Loading...
HomeMy WebLinkAboutWeld-Bolt Inspection Report 02.14.2024725 Scarlet Drive, Grand Junction, CO 81505 ~ (970) 245-2000 ~ Email: info@dwmetalworksinc.com DW Metal Works, Inc. 725 Scarlet Drive Grand Junction, CO 81505 (970) 245-2000 Email: info@dwmetalworksinc.com February 14, 2024 Western Welding, Inc. PO Box 1230 Silt, CO 81652 Attn: Brandon Walpole RE: (Revised 2/14/2024) Continual inspection report for onsite welding at 360 Rivers Bend, Carbondale, CO 81623 Dear Mr. Walpole, Starting on July 25th, through July 26th a continual, visual inspection was conducted on site at 360 Rivers Bend, Carbondale, CO 81623 for the following beam connections listed below. CJP (x2)- 1B9 to 1C5/1C12 1B9 to 1C5 Beam Buckets (x5)- 2B8, 2B14 ,2B7 ,2B15, 1B17 Base plates- 1C23, 1C15, 1C20, 1C14, 1C1, 1C22, 1C2, 1C15, 1C3 Base plate Shims- 1C5, 1C12 Field weld columns- 2C4/1C22, 1C15/2C5 ,2C71/C15 * 2/13/2024- Continual, visual inspection on five ½” plates (8”x16”) evenly spaced on W10x30 (2B5) with ¼” fillet welds. Located between 2B1/2B13 and 2B8/2B14 W beam truss assemblies shown between gridline G and D. An inspection was conducted in accordance with AWS D1.1 Structural Steel 2015, Clause 6, and IBC 2021 Chapter 17 and the approved shop drawings # 407 E1, E2, E3 and E4. All structural welding done complies with and is considered acceptable, per the required codes mentioned above. Respectfully submitted, Chris I. Pena AWS CWI #20023151 QC1 AWS Christopher Issac Pena CWI 20023151 QCI EXP. 2/1/2026 Special Inspection Daily Report City/County of: ________________________ Permit No.: ______________________Date____________ Project Name/Address:________________________________________________________________________ _____________________________________________________________________________________ Inspection Type(s)/Coverage: ____________________________________________________________ □Continuous □Periodic; frequency: ____________________________________ Inspections made, Including locations: _____________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ Te sts Performed: _______________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ Items requiring (1) correction; (2) correction of previously listed items; and (3) previously listed uncorrected items : _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ ________________________________________________________________________________ Changes to approved plans authorized by engineer or architect of record:_________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ Comments:____________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ To the best of my knowledge, the work inspected was in accordance with the building department- approved plans, specifications, and applicable workmanship of the IBC, except as noted above. Signed: ________________________________ Inspection Agency_______________________________ Print full name: _________________________ ID Number: ____________________________________ Carbondale, Garfeild BLRE-07-22-7668 2/13/2024 Vanse Silvias and Bryer Rew are the certified welders performing all welding. Miller trailblazer 325- 128 Amps/50V. None taken Visual inspection with GAL 1/4" fillet gage 360 Rivers Bend Visual once until completion Visual Inspection on 1/4" fillet welds on five 1/2" plates (8"x16") located on W10x30 (2B5) and evenly spaced between 2B1/2B13 and 2B8/2B14 W beam Truss assemblies shown on the Iso view on approved shop drawings (Job-407) 5/31/2023. Adding five 1/2" plates (8"x16") to W10x30 (2B5) that spans between 2B1/2B13 and 2B8/2B14 W beam truss assemblies. Christopher Pena DW Metal Works, Inc.