HomeMy WebLinkAboutEngineer's Framing DetailSunday, Aprit 14, 2024 at O9:19:O2 Mountain Daylight Time
Subject: RE: Finnbar Framing ltems
Date: Friday,April12,2024al4:10:4SPMMountainDaytightTime
From: Chris Bridges
To: Barrett Cyr
Attachments: image001.jpg, image002.png, image003.png
I added it and re-sent the previous emait. As for the truss bearing at gtutam, the ptywood gusset
solution seems adequate, but you should add an A34 ctip at ea bottom 2x chord to provide
stabil.ity.
The intent of the tedger connection was for the ftat roof pLywood to extend to the
tedger/gtul.ambeam which woutd've added some rigidity to that area of roof. Woutd it be possibte to
add some truss blocking (simitar to betow) in every other bay al.ong that wal.t Line? Let me know your
thoughts and if you have any questions.
2'.r)'MAX SHTC & NAILING
P€R SO
'2
TRUSS TOP CHORCI
BIKG PANEL NAILING fO FOLLOW
EXT SW SHTG & HAILING PER
s$.01 - TYF U.N 0
&4 MIN PANEL PERIUETER
FRAMII.JG wt 1fi NAIL$ @ 6'0.c.
TO TRUSSES ANO lOP PLATE
* TRUSS BCIT CiIORCI
'..'-- CSNI 2x OBL TOP PL
rl-
i
i
TYP TRUSS BLKG PANEL
j X $CALE 3i4"; l'-0"
1of5
On Apr 12,2024, at 3:36 PM, Chris Bridges <ch!'i9(OeyoLvestiuot,aqm> wrote
Hi Barrett,
Per item (2) bel.ow, The LVL at entry closet is okay as a (3) 11718" LVL (see he sketch
bel.ow).
<image002.png>
Per item (3) bel.ow, the two referenced headers are okay with (2) trim studs ea end.
Thanks,
Chris
Chris Bridges, P.E.
Project Engineer
<image003.jpg>
1040 Main Street
Carbondale, CO 81623
{970) s 1 0-0773
(207 ) 660 -57 23 Direct/Cell
F ro m : Ba rrett Cyr < b atretl@ cvra n d co m p-A0y-eom>
Sent: Friday, Aprll 12,20247:26 AM
To: Chris Bridges <ch ris@ evolvestruct.com>
Subject: Re: Finnbar Framing ltems
Good morning Chris,
Thanks for Looking into this. My comments are below in purpte. I do feel. that you and I
shoul.d took #4 onsite today. l'tt reach out on your ce[[ to coordinate a time.
Barrett Cyr
principal + builder
po box 9064 aspen colorado 8LGI2
cell 970.948.0404
bagett@grl ra n d co m p-a-n y.eem
www. cv ra n d company-ggm
i nsta gra m @ c.y-fan-des
<image004.png>
From : Chris Bridges <c h ris@ evo lvestrlgt.co m>
Date: Thursday, April 11 ,2024 al4:12 PM
To : B a r rett Cy r < b ar r elt @ c yjan-d-Qg-m p a-0y,-Qqm>
Subject: RE: Finnbar Framing ltems
3of5
Ia: Chris Bridges
It should just sit on toP of the beam
between trusses
lf that makes sense
fn
':i'3ll
'fui---
Ahhh, now I get it.
Like this?
IYP TRUS$ BLK6 PAN€Lx
< ne
That's correct
**iivcr*d :