HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLRE-03 -24-8565
JDC Real Estate Group LLC
New Single-family dwelling w/ attached garage
1 15 Sundance Trail, Carbondale
Aspen Glen, FLG 4, Lot SD-12
1 ) ALL WORK SHALL COMpLy W|TH THE 201s TNTERNATTONAL RESTDENTTAL CODE (r.R.C.)AND 2018
I NTERNATIONAL EN ERGY CONSERVATION CODE (I. E.C.C.)
2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE
ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON
PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH.IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINALAPPROVAL IS
REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
4) ALL EXTERIOR LIGHTTNG TO BE DOWNCAST AND SHIELDED.
5) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNry COMMUNITY DEVELOPMENT WEBSITE FOR
ADDITIONAL I NFORMATION.
6) OPEN HOLE SOTLS REPORT tS REOUTRED AT FOOTTNG TNSPECTTON AND PRIOR TO ANY CONCRETE
POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR.
3,000 PSF soil bearing.
7) pRE-ENGTNEERED ROOF TRUSSES. HAVE ENGTNEERING FOR BUILDING INSPECTOR AT TIME OF
FRAME INSPECTION,
B) BLOWER DOOR TEST tS REOU|RED. MUST SUBMTT BLOWER DOOR TEST REPORT TO GARFIELD
COUNTY COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING
INSPECTION / C.O. FINAL.
9) A LOT TMPROVEMENT CERT|F|CATE, SEALED BYA COLORADO LICENSED SURVEYOR, lS REOUIRED AT
FOUNDATION INSPECTION TO VERIFY STRUCTURE IS IN COMPLIANCE WITH THE PLATTED BUILDING
BUILDING ENVELOPE.
10) AN ELEVATTON SURVEY, SEALED BY A COLORADO PROFESSTONAL LICENSED SURVEYOR, lS
REOUIRED AT FRAME INSPECTION TO VERIFY THAT AS.BUILT ROOFS COMPLY WITH GARFIELD
COUNTY'S 25.FOOT BUILDING HEIGHT LIMIT AS DEFINED IN THE LAND USE DEVELOPMENT CODE.
11) PRESCR|pTtVE PATH USrNG 2018 TECCTABLE 402.1.2 HAS BEEN CHOSEN FOR ENERGYCOMPLIANCE
OF THIS HOME DESIGN. MANUAL J REPORT ALSO ATTACHED FOR REFERENCE.
ALL NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015
IRC TABLE m1507.3.3(1)AND (2) SHOWN ON COVER SHEET.
-Eq
a\
N\s