Loading...
HomeMy WebLinkAboutObservation of Excavation 04.17.24ffi CTL ITHOMPSON :i..rrl:crtii.t; 't illa : April lT,2024 Green Line Architects 65 North lstStreet, Suite 5 Carbondale, CO 81623 Attention: Mike Yeates Subject: Completion of Services 491 High Aspen Drive, Phase 2 491 High Aspen Drive Garfield County, Colorado Project No. GS6546.001 F CTLIThompson, lnc. (CTLIT) is providing construction observation and materials testing services for the 491 High Aspen Drive, Phase 2 project located at 491 High Aspen Drive in Gar- field County, Colorado. The scope of our services included excavation observation and density testing services. At the time of this letter, we have completed Observation and Density Testing of Soils (Phase 345) for the project: Observation and Density Testing of Soils (Phase 345): CTLIT performed Observation and Density Testing of Soils for the building foundation between June 25, 2022 and July 31, 2023. During this period, CTLIT made 12 site visits and performed 32 moisture/density tests, provided 11 density test reports and 1 visual observation report. Our observations and test re- sults indicate that the structural fill placed for the building foundation is in general conformance with the project plans and specifications. No outstanding discrepancies are noted for the subject construction observation and ma- terials testing phases for the 491 High Aspen Drive, Phase 2 project. Please contact us if you have questions or need additional information. CTLITHOMPSON, INC Reviewed by: Thomas Lab & Field Manager tdowninq@ctlthompson. com fLz,BAPs Rl6n R. Barbone, P.E. Division Manager rbarbone@ctlthompson. com CTLlThompson. lnc. Denver, Fort Collins, Colorado Sprinqs, Q,!.enwoodSldngg, Pueb|q, Summit Countv - Colorado Cheyenne, Wyoming and Bozeman, Montana