HomeMy WebLinkAboutBlower Door TestResidential Air Infiltration Test Report
Test date:8/2/2024
Project name:Chuy Chavez
Address:195 Boulder Ridge Drive
GarCo
Code:2018 IECC
Conditioned volume:47,310 Cubic Feet
Attic:non-vented
Crawlspace:conditioned
Garage:excluded
Measured airflow:677 CFM50 Cubic Feet per Minute at 50 Pascal
Temperature; Inside:80
Temperature; Outside:89
Elevation:5,312
Corrected airflow:713 CFM50*Cubic Feet per Minute at 50 Pascal
2015 IECC maximum allowed leakage rate:3.0 ACH50 Air Changes Per Hour at 50 Pascal
Tested air leakage rate:0.9 ACH50 Air Changes Per Hour at 50 Pascal
Test code compliance:PASS
Test notes:
Tests were performed by Chris Taylor; Rated Field Inspector, RFIIN #CY5MPL
* Test results have been corrected for elevation and air density temperature differential.
Passes the 2018 IECC required infiltration test.