HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-03 -24-8547 Colorado Rocky Mountain School Additions and Remodel 2493 County Road 1 06 Carbondale, CO 81623 AllWork shall comply with the 2015 lnternational Building Code (lBC) and the 2018 lnternational Energy Conservation Code (IECC) The approved plans are to be on-site for inspections. Sanitary facilities are required to be provided for workers. A list of required inspections will be attached to the plans. The State is to permit and approve the electrical work. https://www. colorado. qov/pacific/dora/DPO Electrical Plu m bi no Perm its Underground utility locates is the responsibility of thb owner or contractor. 811 is the Colorado Utility Locate Hot Line. Northwest Colorado Council of Governments (NWCCOG) permits and performs inspections on elevators. All inspections will need to be performed and approved by NWCCOG prior to any occupancy of the building. I have attached a handout from NWCCOG for your reference. Separate Sign Permits are required for any external signs. Please contact the County ComDev. Dept. for the application. Electrical Code compliance will be determined based on field inspections performed by the State Electrical lnspector, (303) 869-3458. Please have the inspector sign the building card or provide written documentation of the inspections. The Electrical Code requires a separate Electrical Permit for low voltage fire alarms that has an alarm panel and send a notification to the Fire District when under alarm. A Rough-ln inspection with the State Electrical lnspector is required (303) 869-3458. Please have the inspector sign the building card or provide written documentation of the inspection. The fire sprinkler and alarm are also required to be inspected and approved by the Local Fire Protection District. Please provide shop drawings to the Fire District for review and schedule the inspections accordingly. Please have the Fire Marshal sign the inspection card when the rough inspection is approved and when the final inspection is approved. Any water supply that feeds a fire suppression system is to be inspected by the Fire Marshal for that Fire District prior to backfilling. The storage room under Main Stair 106 is required to be of one-hour construction. Basement Stair 001 is required to be separated from the first floor or all stairs are to be enclosed. The door that is shown at the bottom of the stair is required. (lBC 1019) Please provide special inspections reports to the Building Department as specified within the General Notes of the structural drawings. Geotechnical observation is required when the excavation is complete and written verification be supplied at footing inspection, 3000psf. Safety glazing is not designated on the plans. Safety glazing will be checked during the framing and final inspection. (lBC 2406.4) Any membrane and through penetrations of the fire resistive construction will be required to be fire-stopped with listed fire stopping assemblies. The contractor is to provide a cut sheet for the assemblies at the framing inspection. (lBC 713) A Knox Box is required to be mounted adjacent to the front door. Please contact the Local Fire District for exact location, if not already in place. Two-way communication system is required at each elevator landing on each floor. (lBC 1007.8) lf the fire sprinkler system requires a fire pump. Then the Utility Room that houses the pump will be required to be one-hour construction. (lBC Table 508.2.5) The walls surrounding the toilet are to be non-absorbent for a height of 48" and 2' past on each side of the toilet. All accessible door hardware shall have a shape that is easy to grip, including pocket and sliding doors. (ANSI A117.1 - 404.2.6) The second-floor kitchen may need to be licensed and approved by Garfield County Environmental Health Department. Please contact that County Department for submittal requirements.