Loading...
HomeMy WebLinkAboutOWTS Permit Card  Garfield County Public Health  2014 Blake Ave.   Glenwood Springs, CO 81601  Phone: (970) 945‐6614 ext. 8150  For inspections, call: 970‐945‐6614 ext. 8150 and call the Design Engineer, if applicable   Project Address: TBD CR 115 Carbondale, CO    Parcel No.: 218931400039  Owner Name: BWI Financial, LLC    Owner Phone: (704) 400‐4950  Designed By: Moab Geotechnical Group    Designer Phone: (435) 210‐8282  Contractor: Mike Hyatt Construction    Contractor Phone: (541) 419‐0170  Number of Bedrooms:  0   Minimum Tank Capacity: 1,000‐gallon  Minimum Absorption: 603 ft2  OWTS PERMIT   KEEP AVAILABLE AT PROJECT SITE   Permit Number _SEPT‐8634_______________________________  Permit Type X New X Repair X Remodel/addition X Tank only   Issue Date _05/24/2024____________________ Expiration Date_05/24/2025_________________   Permit Conditions:   Permit Conditions: This OWTS Permit is approved on the condition of compliance with the revised  design as submitted by Moab Geotechnical Group dated May 22, 2024. Changes must be approved  by Garfield County Public Health and the designer prior to construction.     The new OWTS will include a toilet, sink, kitchen sink with garbage grinder (disposal), dishwasher,  and laundry washer in a proposed toy barn. This permit is valid as long as no living areas or  bedrooms are present in the building. This permit will become null and void if living areas or  bedrooms will be present in the building. The system will consist of a new, two‐compartment  1,500‐gallon septic tank set level with access to grade and an effluent filter in the outlet tee of the  tank. Effluent will gravity flow to a distribution box set level with access to grade that will distribute  effluent to 624 ft2 of STA. The new STA will consist of 2 gravelless trenches consisting of 26 Quick4  chambers, for a total of 52 Quick4 chambers. Inspection ports are to be installed at each end of each  trench. Maintain all setbacks and elevations as designed. To assist in scheduling, please contact Garfield County Public Health (970‐945‐6614 ext. 8150) to  notify the start of OWTS construction. Contact the designer and Garfield County Public Health at  least 48 hours prior to requesting final inspection of the installed system prior to backfill. NO OWTS  COMPONENT SHALL BE BACKFILLED WITHOUT PRIOR APPROVAL FROM GARFIELD COUNTY PUBLIC  HEALTH AND THE DESIGNER.    Agreement   All installations must comply with all requirements of the Garfield County OWTS regulations  including but not limited to the conditions specified above.   In consideration of the issuance of the permit, the applicant hereby agrees to comply with all  laws and regulations related to the zoning, location, construction, and erection of the proposed  OWTS and associated structures for which this permit is granted. The applicant further agrees  that if the above said regulations are not fully complied with in the zoning, location, erection,  and construction of the above described OWTS and structure, the permit may then be revoked  by notice from the Health Department and immediately become null and void.  The issuance of a permit and specifications of terms and conditions therein will not constitute  assumption of liability, nor create presumption that the local public health agency or its  employees may be liable for the failure or malfunctioning of any system. Permit issuance will  not constitute a certification that the system, the equipment used in the system, or any  component used for system operation will ensure continuous compliance with the provision of  the OWTS Act, the regulations adopted thereunder, or any terms and conditions of a permit.   Permit Approval  Plans and specifications for the proposed OWTS have been reviewed and are considered  satisfactory. Permission is hereby given to the property owner(s) to perform the work indicated  in accordance with the Garfield County OWTS Regulation. This Permit will expire 1 year from  the date of issuance unless construction on the system has commenced. An "as‐built" drawing  must be submitted and inspection of the system must be completed by GCPH before final  approval of the system will be issued.        05/24/2024  Issued By: Garfield County Environmental Health  Department  Date