Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-04-24-8622 LINDA HANSEN New Detached Garage with 624 sqft living space above (accessory living includes private use office, powder room, bedroom with closeq Not an ADU, does not include tub / shower / kitchen appliances). 3290 CR 210, Rifle - 217906300068 1) ALL WORK SHALL COMply W|TH THE 201s TNTERNATTONAL RESIDENTIAL CODE (l.R.C.)AND 2018 I NTERNATIONAL EN ERGY CONSERVATION CODE ( I.E.C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRICAL pERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINALAPPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) ALL EXTERIOR LTGHTING TO BE DOWNCASTAND SHIELDED. 5) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR ADDITIONAL I NFORMATION. 6) OPEN HOLE SOTLS REPORT tS REOUTRED AT FOOTING TNSPECTION AND PRIOR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 1,500 PSF soil bearing. 7) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGTNEERTNG FOR BUILDING INSPECTOR AT TIME OF FRAME INSPECTION. 8) ACCESSORY STRUCTURE BATHROOM: ACCESSORY BUILDINGS - OTHER THAN APPROVED ACCESSORY DWELLING UNITS (ADU'S) - ARE NOT ALLOWED TO HAVE A SHOWER OR BATHTUB PER GARFIELD COUNTY'S BUILDING RESOLUTION, 9) BLOWER DOOR TEST tS REOUTRED FOR FINTSHED RESTDENTIAL LIVING SPACE. MUST SUBMIT BLOWER DOOR TEST REPORT TO GARFIELD COUNry COMMUNITY DEVELOPMENT DEPT, OFFICE PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL. 10) AN ELEVATTON SURVEY, SEALED BY A COLORADO PROFESSIONAL LICENSED SURVEYOR, lS REOUIRED AT FRAME INSPECTION TO VERIFY THAT AS-BUILT ROOFS COMPLY WITH GARFIELD COUNTY'S 25-FOOT BUILDING HEIGHT LIMIT AS DEFINED IN THE LAND USE DEVELOPMENT CODE. 1 1) SEPTIC SYSTEM REVIEW / APPROVALS: PRIOR TO BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY PROVIDE FINAL APPROVAYSIGN.OFF FROM GARFIELD COUNry'S PUBLIC HEALTH DEPT. 12) 2018 tECC TABLE R402.1.2 HAS BEEN CHOSEN FOR ENERGY COMPLTANCE THE RESIDENTIAL LIVING SPACE. MANUAL J HVAC LOAD CALCULATIONS SCANNED INTO THE BUILDING FILE RECORD. VERIFY METHOD OF WHOLE-HOUSE VENTILATION SYSTEM INSTALLED (201s IRC TABLE m1507.3.3(1) AND (2)SHOWN ON COVER SHEET. $ {l{ N a\ s