Loading...
HomeMy WebLinkAboutCorrections and Conditions of ApprovalGuffield County Community Development Department 04t22t2024 Owner: Glenwood Partners LLLP 214 Center Drive Glenwood Springs, CO 81601 \ /)Architect: Kaufman Design Group 12371 E. Lincoln Court Wichita, KS 67207 h' Contractor: Andover Construction 333 E. Main Street Suite 300 Louisville, KY 40202 Re:Corrections and Conditions of Approval Job Address: TBD Center Drive Parcel # 218506100042 Dear Kaufman Design Group, The County Building Department has performed the review on the building permit application and plans for the new building proposed at the above address. There are items that need to be addressed prior to considering issuance of the building permit and items that can be addressed after the issuance of the building permit. Please provide a response letter addressing each item listed in the "ltems to address prior to issuing a building permit". Response not required for the "Conditions to be addressed during construction" but please address if clarification is needed. Please provide 2 complete sets of corrected sheets, with clouded areas reflecting changes, for the resubmittal. 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970)94s-8212 "'lzl/ Corrections to address prior to issuing a building permit: t/tn"foam plastic insulation in the exterior walls is to be protected with a thermal barrier. The 29 ga. Metal is allowedy'rcnerF story buildings. Plea,se a_ddress accordingly. (lBC 2603.5) 5t€.r.r- f..tP. AGe Q/Yestibu c402.5 7) Ao--4uBrarNJ 4|p€D les are required at the 4 main entrances. Please address accordingly. (IECC ? ,2agy ,rPlease provide an issued CDPHE Stormwater Discharge Permitr' @ne amount of parking provided is questionable. Based on the County's Land Use Code thev closest Use Type is Warehouses, requiring one space per 2000 square foot of floor area, 52 spots. Havirrg-rio parking at tlre uppei errtrlnce is also questionable. Parking shoulcl lre split up between these majorentrances. (LUDC7-302) - ,tODt6?ctt}_AQ\ter?D SrGrt-t'-pc.h+fv_ ./ El ro{ TRrFl) I Z Snu*sr v g/ Sneet SA1 and C-4.0 are indicating snow melt systems at both north entranies, rJfeiriirg to- the MEP drawings. The electrical drawings show a snow melt boiler in the electrical schedules, but no reference to a boiler in the mechanical or plumbing drawings nor schedules. lf snow melt is desired, please coordinate drawings and include the automatic controls required in2018 IECC section C403.12.2. d Please provide drinking fountains. Please also comply with Protruding ltems requirement in the ICC F.177.1 2009. (lBC Table 2902.1 and IPC 410) V'AU - The elevation drawings are indicating signs on the East, West and South Elevations. The County's Land Use Code allows one sign for each lot street frontage. The East side has ' no street frontage. Please remove the sign on the East side of the building. (LUDC 11-202 A 1) \p/ 43.1 - The Material Legend is indicating the signs will be backlit. The illumination section of the Sign Standards indicates sign shall have shielded and covered lightbulbs and shall not ' cause glare or adversely impact residential areas. Please adjust the sign lighting verbiage accordingly. (LUDC 11-228) l ;{ne signs on the building scale approximately 17'x5'= 85 sq. ft. The size limit is 60 sq. ft. within the CL Zone District. Please adjust the size accordingly. (LUDC Table 11-203) dpe^""pictorially show theundisturbed grade and compliance with the 25' height limits on the elevation drawings. Definition below. Height, Building. The distance, measured vertically, from the average undisturbed or natural ground grade horizontal plane of a building footprint to the top of a flat roof or mansard roof or to the mid-point between the eave line and the peak of a gable, hip, shed, or similar pitched roof. . ll A A .l Eil^^^^ ^rr rL^ ^r^r^ ^^ ^-^a^ -^-;-^l^- ;-^,.r-r:^^ l^ lL^ J^r^ir^ r.'ttt.,lo rt t^t^ Ivl r rr.l. r - rrEdDv du|.r r,ilti Drclu urr gr€lutt Pitt ililElEt iltlutclurJrr tL,, urtt uiitclils. tz.v r() il-vly Table$4O2. 1 . 3 and C402.2.4) *nrftnsffiarue of the 1.5" THK xps BoARD being used as the berow grade wan insulation? What is the R-value of the 1 Tz" polyiso under the metal siding? What is the R- value of the 2" THK XPS under the EIFS? -t3 How is daylighting being accomplished? Minimum skylights? Daylight controls on lighting? 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970) 94s-8212 3 {,{Wni"nAdditional Efficiency Package is being utilized? (IECC C4O6) 15, There isn't enough information provided on the plans to verify energy compliance. Please provide ComCheck Reports for the Envelope, the Mechanical, and the Lighting. Please see the attached plan review checklist for guidance regarding information required on the plans. t6 Th"re is a question regarding hazardous material storage in this type of facility. Typically, in storage facilities the leases will cover hazardous material storage. Would you please provide a statement or a sample lease agreement for the County's file. (lBC 414) Gonditions to be addressed durinq construction: The plans have been designed to the 2021 lnternational Building Codes. The adopted codes in Garfield County are the 2015 lnternational Codes except for the 2018 lnternational Energy Conservation Code. The code analysis presented still complies with the 2015 lBC. There could be conflicts in the different versions of the codes, I am not comparing codes during the review. lf any of my comments are allowed in the 2021 Versions of the code The approved plans are to be on-site for inspections Sanitary facilities are required to be provided for workers. A list of required inspections will be attached to the plans. The State is to permit and approve the electrical work. https://www.colorado. qov/pacific/dora/DPO Electrical Plumbins Permits Underground utility locates is the responsibility of the owner or contractor. 811 is the Colorado Utility Locate Hot Line. Evaluate the over topping of the detention ponds during larger magnitude storms. ln the interim between the proposed grade plan and final buildout, it's to be verified that runoff would be safely conveyed through the project without detriment to adjacent properties. All backflow preventers are required to be tested and certified by a licensed backflow specialist after installation and prior to issuance of the Certificate of Occupancy. Separate Sign Permits are required for any external signs. Please see the County's website for the application. Electrical Code compliance will be determined based on field inspections performed by the State Electrical lnspector, (303) 869-3458. Please have the inspector sign the building card or provide written documentation of the inspections. The Electrical Code requires a separate Electrical Permit for low voltage fire alarms that has an alarm panel and send a notification to the Fire District when under alarm. A Rough-ln inspection with the State Electrical lnspector is required (303) 869-3458. Please have the inspector sign the building card or provide written documentation of the inspection. The fire sprinkler and alarm are required to be inspected and approved by the Local Fire Protection District. Please provide shop drawings to the Fire District for review and schedule 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970) 94s-8212 the inspections accordingly. Please have the Fire Marshal sign the inspection card when the rough inspection is approved and when the final inspection is approved. Any water supply that feeds a fire suppression system is to be inspected by the Fire Marshal for that Fire District prior to backfilling. Please provide special inspections reports to the Building Department as specified within the General Notes of the structural drawings. Geotechnical observation is required when the excavation is complete and written verification be supplied at footing inspection. The soils report is requiring 18" of structural fill under the footings and slab. lmported structural fill is required under the retaining wall footings (3000psf). On-site soils can be used as structural fill on the remainder of the footings (2000psf). Combustible material is limited in Type I and Type ll Construction. See IBC 603 for allowed combustible materials. All exterior lighting is to be downcast and shielded Any membrane and through penetrations of the fire resistive construction will be required to be fire-stopped with listed fire stopping assemblies. The contractor is to provide a cut sheet for the assemblies at the framing inspection. (lBC 713) A Knox Box is required to be mounted adjacent to the front door. Please contact the Local Fire District for exact location. lf the fire sprinkler system requires a fire pump. Then the Utility Room that houses the pump will be required to be one-hour construction. (lBC Table 508.2.5) All accessible door hardware shall have a shape that is easy to grip, including pocket and sliding doors. (ANSI A117.1 - 404.2.6) The unit heaters shown in the stair enclosers are not to project into the egress width. (lBC 1003.3) An air leakage test is required prior to performing the final building inspection. (IECC c402.5) The louvers in the mechanical room doors are to be large enough to accommodate the return air for the furnace. Sincerely, John Plano Building Official 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970\ 94s-82r2 cc