HomeMy WebLinkAboutEngergy ReportGenerated by RES check-Web Software
Com pl iance Certificate
Project Eagle Ridge
EnergyCode: 2018 IECC
Location: Parachutc, Colorado
Construction Type; Slngle-famlly
ProjectType: Itlew Constructlon
Conditioned Floor Arear 1,689 ftz
Climate Zone: 5 (6881 HDD'
Permit Date:
Permit Numberl
All Electric false
ls Renewable false
Solar Ready: false
HasCharger falsc
Has Battery: false
Has Heat Pump: false
Electric Ready: falec
Responsive Water Heating: false
Construction Site: OwnerlAgent:
Parachute, Colorado, co 81635
Designer/eontraetor;
Compliance: S.gt6tattc.Thencodc MaximumlJA: A27 YourUA: ff12
Th€ % 8€tt€r or Wolse Than Cod€ lnd€r r€f,€cti how cl66e !o comp$alt€€ the hourc ir lrassi on catie MI rulet,
tt DOES t{OT provide en esdnrat€ of €n€tgy ssc or €ort rdattue b t minltnut'eode home.
Slab-on-grade tradeoffs are no longer considered in the UA or performance compliance path in REScheck, Each slab-on-grade
assembly in the specified climate zone must meet the minimum energy code insulation R-value and depth requirements.
Envelope Assemblies
Ceiling: Flat Ceiling or ScissorTruss 1,689 4C.0 0.0 0.026 0.026 44 44
Wall: Wood Frame,16" o.c, 1,377 2l'"0 0.0 0.057 0'060 78 83
Comptiance Stdtement: The proposed building design described here !9 consistent with the bulldlng Flfns.gqgqq1r;atlons, and other
catcutations submitted with the femit applkation. fhe proposed building has been {.esigryd to m€etthe 2018 lEee re-gulrements ln
REscheckYension : RE5check-Web and tb eomply with the mandatory regulrements listed in the RE5cfteck lnspectlon Checklist"
name - TiHe Srgnahrre Date
Compliance: Passes using UA trade-off
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value
Prop. Req.
U-Factor U-Factor
Prop
UA
Req
UAAssembly
Project Title: Eagle Ridge
Data filename:
Report date; 63123124
Paoe I of 9
REScheck Software Version : REScheck-Web
lnspection Checklist
Energy Code: zALg IECC
Requirements: A.Ao/a were addressed directly in the RE5cfieck software
Text in the ,,CommentslAssumptions" cclumn is provided by the user in th€ REScheek Requirements.ser€en, For eaeh
ieiuiiement, [rt. usei lertJries ttrat a code requiiement wili be met and how that is documented, or that an exeeption
ii6ein! ctairireO. wtrere compliance is itemized in a separate table, a referenee to that table is provided.
Comrncntr/A$umptlonrFlcld Vs{llcd
Yalua Compllcr?Plens Ycrltrcd
Valuc
Sedlon*
& Beo.lD
Prc-lnepcctlon/Plan Rcvle*
143.L,
193.2
[PRl110
Construetion drawings and
documentation demonstrate
energy code compliance for the
building envelope. Thermal
envelope represented on
construction documents.
tlot
ENot Observable
Ewot npplieable
103.1,
L03.2,
403.7
IPR3lr
.a
Construction drawings and
documentation demonstrate
.energy code comPliance for
lighting and rnechanical systems.
'Systems serving multiPle
dwelling units rnust demonstrate
compliance with the IECC
Comrnercial Provisions.
EComBlies
Eooes t{ot
flf.lot Observable
Ettot Epptleabte
Heating and cooling equipment is Heating:
sized per ACCA Manual 5 based Etulhr-
on loads calculated per ACCA C-oolino:
Manual J or other methods Btu/hr-
approved by the code offtcial.
Heating:Btu/hr_
Cooling:Btu/hr_
UDoes f,Iot
rEttlot Obsenrable
:flt{ot nppfieaolce
1
7
Addltlonal Comments/Assumptlons:
I High lmpact flier 1)2 Medium impact tTrer 2l 3 tow ifipact (Tier 3l
Project Title: Eagle Ridge
Data filename:
Report date; A?127124
Paae2 of I
€ompllcr?conm.ntrlAffumptlonrFoundadon lnrpectlon
Scctlon
#t 8cs.lD
303.2.1
lFo11r
,S
is installed to :EComPliesA proteetive covering
exterior insulation flooetlotprotect exposed
of 6 in. belowand extends a minimum ;Ef{otObseruablegrade.
;Elt'lotAppllcable
Snow- and ice-melting system controls
installed.
'S
'Ettot
;flooes ttot
tEtrtot Obs€ruable
Addltlonal CommentslAslumptlonsi
I High tmoact tTier l)2 Medium lmpact lTier 2l 3 low tmoact {Tier 3}
Project Title: Eagle Ridge
Data filename:
Report date: A3123i24
Paoe 3 of 9
Section
#
& Req.lD
framlng / Rough-ln lnsPectlon Plans Vcrlflcd
Valuc
Field Vcdflcd
Valuc Compllcs?€ommcntrlAisumptlont
4o2.4.L.L Air barrier and thermal barrier
[FR23lr installedpermanufacture/s
g instructions.
[JComplies
flDoeE Not
ilNot Obsencable
flNot EBB|ieable
4A2.4.3
IFR20l1
'*',
Fenestration that is not site built
is listed and labeled as rneeting
AAMA IWDI"ItuCSA l0Llt.5.2 I A44A
or has infiltration rat€s Per NFRC
400 that do not exceed eode
limits"
fleomBlies
Eooes Not
fiNot Observabie
flNct npplieable
4A2.4,5
[FR1612
lC-rated recessed lighting ftxtures
sealed at housing/interior finish
and labeled to indicate sz.O c.fm
leakage at75Pa,flNot Obseruab'le
flxot epBlieabie
4t3.3.L
fFR12I1
gJ
Supply and return ducts in attics
insulated >= R-8 where duet is
>= 3 inehes in diameter afid >=
R-6 where < 3 inches. SuPPly and
return duets in other portions of
the building insulated >= R-6 for
diameter >= 3 inches and R-4.2
for < 3 inches in diameter.
EeomBlies
flDoes lrlot
ilNot Ob*eruable
ElNot ApBiicaoie
403.3.2
IFR13I1
,j!)
Duets, air handlers and filter
baxes are sealed with
jcint#seams compliant with
tnternational Mechanical eode or
lnternational Residentiat Code, as
applicable.
ANot Obs€rvable
Etrtot npBlieablc
403.3.5
IFR15I]
'td/
Building cavities are not used as
duets or plenums,
Eeomplies
flDoes Not
[JNot
l--lNot
Observab'le
403.3.6(L,
2t
lFR26l3
!&
Oucts partially or eompletely
buried in ceiling insulation have
an insulation R-value not l€$s
than R'8, the sum of the ceiling
insulaEon R-value against and
abrove the top of the duet, and
against and below the bottorn sf
the duct, is >= than R-19,
excluding tfie R-value of the duct
insulation.
DDoes Not
.nNot Observable
ENot Applaeable
403.3.7
lFR28l3
$r,
Ducts declared to be within the
conditioned space are either 1l
completely witfiin the continuoug
air barrier and within the building
thermal envelope, 2l buried
within ceiling insulation in
aceordance with Section
R403.3.6 and tfie air handler is
located eompletely within the
contlnuous air barrier and within
the brrileting thermal enveloPe
and the duct leakage is <= 1.5
dm I LOA square feet of
conditioned floor area serued bY
the duct system, or 3) the ceiling
insulation R-value installed
against and above the insulated
duct >: to the proposed ceiling
insulation R-value, less the R-
value of the insulation on the
flcomBlles
ilooes Not
ilNot Observable
flNot applicabie
1 Hish hpact tTier 1)2 Medium hpact (Tier 2)3 tow lmpact {Tier 3}
Project Title: Eagle Ridge
Data filename:
Report date: 03123124
Paoe 4 of I
HVAC plping conveying fluids
above 105 oF or chilled fluids
R-_R-_
l{ot
Observableigx*
itrtlot
bclos 55 oF are insslated to eR-
?.
!lot
Observgble
lpiping.
insulation on HVAClPrctecdon
I1
*
are insulahd to R.R-_wat€r ilot
Obseilable
ilot
Sservable
are
lnstalled
and exhausts,
Addltlonat Commctffi/lccurnptlonc:
Low 3'fiert1I
ProiectTitle: Eagle Ridge
Data ftlename:
f;eport dafe: $n3124
Paoe 5 sf I
Conrpllcs?CommcntrlA*umptlonrflcld Vorlficd
Valrr€
Plenc Vcrlllcd
Valga#
&
lnsulatlon lntPcctlon
303.X
u$1312
s
All installed insulation is labeled
or the installed R-values
provided.
flpoes ffot
rElNot Observabl€
Eruot Appiieanle
mass wall with at leastr/z af the
:wall insulation on the wall:extenor, the exterior insulation
requirement applies tFRlOl.
a. R--
I Wood,fl lrtass
I steel
, R--
I Wood
fl Mass;il Stecl
Not
R-value. lf this is
.2.3,
5ee ihe Envelope Assemblles
tabte for values,
ffN311s
,[Nct Obseruable
'Et'tot ABBliearle
4A?'1.L, Wallinsulation
:flilot
LlNot
ftot
Obseruable
363.2
[l$I411
Wall insslation is installed Per
manufacture/s instructions.
Addttlonal CommentslAssumptlons:
I High lmpact 6fier U 2 iiledium lmpact (Tier 2l 3 Low lmpact {Tier 3}
Project Title: Eagle Ridge Report date: A3P3l24
Paoe 6 of 9Data filename:
Sccllon
#
& Reo.lD
Flnal lnspcctlon Provlel,ons Plrng Vorlflcd
Velue
Flald Vcrlfcd
Valuc Compllcs?Commcntr/Amumptlonr
4A2.L.L, iC.eiling insutation R-value.
402.2,L,
4A2,2.2,
402.2.6
lFt1l1
:flComplies
rf]ooes Not
f]Not Observable
R.
,ENot npplieaule l
: R-_
:fl Wood
,fl Steel
I Wood
I Steel
lS€e the Envelope Assemblles
tabie for values,
303.1.1.1,
393.2
TFI?IL
Ceiling insulation installed per
manufu cturef s instructions.
Blown insulation marked every
300 ft,.
[Complies
EDoes I'lot '
tlNot Observable ::flnot Applleable
Vented attics with air permeable
insulation include baffle adjacent
to soffit and eave vents that
extends over insulation.
.3
tn22P ffot
ObseruablerEnot
LlNot
,Attie access hatch and door
insulation =R-value of the
,adjacent assembly.
R.R-_
ilot
;Et{ot Observable
rENot
442.2.4
IFt311
Elower door test @ 50 Pa. <=5
ach in Climate Zanes 1-2, and
'<=3 ach in Climate Zones 3-8,
tftlTlL
ACH50= I A€H50=
tJot
Obseruable,Ef,Iot
Lllrlct
Ducts are pressur€ tested to
determine air leakage with
either: Rough-in tese Total
leakage rneasured with a
pressure differential of 0.1 inch
w.g. across the system including
the manufacturet's air handler
enclosure if anstalled at time of
: test. Postconstruetion test: Total
,leakage measured with a
pressure differential of 0.1 inch
ly.g. across the entire system
including the manufacturet's air
handler enclosure"
cfmlLOO ch/100Tnr-tErzTtl f.Iot
:ffNot Obsenrable
:[lNot ABplicable
ouct tightness test resuft of <=4 ',
-
cf;mlLAA ft2 aeross the system ar ' tt2
:<=3 cfml100 ft2 without air :
.flgaes frIot
,Dltot Observable
,[Jt{ot Appiicable
403.3.4 cfmll00efmlLAA
ft2
occur
handler @ 25 Pa. For rough-in
tests, veriffcataon may need to
4A332.L Air handler leakage designated
lFl?4tr by manufacturer at <=2a/a sl
des;ign airflow.
flComplies
Dgoes iJot
:[filot Obselable
'Eilot Applicable
Programmable tfi ermostats
installed for control of primary
heattng and cooling systems and
inltially set by manufacturer to
code specifications.
;[JComplies
DDces ilot l
,[Not Obselvable r
.flrotlpplicable
4A3J.L
[FteF
tFr1012 Not
Etlot Observabrie
ilruot
Heat pump thermostat installed
on heat pumps.
Cireulating selvice hot water
systems have automatic or
accessible manual controls.
'f]Does ffo't
:nttot Obsewallc
[Ft1U2
f]trtot
2 (Tler 2lMedium 3IHigh lmpact
Project Title: Eagle Ridge
Data filename:
Report date; A3n3i24
Paoe 7 of 9
Compllcc?Cornmcnts/Assu mptl ontPlans Vcrlflcd
Valuc
Field Vcrlflcd
ValucFlnal lnspectlon Provlcisns
Section*
& Req.lD
All mechanical ventilation system
fans not part oftested and listed
HVAC equipment meet etficacY
and air flow limits per Table
R403.6.1.
Not
403.6.L
tFt25t7
ENot Obseruabie
lfNot ABplicable
Heated water eireulation sYstems
have a cireulation pump. The
syst€m retum pipe is a dedicated
return pipe or a cold water suPPlY
pipe, Gravity and thermos-
syBhon circulation systems are
not present. Controls for
circulating hot water system
Bumps start the pumP with signal
for hot water demand within the
occuqancy. eontrols
autonnatically turn off the PumP
when water is in circulation looP
is at set-point tetnBerature and
no demand for hot water exists.
EF126t2 ilot
plies
Hot water boilerc supPlying heat
through one- or two-PiPe hestinq
systems have outdoor setback
control to lower boiler water
temperature based on outdoor
403.s,1.1
tFt28r2
lfNot Observsble
Eil6t AFplicable
[fDoes Not
HNot Observable
flNot Applieab'ie
4A3.5.L"2 Electric heat trae€ systems
tFl29l2 comply with IEEE 515'1 or UL
5 15. eontrols automaticallY
adjust the energy input to the
heattracing to maintain the
desired water ternperature in the
piping,
ilComBlies
flooes ilot
CJNot Observabie
flilot Applieable
Oemand reeirculation water
systems have controls that
flnanage operation of the PumP
and limit the temperature of the
water entering the cold water
fleompiies
ilDoes lrot
flNot Observabie
fltlot tpBlicatie
fo <= 104qF
4.O7.5.2
tFt30l2
Drain water heat recovery units
t€sted in aecordance with CSA
855.1.. Potable water-side
pressure loss of drain water heat
recovery units < 3 psi for
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 Psifor
individual units connected to
three or more showers.
L
IFe6lr
493.5.4
tFt31l2 nDoes ilot
flNot observable
[Jltot *ppiicable
9vo/o ot more of Permanent
fixtures have high efficacy lamps.
[JComBlies
[JDoes Not
[]Not Observable
lNot ApB!icable
404.1.1
lFt23l3
v
flComplies
flsoes ffot
[fNot Obseruable
flivot *pplieanle
Fuel gas lighting systems have
no continuous pilot light.
Cornpliance certifi cate Posted.
N6t
44L.3
lFt7t2
ilNot Observabie
ilNot apBlicabie
{Tier 3}towMedium(Tier 2l1{Tier 1}2 3
Project Title: Eagle Ridge
Data filename:
Report date; 03123124
Paoe 8 oi 9
tot
Observable
rnechanical and rater h€agng
systerns hane been Prodded'
mansals for
Addlllonal Commcntr/AslumFtlonr:
x
ProjectTitle: Eagle Ridge
Data filename:
Report date; 03123124
Pasc I of I
2018 IECC Energy
Efficiency Certificate
WIndow
Door
Above€rade Wall
Below-Grade Wall
Floor
€elllng I Roo,t
Dsctwork (uncondldoned spaccsl :
Heatlng Systgm:-
Coollng Systsn:-
Water He*cr: _-
Comments
2L.Og
o.oo
o.oo
49.OO
Name:Dater
R-Valuelnsulation Rating
Glass & Door Rating U-Factor SHGC
Eff iciencyHeating & Cooling EquiPment