NONEN/A DO NONE (7'-6") King/Trimmer per plan DO (2) 2x6 LSL @ 16 DO 2 and 7/S1.2 Plate washers required (4) 1/2" ABs HTT4 #10x1 1/2 SD @ Both ends N/A (3'-11") DO 10d @ 6" o.c. Bottom plate to Beam 6 and 11/S1.2NONEN/A NONEN/A (7'-0") DODO DO 6/S1.2NONEN/A NONEN/A Per Plan Per Plan King/Trimmer per plan Post per plan @ West, King/Trimmer per plan @ East (3'-11") DODO DO 6 and 11/S1.2NONEN/A NONEN/APer Plan (4'-8") DODO 4 and 11/S1.2NONEN/A NONE2x6 @ 16 10d @ 6" o.c. Bottom plate to Rim 10d toenails @ 6" o.c. Rim to Top plate (15'-0") DO 10d @ 6" o.c. Bottom plate to Rim 4 and 11/S1.2NONEN/A NONE8d @ 6-12 Unblocked DO DO (2) 2X6 MIN (13'-6") DO 10d @ 6" o.c. Bottom plate to Rim @ stair landing 6/S4.2 4 and 11/S1.2 NONEN/A NONE8d @ 4-12 Block all Edges Per Plan LTP4 @ 16" o.c. Rim to Top plate @ stair landing DO (13'-5") DO 10d @ 6" o.c. Bottom plate to Beam 9/S4.2 11/S1.2 NONEN/A NONEDON/A DO8d @ 6-12 Block all Edges Post per plan @ South, (2) 2X6 Min @ North 8d @ 6-12 Block all Edges 5/8" Rod into adhesive 12" Min Embed @ Both Ends (3'-3") (2) 2X6 Min @ West, King/Trimmer per plan @ East DO DO 2, 7 and 11/S1.2 Plate washers required (3) 1/2" ABs HTT4 #10x1 1/2 SD @ East end N/A8d @ 4-12 Block all Edges 5/8" Rod into adhesive 12" Min Embed @ East end 2x6 @ 16 (3'-8") King/Trimmer per plan @ West, (2) 2X6 Min @ East DO DO 2, 7 and 11/S1.2 Plate washers required DO HTT4 #10x1 1/2 SD @ Both ends N/ADO 5/8" Rod into adhesive 12" Min Embed @ Both ends DO King/Trimmer per plan @ West, Post per plan @ East 8d @ 6-12 Block all Edges 2-2E (6'-8") DODO 6/S1.2NONEN/A NONEDO10d @ 6" o.c. Bottom plate to Beam N/A King/Trimmer per plan @ North, Post per plan @ South King/Trimmer per plan These documents are intended for the exclusive use of the project specified below. The use of these documents for any other purpose is not authorized. Written authorization from Glenwood Structural and Civil must be obtained for any other use. This document is to be used within one year of the date of preparation. Use after that period is not authorized. Date Description Scale: Job Number Engineer Date 23705 AG STRUCTURAL & CIVIL, INC. E N G I N E E R S I C O N S T R U C T O R S G L E N W O O D 812 Pitkin Avenue, Glenwood Springs CO 81601 gsc@sopris.net I 970-928-0135 GALLEGOS RESIDENCE 157 Sage Meadow Rd. Glenwood Springs, CO Drafter/Designer KK/WG,AG SHEAR WALL DETAILS & SCHEDULE AS NOTED 05/05/23 Permit/Construction 10/31/23 Stair Revisions 10/31/23 S1.2 6 3 2 4 - 9 7 ' - 6 63 2 5 = 9 8 ' - 6 63 2 6 = 9 9 ' - 6 6 3 2 4 - 9 7 ' - 6 6 3 2 5 - 9 8 ' - 6 63 2 6 = 9 9 ' - 6 6 3 2 7 = 1 0 0 ' - 6 63 2 6 = 9 9 ' - 6 63 2 7 = 1 0 0 ' - 6 1 2 3 4 5 1 2 3 4 5 A B C D E F G A B C D E F G F.1 F.1 95'-3" T.O.CRAWL 1/4:12+/- A B C D B A A B C C C D D B A A 1-1A 1-2 1-G2 1-G4 1-4 1-5 1-E 1-A 1-1F 3 S3.1 2 S3.1 1 S3.1 4 S3.1 TYP. OPENINGS 5 S3.1 6 S3.1 6 S3.1 7 S3.1 7 S3.1 5 S4.1 TYP. OF 6 42'-0" 22'-0"13'-0"7'-0" 8'-0"27'-0"7'-0" 70 ' - 0 " 11 ' - 0 " 25 ' - 7 " 7' - 1 1 1 / 2 " 25 ' - 5 1 / 2 " 17 ' - 4 " 8' - 1 1 / 2 " 42 ' - 6 1 / 2 " 2' - 0 " 13 ' - 1 3 / 4 " 4' - 2 1 / 4 " 3 3/4"7'-8 1/4" 6'-8 1/4"3 3/4" 8' - 8 1 / 4 " 3 3 / 4 " 13 ' - 0 " 11 ' - 2 3 / 4 " 12 ' - 1 1 / 2 " 8' - 1 0 1 / 4 " 11'-0"10'-9 1/4"13'-2 3/4" 4' - 6 " 7'-2 3/4" 1'-8" 1'-2" 8"1'-8" 1'-2" 8" 2' - 0 " 1' - 4 " 8" 2'-0" 1'-4" 8" 2'-0" 1'-4" 8" 15'-0" EXTERIOR SLAB EXTENSION RE: ARCH. 7' - 5 3 / 4 " 13 ' - 7 1 / 4 " 1-B41-B3 BB 3'-6" 2' - 6 " 10 ' - 0 " SCALE: 1/4" = 1'-0" 0'2'8'4'16'1 S2.1 RECOMMENDED CONTROL JOINTS THK REINFSIZE FOOTING SCHEDULE 3'-0" SQ 10"4-#4 EA WAY 4'-0" SQ 10"5-#4 EA WAY 5'-0" SQ 12"5-#5 EA WAY 6'-0" SQ 12"6-#5 EA WAY WIDEN FOOTING 12"X36" & ADD #4 @ 12" EACH WAY BOTTOM TYP OF (3) LOCATIONS (4) 1/2" AB'S (3) 1/2" AB'S (3) 1/2" AB'S (3) 1/2" AB'S (3) 1/2" AB'S 98'-9 7/8" T.O.W. 9 9 ' - 0 " T . O . S . 9 8 ' - 6 " T . O . S . T. O . W . 98 ' - 0 " T. O . W . 98 ' - 0 " T. O . W . 99 ' - 6 " 99'-9 3/4" T.O.W. 99 ' - 9 3 / 4 " T. O . W . 98'-9 7/8" T.O.W. 99 ' - 9 3 / 4 " T. O . W . 99'-9 3/4" T.O.W. 99'-6" T.O.W. 99'-6" T.O.W. 96'-1" T.O.F. (TYP.) 96'-1" T.O.F. (TYP.) T. O . F . 96 ' - 3 " T. O . F . 96 ' - 3 " T. O . F . 96 ' - 3 " T.O.F. 96'-3" T. O . F . 96 ' - 1 " T. O . F . 96 ' - 3 " T. O . F . 96 ' - 1 " T.O.F. 96'-1" 4" SLAB-ON-GRADE W/#4@ 16"O.C. EA. WAY OVER 4" GRAVEL DRAINAGE COURSE. ANY FILL PLACED BELOW SLAB SHALL BE COMPACTED TO AT LEAST 95% STANDARD PROCTOR DENSITY. SAW CUT PER GENERAL NOTES. TYPICAL EXTERIOR 4" SLAB-ON-GRADE W/ 4X4-W2.9XW2.9 OVER 4" GRAVEL DRAINAGE COURSE ON COMPACTED STRUCTURAL FILL APPROVED BY GEOTECHNICAL ENGINEER 4" EXTERIOR SLAB-ON-GRADE SEE NOTE ABOVE @ NORTH PATIO TYP. @ SLAB EDGE Foundation backfill to be tested and approved by Geotechnical Engineer Foundation backfill to be tested and approved by Geotechnical Engineer 1 2 3 4 5 1 2 3 4 5 A B C D E F G A B C D E F G F.1 F.1 100'-0" T.O.PLY 1-1A 1-D 1-2 1-G2 1-G4 1-4 1-5 1-E 1-A 1-1F 3 S4.1 4 S4.1 4 S4.1 1 S4.1 4 S4.1 5 S4.1 TYP. OF 8 5 S3.1 2 S4.1 1 1 7 / 8 " T J I 2 1 0 @ 1 6 " O . C . C O N T . ( 4 - S P A N S ) 1 1 7 / 8 " T J I 2 1 0 @ 16 " O . C . B R E A K @ SU P P O R T S 1 1 7 / 8 " T J I 2 1 0 @ 1 6 " O . C . 1 1 7 / 8 " T J I 2 1 0 @ 1 6 " O . C . CO N T . ( 3 - S P A N S ) (2 ) T J I 2 1 0 @ 1 6 " O . C . 1-B41-B3 SCALE: 1/4" = 1'-0" 0'2'8'4'16'2 S2.1 11 7/8" LVL FLUSH 11 7/8" LVL FLUSH (2) 11 7/8" LVL FLUSH CONT.(2-SPANS) (2) 11 7/8" LVL FLUSH CONT.(2-SPANS) (2)11 7/8" LVL FLUSH (2) HTS24 VERTICAL TWIST STRAPS FROM SIDE OF FLUSH BEAM TO SIDE OF DROPPED BEAM (2) HTS24 VERTICAL TWIST STRAPS FROM SIDE OF FLUSH BEAM TO SIDE OF DROPPED BEAM JOIST @ CRAWLSPACE OPENING TO BREAK AT BEAM (4) 1/2" AB'S (3) 1/2" AB'S (3) 1/2" AB'S ( 2 ) 1 1 7 / 8 " L V L FL U S H 11 7/8" LVL FLUSH (3) 1/2" AB'S (3) 1/2" AB'S (3) 9 1/2" LVL 5/8" ROD INTO 12" MIN. ADHESIVE FOR HOLDOWN CONNECTION @ SHEAR WALL ABOVE MSTC40 VERTICAL STRAP INSTALLED AROUND BEAM BELOW SEE DETAIL 10/S1.2 HOLD DOWN & STRAP SCHEDULE (4 ) 1 1 7 / 8 " L V L D R O P P E D C O N T . (3 S P A N S ) (4 ) 1 1 7 / 8 " L V L D R O P P E D CO N T . ( 2 - S P A N S ) (4 ) 1 1 7 / 8 " L V L D R O P P E D CO N T . ( 2 - S P A N S ) (3 ) 1 1 7 / 8 " L V L D R O P P E D CO N T . ( 2 - S P A N S ) (3 ) 1 1 7 / 8 " L V L D R O P P E D CO N T . ( 2 - S P A N S ) MIU 3 . 5 6 / 1 1 I U S 2 . 0 6 / 1 1 . 8 8 MIT2 . 1 / 1 1 . 8 8 ITS2 . 0 6 / 1 1 . 8 8 ITS 2 . 0 6 / 1 1 . 8 8 MIU 3 . 5 6 / 1 1 MIT 4 1 1 . 8 8 MIT 4 1 1 . 8 8 IT S 2 . 0 6 / 1 1 . 8 8 ITS2 . 0 6 / 1 1 . 8 8 (4) 2 X 6 ( D ) TYP @ 3 - P L Y L V L BEA M U . N . O . (4) 2X 6 ( D ) (4) 2X8 (D) W O O D P O S T ( U ) (4) 2X8 (D) WO O D P O S T (U ) (4) 2X8 (D) W O O D P O S T ( U ) (4) 2X8 (D) TYP. OF (8) NOTE: FLOOR IS NOT DESIGNED TO CARRY A CEMENTITIOUS TOPPING FOR HYDRONIC TUBING IF A CONCRETE TOPPING FOR THIS PURPOSE IS DESIRED, CONTACT THE ENGINEER IN ORDER TO REDESIGN FLOOR BA4. 2 8 / 1 1 . 8 8 I U S 2 . 0 6 / 1 1 . 8 8 I U S 1 . 8 1 / 1 1 . 8 8 (4 ) 2 X 8 ( D ) T Y P @ 4 - P L Y L V L B E A M U . N . O . PROVIDE SOLID LVL OR 2X BLOCKING BELOW PARTITION WALL. (2) 11 7/8" LVL FLUSH CONT.(2-SPANS) These documents are intended for the exclusive use of the project specified below. The use of these documents for any other purpose is not authorized. Written authorization from Glenwood Structural and Civil must be obtained for any other use. This document is to be used within one year of the date of preparation. Use after that period is not authorized. Date Description Scale: Job Number Engineer Date 23705 AG STRUCTURAL & CIVIL, INC. E N G I N E E R S I C O N S T R U C T O R S G L E N W O O D 812 Pitkin Avenue, Glenwood Springs CO 81601 gsc@sopris.net I 970-928-0135 GALLEGOS RESIDENCE 157 Sage Meadow Rd. Glenwood Springs, CO Drafter/Designer KK/WG,AG FOUNDATION & FLOOR FRAMING PLANS AS NOTED 05/05/23 Permit/Construction 10/31/23 Stair Revisions 10/31/23 S2.1 1 2 3 4 5 1 2 3 4 5 A B C D E F G A B C D E F G F.1 F.1 6: 1 2 6: 1 2 6: 1 2 6: 1 2 2-D 2-C 2-4 2-F4 2-F32-F2 9 S4.1 TYP. 12 S4.1 17 S4.1 20 S4.1 11 S4.1 PR E - E N G I N E E R E D SC I S S O R T R U S S E S @ 2 4 " O . C . 2X6 DF#1 LOOKOUT @ 24"O.C. TYP. U.N.O. 10 S4.1 18 S4.1 (2) 2X6 DF#2 OR BETTER STUDS @ 16" O.C. @ LINE F.1 BETWEEN GRIDS 2 & 3 PR E - E N G I N E E R E D SC I S S O R T R U S S E S @ 2 4 " O . C . 11 S4.1 10 S4.1 16 S4.1 SCALE: 1/4" = 1'-0" 0'2'8'4'16'1 S2.2 (2 ) 9 1 / 2 " L V L H E A D E R W I N S U L A T E D C O R E [1 1 9 ' - 2 7 / 8 " ] [1 1 9 ' - 2 7 / 8 " ] FLAT BOTTOM CHORD GABLE END TRUSS GRID 2 - GRID 4 2X6 DF#1 STRUCTURAL FASCIA 8X 1 2 D F # 1 [1 1 9 ' - 2 7 / 8 " ] [1 1 9 ' - 2 7 / 8 " ] GABLE END TRUSS SCISSOR GABLE END TRUSS 8X 1 2 D F # 1 (2) 7 1/4" LVL HEADER W/ INSULATED CORE TYP. @ EXTERIOR U.N.O. T R I P L E K I N G & D O U B L E T R I M M E R T Y P O F ( 4 ) O N LI N E " F 1 " TOP OF HEADERS TO BE FLUSH WITH T.O. PLATE TYP OF (2) ON GRID "2" TYP OF (2) HEADERS ON GRID "2" @ BOTH ENDS OF HEADERS UNDERFRAME LOW CEILING. RE: ARCH FOR LOW CEILING ELEVATION. SIMSIM SIMSIM 8 X 8 D F # 1 P O S T (D ) 8 X 8 D F # 1 P O S T (D ) (5) 2 X 6 L S L ( D ) PRO V I D E H R S 1 2 V E R T I C A L STR A P F R O M S I D E O F BEA M T O S I D E O F S T U D PAC K B E L O W (5) 2X 6 L S L ( D ) PROVI D E H R S 1 2 V E R T I C A L STRAP F R O M S I D E O F BEAM T O S I D E O F S T U D PACK B E L O W TRUSS MANUF. TO DESIGN GABLE END SCISSOR TRUSS FOR ADDITIONAL 30 PLF DEAD LOAD APPLIED AT TOP AND BOTTOM CHORDS 2-2E 2-2F 1 2 3 4 5 1 2 3 4 5 A B C D E F G A B C D E F G F.1 F.1 6: 1 2 6: 1 2 3: 1 2 6: 1 2 110'-1 3/4" T.O.PLY 2-C 2-4 2-F42-F32-F2 1-1A 1-D 1-2 1-G2 1-G4 1-4 1-5 1-E 1-B4 1-A 1-1F 2-D 1/4:12 6 S4.1 7 S4.1 8 S4.1 10 S4.1 9 S4.1 TYP. 11 S4.1 14 S4.1 16 S4.1 9 S4.1 TYP. 5 S4.2 13 S4.1 15 S4.1 2 S4.2 4 S4.2 1 S4.2 19 S4.1 14 S4.1 SIM. PR E - E N G I N E E R E D PA R T I A L S C I S S O R TR U S S E S @ 2 4 " O . C . 11 7/8" TJI210 @ 16"O.C. PR E - E N G I N E E R E D 3: 1 2 B O T T O M C O R D TR U S S E S @ 2 4 " O . C . 2X6 DF#1 LOOKOUT @ 24"O.C. TYP. U.N.O. 6' - 0 " M I N . BA C K - S P A N PR E - E N G I N E E R E D FL A T B O T T O M TR U S S E S @ 2 4 " O . C . 2X 6 D F # 1 L O O K O U T S @ 24 " O . C . (2) 2X6 DF#1 LOOKOUTS @ 16"O.C. U.N.O. (2 ) 2 X 6 DF # 1 @ 24 " O . C . 9 1/2" LVL RIPPED @ 16"O.C. FU L L H E I G H T ( 2 ) 2 X 6 D F # 2 O R B E T T E R ST U D S @ 1 6 " O . C . @ L I N E " 1 " B E T W E E N GR I D S " D " A N D " A " FULL HEIGHT (2) 2X6 LSL 1.3E STUDS @ 16"' O.C. TYP @ LINE "A" U.N.O. 8' - 0 " 10 ' - 0 " 8'-0" (2) 2X6 1.3E LSL STUDS @ 16"O.C. BALLOON-FRAMED @ STAIR WELL FU L L H E I G H T ( 2 ) 2 X 6 D F # 2 O R BE T T E R S T U D S @ 1 6 " O . C . 1-B3 6 S4.2 7 S4.2 SCALE: 1/4" = 1'-0" 0'2'8'4'16'2 S2.2 UNDER FRAMING TO MATCH TRUSSES (2) 11 7/8" LVL HEADER W/ INSULATED CORE (2) 11 7/8" LVL HEADER W/ INSULATED CORE GABLE END TRUSS (2 ) 9 1 / 2 " L V L H E A D E R W I N S U L A T E D C O R E OVERFRAMING & UNDERFRAMING TO MATCH TRUSSES RE: DETAIL 4/S4.2 FOR ADHERED VENEER SUPPORT TYP. PROVIDE CRIPPLE POST IN WALL TO SUPPORT UPPER TIMBER BEAM (3) 9 1/2" LVL HEADER (LOW) FULL HEIGHT (2) 2X6 LSL 1.3E STUDS @ 16" O.C. TYP @ FIREPLACE WALLS 3:12 Sloped (2) 11 7/8" LVL (3 ) 1 1 7 / 8 " L V L (F L U S H ) PROVIDE CRUSH BLOCKING BELOW POSTS WITHIN FLOOR SYSTEM FOR CONTINUOUS BEARING TO FOUNDATION TYP. (3) 11 7/8" LVL (3 ) 2 X 6 L S L GIRDER TRUSS ASSEMBLY GABLE END TRUSS 8X8 D F # 1 (D) 8X8 DF#1 (D) [1 1 2 ' - 1 1 / 8 " ] [1 0 9 ' - 1 1 / 8 " ] [1 0 9 ' - 1 1 / 8 " ] 8X 1 2 D F # 1 [1 0 9 ' - 1 1 / 8 " ] 8X 1 2 D F # 1 GABLE END TRUSS (5) 2 X 6 L S L (5 ) 2 X 6 L S L B U I L T - U P P O S T (U & D ) PROVIDE FULL DEPTH 2X BLOCKING RE: GENERAL NOTES (3) 2X10 HEADER @ INTERIOR TYP. U.N.O. (2) 7 1/4" LVL HEADER W/ INSULATED CORE TYP. @ EXTERIOR U.N.O. (3 ) 2 X 6 L S L (3 ) 2 X 6 L S L (3 ) 2 X 6 L S L (2) 2X6 DF#1 STRUCTURAL FASCIA MIU 1 . 8 1 / 9 IUS 2 . 0 6 / 1 1 . 8 8 LUS 2 6 - 2 LUS2 8 L U S 6 - 3 I N S T A L L E D U P S I D E D O W N L U S 6 - 2 I N S T A L L E D U P S I D E D O W N L U S 6 - 2 LU S 6 - 2 (2 ) 2 X 6 D F # 1 S T R U C T U R A L F A S C I A TRIPL E K I N G & DOUB L E T R I M M E R TYP O F ( 4 ) O N LINE " A " LUS28 (2)11 7/8" LVL IUS 2 . 0 6 / 1 1 . 8 8 LUS 2 8 0 PSF 0 PSF 56 PSF ADDITIONAL SNOW LOAD TRUSS MANUF. TO PROVIDE ADDITIONAL CAPACITY IN AFFECTED TRUSS PROFILES DUE TO ADDITIONAL TAPERED SNOW LOADING AS SHOWN TYP. 0 P S F 50 PSF ADDITIONAL SNOW LOAD SOUTH OF GRID "D" AND BETWEEN "1" AND "2 (2) 8X8 DF#1 TIMBER BEAMS RE: DETAIL 5/S4.2 L S S R 4 1 0 Z 43 PSF ADDITIONAL SNOW LOAD BETWEEN GRIDS 2 & 3 NOTE: FLOOR IS NOT DESIGNED TO CARRY A CEMENTITIOUS TOPPING FOR HYDRONIC TUBING IF A CONCRETE TOPPING FOR THIS PURPOSE IS DESIRED, CONTACT THE ENGINEER IN ORDER TO REDESIGN FLOOR (3) 11 7/8" LVL BOLTED BEAM: BOLT PLIES OF BEAM TOGETHER W/(2) ROWS 1/2"Ø THRU-BOLTS @ 12" O.C. HH U S 5 . 5 0 / 1 0 6 3/4"X24" 24F-V4 DF GLULAM I U S 2 . 0 6 / 1 1 . 8 8 (3) 2X10 HEADER PROVIDE 30" CLEAR X 16" TALL OPENING BELOW FLOOR JOISTS FOR MECH. DSC2 DRAG STRUT CONNECTOR FROM SIDE OF LVL TO TO TOP OF TOP PLATE PROVIDE SOLID LVL BLOCKING BELOW PARTITION WALL MSTC66 HORIZONTAL STRAP OVER SHEATHING FROM SIDE OF TOP PLATE TO BLOCKING (4) 2X6 ( D ) W/ LCE4 P O S T C A P IUS2. 0 6 / 1 1 . 8 8 (4) 2X6 ( D ) W/ LCE4 P O S T C A P (2) 2 X 6 ( D ) WOOD POST ( U ) (5 ) 2 X 6 ( D ) BUIL T - U P POS T (U& D ) (2) 2 X 6 ( D ) WOOD PO S T ( U ) (5) 2 X 6 ( D ) DOUBLE KING DOUBLE TRIM DOU B L E K I N G DOU B L E T R I M DOUBLE K I N G DOUBLE T R I M (2) 11 7/8" LVL HUC 4 1 0 11 7 / 8 " T J I 2 1 0 @ 1 6 " O . C . T Y P . U . N . O . (3 ) 1 1 7 / 8 " L V L [1 1 2 ' - 0 3 / 4 " ] (2) 14" LVL 14 S4.1 SIM. 6 S4.1 11 7/8" LVL LEDGER (LOW) W/ (3) ROWS 16D NAILS @ 16" O.C. 14" LVL STRINGERS (TYP. OF 4) 2-2E 2-2F MIU3 . 5 6 / 1 1 LSSR1. 8 1 Z These documents are intended for the exclusive use of the project specified below. The use of these documents for any other purpose is not authorized. Written authorization from Glenwood Structural and Civil must be obtained for any other use. This document is to be used within one year of the date of preparation. Use after that period is not authorized. Date Description Scale: Job Number Engineer Date 23705 AG STRUCTURAL & CIVIL, INC. E N G I N E E R S I C O N S T R U C T O R S G L E N W O O D 812 Pitkin Avenue, Glenwood Springs CO 81601 gsc@sopris.net I 970-928-0135 GALLEGOS RESIDENCE 157 Sage Meadow Rd. Glenwood Springs, CO Drafter/Designer KK/WG,AG SECOND FLOOR, LOWER & UPPER ROOF FRAMING PLANS AS NOTED 05/05/23 Permit/Construction 10/31/23 Stair Revisions 10/31/23 S2.2 Per Plan T.O.F. Per Plan T.O.W. SCALE: = 1'-0" TYPICAL EXTERIOR FOUNDATION @SLAB 3 S3.13/4" SCALE: = 1'-0" TYPICAL FOUNDATION WALL 1 S3.13/4" Per Plan T.O.F. Per Plan T.O.W. T.O.W. Per Plan T.O.F. Per Plan S.O.G. Per Plan SCALE: = 1'-0" CRAWL SPACE @ GARAGE DETAIL 2 S3.13/4" Per Plan T.O.F. Per Plan T.O.W. SCALE: = 1'-0" TYPICAL EXTERIOR FOUNDATION @ DOORS 4 S3.13/4" SCALE: = 1'-0" INTERIOR POST & PAD 5 S3.13/4" SCALE: = 1'-0" EXTERIOR FOOTING & COLUMN 6 S3.13/4" T.O.F. Per Plan SCALE: = 1'-0" EXTERIOR PORCH SLAB EDGE 7 S3.13/4" Per Plan T.O.Crawl Per Plan T.O.Crawl 3' - 0 " m i n . f r o s t d e p t h 2 1/2" 10" U.N.O. 3" C l r . Per Plan Eq.8"Eq. 5 1/2" 6" m i n . 10 " U. N . O . Per PLAN Eq.8"Eq. 3' - 0 " m i n . f r o s t d e p t h 4' - 1 " m a x b a c k f i l l 6" M I N 8" wall U.N.O. on plan Per Plan 10 " U . N . O . 3' - 9 " m a x b a c k f i l l 3" C l r . 3' - 0 " m i n . f r o s t d e p t h 10" U.N.O. 3" C l r . 1'-8" Eq.8"Eq. Footing dimensions per plan Re: Plan 3" CL R Per plan 6" M i n . Re : A r c h 3' - 0 " M i n . f o r fr o s t p r o t e c t i o n . Per plan 12" Square 10" Square 1' - 0 " m i n . 8" m i n . 8"min. 6" (2) #5 T&B continuous Horiz. Reinf. #5 @16"O.C. Vert. Reinf. #4 @ 16"O.C. w/ Standard 90° hook - alternate legs Slab-on-grade & base course per plan 1/2" fiber pad 1/2" Sealed fiber isolation joint Shear wall sheathing & nailing per schedule & general notes 1/2"AB w/ 7" min. embed @ 48"O.C. U.N.O Footing Reinf.: (2) #5 Continuous See 1/S3.1 #5 Continuous Min. anchorage: 1/2" AB w/ 7" min. embed @ 48" O.C. U.N.O. (2) #5 T&B continuous Footing Reinf.: (2) #5 Continuous Vert. Reinf. #4 @ 16"O.C. w/ Standard 90° hook alternate legs Horiz. Reinf. #5 @16"O.C. Slope grade away Roughen surface Overexcavate and place footings on properly compacted structural fill per the Geotechnical Engineer's recommendations Foundation drain system Re: Geotechnical Report Crawl space grade Slab-on-grade Per Plan Roughen surface Wall & Footing reinforcement: Re: 1/S3.1 Min. anchorage: 1/2" AB w/ 7" min. embed @ 48" O.C. Min. anchorage: 1/2" AB w/ 7" min. embed @ 48" O.C. U.N.O. See floor details for floor framing items Wall framing, shear wall paneling, edge nailing and anchorage per plan See balance of details for framing information See 1/S3.1 Slab-on-grade & base course per plan See 1/S3.1 See 3/S2.1 for balance of information #5 X24" Dowel into 6" min. adhesive @ 24"O.C. @ exterior dowels Floor sheathing & nailing per general notes Joist w/ blocking over support AC6RZ @ single post application or pair LCE4's @ double post applications Footing reinforcement per plan Post width to match beam. (4) 2x6/2x8 built-up post min. or double (4) 2x6/2x8 built-up posts back-to-back as noted on plan BC60 half base on treated plate or ABU66Z directly on pad 2x6x18" min. treated w/ (2) 1/2" expansion anchors 6" embed Crawl Space Grade Floor beam per plan #3 Rebar or #9 Wire ties @ 12" O.C. (For erection only) (4)-#4 "J" Dowels w/ 6" horizontal leg 7" min. embedded into footing Re: 1/S3.1 for foundation subgrade Top Ties: (2) #4 around anchor rods (top 5" of pedestal) Bottom Footing Reinf.: Per Plan Simpson ABU88Z Series post base w/(2) 5/8" anchor bolts or expansion anchors. provide 7" min embedment Timber post per plan Grade Roughen surface Slab-on-grade (2) #4 (2) #4Slope Re: Arch. 1 1 1/2" Fiber isolation joint 1 1 SCALE: = 1'-0" SINGLE MAT CORNER BAR DETAIL 8 S3.11/2" Ld x 2 L d x 2 Ld x 2 1 1/2" clr. for #5 or smaller; 2' clr. for #6 or smaller3x L d Reinf Lap & Hook Schedule #4 #5 #6 SIZE 8" Hd 10" 1'-0" Hd x 2 Ld 2'-0" 1'-8" 1'-4"1'-4" 1'-8" 2'-0" Ld x 2 4'-0" 3'-4" 2'-8" Horiz wall reinf, TYP Corner dowles, TYP Note: Corner dowels shall match the size and spacing of the horiz. wall reinf. Note: Vertical wall reinf not shown for clarity mat reinf conc walls Plan of single centered Note: Dowels are in line with the horiz reinf, lateral offset is 0", TYP Corner dowels @ edge where noted on plan or details Plan of single centered mat reinf. conc. walls w/ corner bars @ edge These documents are intended for the exclusive use of the project specified below. The use of these documents for any other purpose is not authorized. Written authorization from Glenwood Structural and Civil must be obtained for any other use. This document is to be used within one year of the date of preparation. Use after that period is not authorized. Date Description Scale: Job Number Engineer Date 23705 AG STRUCTURAL & CIVIL, INC. E N G I N E E R S I C O N S T R U C T O R S G L E N W O O D 812 Pitkin Avenue, Glenwood Springs CO 81601 gsc@sopris.net I 970-928-0135 GALLEGOS RESIDENCE 157 Sage Meadow Rd. Glenwood Springs, CO Drafter/Designer KK/WG,AG FOUNDATION DETAILS AS NOTED 05/05/23 Permit/Construction 05/05/23 S3.1 SCALE: = 1'-0" FLOOR EDGE PERPENDICULAR & BEARING ON FOUNDATION WALL 1 S4.11" SCALE: = 1'-0" UPLIFT CONNECTION @ CRAWL SPACE BEAM 2 S4.11" SCALE: = 1'-0" FLOOR FRAMING PARALLEL & HUNG OFF FOUNDATION WALL 4 S4.11" SCALE: = 1'-0" FLOOR EDGE PERPENDICULAR & HUNG OFF FOUNDATION WALL 3 S4.11" T.O.W. Per Plan T.O. Ply Per plan T.O.W. Per plan SCALE: = 1'-0" JOISTS BEARING PERPENDICULAR 6 S4.11" SCALE: = 1'-0" JOISTS BEARING PARALLEL 7 S4.11" SCALE: = 1'-0" CRAWL SPACE POST 5 S4.11" SCALE: = 1'-0" HIGH TRUSS TO LOW TRUSS 12 S4.11" SCALE: = 1'-0" TYPICAL TRUSS BEARING 9 S4.11" SCALE: = 1'-0" TYPICAL TRUSS BEARING @ BEAM 10 S4.11" SCALE: = 1'-0" TRUSS AT RAKE WALL 11 S4.11" SCALE: = 1'-0" PORCH LEDGER 13 S4.11" SCALE: = 1'-0" TRUSS @ LEDGER CONNECTION 14 S4.11" SCALE: = 1'-0" TIMBER BEAM TO POST CONNECTION 16 S4.11"SCALE: = 1'-0" DECK @ LEDGER CONNECTION 8 S4.11" SCALE: = 1'-0" HIGH HEEL TRUSSES BEARING 15 S4.11" SCALE: = 1'-0" SHEAR WALL TRANSFER DETAIL @ ROOF & INTERIOR SHEAR WALL 19 S4.11" SCALE: = 1'-0" STRAP CONNECTION @ FLUSH HEADER CONDITION 20 S4.11" Per Plan T.O.Plate 8" M a x 6" Re: Arch. Re: Arch. 1 1 / 2 " 2" 2" 2" 2" 2" 1'-0" Heel height SCALE: = 1'-0" TRUSS OVER SHEAR WALL 17 S4.11" SCALE: = 1'-0" LOOKOUT OVER DROPPED CORD TRUSS 18 S4.11" I-joist per plan 1 1/4" min. continuous LSL rim Floor sheathing & nailing per general notes Check plan and shear wall schedule for wall framing, paneling, & nailing Foundation wall per plan 10d Toenails @ 6"O.C. Floor Diaphragm boundary nailing 10d @ 6 U.N.O. Floor diaphragm boundary nailing 10d @ 6 U.N.O. Joist hanger per plan Floor joists, sheathing & nailing per general notes Check plan and shear wall schedule for wall framing, paneling, nailing, and additional sill bolting reqmts. Foundation wall per plan (4) 10d joist lower flange to sill I-Joist web stiffener per mfr. requirements Provide squash blocks (2x4 verts. min.) full width of any posts or stud packs within wall assembly Slab-on-grade or exterior grade slopes away where occurs Foundation wall per plan Minimum anchorage: 1/2" anchor bolts @ 48" O.C. (6" min. embed), U.N.O. on shear wall schedule or foundation plan Full width 2x sill treated Check plan and shear wall schedule for wall framing, paneling, nailing, and additional sill bolting reqmts. (2) Bays full depth blocking @ 48"O.C. Top flange joist hanger Floor diaphragm boundary nailing 10d @ 6 U.N.O. Floor joists, sheathing & nailing per general notes Slab-on-grade or exterior grade slopes away where occurs Minimum anchorage: 1/2" anchor bolts @ 48"O.C. (7" min. embed), U.N.O. on shear wall schedule or foundation plan Full width 2x sill treated w/ 1/2" AB @ 48"O.C., (7" min. embed) U.N.O. on shear wall schedule or foundation plan I-joist per plan 1 1/4" min. continuous LSL rim I-Joist web stiffener per mfr. requirements Floor joists, sheathing & nailing per plan & general notes 10d Toenails @ 6"O.C., U.N.O. Check shear wall schedule 1 1/4" min. continuous LSL rim Floor joists, sheathing & nailing per plan & general notes 10d Toenails @ 6"O.C., U.N.O. Check shear wall schedule Solid blocking @ 32"O.C. w/ (3) 16d toenails into top plate I-joists per plan Shear wall frame, nailing & sheathing per schedule & plan Floor diaphragm boundary nailing 10d @ 6 U.N.O. Shear wall frame, nailing & sheathing per schedule & plan Floor diaphragm boundary nailing 10d @ 6 U.N.O. I-joist or solid blocking 32"O.C. Beam per plan (4) 2x6 treated or (4) 2x8 treated to (match beam width ) w/ (2) 1/2" expansion anchors @ 8"O.C. staggered to wall (min. 4 embeds) Simpson LCE4Z cap connector ABA66Z w/ 5/8"x4" expansion anchors or 2x6 treated flat w/ (2) 1/2"x4" embed expansion anchor & BC60 or BC60R half base Foundation & footings per foundation plan & details Re: Plan for footing width increases & additional reinforcing @ post locations Crawl space grade Truss per plan Re: Plan for truss bottom cord profile H2.5A Hurricane clip @ all truss bearing (Typ.) Roof sheathing & boundary nailing per general notes Shear wall frame, nailing & sheathing per schedule & plan 10d toenails @ 6" O.C. 2X blocking - Hold down 2" for insulation baffle Per plan HGA10 side of truss to top of beam Roof sheathing & boundary nailing per general notes 10d toenails @ 6" O.C. 2X blocking - Hold down 2" for insulation baffle Per plan Beam per plan 16d @ 6"O.C. Provide blocking and edge nailing @ shear panel breaks U.N.O. on shear wall schedule Dropped top chord gable end truss Prefab truss LPT4 @ 24" top chord to blocking or run shear paneling up to side of blocking 2x6 blocking w/(2)-16d endnails @ ea. lookout Roof sheathing and boundary nailing per general notes Shear paneling and nailing per schedule - 7/16" OSB w/ 8d @ 6-12 min., blocked U.N.O. 2x6 @ 24" Lookout rafter H2.5A @ ea. lookout Shear paneling & nailing per plan & schedule 5 1/2" LVL ledger w/ (2) SDS 1/4"x5" screws into each stud Check plan and shear wall schedule for wall framing, paneling, & nailing Rafter & hanger per plan 10d @ 6 Roof sheathing & nailing per general notes Blocking 10d@6" 2x6 ledger w/(3)-10d at each stud Roof sheathing & nailing per general notes 2x12 ledger w/ (3) SDS 1/4"x5" screws @ 16"O.C. Truss & hanger per plan See 6/S4.1 for balance of information Shear wall frame, nailing & sheathing per schedule & plan Timber ridge beam per plan Timber post per plan (2) 1/2"Ø Lag screws w/ washers countersunk. Provide 6" min penetration into column below. Pre-drill w/ 5/16Ø drill bit. Lag bolts PLAN Column below Beam per plan ELEVATION 9 1/2 LVL ledger w/ (3) SDS 1/4"x5" screws @ 16"O.C. Ripped joists & hanger per plan Glulam Beam per plan Floor sheathing & nailing per plan & general notes Joist & hanger per plan I-Joist web stiffener per mfr. requirements Shear wall framing per plan Truss per plan H2.5A each truss 2x4 Flat blocking w/ 16d @ 6"O.C. 2x4 Both side of truss web 2x4 Blocking - hold down 2" for venting Roof sheathing & nailing per plan & general notes 7/16" O.S.B. shear paneling w/ 8d @ 6-12 blocked 2x4 Both side of truss web 7/16" O.S.B. shear paneling w/ 8d @ 6-12 blocked Truss per plan LPT4 @ each truss bay 2x4 Sill block PLAN SECTION LVL Beam per plan 1 1/4" min. continuous LSL rim Floor sheathing & nailing per general notes Check plan and shear wall schedule for wall framing, paneling, & nailing Foundation wall per plan 10d Toenails @ 6"O.C. Floor Diaphragm boundary nailing 10d @ 6 U.N.O. Minimum anchorage: 1/2" anchor bolts @ 48"O.C. (7" min. embed), U.N.O. on shear wall schedule or foundation plan HGA10 @ both sides of beam to sill w/ 1/4"x1 1/2" SDS screws Provide (2) 16d nails from top and bottom chord of truss to each stud Roof sheathing & nailing per general notes 10d @6 Check plan and shear wall schedule for wall framing, paneling, & nailing King & trimmer assembly per plan. Re: general notes for nailing requirements. LVL header per plan flush to top plate elevation LSTA24 Strap @ both ends of header to top plate MTS12 Twist strap @ both ends of header to trimmer H25A clips each truss Pre-engineered truss per plan Roof sheathing and nailing per general notes See general notes for top plate splicing & nailing requirements Truss per plan Re: Plan for truss bottom cord profile OK to kerf cut Balloon frame 1.3E LSL studs per plan Shear wall frame, nailing & sheathing per schedule & plan 10d @6 Rip tops of joists to slope shown in plan Deck sheathing & nailing per plan & general notes 7/16" OSB w/ 8d @ 6-12 min., blocked A35 @ 24" top chord to blocking or run shear paneling up to side of blocking H2.5A @ ea. lookout 2x blocking w/(2)-16d endnails @ ea. lookout Roof sheathing and boundary nailing per general notes 10d @ 6"O.C. edge nailing High dropped cord Flat-bottomed girder truss assembly 2x6 Ledger w/ (2) 10d @ 12"O.C. to blocking Roof sheathing and nailing per general notes 7/16" OSB w/ 8d @ 6-12min., block all edges Shear wall frame, nailing & sheathing per schedule & plan 2x6 w/ 10d @ 6"O.C.10d @ 6" from truss to 2x6 10d @ 6 Dropped top chord gable end scissor truss LTP4 @ 24" top chord to blocking or run shear paneling up to side of blocking 2x6 blocking w/(2)-16d endnails @ ea. lookout Roof sheathing and boundary nailing per general notes Shear paneling and nailing per schedule - 7/16" OSB w/ 8d @ 6-12 min., blocked U.N.O. 2x6 @ 24" Lookout rafter H2.5A @ ea. lookout Pre-engineered trusses by others These documents are intended for the exclusive use of the project specified below. The use of these documents for any other purpose is not authorized. Written authorization from Glenwood Structural and Civil must be obtained for any other use. This document is to be used within one year of the date of preparation. Use after that period is not authorized. Date Description Scale: Job Number Engineer Date 23705 AG STRUCTURAL & CIVIL, INC. E N G I N E E R S I C O N S T R U C T O R S G L E N W O O D 812 Pitkin Avenue, Glenwood Springs CO 81601 gsc@sopris.net I 970-928-0135 GALLEGOS RESIDENCE 157 Sage Meadow Rd. Glenwood Springs, CO Drafter/Designer KK/WG,AG FRAMING DETAILS AS NOTED 05/05/23 Permit/Construction 05/05/23 S4.1 SCALE: = 1'-0" LEDGER DETAIL @ FIREPLACE WALLS 2 S4.21" SCALE: = 1'-0" STONE SUPPORT @ SHEAR WALLS 3 S4.21" SCALE: = 1'-0" DOUBLE TIMBER BEAM TO POST CONNECTION 1 S4.21" SCALE: = 1'-0" LOOKOUT DETAIL @ GIRDER TRUSS ASSEMBLY & OVERFRAMING 4 S4.21" SCALE: = 1'-0" SHEAR TRANSFER DETAIL @ ROOF & LVL BEAM 5 S4.21" 1 1/2"1 1/2" 1 1/2" 4 1/2" 1 1/2" Eq . Eq . Eq.Eq. Minimum backspan per plan 48" Max cantilever SCALE: = 1'-0" TRUSS @ FLOOR BEAM CONNECTION 6 S4.21" SCALE: = 1'-0" RIPPED DECK JOISTS @ GARAGE 7 S4.21" Check plan and shear wall schedule for wall framing, paneling, & nailing Rafter per plan Hanger per plan 2x6 Ledger w/ (2) SDS 1/4"x4 1/2" screws @ each stud (Typ.) Roof sheathing & nailing per general notes 2x6 DF#1 overframing @ 16"O.C. LUS26 Lookout rafter & hanger per plan Roof sheathing & nailing per general notes Full height LSL 1.3E studs per plan Drainage barrier & thermal envelope by others Re: Arch. Stone support lath system by others Re: Arch. Natural stone adhered veneer system by others Re: Arch. 1 1/4"-1 1/2" stone thickness max 2x4 Backing sistered to primary studs w/ 10d @ 12"O.C. Shear paneling & nailing per schedule Max 1" insulation system Re: Arch. attachment per contractor #12X4" Wood screws (1 1/2" penetration min.into 2X) w/ washer or SDS 1/4"x4" @ 18"O.C. max spacing into backing studs thru insulation & shear paneling for support of stone veneer - Note: @ locations not designated as shear walls, install screws directly to studs without additional sister backing. In addition, @ shear walls where (2) 2x6 full height LSL studs are used, install screws directly to studs without additional sister backing Primary studs @ 16"O.C. per plan Roof sheathing & nailing per general notes Lookout per plan HGA10 each lookout Rafter per plan HGA10 Each rafter 2x blocking w/ 10d toenail @ 6"O.C. 10d @ 6 Notched timber beam per plan Timber post per plan 8x8 D F # 1 8x8 DF# 1 (3) 1/2"Ø Lag bolts provide 6"min. penetration into post below. Pre-drill holes w/ 5/16" drill bitNotched timber beam per plan SECTION PLAN Roof sheathing & nailing per general notes LUS26 Hanger Girder truss assembly Hanger per plan 2x6 DF#1 @ 16"O.C. overframing Lookout per plan H2.5a Clip each lookout Check plan and shear wall schedule for wall framing, paneling, & nailing 10d @6 toenail 2x6 Blocking 10d @ 6 7/16"OSB sheathing w/ 8d @ 6-12 block all edges 10d @6 toenail 2x6 Blocking 10d @ 6 Structural fascia per plan Blocking 10d@6" 2x6 ledger w/(3)-10d at each stud Roof sheathing & nailing per general notes Refer to balance of information on 14/S4.1 Truss & hanger per plan Joist & hanger per plan Shear wall frame, nailing & sheathing per schedule & plan LVL Beam per plan 10d @6 Floor joists, sheathing & nailing per plan & general notes 10d Toenails @ 6"O.C. Ripped joists per plan Shear wall frame, nailing & sheathing per schedule & plan 10d @ 6 1 1/4" min. continuous LSL rim H2.5A each joist Ripp top of joists to slope shown in plan Check plan and shear wall schedule for wall framing, paneling, & nailing Floor joists, sheathing & nailing per general notes I-joist or solid blocking @ 32"O.C. Joist per plan LVL beam per plan 2x8 Ledger w/ (2) 16d each stud Solid blocking @ 32"O.C. 10d @ 6 Roof sheathing and nailing per general notes Tr u s s p e r p l a n These documents are intended for the exclusive use of the project specified below. The use of these documents for any other purpose is not authorized. Written authorization from Glenwood Structural and Civil must be obtained for any other use. This document is to be used within one year of the date of preparation. Use after that period is not authorized. Date Description Scale: Job Number Engineer Date 23705 AG STRUCTURAL & CIVIL, INC. E N G I N E E R S I C O N S T R U C T O R S G L E N W O O D 812 Pitkin Avenue, Glenwood Springs CO 81601 gsc@sopris.net I 970-928-0135 GALLEGOS RESIDENCE 157 Sage Meadow Rd. Glenwood Springs, CO Drafter/Designer KK/WG,AG FRAMING DETAILS AS NOTED 05/05/23 Permit/Construction 05/05/23 S4.2