HomeMy WebLinkAboutCorrespondenceColleen Wlrth
O,Aner
rzebnn/>4/ /
From:
Sent:
To:
Cc:
Subiect:
Keith < shaggs09@yahoo.com >
Wednesday, May 1, 2024 8:01 AM
Colleen Wirth
HannaWit@outlook.com
Re: BLRE-04-24-8599 -MODFIN Design Build LLP is UNDER REVIEW
Fronr: Keith <shaggsO9 @yahoo.com>
Seclt: Wednesday, Apri|24,2024 1:50 PM
To: Co I lee n Wi rth <cwirth @ga rfie ld-co u nty.co m >
Cc: Ha nnaWit@outlook.com
subfect: Re: BLRE-04-24-8599 -MODFIN Design Build LLP is UNDER REVIEW
Colleen, thanks for reaching outl At this point we are only building the main residence with attached
garageandcarport'Thecertificateofoccupancywillonlybethis.--<
My mechanical guy will provide me with the load calculations and ventilation plan as soon as he's done
bidding the project for me. l'll get it to you asap'
Thank you, Keith
Sent from my iPhone
F?b"teapa
WhittenhetT,Keith (lihdfinl
Good morning Colleen! Looks like we'll be doing a whole house exhaust only system. Below is the hvac contractor's
proposed job scope for this house.
Will you also be reviewing the septic plan or is that approval coming from elsewhere?
Thanks, Keith
AMANA S-SERIES Heating and Air Conditioning (AMERICA'S BRAND FOR COMFORT)
1 ea. ACVC96 / TWO-STAGE / VARIABLE-SPEED ECM / UP TO 96% AFUE GAS FURNACE
L ea. CAPEA / ELECTRONIC EXPANSION VALVE / CASED INDOOR "A" EVAPORATOR COIL
i. ea. ASXS6 / S-SER|ES / TNVERTER-DRIVEN / UP TO 17.2 SEER SPLIT SYSTEM AIR CONDITIONER 1 ea. AMANA BRAND
SMART THERMOSTAT
1" ea. AM1L / CLEAN FIT / MERV 1-1 MEDIA AIR CLEANER
lncludes: low voltage wiring to thermostat, sealed duct system as per our duct design, S/A registers with balance control
dampers, fixed bar R/A grilles, air balancing, copper line set to air conditioner, furnace vented, 4" water heater type b
vent, rough-in 6" range vent, make-up air and venting for dryer, 4 ea. Panasonic Whispergreen Bathroom Exhaust Fan, 1
ea. Two-stage panasonic Whispergreen Ventilation Fan for conditioned crawlspace,24GA auxiliary drain pan, complete
installation, start-up, system check, and Monarch Heating and Air Conditioning's 1" Year parts and.labor
Sent from my iPhone
on Apr 24,2024, at2:L5 PM, Colleen Wirth <cwirth@garfield-county.com> wrote:
Soundsgood, thankyou Ss',
il
Lt
\
)
la
->
BtRE-[1-24-85S9
sEFr-[1-2&8EllI
S/F E TB0 Springridge llr
SFRlllERl0GE PIAEE $lB, [c 15, Far#2395[34118[15
On Apr 24,2024, at 11:16 AM, Colleen Wirth@>wrote
BLRE-04-24"8599 -MODFIN Design Build LLC €l TBD
Springridge Dr
Courtesy Message for Keith and Hanna,
l'm starting the building and zoning complianee reviews for nerry construct,ion of y'puu
single-family residence on Lot 15, Springridge PIace.
Before I continue with examination, I need soenre c{arificatio* atid c{ear direction on the
itrtended work scape:
QU ESTI ON S : COMM ENT: Cover Sheet "4f,4 ft€t€s a+? 4PTION"ALqS$ITICN cf l-,SG-o
sq ft, A01 notes a "future addition", A02 notes current and future roof systems,
elevations show main residence with optional or future addltion;
A05 S|TE PLAN includes main residence, garage, future addition Afd0 future bam
structure.
Various pages also appear to show a carport offthe attached garage, structural
foundation and framing sheets appear to reflcct main housc, attochcd garagc and
ca rport.
1.A) What scope of work would you like me to perform and execute full plans
examination on?
1.8) What scope of work do you anticipate tfre buildi*g ilcspect+rs t+ ccmp{ete
inspections on during construction under the current permit BLBE-04-24-8599?
1.C) What scope of work do you anticipate wil.l be inciuded on the Certifr'cate of
Occupancy at time of completion of permit BI.RE-O4-24-8599?
Answers to 1.A - 1.C. will aid in my finalizing the building perunit fee at permit issuance;
confirmation on scope most hetpful, thanks"
UEST FOR FURTHER MECHANI
1. Pursuant to the adopted 2018 IECC, Garfjeld County requires new build homes
to havc somc typc of whole-house ventilation.
While sheet A 01 first floor plan deplcts a 6 ft by 4ft 4 inch mechanjcal room off
tlte pl'upused laurrdry rourn, il. is uirkrrown what method of whole-house
ventilation will be implemented.
Please supply detail about what types of equipment will be placed in the
mechanicai room (anci if any equipment proposed tbr rnsiajiation ln tt:e
attached garage or under-floor crawl space cavitiesi?
For whole-house ventilation are you installing an exhoust onlyfan srystem?
Whale-house cambinatiott ntethod "sis €*t€ +{ $}$re fflV's +r #RV etc? tf s,o,
where is equipment being installed?
I appreciate a written responsc for the buitding file and fcr stapli*g tc the {-t[lD CCPY
Email responses can be sent to Colleen Wirth, Plans Lxarnjuer at cwirth@earfield-
2
COU .com.
Thanks for diligence and effort preparing building application materials, I look forward
to hearing your reply,
Colleen Wirdt
Building Plans Exarniner
Garfield County (ormmunity Development
108 8th Street, Suite 401
(970) 945-1377 ext 1610
cwirth @ga rfie ld-co untv.com
3