Re: Summary of Final Review for Lot FW-19
Dear Julie,
The DRC concluded the final review for your proposed project atLot FW-19, tbd Golden Bear during their
March 5th,2024 meeting. The final plans dated February 13th,2024 are approved.
Receipt of the Security Access Fee ($5,000), Construction Road Access Fee ($5,500), and Builder's Bond
Deposit ($50,000) is also hereby acknowledged.
Site Materials Mock-up - A materials color mock-up wall must be built on-site within 20 days of
installation of the construction fence and installed on the outside of the fence. Once the mock-up has been
built, please contact Silver Mountain Properties so they can coordinate the final approval of exterior
materials.
Plantines - Must be installed as approved on the landscape plan with the type and size specified
The DRC requires a building height veriJication sarvey to be completed prior to the rough framing
inspection (rough- in) inspection and performed by a Colorado professional land surveyor and shall include a
statement by the surveyor stating whether the building is or is not in compliance with Garfield County
building height rules. The owner or owner's representative shall submit a completed height verification
survey to the Aspen Glen DRC. The standard form (and other forms and information) that shall be used is
found on our website aspenglenhoa.com.
An on-site pre-construction meeting is required before construction may commence. Also, a rough-in, dry-
in, and gruding inspection are required during the construction phase of the residence. Please contact the
DRC Administrator to arrange for these inspections per the Design Guidelines and for a final site inspection
by the DRC.
Prior to closing the file and retuming the builder's completion deposit, copies of the Certificate of Occupancy
and an Improvement Location Certificate must be provided to the DRC. The DRC may elect to withhold a
portion of the Builder's Completion Deposit to ensure that final landscaping is completed, and growth is
assured.
80 Bald Eagle Way Carbondale, CO 81623 Tel: (970)-963-3362 www.aspenglenhoa.com
Please keep in mind that a copy of your approved plans will be kept on file for periodic review by the Design
Review Committee to ensure compliance with your approved plans. Any anticipated changes from your
approved plans must be submitted to, reviewed by, and received approval from the Design Review
Committee prior to making any changes.
Thank you for working with the DRC on the final review of this project. Please do not hesitate to contact me
with any questions or comments.
Nick Cova
Aspen Glen DRC Administrator