HomeMy WebLinkAboutOWTS Installation Observation Letter 08.11.232789 Riverside Parkway
Grand Junction, Colorado 81501
Phone: 970-255-8005
Info@huddlestonberry.com
March 12, 2024
Project#00505-0027
Keystone Custom Builders, Inc.
PO Box 1807
Grand Junction, Colorado 81502
Attention: Mr. Jarred Eddy
Subject: OWTS Installation Inspection
68 Wilson Lane
Rifle, Colorado
Reference: OWTS Design, 68 Wilson Lane, Rifle, Colorado by Huddleston-Berry
Engineering & Testing, LLC for Jarred Eddy, August 11, 2023.
Dear Mr. Eddy,
In accordance with Garfield County and State of Colorado regulations, Huddleston-Berry
Engineering & Testing, LLC (HBET) conducted inspection of the installed Onsite Wastewater
Treatment System (OWTS) at 68 Wilson Lane in Rifle, Colorado. As indicated in the referenced
report, HBET completed engineering design of the system.
Based upon our inspection, HBET certifies that the OWTS was constructed in accordance with
the design. The as-built site plan is attached. Please contact us if you have any questions or
comments regarding the contents of this letter.
Respectfully Submitted:
Huddleston-Berry Engineering and Testing, LLC
Wayne D. Anderson, P.E.
Project Engineer
Cc: Garfield County Building Department
ATTACHMENTS
NEW SHOP
WATER
LINE
REPAIR AREA
500
GALLON
TANK
STA
EXISTING
SHED
68 WILSON LANE
AS-BUILT SITE PLAN
Project # 00505-0027
Date: 03/12/24
By: WDA
N
Scale: 1" = 30'
2789 Riverside Parkway
Grand Junction, CO 81501