Loading...
HomeMy WebLinkAboutEngineer's Installation Observation Letter 02.28.24 February 28, 2024 AS-BUILT CERTIFICATE OF INSPECTION & ACCEPTANCE Onsite Wastewater Treatment System 3-BR Single-Family Dwelling 3093 CR 237 Harvey Gap Road Silt, CO 81652 The referenced onsite wastewater treatment system (OWTS) was inspected February 21, 2024. At the time of inspection, the OWTS was installed in conformance with the October 2023 OWTS design plans. Please contact WestWater Engineering for any additional information regarding engineered-design OWTS for referenced address. Respectfully, Dean R. Goebel, MS Hydrogeologist, PG WestWater Engineering Reviewed By: Keith Mendenhall, P.E. 2516 Foresight Circle, #1 Grand Junction, CO 81505 (970) 241-7076 www.westwaterco.com