Loading...
HomeMy WebLinkAboutOWTS Permit Card  Garfield County Public Health  2014 Blake Ave.   Glenwood Springs, CO 81601  Phone: (970) 945‐6614 ext. 8150  For inspections, call: 970‐945‐6614 ext. 8150 and call the Design Engineer, if applicable   Project Address: 5011 County Road 154 Glenwood Springs_  Parcel No.: 239501201003_  Owner Name: Clive and Naoise Nickolay    Owner Phone:   Designed By: CBO, Inc.     Designer Phone: (970) 309‐5259  Number of Bedrooms: _5_   Minimum Tank Capacity: 1,500‐gallon   Minimum Absorption: 843.75 ft2  OWTS PERMIT   KEEP AVAILABLE AT PROJECT SITE   Permit Number _SEPT‐8518_______________________________  Permit Type X New X Repair X Remodel/addition X Tank only   Issue Date _02/13/2024____________________ Expiration Date_02/13/2025_________________   Permit Conditions:   This OWTS Permit is approved on the condition of compliance with the report and design as  submitted by CBO, Inc. dated June 20, 2022. Changes to the design and permit must be approved by  Garfield County Public Health and the designer prior to construction.     The new OWTS will serve an existing four‐bedroom residence and a one‐bedroom ADU. The system  will consist of a new, two‐compartment 1,500‐gallon septic tank set level with access to grade and  an effluent filter in the outlet tee of the tank followed by a 500‐gallon single‐chamber pump  chamber set level with access to grade and a high‐head pump in the pump chamber. Effluent will be  pumped to an automatic distributing valve set at the high point of the system that will distribute  effluent to 850 ft2 of STA. The new STA will consist of two unlined sand filter beds, each bed  consisting of two feet deep of secondary sand media and three distribution laterals placed in  GeoMat distribution media and measuring 10’ x 42.5 feet each. Distribution laterals are to be 1 ½  inch Schedule 40 PVC, with 5/32‐inch orifices every 3‐feet on center and the laterals ending in  flushing valves at the distal end of the laterals. The orifices are to be facing downward. Inspection  ports are to be installed at each corner of each bed.  Maintain all setbacks and elevations as  designed.    Contact the designer and Garfield County Public Health at least 48 hours prior to requesting final  inspection of the installed system prior to backfill. NO OWTS COMPONENT SHALL BE BACKFILLED  WITHOUT PRIOR APPROVAL FROM GARFIELD COUNTY PUBLIC HEALTH AND THE DESIGNER.      Agreement   All installations must comply with all requirements of the Garfield County OWTS regulations  including but not limited to the conditions specified above.   In consideration of the issuance of the permit, the applicant hereby agrees to comply with all  laws and regulations related to the zoning, location, construction, and erection of the proposed  OWTS and associated structures for which this permit is granted. The applicant further agrees  that if the above said regulations are not fully complied with in the zoning, location, erection,  and construction of the above described OWTS and structure, the permit may then be revoked  by notice from the Health Department and immediately become null and void.  The issuance of a permit and specifications of terms and conditions therein will not constitute  assumption of liability, nor create presumption that the local public health agency or its  employees may be liable for the failure or malfunctioning of any system. Permit issuance will  not constitute a certification that the system, the equipment used in the system, or any  component used for system operation will ensure continuous compliance with the provision of  the OWTS Act, the regulations adopted thereunder, or any terms and conditions of a permit.   Permit Approval  Plans and specifications for the proposed OWTS have been reviewed and are considered  satisfactory. Permission is hereby given to the property owner(s) to perform the work indicated  in accordance with the Garfield County OWTS Regulation. This Permit will expire 1 year from  the date of issuance unless construction on the system has commenced. An "as‐built" drawing  must be submitted and inspection of the system must be completed by GCPH before final  approval of the system will be issued.        02/13/2024  Issued By: Garfield County Environmental Health  Department  Date