Loading...
HomeMy WebLinkAboutOWTS Installation Observation Letter 08.11.232789 Riverside Parkway Grand Junction, Colorado 81501 Phone: 970-255-8005 Info@huddlestonberry.com March 12, 2024 Project#00505-0027 Keystone Custom Builders, Inc. PO Box 1807 Grand Junction, Colorado 81502 Attention: Mr. Jarred Eddy Subject: OWTS Installation Inspection 68 Wilson Lane Rifle, Colorado Reference: OWTS Design, 68 Wilson Lane, Rifle, Colorado by Huddleston-Berry Engineering & Testing, LLC for Jarred Eddy, August 11, 2023. Dear Mr. Eddy, In accordance with Garfield County and State of Colorado regulations, Huddleston-Berry Engineering & Testing, LLC (HBET) conducted inspection of the installed Onsite Wastewater Treatment System (OWTS) at 68 Wilson Lane in Rifle, Colorado. As indicated in the referenced report, HBET completed engineering design of the system. Based upon our inspection, HBET certifies that the OWTS was constructed in accordance with the design. The as-built site plan is attached. Please contact us if you have any questions or comments regarding the contents of this letter. Respectfully Submitted: Huddleston-Berry Engineering and Testing, LLC Wayne D. Anderson, P.E. Project Engineer Cc: Garfield County Building Department ATTACHMENTS NEW SHOP WATER LINE REPAIR AREA 500 GALLON TANK STA EXISTING SHED 68 WILSON LANE AS-BUILT SITE PLAN Project # 00505-0027 Date: 03/12/24 By: WDA N Scale: 1" = 30' 2789 Riverside Parkway Grand Junction, CO 81501