Loading...
HomeMy WebLinkAboutEngineer's OWTS Design PlanJune 24, 2024 502 Main Street • Suite A3 • Carbondale, CO 81623 • (970) 704-0311 • Fax (970) 704-0313 S OPRIS E NGINEERING • LLC civil consultants Anne and Laurence Sperry, West S Ranch LLC 33 Sunhill Lane, Newton Center, MA 02459 lsperry@sperryinc.com RE: Design Report–Onsite Wastewater Treatment System (OWTS), Sperry Residence, 0 102 County Road, Carbondale, CO, Lot 2 Hunt Ranch, Garfield County, Colorado SE Job No. 34042.01 Parcel No: 239120100278. Garfield County OWTS Permit #______________. Dear Laurence and Anne: This letter report presents the applicable findings regarding the design and construction of a new Onsite Wastewater Treatment System (OWTS) at the above referenced site, in support of your OWTS permit application to Garfield County. The OWTS design is based on recent site assessment observations by Sopris Engineering of existing physical site features, conditions, and geotechnical soils evaluation with respect to the proposed residential usage and applicable regulatory design criteria in accordance with State and County OWTS Regulations. The design recommendations, specifications and construction details are delineated on the attached OWTS permit/construction plan “C6-OWTS Plan”, dated 06-21-2024. The design criteria and system sizing information is summarized below. Existing and Proposed Conditions The proposed OWTS will serve a new 4-bedroom single family residence with room for a two-bedroom ADU in the future located in the central area of the property within an approximate 35-acre development area. The site is vegetated with sagebrush, pinion/juniper, cedar and small grassland meadows. The subject 35-acre parcel’s existing topography and site conditions are derived from county GIS data base, aerial mapping, Lidar topography and survey information by Sopris Engineering. The central portion of the parcel within the development area consists of relatively gentle slopes that generally trend down gradient to the west and north. The proposed OWTS field will be constructed parallel to the contours on the slightly sloped terrain. The proposed site improvements will include associated driveway, auto court, residential structure, utilities and a new onsite wastewater treatment system. The property’s water supply is from a proposed domestic well located over 100-feet east of the proposed OWTS field. The proposed development improvements and OWTS layout is delineated on the attached OWTS plan. Summary Design Criteria The new OWTS is designed for a treatment capacity of 675 gallons per day based on the design wastewater flow to serve a minimum 6-bedroom residence in accordance with Table 6-2 values, Section 43.6, A.4. The new OWTS will utilize a minimum 2,000 gallon two-compartment concrete tank to be installed off the northwesterly corner of the garage. Sealed ribbed PVC risers with lids will be installed on the new septic tank along with appropriate pipe connections to the new tank utilizing the appropriate fitting adaptor rings for the tank and riser. The new 2,000 gallon 2-compartment septic tank will be installed with appropriate sanitary tees, outlet effluent filter with risers and lids at the surface. A gravity schedule-40 or SDR-35 sewer pipe section with two-way cleanout will be installed between the tank inlet on the gravity sewer line and the residential structure. The STA will consist of leaching chamber trenches that provide 960 S.F. of total absorption area in a trench configuration. The septic tank effluent will be gravity discharged through a new 4-inch schedule-40 or SDR-35, installed at minimum 1.5% slope, to the STA via a distribution box. The effluent will be equally distributed from the OWTS, Sperry Residence 0 102 County Road, Carbondale, CO SE Job No. 34042.01 June 24, 2024 Page2 distribution box via 4” distribution pipes connected to the head end cap of each chamber trench. Observation ports with caps will be installed on the proximal and distal ends of each chamber trench and housed in valve boxes set just above finish surface grade. The design is in compliance with the current County regulations with design calculations based on the soil type, texture and structure with an appropriate long term acceptance rate (LTAR). The designed system meets all required setbacks and will be installed within the general location indicated on the plan. Design Flow The design flow is calculated as follows for the minimum design capacity of an equivalent 6-bedroom residential dwelling. The OWTS is designed for a treatment capacity of 675 gallons per day based on the design wastewater flow in accordance with Table 10-1 values, Section 43.6, A.4. Regulation 43: Minimum population based on 3 bedrooms at 2 persons per bedroom equating to 6 persons plus three bedrooms at 1 person per bedroom equating to a total of 9 persons. The Design flow is calculated based on residential usage of 75 gal/person/day, Max. Design flow (Qd) gallons/day = (# of people) x (avg. flow) gal/person/day. Design flow Qd = 9*75 = 675 gpd Septic Tank Design The septic tank capacity required for a minimum 48 hour retention time is calculated as follows: V = 675 gal/day * 2 day = 1350 gallons. Use a minimum 2,000 gallon 2-compartment concrete septic tank. The tank to be installed with ribbed PVC risers and access lids set a minimum 3 inches above finish grade surface. Sub Surface Conditions and Testing Subsurface soil investigations and USDA soil texture method tests were performed by Kumar, USA and Sopris Engineering on May 29, 2024. The soils from three profile pits, in the vicinity of the proposed STA field area were sampled and characterized by application of the USDA visual/tactile soil texture method analysis. The soils were tested to determine the presence of any limiting soil or hydrological conditions, appropriate hydraulic loading rate, absorptive surface level capacity and to assess appropriate treatment level design for the in-situ native soils. The soils below 9 inches of topsoil consist of dense slit loam with less than 2% scattered gravel or rock content to 7 feet below the surface grades. The soil appears to be generally consistent across the site. The native soils sampled from 2-3 feet below the surface are characterized as a soil type 2A soil consisting of silt loam texture with fine granular structure shape with massive grade. This soil has an effective loading rate for conventional soil treatment of 0.5 Gal/S.F./day for a level 1 conventional treatment system. No rocky soils or significant change of texture was encountered at depth. Some evidence of thin scattered lenses of calcareous deposits at variable depths was encountered in Profile pit 1 and 3. A 6 to 9 inch layer of calcareous deposits at variable pitched depth from 18 to 30 inches below surface grade was encountered in Profile pit 2 that was excavated from existing surface grades approximately 3' below the other pits. Based on this evidence the proposed STA will be situated on slightly higher ground. No free water was encountered in excavations observed on site. Evidence of flood irrigation saturation (potential seasonal perched high ground water) was observed by the presence of redox mottling slightly above and below the thin layer of calcareous deposits in Pit 2. Normal Groundwater levels are expected to be below 8 feet from the existing surface grades. The soils are suitable for the installation of an STA consisting of multiple gravelless chamber trenches. Additional soil evaluation will be performed during construction to verify the soils in the entire field excavation. OWTS, Sperry Residence 0 102 County Road, Carbondale, CO SE Job No. 34042.01 June 24, 2024 Page3 If any adjustments to design or installation recommendations are necessary, notice will be made to County EHD and applicable revisions to design/construction plans and report will be submitted. All conditions and installations will be included in the As-Constructed documentation. Treatment-Soil Treatment Unit/ Absorption System Design The treatment/absorption field is designed based on utilizing the effective Long Term Acceptance Rate (LTAR) for the native soils and the application of appropriate loading factors for a soil treatment unit system utilizing gravity distribution to gravelless chamber trenches. The new treatment system and absorption field will consist of gravity distribution of septic tank effluent via a distribution box to individual chamber trenches with treatment across the native soil absorptive surface. Long Term Acceptance Rate (LTAR) Receiving Wastewater Treatment Level 1; LTAR; (Table 10-1 Soil type 2A loading rate for a massive silt loam is (0.50 gal./S.F./day): Design Flow; Qd = flow (gal/day) = 675 gpd Loading factors; (Table 10-2, Gravity application trenches, L.F.1 = 1.0) (Table 10-3, Gravelless chambers, L.F.2 = 0.7) STA absorption treatment area; A = Area S.F.; A(sf) = Qd x L.F.1 x L.F.2 .: A(sf) = 675 gpd x 1.0 x 0.7 = 945 S.F. LTAR 0.50 Gal/S.F./day Number of Quick-4 Infiltrator chambers 4'x3'x12"chambers: 945 S.F. = 79 chambers; Use 80 chambers 12 S.F./Chamber Number of Equivalent Arc chambers 5'x3'x12"chambers: 945 S.F. = 63 chambers; Use 64 chambers 15 S.F./Chamber Use 80 Quick-4 Low Profile Infiltrator chambers in 4 trenches 82' long by 3' wide with 20 chambers units per trench plus two end caps as delineated on the plan. Alternative use 64 Arc chambers in 4 trenches 80' long by 3' wide with 16 chambers units per trench with ends caps. The septic tank effluent will be gravity distributed to the head of each chamber row via individual distribution pipes from a distribution box. Construction and Inspections Additional assessments and recommendations will be made by the engineer during initial stages of construction to direct installation in accordance with OWTS design, verify the soil conditions and location of the OWTS components. Prior to construction of the permitted system the engineer should be contacted by the contractor to provide adequate time to discuss the system components, answer questions, resolve any conflict issues and schedule inspection site visits based on construction progress. A pre-OWTS construction meeting with the engineer, the contractor, and the qualified installer is essential and required prior to installation of the OWTS components. Pre-construction consultation, and installation by SI Valley Pre-Cast, Inc. or Sopris Engineering will be coordinated by the contractor. UE UE UE UE UE UE UE UE UE UE UE UE U E W W W W W W W W W W W W W W W W W W W W W W x x x x x x x x x x x 4 ' ' S S 4 ' ' S S 4''SS 4''SS 4' ' S S 4' ' S S 4' ' S S 4' ' S S 4''SS 4 ' ' S S 4'' S S 4'' S S 4 ' ' S S 4 ' ' S S 4 ' ' S S 4 ' ' S S 4 ' ' S S 4 ' ' S S 4' ' S S 4' ' S S 4 ' ' S S 2' ' SA 24.0 80.0 4" PVC EFFLUENT PIPE @ MIN. 1 %, USE SCHD-40 OR SDR-35 4" PVC SEWER PIPE @ MIN 2%, USE SCHD-40 OR SDR-35 CONCRETE DISTRIBUTION BOX WITH BAFFLE INSTALLED LEVEL ON COMPACTED BASE, INSTALL RISERS AND LID TO SURFACE 4" PVC DISTRIBUTION PIPES (TYP.) INSTALL 4" RISER PIPE INSPECTION PORT, EXTEND RISER W/ PUSH ON CAP MIN. 4" BELOW FINISH GRADE & COVER WITH 6" DIA. VALVE BOX SET WITH LID 1" ABOVE FINISH GRADE (TYP. EACH TRENCH CHAMBER END CAP) INSTALL CHAMBER END CAP ON ALL END CHAMBERS ABSORPTION/TREATMENT FIELD, USE 80 LOW PROFILE QUICK-4 CHAMBERS IN 4 TRENCHES WITH 20 CHAMBERS PER ROW FOR A TOTAL ABSORPTION AREA OF 960 S.F. THE SYSTEM SHALL BE PLUMBED FOR EQUAL GRAVITY DISTRIBUTION. THE CHAMBERS SHALL BE INSTALLED ON LEVEL GRADE IN EACH TRENCH. THE BOTTOM OF EACH TRENCH TO BE EXCAVATED TO A MAXIMUM AVERAGE DEPTH OF 20" BELOW THE EXISTING SURFACE GRADES, WITHIN THE UPPER HORIZON OF THE NATIVE SILT LOAM SOILS & BACKFILLED WITH A MINIMUM 12" OF COVER OVER THE CHAMBERS. THE FINISH GRADE ACROSS THE FIELD SHALL BE SLIGHTLY MOUNDED A MINIMUM 2" ABOVE EXISTING ADJACENT GRADES. INSTALL 2,000 GALLON, 2-COMPARTMENT CONCRETE SEPTIC TANK (USE VALLEY PRECAST ITEM #IM 2000T-2CP OR APPVD EQUAL) W/ SEALED RISERS AND LIDS INSTALLED AT THE FINISHED GRADE SURFACE. INSTALL INLET SANITARY TEE AND OUTLET EFFLUENT FILTER SANITARY TEE. DEPTH TO TOP OF TANK FROM PROPOSED GRADE IS APPROXIMATELY 24". EXCAVATION DEPTH 20" MIN. TO 48" MAX. BELOW SURFACE GRADE, MIN. 12" COVER OVER TOP OF CHAMBERS, FILL & GRADE FIELD AREA APPROXIMATELY 2" ABOVE EXISTING SURFACE GRADES PROPOSED 4" X 2-WAY CLEANOUT, INV. TO BE 18" - 24" BELOW FINISH GRADE SURFACE INSTALL 4" FULL BODY WYE 2" SCHD 40 PVC SEWER PIPE @ MIN 2%INSTALL 4" FULL BODY WYE W/ 2" X 4" REDUCER INSTALL 4" FULL BODY WYE 4" PVC SEWER PIPE @ MIN 1.5% TO BE STUBBED FOR FUTURE USE, PVC SCHD-40 OR SDR-35 4" PVC SEWER PIPE @ MIN 1.5% TO BE STUBBED FOR FUTURE USE, PVC SCHD-40 OR SDR-35 PROPOSED 4" X 2-WAY CLEANOUT, INV. TO BE 18" - 24" BELOW FINISH GRADE SURFACE PROPOSED 2" X 2-WAY CLEANOUT, INV. TO BE 18" - 24" BELOW FINISH GRADE SURFACE PROPOSED PROPANE TANK, SEE UTILITY PLAN 100-FT WELL SETBACK EXISTING WELL 7070 7072 7074 7074 70 7 4 7 0 7 4 707 6 7078 7 0 7 4 7 0 7 6 7078 7 0 7 8 70 8 0 7 0 7 2 7 0 7 4 7 0 7 0 7 0 6 8 7 0 7 0 7072 7072 7074 7076 7078 7070 7068 70 6 6 7 0 6 4 7 0 6 2 7070 7068 706 6 7 0 6 6 DATE REVISION DRAWING NO. TITLE G: \ 2 0 2 4 \ 3 4 0 4 2 L O T S 2 - 3 H U N T R A N C H \ C I V I L \ C I V I L D W G S \ P L O T \ B U I L D I N G P E R M I T \ 3 4 0 4 2 - O W T S . D W G - J u l 2 3 , 2 0 2 4 - 1 1 : 2 6 a m NO R T H 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 010 10 20 10 405 JOB NO. DATE: DESIGNED BY DRAWN BY CHECKED BY PER SO P R I S E N G I N E E R I N G L L C 50 2 M A I N S T R E E T S U I T E A 3 C A R B O N D A L E C O 8 1 6 2 3 (9 7 0 ) 7 0 4 0 3 1 1 s o p r i s e n g i n e e r i n g . c o m 34042.01 07/24/24 PER WJB C-3.2 OWTS DESIGN NOTE: ALL CHAMBERS IN EACH TRENCH MUST BE INSTALLED ON LEVEL GRADE OVER SCARIFIED NATIVE SOIL. MAXIMUM DEPTH OF TRENCHES NOT TO EXCEED 36" BELOW PROPOSED SURFACE GRADES. INLET AND END CAPS ARE TO BE INSTALLED ON EACH END CHAMBER ROW. IF EXCESSIVE LARGE COBBLES OR BOULDERS ARE ENCOUNTERED IN ANY PART OF THE EXCAVATION, OVER EXCAVATE AND BACKFILL WITH SAND OR SUITABLE SCREENED NATIVE SOILS. BACKFILL WITH SCREENED ONSITE SOILS FREE OF ROCKS IN EXCESS OF 3" DIAMETER OR USE 3/4" TO 1.5' SCREENED ROCK CROWN FIELD TRENCH TO DIVERT SURFACE WATER 4' MIN LEACHING CHAMBER 7"-12" 6" N.T.S. BACKFILL LAYER NATURAL ONSITE SOILS FREE OF ROCKS 4" PVC INLET PORT IN END CAP SCARIFY/TILL BOTTOM SURFACE TO A DEPTH OF 3" 1. ADDITIONAL GEOTECHNICAL EVALUATIONS AND INSPECTIONS BY THE ENGINEER SHOULD BE PERFORMED DURING INITIAL STAGES OF CONSTRUCTION TO VERIFY SOIL CONDITIONS AND OWTS DESIGN. 2. THE EVALUATIONS AND INSPECTIONS MAY RESULT IN MODIFICATIONS TO THE DESIGN THAT MAY INCLUDE FIELD SIZE REVISIONS AND POSSIBLE SOIL REPLACEMENT IN SELECT AREAS IF NEEDED. SUFFICIENT NOTICE TO THE ENGINEER BY THE PROJECT MANAGER/CONTRACTOR NEEDS TO BE MADE IN ORDER TO SCHEDULE THE SITE INSPECTIONS. 3. PRIOR TO CONSTRUCTION OF THE PERMITTED SYSTEM THE ENGINEER SHOULD BE CONTACTED BY THE PROJECT MANAGER/CONTRACTOR WELL IN ADVANCE TO PROVIDE ADEQUATE TIME TO DISCUSS THE SYSTEM COMPONENTS WITH THE CONTRACTOR, ANSWER QUESTIONS, RESOLVE ANY CONFLICT ISSUES AND SCHEDULE INSPECTION SITE VISITS BASED ON CONSTRUCTION PROGRESS. 4. COUNTY REGULATIONS REQUIRE THAT THE DESIGN ENGINEERS OF RECORD PERFORM SITE INSPECTIONS OF THE PERMITTED SYSTEM DURING CONSTRUCTION AND PROVIDE "AS-BUILT" DOCUMENTATION OF THE INSTALLED SYSTEM TO THE COUNTY AFTER CONSTRUCTION IS COMPLETE. THE ENGINEER SHOULD BE CONTACTED AND NOTIFIED OF THE CONSTRUCTION SCHEDULE. 5. THE COUNTY ENVIRONMENTAL HEALTH DEPARTMENT SHOULD BE CONTACTED AT LEAST 48 HOURS PRIOR TO FINAL BACKFILL OF COMPONENTS TO PROVIDE ADVANCED NOTICE OF CONSTRUCTION SCHEDULE IN ORDER TO PERFORM A FINAL INSPECTION OF THE IN PLACE COMPONENTS. The Garfield County contact is: Ted White, P.E., Environmental Health Specialist III.Garfield County Public Health; twhite@garfield-county.com, 970-945-6614 x 8106 (main office) or 970-230-2442 (mobile) 6. OUR DESIGN AND RECOMMENDATIONS ARE BASED OUR SITE ASSESSMENT, SOIL EVALUATION AND UPON INFORMATION SUPPLIED TO US BY OTHERS. IF SUBSURFACE OR SITE CONDITIONS ARE FOUND TO BE DIFFERENT FROM CONDITIONS ASSUMED OR INDICATED, WE SHOULD BE NOTIFIED TO EVALUATE ANY EFFECT ON THE PROPOSED OWTS. IF THE COUNTY REQUESTS CHANGES OR MODIFICATIONS TO THIS DESIGN, WE SHOULD BE CONTACTED TO EVALUATE AND RESPOND TO THE REQUEST. 7. CONTRACTOR SHOULD REVIEW ANY CONDITIONS ON THE ISSUED PERMIT AND COORDINATE WITH THE ENGINEER REGARDING CONSTRUCTION OF THE SYSTEM. THE CONSTRACTOR AND/OR SYSTEM INSTALLAR SHOULD PHOTO DOCUMENT ALL PHASES OF OWTS CONSTRUCTION AND INSTALLATION OF COMPONENTS. 8. IF YOU HAVE ANY QUESTION OR NEED ANY ADDITIONAL INFORMATION, PLEASE CALL PAUL RUTLEDGE AT SOPRIS ENGINEERING, (970) 704-0311. 1. AN EFFLUENT FILTER SHALL BE INSTALLED IN THE DISCHARGE TEE IN THE SECONDARY COMPARTMENT OF THE SEPTIC TANK. WE RECOMMEND THE INSTALLATION OF AN ORENCO SYSTEMS 4" EFFLUENT FILTER FILTERED EFFLUENT THAT WILL DISCHARGE TO A CONCRETE DISTRIBUTION BOX WITH RISERS AND LID AT THE SURFACE. 2. THE DISTRIBUTION SYSTEM WILL BE INSTALLED TO ALLOW FOR EFFLUENT TO BE EQUALLY DISTRIBUTED TO THE ABSORPTION TRENCHES VIA INDIVIDUAL 4" DISTRIBUTION LINES CONNECTED TO THE HEAD OF EACH CHAMBER TRENCH. 3. THE MINIMUM SLOPE OF THE DISCHARGE LINE FROM THE TANK TO THE DISTRIBUTION BOX SHALL SHALL BE INSTALLED AT A MINIMUM 1% SLOPE. THE INDIVIDUAL DISTRIBUTION LINES AT THE HEAD OF THE TRENCHES SHALL BE INSTALLED AT A MINIMUM OF 2% SLOPE. 1. ALL MATERIALS AND INSTALLATION SHALL CONFORM TO STATE AND COUNTY ONSITE WASTEWATER TREATMENT SYSTEM (OWTS) REGULATIONS. 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT ALL UTILITY COMPANIES FOR FIELD LOCATIONS OF UTILITIES PRIOR TO CONSTRUCTION AND EXCAVATION. 3. ALL SEWER LINES TO BE SDR-35 OR SCHEDULE 40 P.V.C. PIPE UNLESS NOTED OTHERWISE. 4. INSTALL A TWO-WAY CLEAN OUT ON THE SERVICE LINE FROM THE STRUCTURE AND AN ADDITIONAL CLEANOUT WITHIN 100' SECTION OF EFFLUENT DISCHARGE PIPE. 5. THE SEPTIC TANK SHALL BE INSTALLED LEVEL ON COMPACTED EARTH. INSTALL WATERTIGHT RISERS AS NECESSARY TO BRING ALL REQUIRED ACCESS POINTS TO THE FINISHED SURFACE GRADE. BACKFILL WITH SUITABLE NATIVE SOIL FREE OF BOULDER AND ROCK IN EXCESS OF 3" DIAMETER. 6. A SANITARY BAFFLE TEE IS REQUIRED ON THE SEPTIC TANK INLET AND OUTLET. INSTALL THE INLET AND OUTLET TEES PLUMB AND IN A POSITION TO ALLOW EASY INSPECTION AND MAINTENANCE OF TANK FROM THE TANK RISERS. 7. INSTALL A 4" EFFLUENT FILTER ON THE 4" OUTLET TEE OF THE SEPTIC TANK. THE FILTER SHOULD BE INSPECTED EVERY SIX MONTHS. THE EFFLUENT FILTER SHALL BE MAINTAINED AND CLEANED WHEN THE TANK IS PERIODICALLY PUMPED OR AS NECESSARY. INSTALL A SUITABLE EXTENSION ON THE FILTER WITH A HANDLE TO BE WITHIN 6" BELOW THE ACCESS LID. 8. THE CONTRACTOR SHALL ENSURE THAT THE SEWER LINES, SEPTIC TANK AND RISERS ARE WATERTIGHT. ALL PLUMBING FIXTURES AND OWTS COMPONENTS SHALL BE INSTALLED AND MAINTAINED TO AVOID SURFACE OR GROUNDWATER FROM ENTERING THE SYSTEM AND TO PREVENT LEAKAGE FROM THE SYSTEM. 9. THE DIMENSIONS AND NOTES SHOWN ON THE PLAN INDICATE MINIMUM AREA, LENGTH, WIDTHS AND SEPARATION DISTANCES FOR THE TRENCHES, BED OR MOUNDED ABSORPTION FIELD. 10. THE ABSORPTION TRENCHES SHALL BE EXCAVATED TO LEVEL GRADE IN NATIVE EARTH. THE TRENCH BOTTOM AND SIDEWALLS SHALL BE SCARIFIED AND/OR RACKED IF SMEARING OCCURS. IF EXCESSIVE LARGE COBBLES OR BOULDERS ARE ENCOUNTERED IN ANY PART OF THE EXCAVATION OVER 6" FROM THE PROPOSED TRENCH BOTTOM SURFACE, OVER EXCAVATE AND BACKFILL WITH SAND. 11. THE LEACHING CHAMBERS SHALL BE INSTALLED LEVEL WITH A MINIMUM COVER OF 10" NOT TO EXCEED 24". 12. LEACHING CHAMBERS WILL BE PLACED IN THE EXCAVATION OVER THE NATIVE SOIL OR SELECT SOIL REPLACEMENT OR ASTM-33 SAND LEVELING COURSE. END CAPS SHALL BE INSTALLED ON THE END CHAMBERS IN EACH TRENCH. 13. VERTICAL INSPECTION PORTS SHALL BE INSTALLED FROM THE PRE MARKED HOLE ON THE TOP OF EACH END CHAMBER OR END CAP. (TYP. BOTH ENDS OF EACH ROW) THE PORTS MAY HAVE THREADED CAPS AT GRADE OR HOUSED IN A 6" VALVE BOX. 14. THE CHAMBERS WILL BE BACKFILLED WITH EXCAVATED MATERIAL VOID OF ROCKS, THE BACKFILL MATERIAL SHALL NOT EXCEED 2 1/2" DIAMETER AND SHALL BE PLACED TO AT LEAST 6" ABOVE THE TOP OF THE CHAMBERS. THE TOP OF THE PLACED BACKFILL SHALL BE COVERED WITH A LAYER OF FILTER FABRIC. A MINIMUM 3" DEPTH OF TOPSOIL IS TO BE PLACED ABOVE THE BACKFILL TO THE SURFACE & RE VEGETATED. 15. INSTALLATION OF LEACHING CHAMBERS SHALL BE IN CONFORMANCE WITH THE MANUFACTURES INSTALLATION INSTRUCTIONS. 16. THE ABSORPTION TRENCHES/BED OR MOUND MUST BE GENERALLY MARKED AT THE FOUR CORNERS WITH INSPECTION PORTS AND/OR BURIED REBAR. THE FIELDS MUST BE PROTECTED FROM VEHICULAR AND LIVESTOCK TRAFFIC. 17. THE ABSORPTION FIELD SURFACES MUST BE SLOPED OR SLIGHTLY MOUNDED TO DIVERT SURFACE DRAINAGE AWAY FROM THE FIELD. 18. THE ABSORPTION FIELD SHALL BE INSTALLED PER THE REQUIRED SETBACK DISTANCES: 10 FEET FROM ANY PROPERTY LINE. 25 FEET FROM ANY POTABLE WATER SUPPLY LINE. 20 FEET FROM ANY OCCUPIED DWELLING WITH CRAWL SPACE . 100 FEET FROM ANY WELL, SPRING OR CISTERN. 50 FEET FROM ANY STREAM OR WATER COURSE. NATIVE, YARD OR LANDSCAPED SURFACE N.T.S. COMPACTED SUBGRADE 4" SDR35 3" DIA 4" SCH40 4" SCH404" SDR35 3" DIA CHAMBER END CAP CONNECT INDIVIDUAL 4" DISTRIBUTION PIPE TO HEAD OF EACH CHAMBER TRENCH (TYPICAL EACH TRENCH). INSTALL CONNECTION AS NEEDED FROM END OR SIDE INLET PORT OF EACH INFILTRATOR CHAMBER END CAP. N.T.S. SUITABLE BACKFILL OR CLASS 6 ROAD BASE 1. THE OWTS AS SHOWN ON THE PLAN AND THE DETAILS WERE DESIGNED BY SOPRIS ENGINEERING. 2. THE PROPOSED LOT CONDITIONS BY SOPRIS ENGINEERING AND SURVEY/PLAT INFORMATION SHOWN IS BASED ON AN ISP BY SOPRIS ENGINEERING, 10-11-23. 3. PRIMARY OWNER NAME AND ADDRESS: WEST S RANCH LLC, 33 SUNHILL LANE, NEWTON CENTER, MA 02459 4. SITE ADDRESS: TBD COUNTY ROAD 102, CARBONDALE, CO 81623 5. Legal Summary: SECTION: 20 TOWNSHIP: 7 RANGE: 87 A PARCEL OF LAND SITUATE WITHIN SECTION 20 BEING MORE PARTICULARLY DESCRIBED PER SPECIAL WARRANTY DEED RECEPTION NO. 969596 35.11 ACRES 6. Parcel Number: 2391-201-00-278 7.COUNTY OWTS PERMIT #: ________________________ 8. CONTRACTOR: _____________________________ 6" MIN. 4" MIN. 6" MIN. 4"4" 4" DISTRIBUTION GRAVITY LINE FROM SEPTIC TANK INVERT IN N.T.S. BAFFLE COMPACTED SUBGRADE 8" AGREGATE BASE COURSE RISER SECTION DISTRIBUTION BOX LID AT GROUND SURFACE EXCAVATED MATERIAL COMPACTED TO 90% STANDARD PROCTOR UNDISTURBED EARTH SILTY LOAM SOIL. REVEGATATION TOPSOIL LAYER 4.0 0.7 Quick4 Plus Low Profile Endcap Detail (to scale) 0.7 1.5 0.9 1.1 LP- QUICK-4 INFILTRATOR END CAP EXTEND 4" RISER PIPE MIN. 3" THROUGH END CAP OR CHAMBER PRE FORMED PENETRATION SECURE WITH SCREWS THROUGH PENETRATION FLANGE INTO PIPE 6" VALVE BOX 4" INSPECTION PORT RISER PUSH ON CAP 6" VALVE BOX COVER EACH CHAMBER ROW W/ FILTER FABRIC COVER Pena Design Calculations OWTS The proposed onsite wastewater treatment system (OWTS) will be installed to serve a 4-bedroom single family residence. A possible future 2-bedroom ADU in the adjacent barn/shop structure may be considered in the future. In order to ensure adequate OWTS capacity for current proposed usage and potential future usage the new system is designed with a design flow based on a total residential population of 9 persons. Therefore design flow treatment capacity is calculated as follows for a minimum equivalent 6-bedroom single family residence. From the Regulation 43 usage table : Minimum population based on 6 bedrooms = (2 persons * 3 bedrooms) + (3 bedrooms * 1 persons)= 9 persons. Gallons per day per person = 75 gal/person/day, No peaking factor Max. Design flow (Qd) gallons/day = (# of people) x (avg. flow) gal/person/day. Design flow Qd = 9*75 = 675 gpd Septic Tank Design: Septic Tank Design: 2-Day detention time = 675 x 2 = 1350 gallons required. Use a 2000 gallon, two compartment concrete septic tank with an effluent filter outlet sanitary tee in the second chamber. The tank shall be installed with sealed PVC risers and lids set to the finish grade surface. Sub Surface Conditions and Testing: Subsurface soil investigations and USDA soil texture method tests were performed by Kumar, USA and Sopris Engineering on May 29, 2024. The soils from three profile pits, in the vicinity of the proposed STA field area were sampled and characterized by application of the USDA visual/tactile soil texture method analysis. The soils were tested to determine the presence of any limiting soil or hydrological conditions, appropriate hydraulic loading rate, absorptive surface level capacity and to assess appropriate treatment level design for the in-situ native soils. The soils below 9" of topsoil consist of dense slit loam with less than 2% scattered gravel or rock content to 7 feet below the surface grades. The soils appear to be generally consistent across the site. The native soils sampled from 2-3 feet below the surface are characterized as a soil type 2A soil consisting of silt loam texture with fine granular structure shape with massive grade. This soil has an effective loading rate for conventional soil treatment of 0.5 Gal/S.F./day for a level 1 conventional treatment system. No rocky soils or significant change of texture was encountered at depth. Some evidence of thin scattered lenses of calcareous deposits at variable depths was encountered in Profile pit 1 and 3. A 6 to 9 inch layer of calcareous deposits at variable pitched depth from 18 to 30" below surface grade was encountered in Profile pit 2 that was excavated from existing surface grades approximately 3' below the the other pits. Based on this evidence the proposed STA will be situated on the slightly higher ground. No free water was encountered in excavations observed on site. However evidence of flood irrigation saturation (potential seasonal perched high ground water) was observed by the presence of redox mottling slightly above and below the thin layer of calcareous deposits in Pit 2. Normal Groundwater levels are expected to be below 8 feet from the existing surface grades. The soils are suitable for the installation of an STA consisting of multiple gravelless chamber trenches. Additional soil evaluation will be performed during construction to verify the soils in the entire field excavation. Soil Treatment Unit/ Absorption System Design: The treatment/absorption field is designed based on utilizing the effective Long Term Acceptance Rate (LTAR) for the native soils and the application of appropriate loading factors for a soil treatment unit system utilizing gravity distribution to gravelless chamber trenches. The new treatment system and absorption field will consist of gravity distribution of septic tank effluent via a distribution box to individual chamber trenches with treatment across the native soil absorptive surface. Long Term Acceptance Rate (LTAR): Receiving Wastewater Treatment Level 1; LTAR; (Table 10-1 Soil type 2A loading rate for a massive silt loam is (0.5 gal./S.F./day); Design Flow; Qd = flow (gal/day) = 675 gpd Loading factors; (Table 10-2, Gravity application trenches, L.F.1 = 1.0 ) (Table 10-3, Gravelless chambers, L.F.2 = 0.7) STU absorption treatment area; A = Area S.F.; A(sf) = Qd x L.F.1 x L.F.2 .: A(sf) = 675 gpd x 1.0 x 0.7 = 945 S.F. LTAR 0.5 Gal/S.F./day Number of Quick-4 Infiltrator chambers 4'x3'x12"chambers: 945 S.F. = 79 chambers; Use 80 chambers 12 S.F./Chamber Number of Equivalent Arc chambers 5'x3'x12"chambers: 945 S.F. = 63 chambers; Use 64 chambers 15 S.F./Chamber Use 80 Quick-4 Infiltrator chambers in 4 trenches 82' long by 3' wide with 20 chamber units per trench plus two end caps as delineated on the plan. Alternative use 64 Arc chambers in 4 trenches 80' long by 3' wide with 16 chambers units per trench with ends caps. The septic tank effluent will be gravity distributed to the head of each chamber row via individual distribution pipes from a distribution box. HU N T R A N C H - L O T 2 CO U N T Y R O A D 1 0 2 CA R B O N D A L E , C O L O R A D O RE S I D E N C E - B U I L D I N G P E R M I T