Loading...
HomeMy WebLinkAboutPlanss ERECTION NOTES 1. All bracing shown and provided by the Metal Building Provider for this building is required and shall be installed by the erector as a permanent part of the structure ("Code of Standard Practice for Steel Buildings and Bridges" in the ANSI/AISC 303-16; Section 7.10). 2. Temporary supports, such as guys, braces, falsework, cribbing or other elements required for the erection operation shall be determined and furnished by the erector ("Code of Standard Practice for Steel Buildings and Bridges" in the ANSI/AISC 303-16; Section 7.10.3). 3. Normal erection operations include the correction of minor misfits by moderate amounts of reaming, grinding, welding or cutting, and the drawing of elements into line through use of drift pins. Errors which require major changes in the member configuration are to be reported immediately to the Metal Building Provider by the customer to enable whoever is responsible either to correct the error or to approve the most efficient and economic method of correction to be used by others ("Code of Standard Practice for Steel Buildings and Bridges" in the ANSI/AISC 303-16; Section 7.14). 4. Erection tolerances are set forth in the "Code of Standard practice for Steel Buildings and Bridges" in the ANSI/AISC 303-16; Section 7.13 note that individual members are considered plumb, level and aligned if the deviation does not exceed 1:500. Variations in finished overall dimensions of structural steel framing are deemed within the limits of good practice when they do not exceed the cumulative effect of rolling, fabricating, and erection tolerances. 4.1. When crane support systems are part of the metal building system erection tolerances Section 6.8, Erection Tolerances, 2015 MBMA Metal Building Systems Manual shall apply. To achieve the required tolerances grouting of the columns and shimming of the runway beams may be required. The customer shall provide grout if required. The contractor erecting the runway beams is responsible for shimming, plumbing, and leveling of the runway system. When aligning the runway beams the alignment shall be with respect to the beam webs so that the center of the aligned rail is over the runway web. 5. As a general rule field welding is not used to assemble a metal building system. In cases where the drawings indicate field welding and in cases where approved corrections are to be made by field welding the following requirements shall be met: 5.1. Welders must be qualified by an independent testing agency, with suitable documentation to AWS D1.1 Structural Welding Code - Steel or AWS D1.3 Structural Welding Code - Sheet Steel as applicable, for the processes, positions, and materials involved. 5.2. All welds must be made in conformance to a documented and approved Welding Procedure Specification (WPS). All joints which are not prequalified must be supported by a certified Procedure Qualification Record (PQR) by an independent testing agency. 6. All documentation and records shall be the responsibility of the customer. 7. Any claims or shortages by buyer must be made to the Metal Building Provider within two (2) working days after delivery, or such claims will be considered to have been waived by the customer and disallowed. All claims should be directed to the Metal Building Provider's Customer Service Department. 8. Claims for correction of alleged misfits will be disallowed unless the Metal Building Provider shall have received prior notice thereof and allowed reasonable inspection of such misfits. Ordinary inaccuracies of shop work shall not be construed as misfits. No part of the building may be returned or charges assessed for alleged misfits without prior approval from the Metal Building Provider. 9. Neither the Metal Building Provider nor the customer will cut, drill or otherwise alter their work, or the work of other trades to accommodate other trades unless such work is clearly specified in the contract documents. Whenever such work is specified the customer is responsible for furnishing complete information as to materials, size, location, and number of alterations prior to preparation of shop drawings ("Code of Standard Practice for Steel Buildings and Bridges" in the ANSI/AISC 303-16; Section 7.15). 10. The Metal Building Provider Field Modifications Policy: 10.1. The Metal Building Provider will only be responsible for the field -modified parts designed and approved by the Metal Building Provider's Customer Service Department. 10.2. Any field modifications designed by third parties may not be approved by the Metal Building Provider and may limit the Metal Building Provider's warranty and liability. 10.3. The Metal Building Provider makes no warranty and hereby disclaims any responsibility with respect to the design, engineering, or construction of any field -modified parts performed by third parties. 11. WARNING - SOME PANELS AND TRIM PARTS ARE FURNISHED WITH A PROTECTIVE PEEL -OFF FILM. PARTS PROVIDED WITH THIS FILM CANNOT BE EXPOSED TO SUNLIGHT WITHOUT FIRST REMOVING THE FILM. THIS FILM MUST BE REMOVED PRIOR TO INSTALLATION. FILM MUST ALSO BE REMOVED FROM ALL NON EXPOSED PARTS WITHIN SIX MONTHS FROM FILM APPLICATION OR IRREPARABLE DAMAGE WILL OCCUR TO THE SURFACE. CLAIMS WILL NOT BE ACCEPTED FOR THIS ISSUE. RESPONSIBILITIES 1. The Metal Building Provider Customer, hereafter referred to as the "customer", obtains and pays for all building permits, licenses, public assessments, paving or utility pro rata, utility connections, occupancy fees and other fees required by any governmental authority or utility in connection with the work provided for in the Contract Documents. The customer provides at his expense all plans and specifications required to obtain a building permit. It is the customer's responsibility to ensure that all plans and specifications comply with the applicable requirements of any governing building authorities. 2. The customer is responsible for identifying all applicable building codes, zoning codes, or other regulations applicable to the Construction Project, including the metal building system. 3. It is the responsibility of the customer to interpret all aspects of the End User's specifications and incorporate the appropriate specifications, design criteria, and design loads into the Order Documents submitted to the Metal Building Provider. 4. It is the responsibility of the Metal Building Provider to furnish the metal building system to meet the specifications including the design criteria and design loads incorporated by the Contractor into the Order Documents. The Metal Building Provider is not responsible for making an independent determination of any local codes or any other requirements not part of the Order Documents. 5. The Metal Building Provider's standard specifications apply unless stipulated otherwise in the Contract Documents. The Metal Building Provider design, fabrication, quality criteria, standards, practice, methods and tolerances shall govern the work any other interpretations to the contrary notwithstanding. It is understood by both parties that the customer is responsible for clarifications of inclusions or exclusions from the Architectural plans. 6. In case of discrepancies between the Metal Building Provider's structural steel plans and plans for other trades, the Metal Building Provider's shall govern ("Code of Standard Practice for Steel Buildings and Bridges" in the AISC 303-16; Section 3.3) 7. The customer is responsible for overall project coordination. All interface, compatibility and design considerations concerning any materials not furnished by the Metal Building Provider and the Metal Building Provider's steel system are to be considered and coordinated by the customer. Specific design criteria concerning this interface between materials must be furnished by the customer before release for fabrication or the Metal Building Provider's assumptions will govern. 8. Foundations, anchor rods, and anchor rod embedment are designed, furnished, and set by the customer in accordance with an approved drawing. Dimensional accuracy shall satisfy the requirements of Section 7.5.1 of "Code of Standard Practice for Steel Buildings and Bridges" in the AISC 303-16, 9. All other embedded items or connection materials between the structural steel and the work of other trades are located and set by the customer in accordance with approved location on erection drawings. Accuracy of these items must satisfy the erection tolerance requirements. 10. The Metal Building Provider does not investigate the influence of the metal building system on existing buildings or structures. The End Customer assures that such buildings and structures are adequate to resist snow drifts, wind loads, or other conditions as a result of the presence of the metal building system. GENERAL SPECIFICATION 1. Wall and liner panels are an integral part of the structural system. Unauthorized removal of panels or cutting panels for framed openings not shown is prohibited. 2. Oil -canning, a perceived waviness inherent to light gauge metal, may exist. This condition does not affect the structural integrity or the finish of the panel, and therefore is not a cause for rejection. 3. The Metal Building Provider's rust inhibited primer are designed for short term field protection from exposure to ordinary atmospheric conditions. This paint is not intended for long term exposure to the elements. 4. All bolts are 1/2" x 1-1/4" A307 unless noted. Refer to the erection drawings for specific framing connections and the cross -sections) for main frame connections. 5. All connections for rigid frames/ wind bents must be properly pre -tensioned. The Specification for Structural Joints Using ASTM A325 or A490 Bolts dated November 13, 1985 (future reference to this section is to be called the Code) recognizes four methods to properly tighten the bolts; 1) "Turn -of -Nut", 2) calibrated wrench, 3) alternate design bolts and 4) direct tension indicator. All of these methods require special bolts and/or equipment to install, except the Turn -of -Nut Method. This is why SISCORP specifies this method for bolt installation. 6. Any type of suspended or load inducing system(s) is prohibited if zero collateral load is designated on the contract. This would include lights, duct work, piping, and insulation types other than 3" standard duty fiberglass blanket insulation, etc. APPROVAL SPECIFICATION 1. Approval of the Metal Building Provider drawings and/or calculations indicate that the Metal Building Provider has correctly interpreted the contract requirements. This approval constitutes the customer acceptance of the Metal Building Provider design, concepts, assumptions, and loadings. 2. Failure to respond to questioned areas and areas to verify may result in additional costs and/or schedule delays for which the Metal Building Provider will not be responsible. 3. Any changes made after the Metal Building Provider's customer has signed and returned the Metal Building Provider drawings and/or calculations and the project is released for fabrication shall be billed to the Metal Building Provider customer including material, engineering, and other costs. An additional fee may be charged if the project must be moved in the fabrication and/or the shipping schedule. 4. It is the responsibility of the customer to field verify all existing conditions prior to fabrication. 5. It is imperative that any changes to these drawings: 5.1. Be made in contrasting ink. 5.2. Be legible and unambiguous. 5.3. Have all instances of changes clearly indicated. 6. A dated signature, in the designated areas, is required on all pages. The signature must be from the person authorized on the contract or a person authorized, in writing, by the Metal Building Provider customer. 7. The Metal Building Provider reserves the right to resubmit drawings with extensive or complex changes required to avoid misfabrication. This may impact the delivery schedule. 8. Any changes noted on the drawings not in conformance with the terms and requirements of the contract between the Metal Building Provider and its customer are not binding on the Metal Building Provider unless subsequently specifically acknowledged and agreed to in writing by change order or separate documentation. 9. Waiving the approval process by designating the order "For Production" supersedes notes 1, 2, 5, 6, and 8 in this section, and constitutes the customer acceptance of the Metal Building Provider's design, concepts, assumptions, and loadings. I MATERIALS SPECIFICA TION 1. MATERIALS : MINIMUM YIELD: HOT ROLLED BAR Fy = 50.0000 STRUCTURAL STEEL SHEET Fy = 50.0000 STRUCTURAL STEEL PLATE Fy = 50.0000 COLD FORMED SHAPES Fy = 57,0000 WALL SHEETING Fy = 60.0000 ROOF SHEETING Fy = 60.0000 BOLTS A307 & A325 THE METAL BUILDING MANUFACTURER RESERVES THE RIGHT TO SUBSTITUTE THE ABOVE MATERIALS WITH EQUAL OR BETTER MATERIAL. CONTRACTOR NOTES: ksi MIN. ksi MIN. ksi MIN. ksi MIN. ksi MIN. ksi MIN. A. CONTRACTOR TO VERIFY ALL BUILDING DIMENSIONS, DETAILS, SECTIONS, AND TRIM CONDITIONS PRIOR TO FABRICATION. B. MARK ALL CHANGES OR CORRECTIONS IN RED INK ON PRINTS AND RETURN ONE SET TO SISCORP FOR CORRECTION AND FABRICATION. C. SISCORP'S APPROVAL DRAWINGS MUST BE SIGNED BEFORE FABRICATION CAN BEGIN. D. DIMENSIONS, TRIM CONDITIONS OR OTHER INFORMATION INDICATED ON THESE DRAWINGS WILL BE ASSUMED CORRECT IF THE APPROVAL DRAWING IS SIGNED AND CHANGES ARE NOT NOTED ON THE PRINTS. PLEASE REFER TO MANUFACTURERS PRODUCT DESIGN/INSTALLATION MANUAL FOR ADDITIONAL ERECTION INFORMATION BUILDING LOADS / DESCRIPTION: WIDTH: 33.5 LENGTH: 42.5 HEIGHT: 26 ^/26 (BUILDING DIMENSIONS ARE NOMINAL. REFER TO PLANS). THIS STRUCTURE IS DESIGNED UTILIZING THE LOADS INDICATED AND APPLIED AS REQUIRED BY : IBC 15 THE CONTRACTOR IS TO CONFIRM THAT THESE LOADS COMPLY WITH THE REQUIREMENTS OF THE LOCAL BUILDING DEPARTMENT. ROOF DEAD LOAD: 6.000 PSF (ROOF PANELS & PURLINS) COLLATERAL LOAD: 5 PSF SNOW EXPOSURE: ROOF LIVE LOAD: 20.00 PSF .WIND EXPOSURE: BUILDING END USE: IMPORTANCE FACTORS: WIND LOAD 1.00 SNOW LOAD 1.1000 SEISMIC LOAD 1.25 1.0000 C ROOF SNOW LOAD: 40.04 PSF THERMAL FACTOR: 1.00 GROUND SNOW LOAD: 52 PSF BASIC WIND SPEED: 120 MPH INTERNAL PRESSURE COEFF.: 0.18 / -0.18 WIND Exposure Category: C WIND Condition: Closed SITE CLASS: D SPECTRAL RESPONSE COEFF. MAPPED SPECTRAL RESPONSE ACC. RISK CATEGORY: III- High Sds 0.31 Ss 0.30 SEISMIC DESIGN CATEGORY: B Sdt 0.13 St 0.08 DESIGN BASE SHEAR, V: EXPANDED FORMULA 0.667*le*Fa*Ss*W/R LONGITUDINAL 6.99 TRANSVERSE 12.12 ADDITIONAL LOADS: 3T top running single girder, hand geared crane Support 1) roof top ventilation system weight not to exceed 800 lbs. Support (2) wall ventilation system weight not to exceed 800 lbs. each. `LLICTRICAIPERMIiT ING&;NlzoC IONS ARh gYTHE COLORADOSTATEELE.t+%,ALBOARD Apr V ® ELECTRICALROUGH IN AP p�CTION .._. TED REQUIREDATFRAMINu N E SUBJECT TO NO EXCEPTIONS & INSPECTIONS GARFIEELD COUNTY Et it, DING DE Y ,RTN'E IT GAT , rat NO INSPECTION WITHOUT T1,ESF PLANS ON SITE .oaa. Faye W1LDFU E MITIGATION aIPLY WITH WILDFIRE ?.1ITIGA.T?0*1 TFENSIBLE SPACE R£QUIREP.*0" eS PL*R'FIRE-WISE CONSTItUC'ItObu: SITE DESIGN & BUILDING I+IA T4,seR A,' PUBLISHED BYANV# AVAxLA8t,R F"•.:r'; COLORADO STA€E FORES`d S THE ENGINEER WHOSE SEAL AND SIGNATURE APPEAR ON THESE DOCUMENTS REPRESENTS STANDARD INDUSTRIAL STRUCTURES CORPORATION AND IS NOT THE ENGINEER OF RECORDS FOR THE OVERALL PROJECT. THE ENGINEER'S RESPONSIBILITY IS LIMITED TO MATERIAL DESIGNED BY STANDARD INDUSTRIAL STRUCTURES CORPORATION AND EXCLUDES PARTS SUCH AS DOORS, WINDOWS, FOUNDATION DESIGN AND ERECTION OF THE BUILDING. L - ELECTRICALFINALAP91110 LIS REQUIRED AT C01FINAL INSPECTION NOTE: 3UILDING IS BEING FABRICATED IN ACCORDANCE WITH THE ATTACHED DRAWINGS. ANY CHANGES TO THESE DRAWINGS CAN RESULT IN EXTRA CHARGES AND POSSIBLE CHANGES IN DELIVERY DATES. DRA WING INDEX DESCRIPTION [EV.DRAWING Al GENERAL NOTES A2 SPECIFICATIONS, ACCESSORIES AND COLOR SCHEDULE 0 A3 FLOOR PLAN 0 A4 ELEVATIONS 0 A5 ELEVATIONS 0 A6 ION 0 A7 FSECTIONS 0 A8 0 A9 SECTIONS 0 A10 SNOW RETENTION 0 F1 ANCHOR ROD PLAN AND GENERAL NOTES 0 F2 ANCHOR ROD SECTIONS AND BASE PLATE DETAILS 0 F3 ANCHOR ROD REACTIONS THIS DRAWING IS PROPERTY OFSTANDARD STANDARD INDUSTRIAL STRUCTURES CORPORATION HOUSTON, TEXAS. and is loaned with the understanding that it will not be copied or reproduced or used for any purpose other than for which it was originally intended. ^, � INDUSTRIAL 7 1y 2665 WESTHOLLOW DRIVE, HOUSTON, TX. 77082 (281) 531 -2800 ®represent 1 CORP STANDARD INDUSTRIAL STRUCTURES CORPORATION HOLSTON, TEXAS The Engineer whose seal and signature appear on these documents SISCORP, and is not the Engineer of Record for the overall project. the Engineers responsibilty is limited to material designed by SISCORP and parts such as doors, windows, ventilation, foundation design, and erection of the building. O0DO Llrf �2 , 59888 GENERAL NOTES COMPRESSOR BUILDING XCEL ENERGY RIFLE, GARFIELD, COLORADO (RIFLE COMPRESSOR STATION) SS/ONAIE 07/21/2022 Andrew Digitally signed by Andrew Youssef YOu55ef oioi.as?osoo1 0 ISSUED FOR CONSTRUCTION KJN 07/11/22 BH SCALE I DRAWN CHECKED APPR'D. FILE No. SHEET No. JOB No. R B RE -ISSUED FOR APPROVAL; REVISED AS NOTED GUS 07/01/22 JRW KJN JRW 3488-01A1 Al OF 10 3488-01 A ISSUED FOR APPROVAL KJN 06 06/22 JRW A DATES 06 01 22 06 06 22 NO. REVISIONS BY DATE I CHKD. W S N E LO T 2 t 42'-6" OUT TO OUT OF STEEL 23'— 3" 16'— 9'" 1 '-3" 8'-5" 2'-7" 6'-5" 2'-7" 4'-6'" 4'-70" 6"-2" 3'-0" 4'-0" 8 B I I I I I I I I I I I I I I o o _ _ _ _ CRANE STOP / \ O TYP. (4)22 o b (2) TYP. O Ir\ / Li z \ / T \ / \ / / \ / \ J & ---- I < << < < < < < < L — — — — — FALLSAFE/ DEVICE ell I �\ RODS / 11'-7%2" 11'-7!1 OSAFETY O— 10XCC Z SWING GATE \ BUILDING SAFETY SWING GATE _ — 'I, \ x / Ili LO Iz R — �— =An 3 —0 10X35C12 N — I I \ / F _ O) I .. _ �I \ Y2"o / RODS / \ / Z QI ro 6'-4%4" / \ 5'-3%8", / .. �.. —� — — — — — — — — —N— 71 ^I O � — — — — — — — — — _ r----------------------------------------------------- I I I I I I -------------------------- , THIS DRAWING IS PROPERTY OF STANDARD INDUSTRIAL STRUCTURES CORPORATION HOUSTON, TEXAS. and is loaned with the understanding that it will not be copied or reproduced or used for any purpose other than for which it 0 ISSUED FOR CONSTRUCTION KJN 07/11 /22 BH was originally intended. B RE —ISSUED FOR APPROVAL; REVISED AS NOTED GUS 07/01/22 JRW A ISSUED FOR APPROVAL KJN 06/06/22 JRW 23'— 3" MIN. TO CLEAR - PORTAL COLUMN FLOOR PLAN 2'— 4%" STANDARD INDUSTRIAL STRUCTURES CORPORATION 2665 WESTHOLLOW DRIVE, HOUSTON, TX. 77082 (281) 531-2800 O 72'-0" The Engineer whose seal and signature appear on these documents CORP represent f SCORP,Record and h not the Engineer of Record for the overall STANDARD INDUSTRIAL STRUCTURES CORPORAIIii?4 project. The Engineer's responsibilty Is HOUSTON, TEXAS limited to material designed by SISCORP and parts such as doors, windows, ventilation, foundation design, and erection of the building. I V�:���W YDG^J'�o LEGEND: LIMITS OF CRANE —3 TON HOOK TRAVEL. 5988, "• FLOOR PLAN COMPRESSOR BUILDING SS/ONAt XCEL ENERGY RIFLE, GARFIELD, COLORADO (RIFLE COMPRESSOR STATION) 07/21/2022 SCALE DRAWN CHECKED APPR'D. FILE No. SHEET N 1_ 0" KJN JRW 3488-01 A3 A3 OF 3488-OIA 0 LOCATION INFORMATION GPS LOCATION: LAT: 39,5N293° LONG: •107.827127° ELEV:5320 FT ZONE DISTRICT: RESOURCE LANDS, GENTLE SLOPES AND LOWER VALLEY FLOOR (RLGS) DigSafely . CALL UNCC THREE WORKING DAYS BEFORE YOU DIG 1-800.922.1987 WWW.DOGGDT9 UTIMY NOTIFICATION CENTER OF COLORADO CAD FILE NAME; DI_4301_G9 star_Rlffe_lnterco Ctdrg RIFLE COMPRESSOR STATION RECOMMISSIONING PROJECT QUESTAR INTERCONNECT WORK ORDER - INDEX WORK ORDER I FUNCTIONAL LOCATION - INDEX I I FUNCTIONAL LOCATION I DESCRIPTION I W. st— Star Im Q PROJECT CONTACTS NAME ROLE PHONE# EMAIL TRENT JOHNSON XCEL PROJECT MANAGER (832) 326 - 5994 TRENT.M.JOHNSON@XCELENERGY.COM HISTORY DATE REVISIONS / o° a 'w f� EWingineefing DRAWN BY: Ps osiz412 NC, DESCRIPTION (l=/ Xcei Energy �j 4`'-'f� DESIGNED BY: &A DU08122 C ISSUED F(AP PERMIT " 5u31 s 9]]] PYRAYIO COURT, STE 300 ENGIEWCO0, CO. B0112 CHECKED BY: rx 04108129 TEL 303-405-27" y -_. N^MN.ENENcmEERING.wY APPROVED BY: BG 04108122 4^ 4RL_ FLOC IN SERVICE DATE: DRAWING NUMBER SERIES - INDEX NUMBER SERIES DISCIPLINE 4300 COVER SHEETS 4301 SITE LAYOUT PLAN 4302 GRADING PLAN 4303 OVERALL SITE PLAN WITH GRADE PROFILES FIY.INxA wATe34FNT I HEREHr ATTEST T. T TH45 G ING AND DIMON FOR THE RIFLE COMPRESSOR SrAT FECOAW6SgNNC PRLUECT HAS BEEN PNC.EO W YE CI? tMXR MY DIRECT SUPEPNSK)µ AND TO ME BEST OF W KNOWLEDGE MO ABLLRY HAS BEEN M INNICEO IN ACCONIT)NCE WITH THE TTTEST YENSpN OF THE WFIEID CWNIY CMERN THE S TURE AND STAMP AFFIXED HEREON CERTIFIES THAT THIS DO:VmeM WAS PREPARED IN ACCOROMCE WITH THE REQUIRED REGULATIONS AND CRI.K HOWEVER, THE STAMP ANC SIGINTURE ODES NOT CERnFY OR W>RINIEE FUNRE PERFORM+NCE OF THE EXECUTION OF THE R W THE CONFVu TOR, THE CONTRACTOR IS RESP 16 9 FOR EYECUPW THE C0145TRUCTION WORK A ORDING TD THE INFORMATION SET FOfRH IN TIE PUN .0 IN ACCORDANCE WITH ALL APP r•®r REWIRENFNTS. RE05TERE0 PROFESSIONLL ENGINEER: AlyO,,,,- IA,, B2 STATE Of COLORAOO NO.: 223 06rL7:22 DATE APPLICANT NAME: Cheryl L Diedrich. CPL )(of Energy I Responsible By Nature Senior Agent, Right of Way 8 Permits 1123 West 3rd Aw., Dew CO. B0223 R 303-571.3116 C: 303908-0299 F: 303-571-3284 RIFLE COMPRESSOR STATION RECOMMISSIONING PROJECT DRAWING COVER SHEET 4300 TITLE SHEET & LOCATION MAP 1( I SERVICE CENTER: I LOCATION: I DIVISION: ICITYICOUNTY: R7ELE/44nELD ON LOCATION INFORMATION GPS LOCATION: LAT: 39.529293' LONG:-107.827127' ELEV: 5320 FT ZONE DISTRICT: RESOURCE LANDS, GENTLE SLOPES AND LOWER VALLEY FLOOR (RLGS) PLACE 6- THICK (MIN) AASHTO NO 57 (OR EQUIVALENT STONE) IN LIFTS OF 4" (MAX) COMPACT LIFTS TO 9D% MODIFIED PROCTOR 4 GEO-TEXTILE FABRIC �—COMPACTED SUB -GRADE TYPICAL YARD GRAVEL SURFACE SECTION yr Im Dig Safely . CALL UNCC THREE WORKING DAYS F:EFORE YOU DIG 1-800.922-1987 ...Dec.or9 UTILITY NOTIFICATION CEN rER OF COLORADO CAD FILE NPME1 D_4,7P1_ est¢r_Riffe_inierco ectdwg '& Xcel Energy° FLOC: 4P-3" 33,^- GC BLDG. (8x16 �i DISCHARGE FILTERICOAI I I TOP OF BANK TOE OF BANK GRAVEL ACCESS ROAD (PRIVATE) (COUNTY RD. 264) 4M" 1i 29 0 I' YI u s3'`s�e _---- '_ _>I�,: �-,j— EXIST. ELEC. t7a 1L BLDG. A - f 3 RECTIFIER FUTURE s EXISTING 28' SWING I I BLDG.r 79 5 GATE TO REMAIN EWCONTROL EXPANSION — BLIX9.(tOx14) - PROPOSED SUCTION fILTEW iCOMPRESSOR AMP' \ BUILDING COALESCER SLGO HT 6'it"' i 1APPROX315�1 �q�0" • • 39.G 10' 3 GENERATOR s's ( o ���; I,'I-- PROPERTY LINE 20 0" AREA TO BE ' — EXIST. RTU BLDG. UNDISTURSEDA._ a —�101'-0„ �u - L I� SLOWDOWN -.HP AND LP STACK - I Roo L DRAIN TANKS,' f0'-1y a�f� _INSAIRBLDG. —sn•,� ��``�--'.�1.�\�'� n N I / EXISTING FENCE TO BE REPLAI CED J WITH NEW 10' FENCE (MATCH EXISTING PERIMETER) I PROPERTY LINE 0 2,0 40 60 SITE MAP 1,2020 SCALE: V = 20' TOTAL AREA OF SITE:1.188ACRES HISTORY DATE 01-2 DRAWNBY: PsEA[;nglneerEng 9m PrRAum couRr, sTE sco DESIGNED BY&A*co. 30112 CHECKED BY: 7,x D4rDai22 05-2299 "IN.ENENGINEERING.GOM APPROVEDBY: BE a4raar22 _. IN SERVICE DATE: LEGEND EX. MAJOR CONTOUR EX. MINOR CONTOUR -sooO MAJOR CONTOUR -sow MINOR CONTOUR -- — LOD---- -LDO-- LIMIT OF GRADING DISTURBANCE EXISTING YARD GRAVEL PROPOSED YARD GRAVEL 0 PROPOSED CONCRETE Ly G LINE IQ 8 CURVE (C) DATA (REFER TO LINE AND CURVE TABLES THIS SHEET) LINE TABLE ' UAENO. BEVNNG DISTANCE BEGIN RDINATE END COORDINATE LI sn tlP xn5alusll E3Nne151 Nxalm@Irz>Lwt�ev I3 ]lYAY51W 18i Nt�6rex93EY]4N]1gg N'Iyb i4RI�YJt5155p U IDfY;2]'N f&] N1�'NRIE: Mb159 ti1pb W5 :E3H]N'4ft N fil'9PLN N.f NI@NAR ETM4#l.N Nf03Wl]I5=2M]V'!A 1: Ha46iv u XltlNns51E.. NmtlM33IEta1 ' LI MItli934 113 K1121 ,MIE3]IZ119 N. I6iPA#N51EWiXl2q I3 IO3'NIiE 9,P N IDIE'HV#I3.W X: feMN1d E N, Ya U 0IIfl'E — N. 1Rt RIE 2WP1t6 "lien 5L1E.SN . is IEP1:94 4E Nlmlgll [eL llB X:'131591!E:lN31B159 Ix N1Y<tZln 1Ei N15$1111 E2a]R1y X'.15g pol !En]i0191 LN 9Y'Y41'£ N:' M16'&'4d1 3YPAAd] NiEX,NE181E i3tlP0.55' LI3 mIp,TTY .5 N:#$✓e1NIE:2NPG.4 N.1a&1BSIIE3)l'�i LI] MBSISTY l51 N:"re" :3W151.11 Nt�59p55DIE]NIF21ID LIA W1V)(0£ @9 N1N}IDjI 1e8 N:BffifliNlc..lW.ittl Ln rAn3elre Ala Nlem#]aez]1xsEa N1pE135mEn][aA.l9 Lb ]®'SiEiE flP NI�IEIH ELMtl9A.53 N'tA]fi15 OIE2UP@5] L1i &E5i6:'E qg N:I�Itl91i E3',xTt1II N.1ffiIn,3BIE INY+5 P2 '. llt ml'piRTV i15 NI@fi1tlA E2WpEN R1W®.,U E;oO. 3I CURVE TABLE CURVENO. RADIUS LENGTH PC I BEGIN ODDRDINATE PTIENDCOORDINATc RADIUS CENTER POINT COORDINATE C1 N 1dd' X:1Xmlp,$ E:L{8914� N'. Ncw/d.11lE: ZNYHN µ1@n1IP 51 E:LLLNtl.l3 Q ID IAA' XIFIDBi.@EllAWRW X.OWE.N N 1uxelit1IE:}S. 'i; Ct e? NIS k IM1115 I E: SNyL,19 X16591'%E:1Lmm N!BID]##IEb]ltl9 G F A}1 NlCeD"LT]IE'. LWIAN Llies"DWE:.13] H'.fF.9Agi1 E91&1133 f5 yl .? L1.1E:4kPo21 NI&914DW1-c: iilgOS 1&51951 EZYIiA& IE S Ta Nim1Ry[E1L]I¢M N 10ItCrtIE:IIfSIB/dB N1E511p.51 ETN5'Yd8 Li 5 ]9 Nf6$15g1d E3]411TNSF k1ReFEI,v F:Y4]RfE k E&YI.t,E: YAi]156 W p Yi N1B'D]IB.MF:ll1THSB H, INE�ImEm151.11 N,1�]iePJ IElNe15i5] I C6 3 Re N: I11591i E: 3L3N15`v N.1N q91 E:2N81M NI&ER]SI EZs`]&"A3 Cb ]P .1 HIBSmusjtfl 19 N:'mSu, NI ELUTR.41 CAI IP #i XI&6151.1)E: MI)W.9 k16511QyE lllditt3l X. 1681011fE: Lf1:IlLp.D SURVEY EXISTING CONDITIONS ARE SHOWN FOR REFERENCE ONLY. CONTRACTOR TO FIELD 1 APPLICANT NAME: VERIFY CONDITIONS PRIOR TO CONSTRUCTION. Cheryl L. Diedrich, CPL 2. EXISTING SITE TOPOGRAPHY, BOUNDARY, UTILITIES, AND HORIZONTAL CONTROL Xcei Energy I Responsible By Nature SHOWN ON THE DRAWINGS WERE OBTAINED FROM SURVEY DATA PREPARED BY: Senior Agent Right of Way 8 Permits SHORT ELLIOTT HENDRICKSON INC. (SEH) 1123 West 3N Ave., Denver, CO. B0223 TEL: (800) 325-2055 P: 303.571.3116 C: 303-908-0299 F: 308 571-3284 3. HORIZONTAL DATUM NAD 83, COLORADO STATE PLANES, CENTRAL ZONE, US FOOT ---- VERTICAL DATUM: NAVD88, US FOOT. REVISIONS RIFLE COMPRESSOR STATION RECOMMISSIONING PROJECT DRAWING DESCRIPTION BY DATE SITE LAYOUT PLAN �30 FqR REvr£v Ps 04108122 CIVIL & STRUCTURAL /iED FOR REVIEW PS 05/04122 FDR PERMIT Ps 06124122 SERVICE CENTER: LOCATION: //11 I DIVISION: CITY/COUNTY: auLricaRFt£LD TYPE: L�