Loading...
HomeMy WebLinkAboutConditions of Permit-Amendedc ONDITIONS OF PERMIT BLCO-O5 -19-57 60 BUCKY SCHAFER REVISED EXISTING SUBMITTAL TO DEMO WOOD FRAMED OFFICE REBUILD THE OFFICE IN THE UPPER LEVEL AND ADD AN APARTMENT AND OFFICE IN THE BASEMENT. 252 COUNTY ROAD 167, GWS PARCEL# 239501 400057 1) ALL CONDICTIONS FROM THE PREVIOUS SUBMITTAL STILL APPLY. 2) THE APPROVED PLANS ARE TO BE ON-SlrE FOR INSPECTIONS. 3) SANTTARY FACILITIES ARE REOUIRED TO BE PROVIDED FOR WORKERS. 4) A L|ST OF REOUTRED tNSPECT|ONS WrLL BE ATTACHED TO THE PLANS. THE STATE IS TO PERMIT AND APPROVE THE ELECTRICAL WORK. HTTPS ://WWW.CO LO RADO.G OV/PAC I F I C/DO RA/D PO-E LECTR I CAL-P LU M B I N G-P E RMITS 5) UNDERGROUND UTtLrTy LOCATES rS THE RESPONSTBTLTry OF THE OWNER OR CONTRACTOR. 811 IS THE COLORADO UTILITY LOCATE HOT LINE. 6) DRAINAGE ACROSS PROPERTY LINES SHALL NOT EXCEED THAT WHICH EXISTED PRIOR TO GRADING. EXCESS OR CONCENTRATED DRAINAGE SHALL BE CONTAINED ON SITE OR DIRECTED TO AN APPROVED DRAINAGE FACILIry. EROSION OF THE GROUND IN THE AREA OF DISCHARGE SHALL BE PREVENTED BY THE INSTALLATION OF NON-EROSIVE DOWN DRAINS OR OTHER DEVICES. 7) ALL BACKFLOW PREVENTERS ARE REOUIRED TO BE TESTED AND CERTIFIED BY A LICENSED BACKFLOW SPECIALIST AFTER INSTALLATION AND PRIOR TO ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. 8) NORTHWEST COLORADO COUNCTL OF GOVERNMENTS (NWCCOG) PERMITS AND PERFORMS INSPECTIONS ON ELEVATORS AND LIFTS. ALL INSPECTIONS WILL NEED TO BE PERFORMED AND APPROVED BY NWCCOG PRIOR TO ANY OCCUPANCY OF THE BUILDING. I HAVE ATTACHED A HANDOUT FROM NWCCOG FOR YOUR REFERENCE. 9) ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD INSPECTIONS PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-3458. PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE A WRITTEN DOCUMENTATION OF THE INSPECTIONS. 1O)THE ELECTRICAL CODE REOUIRES A SEPARATE ELECTRICAL PERMIT FOR LOW VOLTAGE FIRE ALARMS THAT HAS AN ALARM PANEL AND SEND A NOTIFICATION TO THE FIRE DISTRICT WHEN UNDER ALARM, IF INSTALLED. A ROUGH-IN INSPECTION WITH THE STATE ELECTRICAL INSPECTOR IS REOUIRED (303)869- 3458. PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE A WRITTEN DOCUMENTATION OF THE INSPECTION. 11)PLEASE PROVIDE SPECIAL INSPECTIONS REPORTS TO THE BUILDING DEPARTMENT AS SPECIFIED WITHIN THE GENERAL NOTES OF THE STRUCTURAL DRAWINGS. 12)GEOTECHNTCAL OBSERVATTON tS REQUTRED WHEN THE EXCAVATTON rS COMPLETE AND WRITTEN VERIFICATION BE SUPPLIED AT FOOTING INSPECTION, 3500PSF. 13)SAFETY GLAZING IS NOT DESIGNATED ON THE PLANS. SAFEry GLAZING WILL BE cHECKED DURTNG THE FRAMTNG AND FrNAL TNSPECTTON. (rBC 2406.4) 14)ANY MEMBRANE AND THROUGH PENETRATIONS OF THE FIRE RESISTIVE CONSTRUCTION WILL BE REOUIRED TO BE FIRE-STOPPED WITH LISTED FIRE STOPPING ASSEMBLIES. THE CONTRACTOR IS TO PROVIDE A CUT SHEET FOR THE ASSEMBLIES AT THE FRAMING INSPECTION. THIS INCLUDES THE WASTE LINES FROM THE WAREHOUSE THRU THE 3-HOUR WALL. (rBC 713) 15)A KNOX BOX IS REQUIRED TO BE MOUNTED ADJACENT TO THE FRONT DOOR. PLEASE CONTACT THE LOCAL FIRE DISTRICT FOR EXACT LOCATION. 16)THE WALLS SURROUNDTNG THE COMMERCTAL TOTLETS ARE TO BE NON- ABSORBENT FOR A HEIGHT OF 48" AND 2' PAST ON EACH SIDE OF THE TOILET. 17)ALL ACCESSIBLE DOOR HARDWARE SHALL HAVE A SHAPE THAT IS EASY TO GRIP, TNCLUDTNG POCKET AND SLTDTNG DOORS. (ANS| A117.1 - 404.2.6) 18)GRAB BAR BACKTNG tS TO BE lN pLAeE FOR ALL TOtLETS, BATHTUBS AND SHOWERS AT ROUGH_IN INSPECTION. 19)tT APPEARS THAT THE DUCTTNG tN THE APARTMENT tS BELOW THE 2-HOUR FtRE- RESISTIVE FLOOR/CEILING ASSEMBLY. FIRE-DAMPERS WILL BE REOUIRED IF PENETRATI NG THE ASSEM BLY. 20)THE CRAWLSPACE IS NOT TO BE USED FOR STROAGE UNLESS IT'S CONSTRUCTED TO ONE-HOUR. 2 1 ) TH E DRYWALL MU LT|-LAYER Fr RE-RESTSTTVE FLOOR/CE| Lr NG ASSEM BLY Wr LL REOUIRE MULTIPLE INSPECTIONS, CALL FOR INSPECTION PRIOR TO INSTALLING THE 2ND LAYER OF DRYWALL. 22)ALL STRUTURAL MEMBERS SUPORTING THE 2-HOUR FLOOR CEILING ASSEMBLY ARE TO BE PROTECTED WITH THE SAME RATING.