HomeMy WebLinkAboutConditions of PermitCONDITIO NS OF PERMIT
BLRE-02-24-8524
RICK & JENNIFER JABLONSKY
New Single-family dwelling w/ attached garage
306 CR 340, Parachute
Morrisania Ranch, Lot 30 - 24070340001 0
1 ) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.) AND 2018
I NTERNATIONAL ENERGY CONSERVATION CODE ( I.E.C.C.)
2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE
ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON
PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL PERMtTTtNG AND TNSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS
REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
4) ALL EXTERIOR LTGHTTNG TO BE DOWNCAST AND SHIELDED.
5) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNIry DEVELOPMENT WEBSITE FOR
ADDITIONAL I N FORMATION.
6) OPEN HOLE SOTLS REPORT - tNCLUDTNG COMPACTION REPORT FOR ANY STRUCTURAL FILL -- lS
REOUIRED AT FOOTING INSPECTION AND PRIOR TO ANY CONCRETE POUR. PROVIDE COPY OF
GEOTECHNICAL ENGINEERS REPORT TO THE BUILDlNG INSPECTOR. 3,000 PSF soil bearing.
7) THERMAL BARRIER AT ICF FOUNDATIONS: PROVIDE THERMAL BARRIER AT INSIDE FACE OF ICF
FOUNDATTON WALLS (AS PER 2015 tRC SECI/ON R316.4)
8) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGTNEERING FOR BUTLDTNG TNSPECTOR AT TIME OF
FRAME INSPECTION. SEE FIELD COPY OF PROJECT BINDER FOR MORE DETAIL.
9) BLOWER DOOR TEST tS REOUTRED. MUST SUBMTT BLOWER DOOR TEST REPORTTO GARFIELD
COUNTY COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING
INSPECTION / C.O. FINAL.
10) SEPTIC SYSTEM REVIEW / APPROVALS: PRIOR TO BUILDING INSPECTION & CERTIFICATE OF
OCCUPANCY PROVIDE FINAL APPROVAUSIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH
DEPT.
1 1) PRESCRIPTIVE PATH USING ATTACHED RESCHECK REPORT HAS BEEN CHOSEN FOR ENERGY
COMPLIANCE OF THIS HOME DESIGN. MANUAL J REPORT ALSO ATTACHED FOR REFERENCE.
ALL NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015
IRC TABLE m1507.3.3(1)AND (2) SHOWN ON COVER SHEET.
-t
0
(n
atr
s
\
t-
1o
5
ro