Loading...
HomeMy WebLinkAbout1.08 Middle Colorado Ag Collaborative - Ryden No. 2 (Project 2)_Part2SF S F S F SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF S F SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF COUNT Y R O A D 2 4 3 UPLAND SEED, SEE SHEET DTXX DRAINAGE CROSSING 2, SEE SHEET PP09 30" HDPE PIPE JBH/DTL JBH/DTL SDS 4/26/2024 SHOWN NO.BY DATE COMMENTS SCALE DETAIL CHECK DESIGN Pl o t D a t e / T i m e : 0 4 / 2 5 / 2 0 2 4 , 0 8 : 1 0 : 2 7 P M ; G : \ W W E \ 2 1 1 - 0 2 0 \ 0 2 0 \ C A D \ 0 2 _ D W G S \ S W X X - S T O R M W A T E R M A N A G E M E N T P L A N . D W G - S W 0 2 - 2 S W M P SHEET NO. JOB NO. REVISION NO. DATE DESCRIPTIONWRIGHT WATER ENGINEERS, INC. GLENWOOD SPRINGS, CO 81602 (970)945-7755 FAX(970)945-9210 818 COLORADO AVE. P.O. BOX 219 DRAFT NOT FOR CONSTRUCTION BID SET 4/26/2024 4/26/2024 STORMWATER MANAGEMENT PLAN 211-020.020 ---- SW02 COMBINE RYDEN NO. 2 AND BENSON PIERSON NELSON DIVERSIONS MA T C H L I N E , SE E S H E E T S W 0 3 MA T C H L I N E , SE E S H E E T S W 0 1 LOC LOC CWA SP SF SF ECB ECB SSA LOC ECB LOC ECB LOC ECB LOC SF ECB LOC SF ECB LOC SF ECB NORTH 30 30 60 FT0 PLAN SWMP NOTES: 1.CONTRACTOR TO OBTAIN ALL NECESSARY GRADING, EROSION CONTROL, AND DEWATERING PERMITS NECESSARY TO COMPLETE THE WORK. 2.STORMWATER MANAGEMENT PLAN (SWMP) BEST MANAGEMENT PRACTICES SHOWN ON THIS PLAN ARE FOR REFERENCE ONLY. ADDITIONAL BMPS NOT SHOWN ON THIS PLAN MAY BE REQUIRED AND IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE BMPS TO LIMIT EROSION AND SEDIMENT TRANSPORT. 3.CLEARING AND GRUBBING WILL BE REQUIRED IN SOME LOCATIONS. 4.TOTAL DISTURBED AREA IS EQUAL TO APPROXIMATELY 2.1 ACRES. 5.SEE BEST MANAGEMENT PRACTICES (BMP) DETAILS ON SHEET DT08-DT10. 6.CONTRACTOR SHALL SEED AND MULCH ALL DISTURBED AREAS ONCE THEY REACH FINAL GRADE. 7.CONTRACTOR SHALL PROVIDE A 2-YEAR, 70% COVER WARRANTY ON ALL REVEGETATION COMPONENTS. 8.BEST MANAGEMENT PRACTICES (BMPS) SHOWN ON THIS PLAN ARE PROVIDED FOR CONTRACTOR REFERENCE ONLY. IF FIELD CHANGES (SUCH AS GRADING WORK) OCCUR THAT NECESSITATE THE MOVEMENT OF ANY BMPS OR THE PLACEMENT OF ADDITIONAL BMPS, CONTRACTOR SHALL REDLINE THIS PLAN WITH UPDATED BMP LOCATIONS. 9.LOCATION OF STABILIZED STAGING AREA, STOCKPILE, CONCRETE WASHOUT AREA, AND VEHICLE TRACKING CONTROL MAY NEED TO BE SHIFTED DURING CONSTRUCTION TO ACCOMMODATE PROPOSED GRADING SHOWN ON THESE PLANS. CONTRACTOR SHALL COORDINATE LOCATIONS OF THESE BMPS WITH THE OWNER AND REDLINE THIS PLAN WITH NEW BMP LOCATIONS. 10.CONTRACTOR MAY USE SILT FENCE OR SEDIMENT CONTROL LOGS AS PERIMETER CONTROLS WHERE INDICATED ON THIS PLAN. 11.CONTRACTOR SHALL INSPECT PAVED ROADS USED FOR ACCESS ON A DAILY BASIS AND MORE FREQUENTLY AS NEEDED. ACCUMULATED SEDIMENT SHALL BE REMOVED IMMEDIATELY. 12.AUTHORIZATION TO WORK ON PROPERTIES NEEDS TO BE SECURED PRIOR TO CONSTRUCTION. 13.CARE TO BE TAKEN ACCESSING THE SITE TO MINIMIZE IMPACTS TO EXISTING VEGETATION. 14.SEDIMENT ACCUMULATED IN DOWNSTREAM CHANNEL TO BE REMOVED BY CONTRACTOR AND HAULED OFF-SITE. 15.AREAS WITHIN THE RIPARIAN AREA BUT OUTSIDE THE ACTIVE CHANNEL WILL BE REVEGETATED WITH UPLAND SEED MIX OR PASTURE SEED MIX SPECIFIED IN PLANS. SEED MIX TO BE APPROVED BY ENGINEER PRIOR TO CONSTRUCTION. 16.SHOWN EXTENTS OF EROSION CONTROL BLANKET IS THE MINIMUM. ALL EROSION CONTROL BLANKET SHALL BE S400 OR APPROVED EQUAL. SWMP PHASING NOTES: 1.SILT FENCE AND/OR SEDIMENT CONTROL LOGS SHALL BE PLACED PRIOR TO CONSTRUCTION AND REMAIN IN PLACE UNTIL FINAL STABILIZATION IS ACHIEVED. 2.STABILIZED STAGING AREA(S) AND VEHICLE TRACKING CONTROL SHALL BE PLACED PRIOR TO CONSTRUCTION AND REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETED. 3.STOCKPILE CONTROLS SHALL BE PUT IN PLACE PRIOR TO ANY GRADING WORK AND REMAIN IN PLACE UNTIL GRADING WORK IS COMPLETED. 4.CONCRETE WASHOUT AREA SHALL BE PUT IN PLACE PRIOR TO ANY CONCRETE WORK AND REMAIN IN PLACE UNTIL ALL CONCRETE WORK IS COMPLETE. COLORADO PARKS AND WILDLIFE NOTES: 1.AVOID MOBILIZING SIGNIFICANT AMOUNTS OF FINE SEDIMENT DOWNSTREAM TO MINIMIZE IMPACTS TO AQUATIC ORGANISMS. 1.1.ISOLATE WORK AREAS INSTREAM AND “WORK IN THE DRY” TO AVOID MOBILIZING FINE SEDIMENTS DOWNSTREAM DURING EXTENDED CONSTRUCTION ACTIVITIES 1.2.UTILIZE COFFER DAMS AND TURBIDITY CURTAINS TO CAPTURE MOBILIZED FINE SEDIMENTS DOWNSTREAM OF CONSTRUCTION DISTURBANCES. REMOVE AND DISPOSE OF BUILT UP SEDIMENT DEPOSITS PRIOR TO DECOMMISSION OF COFFER DAMS OR TURBIDITY CURTAINS. UNINSTALL SEDIMENT CONTAINMENT INFRASTRUCTURE OUTSIDE OF SPAWNING PERIODS OR WHEN FLOWS NATURALLY INCREASE TO FLUSH ANY REMAINING SEDIMENTS. 1.3.MAINTAIN VISUALLY COMPARABLE TURBIDITY LEVELS UPSTREAM AND 300 YARDS DOWNSTREAM OF CONSTRUCTION ACTIVITIES. 1.4.INSTALL SEDIMENT CONTAINMENT INFRASTRUCTURE ON DISTURBED BANKS AND AREAS ADJACENT TO STREAMS AND RIVERS TO AVOID MOBILIZING SEDIMENT DURING RAIN EVENTS, SNOWMELT, OR HEAVY EQUIPMENT OPERATION INTO OR NEAR THE STREAM CHANNEL. ADDRESS ANY INPUTS THAT VISUALLY INCREASE STREAM TURBIDITY. 2.CLEAN AND DRY EQUIPMENT USED PREVIOUSLY IN FLOWING OR STANDING WATERS AND FOLLOWING CURRENT INSTREAM CONSTRUCTION ACTIVITIES TO AVOID SPREADING AQUATIC NUISANCE ORGANISMS INCLUDING PATHOGENS, PARASITES, AND INVASIVE SPECIES. 3.DISCOURAGE THE DEPOSITION OF FINE SEDIMENTS AND DEBRIS THAT INCREASE HABITAT FOR TUBIFEX WORMS, A HOST TO THE PATHOGEN THAT CAUSES WHIRLING DISEASE IN SALMONIDS. 4.CONTRACTOR IS RESPONSIBLE FOR MAKING PERIODIC TURBIDITY OBSERVATIONS DURING CONSTRUCTION. DURING THE FIRST TWO DAYS OF CONSTRUCTION, THE CONTRACTOR WILL MAKE OBSERVATIONS OF WATER CLARITY AT NO LESS THAN 1 HOUR INTERVALS AT THREE SPECIFIED POINTS. POINT #1 SHALL BE A REFERENCE POINT IMMEDIATELY ABOVE THE CONSTRUCTION SITE. POINTS #2 AND #3 SHALL BE LOCATED DOWNSTREAM OF THE CONSTRUCTION SITE APPROXIMATELY 150 YARDS AND 300 YARDS RESPECTIVELY. ONCE THE CONSTRUCTION SITE BECOMES STABLE CONTRACTOR WILL MAKE OBSERVATIONS 2 TIMES DAILY AT THE SPECIFIED POINTS. 5.IF TURBIDITY IS NOTICEABLY GREATER 300 YARDS DOWNSTREAM OF THE PROJECT AREA, THEN HALT CONSTRUCTION ACTIVITIES UNTIL THE STREAM CLEARS AND TURBIDITY IS COMPARABLE TO THE STREAM UPSTREAM OF THE PROJECT. INSTALL SEDIMENT CONTAINMENT INFRASTRUCTURE OR MODIFY CONSTRUCTION ACTIVITY TO ADDRESS SEDIMENT MOBILIZATION ISSUES. THEN RESUME 1-HOUR OBSERVATIONS UNTIL WATER CLARITY CONDITIONS REMAIN STABLE DOWNSTREAM OF THE PROJECT. 6.CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT THE CONSTRUCTION SITE IS STABLE AT THE END OF EACH DAY AND NOT CONTRIBUTING ANY CONSTRUCTION RELATED TURBIDITY TO THE STREAM. LIMITS OF CONSTRUCTION SILT FENCE STABILIZED STAGING AREA STOCKPILE CONCRETE WASHOUT AREA CHECK DAM EROSION CONTROL BLANKET VEHICLE TRACKING CONTOL WILLOW STAKES UPLAND SEED SF SFSFSF SF SF SF SF SF SF SF LOC SSA SP SF SWMP LEGEND CWA CD VTC ECB MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 3-BUSINESS DAYS IN ADVANCE CENTER OF COLORADO OR CALL UTILITY NOTIFICATION 1-800-922-1987 811 CALL COLORADO SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF S F SF S F SF DRAINAGE CROSSING 2, SEE SHEET PP09 DRAINAGE CROSSING 3, SEE SHEET PP09 VOID-FILLED RIPRAP, (D50 = 18"), 3' THICK VOID-FILLED RIPRAP, (D50 = 18") 3' THICK 24" PARSHALL FLUME UPLAND SEED, SEE SHEET DT05 VOID-FILLED RIPRAP (D50 = 12"), 2' THICK CONCRETE SPLITTER STRUCTURE 30" HDPE PIPE PROPOSED CONNECTION TO EXISTING BENSON PIERSON NELSON DITCH, SEE SHEETS PP06 - PP07 CONTRACTOR SHALL COORDINATE WITH OWNER AND ENGINEER REGARDING REVEGETATION OF FIELD FOLLOWING PIPE INSTALLATION, FIELD WILL NEED TO BE RESTORED TO ITS PRE-PROJECT FUNCTION. JBH/DTL JBH/DTL SDS 4/26/2024 SHOWN NO.BY DATE COMMENTS SCALE DETAIL CHECK DESIGN Pl o t D a t e / T i m e : 0 4 / 2 5 / 2 0 2 4 , 0 8 : 1 1 : 3 3 P M ; G : \ W W E \ 2 1 1 - 0 2 0 \ 0 2 0 \ C A D \ 0 2 _ D W G S \ S W X X - S T O R M W A T E R M A N A G E M E N T P L A N . D W G - S W 0 3 - 2 S W M P SHEET NO. JOB NO. REVISION NO. DATE DESCRIPTIONWRIGHT WATER ENGINEERS, INC. GLENWOOD SPRINGS, CO 81602 (970)945-7755 FAX(970)945-9210 818 COLORADO AVE. P.O. BOX 219 DRAFT NOT FOR CONSTRUCTION BID SET 4/26/2024 4/26/2024 STORMWATER MANAGEMENT PLAN 211-020.020 ---- SW03 COMBINE RYDEN NO. 2 AND BENSON PIERSON NELSON DIVERSIONS MATCH LINE, SEE SHEET SW04 MA T C H L I N E , SE E S H E E T S W 0 2 SF SF SP CWA SSA SSA SPSF LOC LOC LOC LOC ECB SF LOC ECB LOC ECB ECB LOC LOC NORTH 30 30 60 FT0 PLAN SWMP NOTES: 1.CONTRACTOR TO OBTAIN ALL NECESSARY GRADING, EROSION CONTROL, AND DEWATERING PERMITS NECESSARY TO COMPLETE THE WORK. 2.STORMWATER MANAGEMENT PLAN (SWMP) BEST MANAGEMENT PRACTICES SHOWN ON THIS PLAN ARE FOR REFERENCE ONLY. ADDITIONAL BMPS NOT SHOWN ON THIS PLAN MAY BE REQUIRED AND IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE BMPS TO LIMIT EROSION AND SEDIMENT TRANSPORT. 3.CLEARING AND GRUBBING WILL BE REQUIRED IN SOME LOCATIONS. 4.TOTAL DISTURBED AREA IS EQUAL TO APPROXIMATELY 2.1 ACRES. 5.SEE BEST MANAGEMENT PRACTICES (BMP) DETAILS ON SHEET DT08-DT10. 6.CONTRACTOR SHALL SEED AND MULCH ALL DISTURBED AREAS ONCE THEY REACH FINAL GRADE. 7.CONTRACTOR SHALL PROVIDE A 2-YEAR, 70% COVER WARRANTY ON ALL REVEGETATION COMPONENTS. 8.BEST MANAGEMENT PRACTICES (BMPS) SHOWN ON THIS PLAN ARE PROVIDED FOR CONTRACTOR REFERENCE ONLY. IF FIELD CHANGES (SUCH AS GRADING WORK) OCCUR THAT NECESSITATE THE MOVEMENT OF ANY BMPS OR THE PLACEMENT OF ADDITIONAL BMPS, CONTRACTOR SHALL REDLINE THIS PLAN WITH UPDATED BMP LOCATIONS. 9.LOCATION OF STABILIZED STAGING AREA, STOCKPILE, CONCRETE WASHOUT AREA, AND VEHICLE TRACKING CONTROL MAY NEED TO BE SHIFTED DURING CONSTRUCTION TO ACCOMMODATE PROPOSED GRADING SHOWN ON THESE PLANS. CONTRACTOR SHALL COORDINATE LOCATIONS OF THESE BMPS WITH THE OWNER AND REDLINE THIS PLAN WITH NEW BMP LOCATIONS. 10.CONTRACTOR MAY USE SILT FENCE OR SEDIMENT CONTROL LOGS AS PERIMETER CONTROLS WHERE INDICATED ON THIS PLAN. 11.CONTRACTOR SHALL INSPECT PAVED ROADS USED FOR ACCESS ON A DAILY BASIS AND MORE FREQUENTLY AS NEEDED. ACCUMULATED SEDIMENT SHALL BE REMOVED IMMEDIATELY. 12.AUTHORIZATION TO WORK ON PROPERTIES NEEDS TO BE SECURED PRIOR TO CONSTRUCTION. 13.CARE TO BE TAKEN ACCESSING THE SITE TO MINIMIZE IMPACTS TO EXISTING VEGETATION. 14.SEDIMENT ACCUMULATED IN DOWNSTREAM CHANNEL TO BE REMOVED BY CONTRACTOR AND HAULED OFF-SITE. 15.AREAS WITHIN THE RIPARIAN AREA BUT OUTSIDE THE ACTIVE CHANNEL WILL BE REVEGETATED WITH UPLAND SEED MIX OR PASTURE SEED MIX SPECIFIED IN PLANS. SEED MIX TO BE APPROVED BY ENGINEER PRIOR TO CONSTRUCTION. 16.SHOWN EXTENTS OF EROSION CONTROL BLANKET IS THE MINIMUM. ALL EROSION CONTROL BLANKET SHALL BE S400 OR APPROVED EQUAL. SWMP PHASING NOTES: 1.SILT FENCE AND/OR SEDIMENT CONTROL LOGS SHALL BE PLACED PRIOR TO CONSTRUCTION AND REMAIN IN PLACE UNTIL FINAL STABILIZATION IS ACHIEVED. 2.STABILIZED STAGING AREA(S) AND VEHICLE TRACKING CONTROL SHALL BE PLACED PRIOR TO CONSTRUCTION AND REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETED. 3.STOCKPILE CONTROLS SHALL BE PUT IN PLACE PRIOR TO ANY GRADING WORK AND REMAIN IN PLACE UNTIL GRADING WORK IS COMPLETED. 4.CONCRETE WASHOUT AREA SHALL BE PUT IN PLACE PRIOR TO ANY CONCRETE WORK AND REMAIN IN PLACE UNTIL ALL CONCRETE WORK IS COMPLETE. COLORADO PARKS AND WILDLIFE NOTES: 1.AVOID MOBILIZING SIGNIFICANT AMOUNTS OF FINE SEDIMENT DOWNSTREAM TO MINIMIZE IMPACTS TO AQUATIC ORGANISMS. 1.1.ISOLATE WORK AREAS INSTREAM AND “WORK IN THE DRY” TO AVOID MOBILIZING FINE SEDIMENTS DOWNSTREAM DURING EXTENDED CONSTRUCTION ACTIVITIES 1.2.UTILIZE COFFER DAMS AND TURBIDITY CURTAINS TO CAPTURE MOBILIZED FINE SEDIMENTS DOWNSTREAM OF CONSTRUCTION DISTURBANCES. REMOVE AND DISPOSE OF BUILT UP SEDIMENT DEPOSITS PRIOR TO DECOMMISSION OF COFFER DAMS OR TURBIDITY CURTAINS. UNINSTALL SEDIMENT CONTAINMENT INFRASTRUCTURE OUTSIDE OF SPAWNING PERIODS OR WHEN FLOWS NATURALLY INCREASE TO FLUSH ANY REMAINING SEDIMENTS. 1.3.MAINTAIN VISUALLY COMPARABLE TURBIDITY LEVELS UPSTREAM AND 300 YARDS DOWNSTREAM OF CONSTRUCTION ACTIVITIES. 1.4.INSTALL SEDIMENT CONTAINMENT INFRASTRUCTURE ON DISTURBED BANKS AND AREAS ADJACENT TO STREAMS AND RIVERS TO AVOID MOBILIZING SEDIMENT DURING RAIN EVENTS, SNOWMELT, OR HEAVY EQUIPMENT OPERATION INTO OR NEAR THE STREAM CHANNEL. ADDRESS ANY INPUTS THAT VISUALLY INCREASE STREAM TURBIDITY. 2.CLEAN AND DRY EQUIPMENT USED PREVIOUSLY IN FLOWING OR STANDING WATERS AND FOLLOWING CURRENT INSTREAM CONSTRUCTION ACTIVITIES TO AVOID SPREADING AQUATIC NUISANCE ORGANISMS INCLUDING PATHOGENS, PARASITES, AND INVASIVE SPECIES. 3.DISCOURAGE THE DEPOSITION OF FINE SEDIMENTS AND DEBRIS THAT INCREASE HABITAT FOR TUBIFEX WORMS, A HOST TO THE PATHOGEN THAT CAUSES WHIRLING DISEASE IN SALMONIDS. 4.CONTRACTOR IS RESPONSIBLE FOR MAKING PERIODIC TURBIDITY OBSERVATIONS DURING CONSTRUCTION. DURING THE FIRST TWO DAYS OF CONSTRUCTION, THE CONTRACTOR WILL MAKE OBSERVATIONS OF WATER CLARITY AT NO LESS THAN 1 HOUR INTERVALS AT THREE SPECIFIED POINTS. POINT #1 SHALL BE A REFERENCE POINT IMMEDIATELY ABOVE THE CONSTRUCTION SITE. POINTS #2 AND #3 SHALL BE LOCATED DOWNSTREAM OF THE CONSTRUCTION SITE APPROXIMATELY 150 YARDS AND 300 YARDS RESPECTIVELY. ONCE THE CONSTRUCTION SITE BECOMES STABLE CONTRACTOR WILL MAKE OBSERVATIONS 2 TIMES DAILY AT THE SPECIFIED POINTS. 5.IF TURBIDITY IS NOTICEABLY GREATER 300 YARDS DOWNSTREAM OF THE PROJECT AREA, THEN HALT CONSTRUCTION ACTIVITIES UNTIL THE STREAM CLEARS AND TURBIDITY IS COMPARABLE TO THE STREAM UPSTREAM OF THE PROJECT. INSTALL SEDIMENT CONTAINMENT INFRASTRUCTURE OR MODIFY CONSTRUCTION ACTIVITY TO ADDRESS SEDIMENT MOBILIZATION ISSUES. THEN RESUME 1-HOUR OBSERVATIONS UNTIL WATER CLARITY CONDITIONS REMAIN STABLE DOWNSTREAM OF THE PROJECT. 6.CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT THE CONSTRUCTION SITE IS STABLE AT THE END OF EACH DAY AND NOT CONTRIBUTING ANY CONSTRUCTION RELATED TURBIDITY TO THE STREAM. LIMITS OF CONSTRUCTION SILT FENCE STABILIZED STAGING AREA STOCKPILE CONCRETE WASHOUT AREA CHECK DAM EROSION CONTROL BLANKET VEHICLE TRACKING CONTOL WILLOW STAKES UPLAND SEED SF SFSFSF SF SF SF SF SF SF SF LOC SSA SP SF SWMP LEGEND CWA CD VTC ECB MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 3-BUSINESS DAYS IN ADVANCE CENTER OF COLORADO OR CALL UTILITY NOTIFICATION 1-800-922-1987 811 CALL COLORADO D SFSF SF SF 30" HDPE PIPE VOID-FILLED RIPRAP (D50 = 12") CHECK DAM TO LIMIT BACKWATER VOID-FILLED RIPRAP (D50 = 12") 2' THICK 24" PARSHALL FLUME UPLAND SEED, SEE SHEET DT08 COUNTY R O A D 2 4 3 ELK CR E E K FLOW CONTRACTOR SHALL COORDINATE WITH OWNER AND ENGINEER REGARDING REVEGETATION OF FIELD FOLLOWING PIPE INSTALLATION. FIELD WILL NEED TO BE RESTORED TO ITS PRE-PROJECT CONDITION. JBH/DTL JBH/DTL SDS 4/26/2024 SHOWN NO.BY DATE COMMENTS SCALE DETAIL CHECK DESIGN Pl o t D a t e / T i m e : 0 4 / 2 5 / 2 0 2 4 , 0 8 : 1 2 : 4 2 P M ; G : \ W W E \ 2 1 1 - 0 2 0 \ 0 2 0 \ C A D \ 0 2 _ D W G S \ S W X X - S T O R M W A T E R M A N A G E M E N T P L A N . D W G - S W 0 4 - 2 S W M P SHEET NO. JOB NO. REVISION NO. DATE DESCRIPTIONWRIGHT WATER ENGINEERS, INC. GLENWOOD SPRINGS, CO 81602 (970)945-7755 FAX(970)945-9210 818 COLORADO AVE. P.O. BOX 219 DRAFT NOT FOR CONSTRUCTION BID SET 4/26/2024 4/26/2024 STORMWATER MANAGEMENT PLAN 211-020.020 ---- SW04 COMBINE RYDEN NO. 2 AND BENSON PIERSON NELSON DIVERSIONS MATCH LINE, SEE SHEET SW03 LOC SSA SP SF VTC LOC LOC CWA VTC NORTH 30 30 60 FT0 PLAN SWMP NOTES: 1.CONTRACTOR TO OBTAIN ALL NECESSARY GRADING, EROSION CONTROL, AND DEWATERING PERMITS NECESSARY TO COMPLETE THE WORK. 2.STORMWATER MANAGEMENT PLAN (SWMP) BEST MANAGEMENT PRACTICES SHOWN ON THIS PLAN ARE FOR REFERENCE ONLY. ADDITIONAL BMPS NOT SHOWN ON THIS PLAN MAY BE REQUIRED AND IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE BMPS TO LIMIT EROSION AND SEDIMENT TRANSPORT. 3.CLEARING AND GRUBBING WILL BE REQUIRED IN SOME LOCATIONS. 4.TOTAL DISTURBED AREA IS EQUAL TO APPROXIMATELY 2.1 ACRES. 5.SEE BEST MANAGEMENT PRACTICES (BMP) DETAILS ON SHEET DT08-DT10. 6.CONTRACTOR SHALL SEED AND MULCH ALL DISTURBED AREAS ONCE THEY REACH FINAL GRADE. 7.CONTRACTOR SHALL PROVIDE A 2-YEAR, 70% COVER WARRANTY ON ALL REVEGETATION COMPONENTS. 8.BEST MANAGEMENT PRACTICES (BMPS) SHOWN ON THIS PLAN ARE PROVIDED FOR CONTRACTOR REFERENCE ONLY. IF FIELD CHANGES (SUCH AS GRADING WORK) OCCUR THAT NECESSITATE THE MOVEMENT OF ANY BMPS OR THE PLACEMENT OF ADDITIONAL BMPS, CONTRACTOR SHALL REDLINE THIS PLAN WITH UPDATED BMP LOCATIONS. 9.LOCATION OF STABILIZED STAGING AREA, STOCKPILE, CONCRETE WASHOUT AREA, AND VEHICLE TRACKING CONTROL MAY NEED TO BE SHIFTED DURING CONSTRUCTION TO ACCOMMODATE PROPOSED GRADING SHOWN ON THESE PLANS. CONTRACTOR SHALL COORDINATE LOCATIONS OF THESE BMPS WITH THE OWNER AND REDLINE THIS PLAN WITH NEW BMP LOCATIONS. 10.CONTRACTOR MAY USE SILT FENCE OR SEDIMENT CONTROL LOGS AS PERIMETER CONTROLS WHERE INDICATED ON THIS PLAN. 11.CONTRACTOR SHALL INSPECT PAVED ROADS USED FOR ACCESS ON A DAILY BASIS AND MORE FREQUENTLY AS NEEDED. ACCUMULATED SEDIMENT SHALL BE REMOVED IMMEDIATELY. 12.AUTHORIZATION TO WORK ON PROPERTIES NEEDS TO BE SECURED PRIOR TO CONSTRUCTION. 13.CARE TO BE TAKEN ACCESSING THE SITE TO MINIMIZE IMPACTS TO EXISTING VEGETATION. 14.SEDIMENT ACCUMULATED IN DOWNSTREAM CHANNEL TO BE REMOVED BY CONTRACTOR AND HAULED OFF-SITE. 15.AREAS WITHIN THE RIPARIAN AREA BUT OUTSIDE THE ACTIVE CHANNEL WILL BE REVEGETATED WITH UPLAND SEED MIX OR PASTURE SEED MIX SPECIFIED IN PLANS. SEED MIX TO BE APPROVED BY ENGINEER PRIOR TO CONSTRUCTION. 16.SHOWN EXTENTS OF EROSION CONTROL BLANKET IS THE MINIMUM. ALL EROSION CONTROL BLANKET SHALL BE S400 OR APPROVED EQUAL. SWMP PHASING NOTES: 1.SILT FENCE AND/OR SEDIMENT CONTROL LOGS SHALL BE PLACED PRIOR TO CONSTRUCTION AND REMAIN IN PLACE UNTIL FINAL STABILIZATION IS ACHIEVED. 2.STABILIZED STAGING AREA(S) AND VEHICLE TRACKING CONTROL SHALL BE PLACED PRIOR TO CONSTRUCTION AND REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETED. 3.STOCKPILE CONTROLS SHALL BE PUT IN PLACE PRIOR TO ANY GRADING WORK AND REMAIN IN PLACE UNTIL GRADING WORK IS COMPLETED. 4.CONCRETE WASHOUT AREA SHALL BE PUT IN PLACE PRIOR TO ANY CONCRETE WORK AND REMAIN IN PLACE UNTIL ALL CONCRETE WORK IS COMPLETE. COLORADO PARKS AND WILDLIFE NOTES: 1.AVOID MOBILIZING SIGNIFICANT AMOUNTS OF FINE SEDIMENT DOWNSTREAM TO MINIMIZE IMPACTS TO AQUATIC ORGANISMS. 1.1.ISOLATE WORK AREAS INSTREAM AND “WORK IN THE DRY” TO AVOID MOBILIZING FINE SEDIMENTS DOWNSTREAM DURING EXTENDED CONSTRUCTION ACTIVITIES 1.2.UTILIZE COFFER DAMS AND TURBIDITY CURTAINS TO CAPTURE MOBILIZED FINE SEDIMENTS DOWNSTREAM OF CONSTRUCTION DISTURBANCES. REMOVE AND DISPOSE OF BUILT UP SEDIMENT DEPOSITS PRIOR TO DECOMMISSION OF COFFER DAMS OR TURBIDITY CURTAINS. UNINSTALL SEDIMENT CONTAINMENT INFRASTRUCTURE OUTSIDE OF SPAWNING PERIODS OR WHEN FLOWS NATURALLY INCREASE TO FLUSH ANY REMAINING SEDIMENTS. 1.3.MAINTAIN VISUALLY COMPARABLE TURBIDITY LEVELS UPSTREAM AND 300 YARDS DOWNSTREAM OF CONSTRUCTION ACTIVITIES. 1.4.INSTALL SEDIMENT CONTAINMENT INFRASTRUCTURE ON DISTURBED BANKS AND AREAS ADJACENT TO STREAMS AND RIVERS TO AVOID MOBILIZING SEDIMENT DURING RAIN EVENTS, SNOWMELT, OR HEAVY EQUIPMENT OPERATION INTO OR NEAR THE STREAM CHANNEL. ADDRESS ANY INPUTS THAT VISUALLY INCREASE STREAM TURBIDITY. 2.CLEAN AND DRY EQUIPMENT USED PREVIOUSLY IN FLOWING OR STANDING WATERS AND FOLLOWING CURRENT INSTREAM CONSTRUCTION ACTIVITIES TO AVOID SPREADING AQUATIC NUISANCE ORGANISMS INCLUDING PATHOGENS, PARASITES, AND INVASIVE SPECIES. 3.DISCOURAGE THE DEPOSITION OF FINE SEDIMENTS AND DEBRIS THAT INCREASE HABITAT FOR TUBIFEX WORMS, A HOST TO THE PATHOGEN THAT CAUSES WHIRLING DISEASE IN SALMONIDS. 4.CONTRACTOR IS RESPONSIBLE FOR MAKING PERIODIC TURBIDITY OBSERVATIONS DURING CONSTRUCTION. DURING THE FIRST TWO DAYS OF CONSTRUCTION, THE CONTRACTOR WILL MAKE OBSERVATIONS OF WATER CLARITY AT NO LESS THAN 1 HOUR INTERVALS AT THREE SPECIFIED POINTS. POINT #1 SHALL BE A REFERENCE POINT IMMEDIATELY ABOVE THE CONSTRUCTION SITE. POINTS #2 AND #3 SHALL BE LOCATED DOWNSTREAM OF THE CONSTRUCTION SITE APPROXIMATELY 150 YARDS AND 300 YARDS RESPECTIVELY. ONCE THE CONSTRUCTION SITE BECOMES STABLE CONTRACTOR WILL MAKE OBSERVATIONS 2 TIMES DAILY AT THE SPECIFIED POINTS. 5.IF TURBIDITY IS NOTICEABLY GREATER 300 YARDS DOWNSTREAM OF THE PROJECT AREA, THEN HALT CONSTRUCTION ACTIVITIES UNTIL THE STREAM CLEARS AND TURBIDITY IS COMPARABLE TO THE STREAM UPSTREAM OF THE PROJECT. INSTALL SEDIMENT CONTAINMENT INFRASTRUCTURE OR MODIFY CONSTRUCTION ACTIVITY TO ADDRESS SEDIMENT MOBILIZATION ISSUES. THEN RESUME 1-HOUR OBSERVATIONS UNTIL WATER CLARITY CONDITIONS REMAIN STABLE DOWNSTREAM OF THE PROJECT. 6.CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT THE CONSTRUCTION SITE IS STABLE AT THE END OF EACH DAY AND NOT CONTRIBUTING ANY CONSTRUCTION RELATED TURBIDITY TO THE STREAM. LIMITS OF CONSTRUCTION SILT FENCE STABILIZED STAGING AREA STOCKPILE CONCRETE WASHOUT AREA CHECK DAM EROSION CONTROL BLANKET VEHICLE TRACKING CONTOL WILLOW STAKES UPLAND SEED SF SFSFSF SF SF SF SF SF SF SF LOC SSA SP SF SWMP LEGEND CWA CD VTC ECB MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 3-BUSINESS DAYS IN ADVANCE CENTER OF COLORADO OR CALL UTILITY NOTIFICATION 1-800-922-1987 811 CALL COLORADO DocuSign Envelope ID: 35746514-E0DC-43D3-9A15-59F7C2E9F7BE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE w w w w w w ww w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w 2+22 1+0 0 2+00 2+63 1+00 2 + 0 0 3+33 1+0 0 2+00 3 + 0 0 1+ 4 8 1+00 BEGIN RYDEN NO. 2 - FISH PASSAGE PROFILE ALIGNMENT STA: 1+00.00 N: 1663307.74 E: 2414866.81 BEGIN RYDEN NO. 2 - DIVERSION ALIGNMENT STA: 1+00.00 N: 1663413.58 E: 2414843.47 BEGIN RYDEN NO. 2 - SEDIMENT SLUICE ALIGNMENT STA: 1+00.00 N: 1663415.09 E: 2414879.92 END RYDEN NO. 2 - FISH PASSAGE PROFILE ALIGNMENT STA: 3+32.88 N: 1663469.31 E: 2414983.17 END RYDEN NO. 2 - DIVERSION ALIGNMENT STA: 2+62.80 N: 1663469.31 E: 2414983.17 END RYDEN NO. 2 - CONCRETE DIVERSION STRUCTURE WALL ALIGNMENT STA: 2+21.79 N: 1663503.72 E: 2414909.00 END RYDEN NO. 2 - SEDIMENT SLUICE ALIGNMENT STA: 1+47.87 N: 1663457.12 E: 2414858.42 1+ 0 0 2+ 0 0 2+27 BEGIN RYDEN NO. 2 - CONCRETE DIVERSION STRUCTURE WALL ALIGNMENT STA: 1+00.00 N: 1663469.10 E: 2414868.13 END RYDEN NO. 2 - BOULDER WALL CREST ALIGNMENT STA: 2+26.57 N: 1663423.16 E: 2414927.93 BEGIN RYDEN NO. 2 - BOULDER WALL CREST ALIGNMENT STA: 1+05.00 N: 1663450.75 E: 2414856.74 L1 L2 L3 L4 L5 L6 L7 L 8 L 9 L10 L11 L 1 2 L 1 3 L 1 4 L15 L1 6 L1 7 L1 8 L1 9 C 1 L20 L21 L2 2 L2 3 L2 4 L25 DIVERSION STRUCTURE CREST ALIGNMENT CONCRETE DIVERSION STRUCTURE WALL ALIGNMENTLINE DATA LINE #LENGTH DIRECTION START STATION END STATION DIVERSION ALIGNMENTFISH PASSAGE ALIGNMENT RETURN FLOW ALIGNMENT LINE DATA LINE # L1 L2 L3 L4 L5 L6 L7 L8 L9 LENGTH 43.85' 20.78' 19.32' 22.34' 19.20' 40.70' 13.00' 17.20' 36.49' DIRECTION N7°12'31"W N9°09'38"E N13°29'39"E N28°28'21"E N24°38'58"E N56°16'53"E N41°50'58"E N79°39'02"E N80°02'26"E START STATION 1+00.00 1+43.85 1+64.63 1+83.95 2+06.29 2+25.49 2+66.19 2+79.19 2+96.38 END STATION 1+43.85 1+64.63 1+83.95 2+06.29 2+25.49 2+66.19 2+79.19 2+96.38 3+32.88 LINE DATA LINE # L10 L11 L12 L13 L14 LENGTH 35.46' 45.32' 1.00' 41.64' 39.37' DIRECTION N42°07'49"E N50°09'46"E S79°31'36"E N81°22'04"E S81°43'13"E START STATION 1+00.00 1+35.46 1+80.78 1+81.78 2+23.43 END STATION 1+35.46 1+80.78 1+81.78 2+23.43 2+62.80 LINE DATA LINE # L15 L16 L17 LENGTH 18.21' 4.00' 25.66' DIRECTION N14°55'05"W N34°31'36"W N34°31'36"W START STATION 1+00.00 1+18.21 1+22.21 END STATION 1+18.21 1+22.21 1+47.87 CURVE DATA CURVE # C1 RADIUS 20.52' LENGTH 52.07' CHORD DIRECTION S51°57'24"E START STATION 1+64.50 END STATION 2+16.57 LINE DATA LINE # L18 L19 L20 LENGTH 25.00' 39.50' 10.00' DIRECTION S34°31'36"E N55°28'24"E S20°43'37"W START STATION 1+00.00 1+25.00 2+16.57 END STATION 1+25.00 1+64.50 2+26.57 LINE DATA LINE # L21 L22 L23 L24 L25 LENGTH 19.15' 8.21' 10.08' 39.06' 45.29' DIRECTION S4°31'36"E S55°28'24"W S34°31'36"E N55°28'24"E N10°28'24"E START STATION 1+00.00 1+19.15 1+27.36 1+37.44 1+76.50 END STATION 1+19.15 1+27.36 1+37.44 1+76.50 2+21.79 JBH/DTL JBH/DTL SDS 4/26/2024 SHOWN MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 3-BUSINESS DAYS IN ADVANCE CENTER OF COLORADO OR CALL UTILITY NOTIFICATION 1-800-922-1987 811 CALL COLORADO NO.BY DATE COMMENTS SCALE DETAIL CHECK DESIGN Pl o t D a t e / T i m e : 0 4 / 2 5 / 2 0 2 4 , 0 8 : 1 4 : 1 8 P M ; G : \ W W E \ 2 1 1 - 0 2 0 \ 0 2 0 \ C A D \ 0 2 _ D W G S \ H Z X X - P R O J E C T 2 H O R I Z O N T A L C O N T R O L . D W G - H Z 0 1 - P R O J 2 SHEET NO. JOB NO. REVISION NO. DATE DESCRIPTIONWRIGHT WATER ENGINEERS, INC. GLENWOOD SPRINGS, CO 81602 (970)945-7755 FAX(970)945-9210 818 COLORADO AVE. P.O. BOX 219 DRAFT NOT FOR CONSTRUCTION BID SET 4/26/2024 4/26/2024 HORIZONTAL CONTROL PLAN 211-020.020 ---- HZ01 10 10 20 FT0 NORTH PLAN COMBINE RYDEN NO. 2 AND BENSON PIERSON NELSON DIVERSIONS ALIGNMENT TABLE ALIGNMENT NAME SHEET NUMBER FISH PASSAGE PP01 DIVERSION PP02 RETURN FLOW PP02 RYDEN NO. 2 PROPOSED DITCH CENTERLINE PP03 - PP05 BENSON PIERSON NELSON PROPOSED DITCH CENTERLINE PP06 - PP07 DIVERSION STRUCTURE CREST XS01 CONCRETE DIVERSION STRUCTURE WALL XS01 ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ 8+41 6+00 7+00 8+ 0 0 5 + 0 0 6+00 7+00 END BENSON PIERSON NELSON PROPOSED DITCH CENTERLINE ALIGNMENT STA: 8+40.68 N: 1661754.92 E: 2414110.63 L43 L4 4 L45 L46 L47 ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ x x x x x x x ^ ^x ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ x x x x x x x x x x x x x ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ D 1 + 0 0 2 + 0 0 3+00 4+00 BEGIN BENSON PIERSON NELSON PROPOSED DITCH CENTERLINE ALIGNMENT STA: 1+00.00 N: 1661118.89 E: 2414187.69 L 2 6 L 2 7 L28 L29 L30 L31 L 3 2 L 3 3 L 3 4 L 3 5 L 3 6 L37 L38 L39 L40 L41 L42 LINE DATA LINE #LENGTH DIRECTION START STATION END STATION BENSON PIERSON NELSON PROPOSED DITCH CENTERLINE LINE DATA LINE #LENGTH DIRECTION START STATION END STATION RYDEN NO. 2 PROPOSED DITCH CENTERLINE LINE DATA LINE # L26 L27 L28 L29 L30 L31 L32 L33 L34 L35 L36 L37 L38 L39 L40 L41 L42 L43 L44 L45 L46 L47 LENGTH 36.11' 30.25' 4.47' 3.26' 6.35' 2.88' 17.13' 12.99' 11.14' 4.93' 10.29' 2.81' 2.17' 4.20' 6.81' 23.99' 3.48' 494.18' 24.91' 2.33' 16.01' 20.00' DIRECTION N57°13'09"E N55°01'34"E N39°54'20"E N24°18'50"E N3°47'11"E N44°00'56"E N38°48'43"E N47°59'26"E N55°59'25"E N54°27'54"E N43°35'19"E N35°12'55"E N35°47'11"E N36°31'01"E N23°59'45"E N15°57'05"E N21°32'49"E N21°07'37"W N68°23'46"W N68°23'46"W N21°32'55"E N5°37'59"E START STATION 1+00.00 1+36.11 1+66.36 1+70.83 1+74.09 1+80.44 1+83.33 2+00.46 2+13.45 2+24.59 2+29.52 2+39.81 2+42.61 2+44.78 2+48.99 2+55.80 2+79.78 2+83.26 7+77.43 8+02.34 8+04.67 8+20.68 END STATION 1+36.11 1+66.36 1+70.83 1+74.09 1+80.44 1+83.33 2+00.46 2+13.45 2+24.59 2+29.52 2+39.81 2+42.61 2+44.78 2+48.99 2+55.80 2+79.78 2+83.26 7+77.43 8+02.34 8+04.67 8+20.68 8+40.68 JBH/DTL JBH/DTL SDS 4/26/2024 SHOWN MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 3-BUSINESS DAYS IN ADVANCE CENTER OF COLORADO OR CALL UTILITY NOTIFICATION 1-800-922-1987 811 CALL COLORADO NO.BY DATE COMMENTS SCALE DETAIL CHECK DESIGN Pl o t D a t e / T i m e : 0 4 / 2 5 / 2 0 2 4 , 0 8 : 1 4 : 3 0 P M ; G : \ W W E \ 2 1 1 - 0 2 0 \ 0 2 0 \ C A D \ 0 2 _ D W G S \ H Z X X - P R O J E C T 2 H O R I Z O N T A L C O N T R O L . D W G - H Z 0 2 - P R O J 2 SHEET NO. JOB NO. REVISION NO. DATE DESCRIPTIONWRIGHT WATER ENGINEERS, INC. GLENWOOD SPRINGS, CO 81602 (970)945-7755 FAX(970)945-9210 818 COLORADO AVE. P.O. BOX 219 DRAFT NOT FOR CONSTRUCTION BID SET 4/26/2024 4/26/2024 HORIZONTAL CONTROL PLAN 211-020.020 ---- HZ02 NOTES: 1.IMPROVEMENTS INCLUDED IN THESE PLANS INCLUDE INFRASTRUCTURE FOR THE COMBINED DIVERSION FOR THE RYDEN NO. 2 AND BENSON PIERSON NELSON DITCHES AND THE DOWNSTREAM SPLITTER STRUCTURE. THE DITCH BETWEEN THE DIVERSION AND THE SPLITTER DOES NOT HAVE CAPACITY FOR THE TOTAL COMBINED DIVERSION RATE. IMPROVEMENTS TO THE DITCH TO PROVIDE THE ADDITIONAL REQUIRED CAPACITY WILL BE THE RESPONSIBILITY OF THE OWNER. COMBINE RYDEN NO. 2 AND BENSON PIERSON NELSON DIVERSIONS 20 40 FT200 NORTH PLAN MA T C H L I N E S T A . 5 + 0 0 , SE E T H I S S H E E T MA T C H L I N E S T A . 5 + 0 0 , SE E T H I S S H E E T DRAFT WORK IN PROGRESS OE OE OE OE OE OE OE OE OE OE OE OE ww w w ww w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w 59 0 5 59 0 4 590 3 5902 59 0 1 59 0 2 590 3 5902 5901 590 0 58 9 9 589 9 590 0 5901 590 2 5903 5904 5900 5901 5905 5906 5 9 0 7 59 0 8 59 0 9 5 9 0 8 5 9 0 7 590 6 59 0 2 5 9 0 3 5 9 0 4 59 0 5 590 5 5 9 0 6 5 9 0 6 59 0 7 5 9 0 8 5 9 0 9 5910 5904 5909 5 9 0 5 590 6 59 0 9 5906 5907 5908 5 9 0 7 5 9 0 5 5907 590 5 590 6 590 7 590 8 590 9 5908 5907 5 9 0 6 5905 5904 59 0 7 59 0 8 59 0 5 5 9 0 5 59 0 6 590 5 3+33 1+0 0 2+00 3 + 0 0 ELK C R E E K FLO W DEBRIS DEFLECTOR BOULDERS STREAM SUBSTRATE (D50 = 18") SPOT TREATMENT BOULDERS REVEGETATION: WILLOW STAKES REMOVABLE TRASH RACK AND FISH SCREEN RYDEN NO. 2 - FISH PASSAGE, SEE PROFILE BELOW APPROXIMATE LOCATION OF SPOT TREATMENT BOULDERS, SEE SHEET DT01 REVEGETATION: UPLAND SEED HDPE PIPE COORDINATE WITH ENGINEER TO PRESERVE AND/OR CREATE BACKWATER HABITAT EL E V A T I O N , ( F T ) STA. (FT) RYDEN NO. 2 - FISH PASSAGE PROFILE 5890 5895 5900 5905 5910 5915 5920 5890 5895 5900 5905 5910 5915 5920 1+00 2+00 3+00 3+32 EXISTING GRADE 11.2% 14.9 % MATCH EXISTING GRADE STA: 2+66.19 EL: 5904.94 MATCH EXISTING GRADE STA: 2+79.19 EL: 5904.75 PROPOSED LOW FLOW CREST ELEVATION STA: 2+72.69 EL: 5905.50 STREAM SUBSTRATE (D50 = 18"), AS NEEDED BOULDER CREST SILL MINOR GRADING AND BOULDER REMOVAL/PLACEMENT MIGHT BE REQUIRED IN THIS AREA AS DIRECTED BY ENGINEERAPPROXIMATE LOCATION OF SPOT TREATMENT BOULDERS, SEE SHEET DT01 CONTRACTOR TO PLACE BOULDERS AND BACKFILL WITH STREAM SUBSTRATE AND COMPACT JBH/DTL JBH/DTL SDS 4/26/2024 SHOWN MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 3-BUSINESS DAYS IN ADVANCE CENTER OF COLORADO OR CALL UTILITY NOTIFICATION 1-800-922-1987 811 CALL COLORADO NO.BY DATE COMMENTS SCALE DETAIL CHECK DESIGN Pl o t D a t e / T i m e : 0 4 / 2 5 / 2 0 2 4 , 0 8 : 1 7 : 1 9 P M ; G : \ W W E \ 2 1 1 - 0 2 0 \ 0 2 0 \ C A D \ 0 2 _ D W G S \ P P X X - D I V E R S I O N A N D F I S H P A S S A G E P & P . D W G - P P 0 1 - 2 - F I S H P A S S A G E P & P SHEET NO. JOB NO. REVISION NO. DATE DESCRIPTIONWRIGHT WATER ENGINEERS, INC. GLENWOOD SPRINGS, CO 81602 (970)945-7755 FAX(970)945-9210 818 COLORADO AVE. P.O. BOX 219 DRAFT NOT FOR CONSTRUCTION BID SET 4/26/2024 4/26/2024 FISH PASSAGE PLAN & PROFILE 211-020.020 ---- PP01 10 10 20 FT0 0 1010 0 55 VERTICALHORIZONTAL 20 FT 10 FT NORTH PLAN PROFILE COMBINE RYDEN NO. 2 AND BENSON PIERSON NELSON DIVERSIONS NOTES: 1.PLACEMENT OF ALL BOULDERS SHOULD BE REVIEWED AND ACCEPTED BY THE ENGINEER. BOULDERS PLACED WITHOUT ENGINEER APPROVAL ARE SUBJECT TO REMOVAL AND REPLACEMENT. 2.CONTRACTOR SHALL WORK IN CLOSE COORDINATION WITH ENGINEER ON IMPLEMENTATION OF PROPOSED CREST ELEVATION. CONTRACTOR SHALL VERIFY CREST ELEVATION WITH ENGINEER PRIOR TO CONSIDERING WORK COMPLETE. 3.CREST ELEVATION ONLY BE MODIFIED SLIGHTLY BUT TOP OF CREST ELEVATION SHALL BE ACHIEVED WITH BOULDERS AT THE TOP (I.E. NOT STREAM SUBSTRATE). 4.CONTRACTOR SHALL LIMIT WORK TO AREA NEEDED TO LIMIT DISTURBANCE. 5.STREAM SUBSTRATE SHALL BE USED AS BASE FOR BOULDERS AND TO FILL ANNULAR SPACES TO ACHIEVE GRADE AT TOP OF BOULDER OR BEDDING. CONTRACTOR TO COORDINATE WITH ENGINEER AS NEEDED. 6.ALL VOIDS BETWEEN BOULDERS SHALL BE BACKFILLED WITH STREAM SUBSTRATE. ROCK SHALL BE COMPACTED WITH AN EXCAVATOR BUCKET OR EQUIVALENT AND WASHED IN TO CREATE AN INTERLOCKING MASS OF BOULDERS AND STREAM SUBSTRATE. O E O E O E O E O E O E O E O E w w w w w w w w w w w w w w w w w w ww w wwwwwww w O E O E O E w w w w DEBRIS DEFLECTOR BOULDERS BOULDERS REVEGETATION: WILLOW STAKES FL O W EL K C R E E K CONCRETE DIVERSION STRUCTURE RYDEN NO. 2 - DIVERSION RYDEN NO. 2 - SEDIMENT SLUICE REMOVABLE TRASH RACK AND FISH SCREEN STRUCTURE STREAM SUBSTRATE (D50 = 18") FLO W ELK C R E E K REVEGETATION: UPLAND SEED REVEGETATION: UPLAND SEED FRESNO 24" X 24" SERIES 8200 FABRICATED SLIDE GATE FRESNO 36" X 36" SERIES 8200 FABRICATED SLIDE GATE 5904 5907 5908 5909 5908 59 0 6 5 9 0 5 5905 59 0 6 590 7 590 8 5905 5906 591 5 592 0 5904 59 0 3 590 2 59 0 1 5900 5900 5901 5902 5903 5904 5 9 0 5 5907 59 0 6 59 0 7 5 9 0 8 5909 590 8 5907 5 9 0 6 59 0 6 59 0 7 59 0 8 59 0 9 5 9 1 0 5 9 0 1 5 9 0 2 5903 5905 590 5 5904 590 3 5910 5909 5908 5907 5910 5909 5 9 0 8 59 0 7 2+63 1+00 2+0 0 1+ 0 0 1 + 4 8 HDPE PIPE EXISTING OVERHEAD UTILITY COORDINATE WITH ENGINEER TO PRESERVE AND/OR CREATE BACKWATER HABITAT 5910 5909 5908 5907 5906 5905 5 9 1 0 5911 5909 5908 5907 5906 5905 590 5 5910 590 7 EL E V A T I O N , ( F T ) STA. (FT) RYDEN NO. 2 - DIVERSION PROFILE 5890 5895 5900 5905 5910 5915 5920 5890 5895 5900 5905 5910 5915 5920 1+00 2+00 2+63 71.00' OF 30" HDPE PIPE @ 0.57% EXISTING GRADE 0.1%7.9% DIVERSION INV EL: 5905.52 (MATCH EXISTING HEADGATE INVERT) SEDIMENT SLUICE INV EL: 5904.52 DIVERSION CHANNEL INV EL: 5904.27 STA: 1+34.43 EL: 5911.00 STA: 1+47.16 EL: 5911.00 STA: 1+50.16 EL: 5908.00 STA: 1+70.07 EL: 5908.00 STA: 1+71.07 EL: 5909.00 STA: 1+81.78 EL: 5909.00 STA: 1+81.78 EL: 5896.00 STA: 1+34.43 EL: 5896.00 STA: 1+40.48 EL: 5904.19 STA: 1+35.46 EL: 5904.19 STA: 1+25.02 EL: 5909.19 MATCH EXISTING GRADE STA: 1+87.08 EL: 5904.69 CONCRETE WALL SHOWN SUPERIMPOSED, SEE SHEET XS01 BOULDERS, SEE SHEET XS01 PROPOSED GRADE FRESNO 24" X 24" SERIES 8200 FABRICATED SLIDE GATE FRESNO 36" X 36" SERIES 8200 FABRICATED SLIDE GATE STREAM SUBSTRATE (D50 = 18") DEBRIS DEFLECTOR BOULDERS, SEE PLAN VIEW REMOVABLE TRASH RACK AND FISH SCREEN GRATE COMPACT SUBGRADE EL E V A T I O N , ( F T ) STA. (FT) RYDEN NO. 2 - SEDIMENT SLUICE PROFILE 5890 5895 5900 5905 5910 5915 5920 5890 5895 5900 5905 5910 5915 5920 0+75 1+00 1+75 EXISTING GRADE 10.4% SEDIMENT SLUICE INV EL: 5904.5 DIVERSION INV EL: 5905.5 (MATCH EXISTING HEADGATE INVERT) STA: 1+25.07 EL: 5911.00 STA: 1+36.16 EL: 5911.00 MATCH EXISTING GRADE STA: 1+44.98 EL: 5912.00 MATCH EXISTING GRADE STA: 1+08.59 EL: 5903.12 STA: 1+25.07 EL: 5896.00 STA: 1+36.16 EL: 5896.00 EL: 5904.19 EL: 5904.19 PROPOSED GRADE BOULDERS STREAM SUBSTRATE (D50 = 18") CONCRETE WALL, SEE SHEET XS01 FRESNO 24" X 24" SERIES 8200 FABRICATED SLIDE GATE FRESNO 36" X 36" SERIES 8200 FABRICATED SLIDE GATE GRATE COMPACT SUBGRADE JBH/DTL JBH/DTL SDS 4/26/2024 SHOWN MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 3-BUSINESS DAYS IN ADVANCE CENTER OF COLORADO OR CALL UTILITY NOTIFICATION 1-800-922-1987 811 CALL COLORADO NO.BY DATE COMMENTS SCALE DETAIL CHECK DESIGN Pl o t D a t e / T i m e : 0 4 / 2 5 / 2 0 2 4 , 0 8 : 1 7 : 4 9 P M ; G : \ W W E \ 2 1 1 - 0 2 0 \ 0 2 0 \ C A D \ 0 2 _ D W G S \ P P X X - D I V E R S I O N A N D F I S H P A S S A G E P & P . D W G - P P 0 2 - 2 - D I V E R S I O N P & P SHEET NO. JOB NO. REVISION NO. DATE DESCRIPTIONWRIGHT WATER ENGINEERS, INC. GLENWOOD SPRINGS, CO 81602 (970)945-7755 FAX(970)945-9210 818 COLORADO AVE. P.O. BOX 219 DRAFT NOT FOR CONSTRUCTION BID SET 4/26/2024 4/26/2024 10 10 20 FT0 0 1010 0 55 VERTICALHORIZONTAL 20 FT 10 FT NORTH PLAN PROFILE DIVERSION AND RETURN FLOW PLAN & PROFILE 211-020.020 ---- PP02 COMBINE RYDEN NO. 2 AND BENSON PIERSON NELSON DIVERSIONS OE OE OE OE OE OE OE OE OE OE OE ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ELK C R E E K FLO W COU N T Y R O A D 2 4 3 26+10 18+00 19 + 0 0 20 + 0 0 21+00 22+00 23+00 24 + 0 0 25+ 0 0 26+00 RYDEN NO. 2 DIVERSION STRUCTURE RYDEN NO. 2 - PROPOSED DITCH CENTERLINE, SEE PROFILE BELOW 30" HDPE PIPE DRAINAGE CROSSING, SEE PROFILE BELOW VOID-FILLED RIPRAP (D50 = 12"), 2' THICK 24-INCH PARSHALL FLUME REPLACE EXISTING 24" CMP CULVERT BENEATH ROADWAY WITH 30" HDPE PIPE 30" HDPE PIPE BEND: 44.96° BEND: 41.11° BEND: 34.41° BEND: 44.82° BEND: 26.05° BEND: 23.13° BEND: 36.54° BEND: 20.85° BEND: 37.63° BEND: 28.20° BEND: 35.55° BEND: 25.88° BEND: 32.02° BEND: 6.10° BEND: 3.66° VOID FILLED RIPRAP (D50 = 12"), 2' THICK SEDIMENT DEPOSITIONAL AREA, SEE SHEET TS01 VOID-FILLED RIPRAP (D50 = 18"), 3' THICK 5900 5905 5900 5905 59 0 559 1 0 5910 5 9 0 5 5 9 0 5 5905 5 9 0 5 5 9 0 0 59 0 0 59 0 5 5900 5910 5915 59 0 0 590 0 5900 5 9 0 5 5905 5920 5920 591 5 EXISTING OVERHEAD UTILITY 2 : 1 1 : 1 2: 1 3 : 1 2 : 1 2 : 1 EL E V A T I O N , ( F T ) STA. (FT) RYDEN NO. 2 - PROPOSED DITCH CENTERLINE PROFILE 5860 5865 5870 5875 5880 5885 5890 5895 5900 5905 5910 5915 5920 5925 5930 5935 5940 5860 5865 5870 5875 5880 5885 5890 5895 5900 5905 5910 5915 5920 5925 5930 5935 5940 17+50 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 26+25 MA T C H L I N E S T A . 1 7 + 5 0 , SE E S H E E T P P 0 4 EXISTING GRADE 0.57% 2.13% 438 LF OF 30" HDPE PIPE @ 0.57% SLOPE EXISTING DRAINAGE CROSSING, SEE SHEET PP08 285 LF OF 30" HDPE PIPE @ 0.12% SLOPE 22' COUNTY ROAD, 2' MIN. COVER OVER PIPE FLARED END SECTION WITH TRASH GUARD STA: 21+48.18 INV EL: 5903.00 PROPOSED 24-INCH PARSHALL FLUME, 1-FOOT DROP ON DOWNSTREAM SIDE (MIN.) PROPOSED GRADE, 1-FOOT MIN. COVER OVER PIPE PIPE SUPPORTS STA: 21+15.30 INV EL: 5902.82 STA: 21+05.38 INV EL: 5901.57 FLARED END SECTION WITH TRASH GUARD STA: 20+36.62 INV EL: 5900.12 PROPOSED GRADE, 1-FOOT MIN. COVER OVER PIPE VOID-FILLED RIPRAP (D50 = 18"), 3' THICK STEEL PIPE ENCASEMENT, SEE SHEET PP08 VOID-FILLED RIPRAP (D50 = 12"), 2' THICKVOID-FILLED RIPRAP (D50 = 12"), 2' THICK SEDIMENT DEPOSITIONAL AREA DIVERSION STA: 25+89.63 INV EL: 5905.52 SEE SHEET PP02 FRESNO 36" X 36" SERIES 8200 FABRICATED SLIDE GATE OVERHEAD UTILITY STA: 25+31.18 REPLACE EXISTING 24" CMP CULVERT BENEATH ROADWAY WITH 30" HDPE PIPE CLEANOUT STA: 23+70.55 CAP EL: 5908.00 JBH/DTL JBH/DTL SDS 4/26/2024 SHOWN MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 3-BUSINESS DAYS IN ADVANCE CENTER OF COLORADO OR CALL UTILITY NOTIFICATION 1-800-922-1987 811 CALL COLORADO NO.BY DATE COMMENTS SCALE DETAIL CHECK DESIGN Pl o t D a t e / T i m e : 0 4 / 2 5 / 2 0 2 4 , 0 8 : 2 0 : 4 7 P M ; G : \ W W E \ 2 1 1 - 0 2 0 \ 0 2 0 \ C A D \ 0 2 _ D W G S \ P P X X - D I T C H A N D M I S C P & P . D W G - P P 0 3 - P R O J 2 SHEET NO. JOB NO. REVISION NO. DATE DESCRIPTIONWRIGHT WATER ENGINEERS, INC. GLENWOOD SPRINGS, CO 81602 (970)945-7755 FAX(970)945-9210 818 COLORADO AVE. P.O. BOX 219 DRAFT NOT FOR CONSTRUCTION BID SET 4/26/2024 4/26/2024 211-020.020 ---- PP03 COMBINE RYDEN NO. 2 AND BENSON PIERSON NELSON DIVERSIONS RYDEN NO. 2 DITCH PLAN AND PROFILE 30 30 60 FT0 NORTH PLAN 0 3030 0 1515 VERTICALHORIZONTAL 60 FT 30 FT PROFILE MA T C H L I N E S T A . 1 7 + 5 0 , SE E S H E E T P P 0 4 NOTES: 1.DITCH SHALL HAVE POSITIVE DRAINAGE THROUGH ALL REACHES. PROFILE AND SLOPE OF DITCH TO BE VERIFIED AND DOCUMENTED EVERY 300' AND AT ALL PIPE INLETS AND OUTLETS AND SHALL MEET +/- 0.1' TOLERANCE. SURVEY WORK SHALL BE PERFORMED BY LICENSED SURVEYOR. 2.REPLACEMENT OF PIPE UNDERNEATH COUNTY ROAD TO FOLLOW COUNTY GUIDELINES AND DETAILS. RIGHT OF WAY PERMIT TO BE ACQUIRED BY CONTRACTOR. 3.CONTRACTOR TO RESTORE COUNTY ROAD 243 TO PRE-PROJECT CONDITIONS FOLLOWING CULVERT REPLACEMENT. 4.THIS PLAN MAY NOT SHOW ALL EXISTING UTILITIES. UNDERGROUND UTILITIES IN THE AREA OF CONSTRUCTION WILL NEED TO BE LOCATED BY THE CONTRACTOR. THE CONTRACTOR SHOULD ASSUME FULL RESPONSIBILITY FOR THE PROTECTION OF ALL UTILITIES. 5.CONTRACTOR REQUIRED TO PROVIDE TRAFFIC CONTROL PLAN FOR INSTALLATION AT ROAD CROSSING. 6.CONTRACTOR TO COORDINATE WITH ENGINEER AND PIPE SUPPLIER ON ALIGNMENT, BENDS, AND LEAD TIME. CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR PIPE ALIGNMENT AND APPURTENANCES. 7.SOME MINOR VEGETATION REMOVAL AND GRADING MIGHT BE REQUIRED FOR PIPE INSTALLATION AND SHALL BE CONSIDERED INCIDENTAL TO INSTALLATION OF THE PIPE. B TS01 C TS01 x x x x x x x ^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ COUNT Y R O A D 2 4 3 30" HDPE PIPE DRAINAGE CROSSING, SEE PROFILE BELOW RYDEN NO. 2 - PROPOSED DITCH CENTERLINE, SEE PROFILE BELOW INSTALL TURNOUT STRUCTURE, SEE SHEET DT03 STA: 10+25.07 N: 1662107.90 E: 2414351.34 REMOVE AND RESET FENCE 10+ 0 0 11+ 0 0 12+00 13+00 14+00 15+ 0 0 16+ 0 0 17+00 BEND: 13.68° BEND: 13.60° BEND: 13.18° BEND: 13.70° BEND: 16.93° BEND: 23.88° BEND: 11.39° BEND: 13.93° BEND: 21.50° BEND: 9.93° BEND: 18.24° BEND: 13.23° BEND: 3.99° VOID-FILLED RIPRAP (D50 = 18"), 3' THICK 5895 5900 5890 5885 5885 5890 5905 5900 5910 5905 5900 5900 5 9 0 0 5905 5900 5900 590 0 5900 5895 5900 5895 5890 5900 5900 5900 2: 1 2 : 1 2 : 1 2:1 EL E V A T I O N , ( F T ) STA. (FT) RYDEN NO. 2 - PROPOSED DITCH CENTERLINE PROFILE 5860 5865 5870 5875 5880 5885 5890 5895 5900 5905 5910 5915 5920 5925 5930 5935 5940 5860 5865 5870 5875 5880 5885 5890 5895 5900 5905 5910 5915 5920 5925 5930 5935 5940 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 17+50 MA T C H L I N E S T A . 1 7 + 5 0 , SE E S H E E T P P 0 3 MA T C H L I N E S T A . 9 + 5 0 , SE E S H E E T P P 0 5 EXISTING GRADE 850 LF OF 30" HDPE PIPE @ 0.12% SLOPE EXISTING DRAINAGE CROSSING, SEE SHEET PP09 PIPE SUPPORTS PROPOSED GRADE, 1-FOOT MIN. COVER OVER PIPE INSTALL TURNOUT STRUCTURE, SEE SHEET DT03 STA: 10+24.92 INV EL: 5898.85 VOID-FILLED RIPRAP (D50 = 18"), 3' THICK STEEL PIPE ENCASEMENT, SEE SHEET PP09 CLEANOUT STA: 11+32.37 CAP EL: 5902.76 CLEANOUT STA: 14+32.37 CAP EL: 5903.10 CLEANOUT STA: 17+32.36 CAP EL: 5903.44 JBH/DTL JBH/DTL SDS 4/26/2024 SHOWN MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 3-BUSINESS DAYS IN ADVANCE CENTER OF COLORADO OR CALL UTILITY NOTIFICATION 1-800-922-1987 811 CALL COLORADO NO.BY DATE COMMENTS SCALE DETAIL CHECK DESIGN Pl o t D a t e / T i m e : 0 4 / 2 5 / 2 0 2 4 , 0 8 : 2 1 : 0 0 P M ; G : \ W W E \ 2 1 1 - 0 2 0 \ 0 2 0 \ C A D \ 0 2 _ D W G S \ P P X X - D I T C H A N D M I S C P & P . D W G - P P 0 4 - P R O J 2 SHEET NO. JOB NO. REVISION NO. DATE DESCRIPTIONWRIGHT WATER ENGINEERS, INC. GLENWOOD SPRINGS, CO 81602 (970)945-7755 FAX(970)945-9210 818 COLORADO AVE. P.O. BOX 219 DRAFT NOT FOR CONSTRUCTION BID SET 4/26/2024 4/26/2024 211-020.020 ---- PP04 COMBINE RYDEN NO. 2 AND BENSON PIERSON NELSON DIVERSIONS RYDEN NO. 2 DITCH PLAN AND PROFILE 30 30 60 FT0 NORTH PLAN 0 3030 0 1515 VERTICALHORIZONTAL 60 FT 30 FT PROFILE MA T C H L I N E S T A . 1 7 + 5 0 , SE E S H E E T PP 0 3 MA T C H L I N E S T A . 9 + 0 0 , SE E S H E E T P P 0 5 NOTES: 1.DITCH SHALL HAVE POSITIVE DRAINAGE THROUGH ALL REACHES. PROFILE AND SLOPE OF DITCH TO BE VERIFIED AND DOCUMENTED EVERY 300' AND AT ALL PIPE INLETS AND OUTLETS AND SHALL MEET +/- 0.1' TOLERANCE. SURVEY WORK SHALL BE PERFORMED BY LICENSED SURVEYOR. 2.EXACT LOCATION OF TURNOUTS TO BE LOCATED IN THE FIELD WITH ENGINEER. 3.CONTRACTOR TO COORDINATE WITH ENGINEER AND PIPE SUPPLIER ON ALIGNMENT, BENDS, AND LEAD TIME. CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR PIPE ALIGNMENT AND APPURTENANCES. 4.SOME MINOR VEGETATION REMOVAL AND GRADING MIGHT BE REQUIRED FOR PIPE INSTALLATION AND SHALL BE CONSIDERED INCIDENTAL TO INSTALLATION OF THE PIPE. x x x x x x ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^^ ^ ^ ^^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^ 30" HDPE PIPE DRAINAGE CROSSING, SEE PROFILE BELOW INSTALL TURNOUT STRUCTURE, SEE SHEET DT03 STA: 8+56.91 N: 1661978.51 E: 2414249.77 CONCRETE SPLITTER STRUCTURE, SEE SHEET XS02 24-INCH PARSHALL FLUME VOID FILLED RIPRAP (D50 = 12"), 2' THICK PROPOSED CONNECTION TO EXISTING BENSON PIERSON NELSON DITCH, SEE SHEETS PP06 - PP07 5880 5885 5890 5895 5885 5890 5895 5900 5905 591 0 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 BEND: 21.56° BEND: 17.90° BEND: 16.36° BEND: 17.76° BEND: 7.63° BEND: 19.87° 30" HDPE PIPE VOID-FILLED RIPRAP (D50 = 18"), 3' THICK 5900 5900 5902 5901 RYDEN NO. 2 - PROPOSED DITCH CENTERLINE, SEE PROFILE BELOW PROTECT EXISTING TURNOUT IN PLACE 4 : 1 4 : 1 3 : 1 2 : 1 3 : 1 EL E V A T I O N , ( F T ) STA. (FT) RYDEN NO. 2 - PROPOSED DITCH CENTERLINE PROFILE 5860 5865 5870 5875 5880 5885 5890 5895 5900 5905 5910 5915 5920 5925 5930 5935 5940 5860 5865 5870 5875 5880 5885 5890 5895 5900 5905 5910 5915 5920 5925 5930 5935 5940 0+75 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 MA T C H L I N E S T A . 9 + 0 0 , SE E S H E E T P P 0 4 7' EXISTING GRADE 0.15%0.43% 351 LF OF 30" HDPE PIPE @ 0.12% SLOPE EXISTING DRAINAGE CROSSING, SEE SHEET PP10 PROPOSED GRADE, 1-FOOT MIN. COVER OVER PIPE 24-INCH PARSHALL FLUME, 1-FOOT DROP ON DOWNSTREAM SIDE (MIN.) FRESNO 30" X 30" SERIES 8200 FABRICATED SLIDE GATE VOID FILLED RIPRAP (D50 = 12",) 2' THICK CONCRETE SPLITTER STRUCTURE, SEE SHEET XS02 STA: 5+49.62 INV EL: 5898.28 STA: 5+44.95 INV EL: 5898.28 STA: 5+12.59 INV EL: 5897.00 STA: 5+22.51 INV EL: 5898.25 MATCH EXISTING DITCH THALWEG STA: 4+32.28 INV EL: 5896.66 INSTALL TURNOUT STRUCTURE, SEE SHEET DT03 STA: 8+56.35 INV EL: 5898.65 PIPE SUPPORTS VOID-FILLED RIPRAP (D50 = 18"), 3' THICK STEEL PIPE ENCASEMENT, SEE SHEET PP10 CLEANOUT STA: 8+32.30 CAP EL: 5902.43 CLEANOUT STA: 6+82.31 CAP EL: 5902.26 JBH/DTL JBH/DTL SDS 4/26/2024 SHOWN MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 3-BUSINESS DAYS IN ADVANCE CENTER OF COLORADO OR CALL UTILITY NOTIFICATION 1-800-922-1987 811 CALL COLORADO NO.BY DATE COMMENTS SCALE DETAIL CHECK DESIGN Pl o t D a t e / T i m e : 0 4 / 2 5 / 2 0 2 4 , 0 8 : 2 1 : 1 7 P M ; G : \ W W E \ 2 1 1 - 0 2 0 \ 0 2 0 \ C A D \ 0 2 _ D W G S \ P P X X - D I T C H A N D M I S C P & P . D W G - P P 0 5 - P R O J 2 SHEET NO. JOB NO. REVISION NO. DATE DESCRIPTIONWRIGHT WATER ENGINEERS, INC. GLENWOOD SPRINGS, CO 81602 (970)945-7755 FAX(970)945-9210 818 COLORADO AVE. P.O. BOX 219 DRAFT NOT FOR CONSTRUCTION BID SET 4/26/2024 4/26/2024 211-020.020 ---- PP05 COMBINE RYDEN NO. 2 AND BENSON PIERSON NELSON DIVERSIONS RYDEN NO. 2 DITCH PLAN AND PROFILE 30 30 60 FT0 NORTH PLAN 0 3030 0 1515 VERTICALHORIZONTAL 60 FT 30 FT PROFILE MA T C H L I N E S T A . 9 + 0 0 , SE E S H E E T P P 0 5 D TS01 NOTES: 1.DITCH SHALL HAVE POSITIVE DRAINAGE THROUGH ALL REACHES. PROFILE AND SLOPE OF DITCH TO BE VERIFIED AND DOCUMENTED EVERY 300' AND AT ALL PIPE INLETS AND OUTLETS AND SHALL MEET +/- 0.1' TOLERANCE. SURVEY WORK SHALL BE PERFORMED BY LICENSED SURVEYOR. 2.EXACT LOCATION OF TURNOUTS TO BE LOCATED IN THE FIELD WITH ENGINEER. 3.CONTRACTOR TO COORDINATE WITH ENGINEER AND PIPE SUPPLIER ON ALIGNMENT, BENDS, AND LEAD TIME. CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR PIPE ALIGNMENT AND APPURTENANCES. 4.SOME MINOR VEGETATION REMOVAL AND GRADING MIGHT BE REQUIRED FOR PIPE INSTALLATION AND SHALL BE CONSIDERED INCIDENTAL TO INSTALLATION OF THE PIPE. ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ BENSON PIERSON NELSON PROPOSED DITCH CENTERLINE, SEE PROFILE BELOW 8+41 6+00 7+00 8+00 CONCRETE SPLITTER STRUCTURE, SEE SHEET XS02 58 7 5 588 0 5 8 8 5 5 8 9 0 5 8 7 6 5 8 7 7 5 8 7 8 587 9 588 1 5 8 8 2 5 8 8 3 5 8 8 4 5 8 8 6 5 8 8 7 5 8 8 8 5 8 8 9 58 9 1 58 9 2 58 9 3 58 9 4 BEND: 15.92°590 0 5900 30-INCH HDPE EXISTING DRAINAGE CROSSING, SEE SHEET PP10 45-DEGREE MITERED BEND WITH THRUST BLOCK 4: 1 3: 1 EL E V A T I O N , ( F T ) STA. (FT) BENSON PIERSON NELSON PROPOSED DITCH CENTERLINE PROFILE 5865 5870 5875 5880 5885 5890 5895 5900 5905 5910 5915 5920 5865 5870 5875 5880 5885 5890 5895 5900 5905 5910 5915 5920 5+00 6+00 7+00 8+00 8+32 MA T C H L I N E S T A . 5 + 0 0 , SE E S H E E T P P 0 7 19.25' OF 30" HDPE PIPE @ 7.60% 414.67' OF 3 0 " H D P E P I P E @ 7 . 6 0 % EXISTING GRADE FRESNO 30" X 30" SERIES 8200 FABRICATED SLIDE GATE CONCRETE SPLITTER STRUCTURE, SEE SHEET XS02 STA: 8+07.00 INV EL: 5898.28 STA: 8+02.34 INV EL: 5898.30 STA: 7+96.68 INV EL: 5892.97 45-DEGREE MITERED BEND WITH THRUST BLOCK STA: 7+77.43 INV EL: 5891.51 MATCH EXISTING GRADE STA: 7+89.68 EL: 5897.66 JBH/DTL JBH/DTL SDS 4/26/2024 SHOWN MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 3-BUSINESS DAYS IN ADVANCE CENTER OF COLORADO OR CALL UTILITY NOTIFICATION 1-800-922-1987 811 CALL COLORADO NO.BY DATE COMMENTS SCALE DETAIL CHECK DESIGN Pl o t D a t e / T i m e : 0 4 / 2 5 / 2 0 2 4 , 0 8 : 2 1 : 3 7 P M ; G : \ W W E \ 2 1 1 - 0 2 0 \ 0 2 0 \ C A D \ 0 2 _ D W G S \ P P X X - D I T C H A N D M I S C P & P . D W G - P P 0 6 - P R O J 2 SHEET NO. JOB NO. REVISION NO. DATE DESCRIPTIONWRIGHT WATER ENGINEERS, INC. GLENWOOD SPRINGS, CO 81602 (970)945-7755 FAX(970)945-9210 818 COLORADO AVE. P.O. BOX 219 DRAFT NOT FOR CONSTRUCTION BID SET 4/26/2024 4/26/2024 211-020.020 ---- PP06 BENSON PIERSON NELSON DITCH PLAN AND PROFILE 20 40 FT200 NORTH PLAN 0 1010 0 55 VERTICALHORIZONTAL 20 FT 10 FT PROFILE MA T C H L I N E S T A . 5 + 0 0 , SE E S H E E T P P 0 7 COMBINE RYDEN NO. 2 AND BENSON PIERSON NELSON DIVERSIONS NOTES: 1.DITCH SHALL HAVE POSITIVE DRAINAGE THROUGH ALL REACHES. PROFILE AND SLOPE OF DITCH TO BE VERIFIED AND DOCUMENTED EVERY 300' AND AT ALL PIPE INLETS AND OUTLETS AND SHALL MEET +/- 0.1' TOLERANCE. SURVEY WORK SHALL BE PERFORMED BY LICENSED SURVEYOR. 2.REVEGETATION THROUGH FIELD TO BE COORDINATED WITH ENGINEER AND RANCH OWNER ON SPECIFIC SEED TYPE. 3.CONTRACTOR TO COORDINATE WITH ENGINEER AND PIPE SUPPLIER ON ALIGNMENT, BENDS, AND LEAD TIME. CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR PIPE ALIGNMENT AND APPURTENANCES. ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ x x x x x x x ^ ^ ^ x x ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ x x x x x x x x x x x x x x ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ D C O U N T Y R O A D 2 4 3 1 + 0 0 2 + 0 0 3+00 4+00 BENSON PIERSON NELSON PROPOSED DITCH CENTERLINE, SEE PROFILE BELOW VOID-FILLED RIPRAP (D50 = 12"), 2' THICK VOID-FILLED RIPRAP (D50 = 12") CHECK DAM TO LIMIT BACKWATER. CONTRACTOR TO PLACE RIPRAP AND COVER WITH DIRT REPLACE EXISTING PARSHALL FLUME WITH 24-INCH PARSHALL FLUME ADS FLAT TOP MH FLARED END SECTION WITH TRASH GUARD LIMIT OF IMPROVEMENTS STA: 2+24.59 N: 1661198.87 E: 2414279.09 REMOVE AND RESET FENCE 30-INCH HDPE PIPE 5860 5 8 6 5 5 8 7 0 5 8 7 5 58 6 1 5 8 6 2 5 8 6 3 5 8 6 4 5 8 6 6 5 8 6 7 5 8 6 8 5 8 6 9 5 8 7 1 5 8 7 2 5 8 7 3 5 8 7 4 5 8 7 6 5 8 7 7 5 8 7 8 5 8 6 5 5 8 7 0 5 8 6 6 5 8 6 7 5 8 6 8 5 8 6 9 5 8 7 1 5 8 7 2 5 8 7 3 585 8 586 0 586 1 5862 5 8 5 5 58 5 3 58 5 4 5 8 5 5 5 8 5 4 58 5 6 58 6 0 5860 5859 5 8 5 7 5 8 5 8 5 8 5 9 5 8 5 6 5 8 6 0 5 8 6 0 5859 5858 58 5 7 5856 5860 5 8 6 0 5 8 6 1 5 8 6 1 5 8 6 0 CONTRACTOR TO PROTECT AND MAINTAIN EXISTING DOWNSTREAM FLOW PATTEN IN PLACE EXISTING BENSON PIERSON NELSON DITCH EXISTING BENSON PIERSON NELSON (BPN) DITCH EL E V A T I O N , ( F T ) STA. (FT) BENSON PIERSON NELSON PROPOSED DITCH CENTERLINE PROFILE 5845 5850 5855 5860 5865 5870 5875 5880 5885 5890 5845 5850 5855 5860 5865 5870 5875 5880 5885 5890 1+00 2+00 3+00 4+00 5+00 EL E V A T I O N , ( F T ) COUNTY ROAD 243 ADS FLAT TOP MH STA: 3+62.77 RIM: 5864.31 INV IN: 5860.00 INV OUT: 5858.64 MA T C H L I N E S T A . 5 + 0 0 , SE E S H E E T P P 0 6 7' 13.17' 414.67' OF 3 0 " H D P E P I P E @ 7 . 6 0 % 75.26' OF 30" HDPE PIPE @ 0.42% EXISTING GRADE 0.11% 0.21% 2-FOOT MIN. COVER BENEATH ROADWAY, (TYP.) FLARED END SECTION WITH TRASH GUARD STA: 2+83.26 INV EL: 5858.21 PROPOSED GRADE 24-INCH PARSHALL FLUME, 1-FOOT DROP ON DOWNSTREAM SIDE (MIN.) VOID-FILLED RIPRAP (D50 = 12"), 2' THICK CONCRETE THRUST BLOCK MATCH EXISTING DITCH GRADE, SEE NOTES STA: 2+24.59 INV EL: 5857.00 STA: 2+38.79 INV EL: 5857.03 STA: 2+48.71 INV EL: 5858.28 MATCH EXISTING GRADE STA: 3+03.34 INV EL: 5862.00 JBH/DTL JBH/DTL SDS 4/26/2024 SHOWN MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 3-BUSINESS DAYS IN ADVANCE CENTER OF COLORADO OR CALL UTILITY NOTIFICATION 1-800-922-1987 811 CALL COLORADO NO.BY DATE COMMENTS SCALE DETAIL CHECK DESIGN Pl o t D a t e / T i m e : 0 4 / 2 5 / 2 0 2 4 , 0 8 : 2 1 : 5 4 P M ; G : \ W W E \ 2 1 1 - 0 2 0 \ 0 2 0 \ C A D \ 0 2 _ D W G S \ P P X X - D I T C H A N D M I S C P & P . D W G - P P 0 7 - P R O J 2 SHEET NO. JOB NO. REVISION NO. DATE DESCRIPTIONWRIGHT WATER ENGINEERS, INC. GLENWOOD SPRINGS, CO 81602 (970)945-7755 FAX(970)945-9210 818 COLORADO AVE. P.O. BOX 219 DRAFT NOT FOR CONSTRUCTION BID SET 4/26/2024 4/26/2024 211-020.020 ---- PP07 BENSON PIERSON NELSON DITCH PLAN AND PROFILE 20 40 FT200 NORTH PLAN 0 2020 0 1010 VERTICALHORIZONTAL 40 FT 20 FT PROFILE MA T C H L I N E S T A . 5 + 0 0 , SE E S H E E T P P 0 6 COMBINE RYDEN NO. 2 AND BENSON PIERSON NELSON DIVERSIONS NOTES: 1.DITCH SHALL HAVE POSITIVE DRAINAGE THROUGH ALL REACHES. PROFILE AND SLOPE OF DITCH TO BE VERIFIED AND DOCUMENTED EVERY 300' AND AT ALL PIPE INLETS AND OUTLETS AND SHALL MEET +/- 0.1' TOLERANCE. SURVEY WORK SHALL BE PERFORMED BY LICENSED SURVEYOR. 2.THESE DESIGN PLANS SHOW IMPROVEMENTS TO DITCH STATION 2+24.59. DITCH OWNER RESPONSIBLE FOR MAINTENANCE AND ANY UPGRADES ASSOCIATED WITH DOWNSTREAM FLOW SPLIT. 3.REVEGETATION THROUGH FIELD TO BE COORDINATED WITH ENGINEER AND RANCH OWNER ON SPECIFIC SEED TYPE. 4.CONTRACTOR TO COORDINATE WITH ENGINEER AND PIPE SUPPLIER ON ALIGNMENT, BENDS, AND LEAD TIME. CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR PIPE ALIGNMENT AND APPURTENANCES. 5.CONTRACTOR TO RESTORE COUNTY ROAD 243 TO PRE-PROJECT CONDITIONS FOLLOWING CULVERT REPLACEMENT. 6.THIS PLAN MAY NOT SHOW ALL EXISTING UTILITIES. UNDERGROUND UTILITIES IN THE AREA OF CONSTRUCTION WILL NEED TO BE LOCATED BY THE CONTRACTOR. THE CONTRACTOR SHOULD ASSUME FULL RESPONSIBILITY FOR THE PROTECTION OF ALL UTILITIES. E TS01 ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ FL O W D R A I N A G E 1 FLO W RY D E N N O . 2 1+00 1+20 1+ 4 0 1+ 6 0 1+ 8 0 2+002+08 23 . 0 0 ' 23 . 0 0 ' VOID-FILLED RIPRAP (D50=18"), 3' THICK 30" HDPE PIPE FLARED END SECTION WITH TRASH GUARD EXISTING DRAINAGE 1 ALIGNMENT 24-INCH PARSHALL FLUME RYDEN NO. 2 PROPOSED DITCH CENTERLINE VOID FILLED RIPRAP (D50= 12"), 2' THICK STEEL PIPE SUPPORT VOID-FILLED RIPRAP (D50=12"), 2' THICK STEEL PIPE ENCASEMENT EXTENDING 3' BEYOND PIPE SUPPORTS STEEL PIPE SUPPORT, SEE DETAIL THIS SHEET 20 + 8 0 21 + 0 0 21 + 2 0 21 + 4 0 21+60 21+ 8 0 22 + 0 0 22 + 2 0 22 + 4 0 22 + 6 0 5 9 0 0 59 0 1 59 0 2 59 0 3 59 0 5 59 0 4 5 9 0 4 59 0 6 59 0 7 58 9 9 59 0 0 5 9 0 4 59 0 2 59 0 4 59 0 3 59 0 1 59 0 0 59 0 4 590 2 59 0 6 590 8 REVEGETATION: UPLAND SEED REVEGETATION: UPLAND SEED 2:1 2:1 2:1 2 : 1 3: 1 3:1 2: 1 2:1 3:1 2:1 2:1 2: 1 2:1 EL E V A T I O N , ( F T ) STA. (FT) RYDEN NO. 2 - EXISTING DRAINAGE CROSSING 1 PROFILE 5890 5895 5900 5905 5910 5890 5895 5900 5905 5910 1+00 1+50 2+00 25.1% 1.8% EXISTING GRADE STA: 1+72.54 EL: 5900.29 STA: 1+45.28 EL: 5898.54 STA: 1+67.09 EL: 5898.92 30" HDPE PIPE 4.20' VOID-FILLED RIPRAP (D50= 18"), 3' THICK PROPOSED GRADE MAINTAIN EXISTING THALWEG GRADE STEEL PIPE ENCASING EL E V A T I O N , ( F T ) STA. (FT) RYDEN NO. 2 - PROPOSED DITCH CENTERLINE - EXISTING DRAINAGE CROSSING 1 SECTION 5890 5895 5900 5905 5910 5915 5890 5895 5900 5905 5910 5915 21+25 21+50 22+00 22+25 APPROX. STEEL ENCASEMENT LENGTH 33' EXISTING GRADE STA: 21+92.94 EL: 5906.99 APPROX. 25' 7' STA: 21+74.00 EL: 5898.73 STA: 21+60.19 EL: 5903.43 STA: 21+52.42 EL: 5905.53 30" HDPE PIPE STA: 21+85.09 EL: 5903.13 PLACE ROCK TO TOP OF PIPE FOR APPROX. 3' ON EITHER SIDE OF DRAINAGE CROSSING 5' PROPOSED GRADESTEEL PIPE SUPPORTS, SEE DETAIL THIS SHEET VOID-FILLED RIPRAP (D50= 18", 3' THICK) VOID-FILLED RIPRAP (D50= 12"), 2' THICK FLARED END SECTION WITH TRASH GUARD ENCASE PIPE 3' BEYOND STEEL SUPPORT 2 H : 1 V 2H: 1 V JBH/DTL JBH/DTL SDS 4/26/2024 SHOWN MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 3-BUSINESS DAYS IN ADVANCE CENTER OF COLORADO OR CALL UTILITY NOTIFICATION 1-800-922-1987 811 CALL COLORADO NO.BY DATE COMMENTS SCALE DETAIL CHECK DESIGN Pl o t D a t e / T i m e : 0 4 / 2 5 / 2 0 2 4 , 0 8 : 2 3 : 1 5 P M ; G : \ W W E \ 2 1 1 - 0 2 0 \ 0 2 0 \ C A D \ 0 2 _ D W G S \ P P X X - P R O J E C T 2 D R A I N A G E C R O S S I N G S . D W G - P P 0 8 - P R O J 2 SHEET NO. JOB NO. REVISION NO. DATE DESCRIPTIONWRIGHT WATER ENGINEERS, INC. GLENWOOD SPRINGS, CO 81602 (970)945-7755 FAX(970)945-9210 818 COLORADO AVE. P.O. BOX 219 DRAFT NOT FOR CONSTRUCTION BID SET 4/26/2024 4/26/2024 211-020.020 ---- PP08 COMBINE RYDEN NO. 2 AND BENSON PIERSON NELSON DIVERSIONS RYDEN NO. 2 DRAINAGE CROSSINGS 10 10 20 FT0 NORTH PLAN 0 1010 0 55 VERTICALHORIZONTAL 20 FT 10 FT PROFILE 0 1010 0 55 VERTICALHORIZONTAL 20 FT 10 FT SECTION NOTES: 1.EXISTING THALWEG ALIGNMENT AND PROFILE TO BE MAINTAINED THROUGHOUT GRADED CHANNEL. 2.STEEL PIPE SUPPORTS TO BE DRIVEN 5 FEET BELOW DRAINAGE INVERT. 3.CONTRACTOR TO WELD STEEL PIPE SUPPORTS TO STEEL PIPE ENCASEMENT, STEEL ENCASEMENT SHOULD BE SIZED BASED ON 30" HDPE WITH 36" OUTSIDE DIAMETER. 4.CONTRACTOR SHALL CUT SEMICIRCLE IN PIPE SUPPORTS TO CRADLE STEEL ENCASEMENT. 5.CONTRACTOR TO PROVIDE SHOP DRAWINGS OF PIPE SUPPORTS. 6.STEEL PIPE SUPPORTS TO BE H-PILES OR CLOSED/CONCRETE-FILLED STEEL PIPE DRIVEN INTO THE GROUND. CONTRACTOR TO COORDINATE WITH ENGINEER ON FINAL DESIGN. 7.STEEL PIPE SUPPORTS SHALL BE DESIGNED TO HOLD LOAD OF STEEL PIPE ENCASEMENT AND 30" HDPE PIPE FLOWING FULL. APPROXIMATE WEIGHT IS 7,500 POUNDS. 8.CONTRACTOR SHALL SET HDPE PIPE SO THAT JOINTS ARE NOT LOCATED IN CLOSE PROXIMITY TO ENDS OF STEEL ENCASEMENT. KEY PLAN NORTH RY D E N N O . 2 DIT C H EL K C R E E K N.T.S DRAINAGE CROSSING 1 DRAINAGE CROSSING 2 DRAINAGE CROSSING 3 PIPE SUPPORT DETAIL DETAILED SECTION VIEW DETAILED PLAN VIEW STEEL ENCASEMENT PIPE 30" HDPE PIPE PROPOSED GRADE PROPOSED CHANNEL GRADE STEEL PIPE SUPPORTS, DESIGNED BY CONTRACTOR DISTANCE VARIES, SEE SECTION VIEW 5' (MIN.) WELD PIPE SUPPORTS TO STEEL PIPE STEEL ENCASEMENT PIPE 30" HDPE PIPE STEEL PIPE SUPPORTS, DESIGNED BY CONTRACTOR ENCASEMENT PIPE TO EXTEND 3' BEYOND STEEL PIPE SUPPORT, (MIN.) LENGTH VARIES, SEE PLAN ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ 590 0 59 0 0 5900 590 0 590 0 590 0 FLO W RY D E N N O . 2 1+ 0 0 1+ 2 0 1+ 4 0 1 + 6 0 1+8 0 2+0 0 2+ 2 0 2+ 3 9 F L O W D R A I N A G E 2 5 9 0 0 5 8 9 8 589 7 5900 589 7 58 9 9 5899 5 9 0 0 5 8 9 9 5 8 9 8 5 8 9 7 589 8 589 9 589 8 5899 58 9 9 589 8 5899 5898 5897 5 8 9 9 5 8 9 9 59 0 0 590 2 590 1 590 0 589 9 59 0 2 59 0 1 58 9 8 5 8 9 8 5897 5 9 0 1 5 9 0 2 7.42' 10.19' 30" HDPE PIPE EXISTING DRAINAGE 2 ALIGNMENT RYDEN NO. 2 PROPOSED DITCH CENTERLINE VOID-FILLED RIPRAP (D50= 18"), 3' THICK STEEL PIPE SUPPORTS, SEE DETAIL ON SHEET PP08 STEEL PIPE ENCASEMENT EXTENDING 3' BEYOND PIPE SUPPORTS 8+4 0 8+6 0 8+8 0 9+ 0 0 9+ 2 0 9+ 4 0 9+6 0 9+8 0 10+ 0 0 10+ 2 0 10+ 4 0 REVEGETATION: UPLAND SEED REVEGETATION: UPLAND SEED 2 : 1 2 : 1 2: 1 2 : 1 2 : 1 3:1 3: 1 EL E V A T I O N , ( F T ) STA. (FT) RYDEN NO. 2 - EXISTING DRAINAGE CROSSING 2 PROFILE 5890 5895 5900 5905 5910 5890 5895 5900 5905 5910 1+25 1+50 2+00 2+25 0.2% 25.0% EXISTING GRADE APPROX. EXISTING GRADE STA: 2+19.13 EL: 5900.73 STA: 1+97.81 EL: 5896.65 STA: 2+02.85 EL: 5896.66 STA: 1+77.81 EL: 5896.61 30" HDPE PIPE 2.00' STA: 1+39.57 EL: 5896.53 PROPOSED GRADE VOID FILLED RIPRAP (D50= 18"), 3' THICK STEEL PIPE ENCASING EL E V A T I O N , ( F T ) STA. (FT) RYDEN NO. 2 - PROPOSED DITCH CENTERLINE - EXISTING DRAINAGE CROSSING 2 SECTION 5890 5895 5900 5905 5910 5915 5890 5895 5900 5905 5910 5915 8+75 9+00 9+50 9+75 PLACE ROCK TO TOP OF PIPE FOR APPROX. 3' ON EITHER SIDE OF DRAINAGE CROSSING EXISTING GRADE STA: 9+42.79 EL: 5902.56 STA: 9+14.24 EL: 5902.52 APPROX. 20' 5' APPROX. STEEL ENCASEMENT LENGTH 28' STA: 9+38.57 EL: 5900.05 STA: 9+18.57 EL: 5900.05 STA: 9+29.94 EL: 5896.64 30" HDPE PIPE PROPOSED GRADE STEEL PIPE SUPPORTS, SEE DETAIL ON SHEET PP08 VOID-FILLED RIPRAP (D50= 18"), 3' THICK 2 H : 1 V 2H: 1 V 5' JBH/DTL JBH/DTL SDS 4/26/2024 SHOWN MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 3-BUSINESS DAYS IN ADVANCE CENTER OF COLORADO OR CALL UTILITY NOTIFICATION 1-800-922-1987 811 CALL COLORADO NO.BY DATE COMMENTS SCALE DETAIL CHECK DESIGN Pl o t D a t e / T i m e : 0 4 / 2 5 / 2 0 2 4 , 0 8 : 2 3 : 2 5 P M ; G : \ W W E \ 2 1 1 - 0 2 0 \ 0 2 0 \ C A D \ 0 2 _ D W G S \ P P X X - P R O J E C T 2 D R A I N A G E C R O S S I N G S . D W G - P P 0 9 - P R O J 2 SHEET NO. JOB NO. REVISION NO. DATE DESCRIPTIONWRIGHT WATER ENGINEERS, INC. GLENWOOD SPRINGS, CO 81602 (970)945-7755 FAX(970)945-9210 818 COLORADO AVE. P.O. BOX 219 DRAFT NOT FOR CONSTRUCTION BID SET 4/26/2024 4/26/2024 211-020.020 ---- PP09 COMBINE RYDEN NO. 2 AND BENSON PIERSON NELSON DIVERSIONS RYDEN NO. 2 DRAINAGE CROSSINGS 10 10 20 FT0 NORTH PLAN 0 1010 0 55 VERTICALHORIZONTAL 20 FT 10 FT PROFILE 0 1010 0 55 VERTICALHORIZONTAL 20 FT 10 FT SECTION RY D E N N O . 2 DIT C H EL K C R E E K N.T.S KEY PLAN NORTH DRAINAGE CROSSING 1 DRAINAGE CROSSING 2 DRAINAGE CROSSING 3 NOTES: 1.EXISTING THALWEG ALIGNMENT AND PROFILE TO BE MAINTAINED THROUGHOUT GRADED CHANNEL. 2.STEEL PIPE SUPPORTS TO BE DRIVEN 5 FEET BELOW DRAINAGE INVERT. 3.CONTRACTOR TO WELD STEEL PIPE SUPPORTS TO STEEL PIPE ENCASEMENT, STEEL ENCASEMENT SHOULD BE SIZED BASED ON 30" HDPE WITH 36" OUTSIDE DIAMETER. 4.CONTRACTOR SHALL CUT SEMICIRCLE IN PIPE SUPPORTS TO CRADLE STEEL ENCASEMENT. 5.CONTRACTOR TO PROVIDE SHOP DRAWINGS OF PIPE SUPPORTS. 6.STEEL PIPE SUPPORTS TO BE H-PILES OR CLOSED/CONCRETE-FILLED STEEL PIPE DRIVEN INTO THE GROUND. CONTRACTOR TO COORDINATE WITH ENGINEER ON FINAL DESIGN. 7.STEEL PIPE SUPPORTS SHALL BE DESIGNED TO HOLD LOAD OF STEEL PIPE ENCASEMENT AND 30" HDPE PIPE FLOWING FULL. APPROXIMATE WEIGHT IS 6,000 POUNDS. 8.CONTRACTOR SHALL SET HDPE PIPE SO THAT JOINTS ARE NOT LOCATED IN CLOSE PROXIMITY TO ENDS OF STEEL ENCASEMENT. ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ FL O W DR A I N A G E 3 FL O W RY D E N N O . 2 1 + 0 0 1 + 2 0 1+40 1+60 1+80 2 + 0 0 2+ 2 0 2+ 4 0 2+ 5 0 58 9 5 5 8 9 5 58 9 5 59 0 0 5899 5900 59 0 0 59 0 0 5 8 9 7 12.10' 11.65' 59 0 1 59 0 2 58 9 9 58 9 9 58 9 8 59 0 0 59 0 0 58 9 9 59 0 1 59 0 2 59 0 2 59 0 1 59 0 1 58 9 9 58 9 9 58 9 9 58 9 8 58 9 7 58 9 7 58 9 8 58 9 9 5896 58 9 8 58 9 7 589 4 589 3 589 2 58 9 1 58 9 8 58 9 7 58 9 6 58 9 5 58 9 4 58 9 8 5898 5897 589 6 5897 5 8 9 8 58 9 9 5 9 0 0 5 9 0 1 5 9 0 2 30" HDPE PIPE EXISTING DRAINAGE 3 ALIGNMENT RYDEN NO. 2 PROPOSED DITCH CENTERLINE CONCRETE SPLITTER STRUCTURE VOID-FILLED RIPRAP (D50 = 12"), 2' THICK PROPOSED CONNECTION TO EXISTING BENSON PIERSON NELSON DITCH, SEE SHEETS PP06 - PP07 24-INCH PARSHALL FLUME VOID-FILLED RIPRAP (D50 = 18"), 3' THICK STEEL PIPE SUPPORTS. SEE DETAIL ON SHEET PP08 STEEL PIPE ENCASEMENT EXTENDING 3' BEYOND PIPE SUPPORTS 5+ 2 0 5+ 4 0 5+ 6 0 5+ 8 0 6+ 0 0 6+ 2 0 6+ 4 0 6+ 6 0 6+ 8 0 7+ 0 0 REVEGETATION: UPLAND SEED REVEGETATION: UPLAND SEED 4:1 4:1 3:1 3: 1 2: 1 3:1 2:1 4:1 EL E V A T I O N , ( F T ) STA. (FT) RYDEN NO. 2 - EXISTING DRAINAGE CROSSING 3 PROFILE 5890 5895 5900 5905 5910 5890 5895 5900 5905 5910 1+50 2+00 2+50 25.0% 3.0% EXISTING GRADE STA: 2+28.46 EL: 5899.16 STA: 1+94.58 EL: 5894.83 STA: 2+13.37 EL: 5895.39 30" HDPE PIPE 3.00' PROPOSED GRADE VOID FILLED RIPRAP (D50= 18"), 3' THICK STEEL PIPE ENCASING EL E V A T I O N , ( F T ) STA. (FT) RYDEN NO. 2 - PROPOSED DITCH CENTERLINE - EXISTING DRAINAGE CROSSING 3 SECTION 5890 5895 5900 5905 5910 5915 5890 5895 5900 5905 5910 5915 5+50 6+00 6+50 EXISTING GRADE 5' APPROX. 25' APPROX. STEEL ENCASEMENT LENGTH 33' STA: 5+91.82 EL: 5902.16 STA: 6+24.45 EL: 5902.20 STA: 6+07.94 EL: 5895.27 STA: 6+20.69 EL: 5899.67 STA: 5+95.69 EL: 5899.67 PLACE ROCK TO TOP OF PIPE FOR APPROX. 3' ON EITHER SIDE OF DRAINAGE CROSSING VOID FILLED RIPRAP (D50= 18"), 3' THICK STEEL PIPE SUPPORTS, SEE DETAIL ON SHEET PP08 PROPOSED GRADE ENCASE PIPE 3' BEYOND STEEL SUPPORT 30" HDPE PIPE 2 H : 1 V 2H: 1 V JBH/DTL JBH/DTL SDS 4/26/2024 SHOWN MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 3-BUSINESS DAYS IN ADVANCE CENTER OF COLORADO OR CALL UTILITY NOTIFICATION 1-800-922-1987 811 CALL COLORADO NO.BY DATE COMMENTS SCALE DETAIL CHECK DESIGN Pl o t D a t e / T i m e : 0 4 / 2 5 / 2 0 2 4 , 0 8 : 2 3 : 3 7 P M ; G : \ W W E \ 2 1 1 - 0 2 0 \ 0 2 0 \ C A D \ 0 2 _ D W G S \ P P X X - P R O J E C T 2 D R A I N A G E C R O S S I N G S . D W G - P P 1 0 - P R O J 2 SHEET NO. JOB NO. REVISION NO. DATE DESCRIPTIONWRIGHT WATER ENGINEERS, INC. GLENWOOD SPRINGS, CO 81602 (970)945-7755 FAX(970)945-9210 818 COLORADO AVE. P.O. BOX 219 DRAFT NOT FOR CONSTRUCTION BID SET 4/26/2024 4/26/2024 211-020.020 ---- PP10 COMBINE RYDEN NO. 2 AND BENSON PIERSON NELSON DIVERSIONS RYDEN NO. 2 DRAINAGE CROSSINGS 10 10 20 FT0 NORTH PLAN 0 1010 0 55 VERTICALHORIZONTAL 20 FT 10 FT PROFILE 0 1010 0 55 VERTICALHORIZONTAL 20 FT 10 FT SECTION RY D E N N O . 2 DIT C H EL K C R E E K N.T.S KEY PLAN NORTH DRAINAGE CROSSING 1 DRAINAGE CROSSING 2 DRAINAGE CROSSING 3 NOTES: 1.EXISTING THALWEG ALIGNMENT AND PROFILE TO BE MAINTAINED THROUGHOUT GRADED CHANNEL. 2.STEEL PIPE SUPPORTS TO BE DRIVEN 5 FEET BELOW DRAINAGE INVERT. 3.CONTRACTOR TO WELD STEEL PIPE SUPPORTS TO STEEL PIPE ENCASEMENT, STEEL ENCASEMENT SHOULD BE SIZED BASED ON 30" HDPE WITH 36" OUTSIDE DIAMETER. 4.CONTRACTOR SHALL CUT SEMICIRCLE IN PIPE SUPPORTS TO CRADLE STEEL ENCASEMENT. 5.CONTRACTOR TO PROVIDE SHOP DRAWINGS OF PIPE SUPPORTS. 6.STEEL PIPE SUPPORTS TO BE H-PILES OR CLOSED/CONCRETE-FILLED STEEL PIPE DRIVEN INTO THE GROUND. CONTRACTOR TO COORDINATE WITH ENGINEER ON FINAL DESIGN. 7.STEEL PIPE SUPPORTS SHALL BE DESIGNED TO HOLD LOAD OF STEEL PIPE ENCASEMENT AND 30" HDPE PIPE FLOWING FULL. APPROXIMATE WEIGHT IS 7,500 POUNDS. 8.CONTRACTOR SHALL SET HDPE PIPE SO THAT JOINTS ARE NOT LOCATED IN CLOSE PROXIMITY TO ENDS OF STEEL ENCASEMENT. EL E V A T I O N , ( F T ) STA. (FT) RYDEN NO. 2 - BOULDER WALL CREST 5890 5895 5900 5905 5910 5915 5920 5890 5895 5900 5905 5910 5915 5920 0+90 1+00 2+00 2+30 EXISTING GRADE 2.0' 2.0' FOOTER, SEE STRUCTURAL MATCH EXISTING GRADE STA: 1+04.77 EL: 5912.0 STA: 1+12.92 EL: 5911.0 STA: 1+28.50 EL: 5904.5 STA: 1+31.50 EL: 5904.5 STA: 1+39.50 EL: 5911.0 STA: 1+62.50 EL: 5908.0 STA: 1+63.50 EL: 5909.0 STA: 1+66.15 EL: 5909.0 STA: 1+82.83 EL: 5907.2 STA: 1+86.85 EL: 5906.0 STA: 1+91.90 EL: 5905.5 STA: 1+96.95 EL: 5906.0 STA: 2+00.98 EL: 5907.2 MATCH EXISTING GRADE STA: 2+16.57 EL: 5908.0 STA: 1+42.52 EL: 5908.0 STA: 1+65.92 EL: 5896.0 STA: 1+12.92 EL: 5896.0 PROPOSED GRADE BOULDERS STREAM SUBSTRATE (D50 = 18") LARGER BOULDERS TO BE USED AT LOW FLOW CHANNEL CONCRETE WALL SHOWN SUPERIMPOSED, SEE SECTION THIS SHEET BACKFILL WITH VOID-FILLED RIPRAP (D50 = 18") O E O E O E O E O E O E O E w w w w w w w w w w w w w w w w w ww w wwwwwww w O E O E O E ELK C R E E K FLOW 5906 59075908 590 7 5908 5 9 0 7 5 9 0 6 59 0 6 5 9 0 7 5906 5907 5908 5909 5910 5907 5906 5905 5909 5907 5904 5923 5922 5921 5920 5915 590 3 590 2 5900 59 0 0 5903 5902 590 1 590 1 590 2 5903 590 4 5907 5906 5905 5 9 0 4 590 5 5909 5 9 0 8 590 8 590 7 5906 5 9 0 6 5 9 0 5 5 9 0 6 5907 59 0 8 5 9 0 9 5 9 1 0 5915 5910 5909 5908 5907 5909 5908 5907 5906 5905 5904 5910 5910 5911 5 9 0 5 5 9 0 5 REMOVABLE TRASH RACK AND FISH SCREEN STREAM SUBSTRATE (D50 = 18")BOULDERS CONTRACTOR TO GRADE SMOOTH AREA FOR MAINTENANCE ACCESS CONTRACTOR TO LIMIT DISTURBANCE TO GREATEST EXTENT POSSIBLE RYDEN NO. 2 - CONCRETE DIVERSION STRUCTURE WALL RYDEN NO. 2 - BOULDER WALL CREST 1+ 0 0 2+0 0 2+2 2 1 + 0 0 2+ 0 0 2+2 7 EL E V A T I O N , ( F T ) STA. (FT) RYDEN NO. 2 - CONCRETE DIVERSION STRUCTURE WALL 5890 5895 5900 5905 5910 5915 5920 5890 5895 5900 5905 5910 5915 5920 0+90 1+00 2+00 2+30 2 : 1 2: 1 1 : 1 6.6% EXISTING GRADE 10' 3.0' 2.0' 2.0' 4.0' FOOTER, SEE STRUCTURAL MATCH EXISTING GRADE STA: 1+05.00 EL: 5911.0 ST A : 1 + 1 9 . 1 5 AL I G N M E N T C H A N G E ST A : 1 + 2 7 . 3 6 AL I G N M E N T C H A N G E ST A : 1 + 3 7 . 6 5 AL I G N M E N T C H A N G E ST A : 1 + 7 6 . 5 1 AL I G N M E N T C H A N G E MATCH EXISTING GRADE STA: 2+11.79 EL: 5910.0 STA: 1+02.00 EL: 5911.0 STA: 1+02.00 EL: 5906.0 STA: 1+19.15 EL: 5896.0 STA: 1+96.79 EL: 5896.0 STA: 2+14.79 EL: 5905.0 STA: 2+14.79 EL: 5910.0 STA: 1+96.69 EL: 5909.0 STA: 1+73.94 EL: 5909.0 STA: 1+72.94 EL: 5908.0 STA: 1+52.94 EL: 5908.0 STA: 1+49.94 EL: 5911.0 STA: 1+86.30 EL: 5908.3 STA: 1+86.30 EL: 5904.3 DIVERSION INVERT STA: 1+34.36 EL: 5905.5 SEDIMENT SLUICE INVERT STA: 1+40.44 EL: 5904.5 REMOVABLE TRASH RACK AND FISH SCREEN CONCRETE BOULDER WALL SHOWN SUPERIMPOSED, SEE SECTION THIS SHEET JBH/DTL JBH/DTL SDS 4/26/2024 SHOWN MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 3-BUSINESS DAYS IN ADVANCE CENTER OF COLORADO OR CALL UTILITY NOTIFICATION 1-800-922-1987 811 CALL COLORADO NO.BY DATE COMMENTS SCALE DETAIL CHECK DESIGN Pl o t D a t e / T i m e : 0 4 / 2 5 / 2 0 2 4 , 0 8 : 2 5 : 1 8 P M ; G : \ W W E \ 2 1 1 - 0 2 0 \ 0 2 0 \ C A D \ 0 2 _ D W G S \ X S X X - S E C T I O N S . D W G - X S 0 1 - P R O J 2 SHEET NO. JOB NO. REVISION NO. DATE DESCRIPTIONWRIGHT WATER ENGINEERS, INC. GLENWOOD SPRINGS, CO 81602 (970)945-7755 FAX(970)945-9210 818 COLORADO AVE. P.O. BOX 219 DRAFT NOT FOR CONSTRUCTION BID SET 4/26/2024 4/26/2024 SECTIONS 211-020.020 ---- XS01 10 10 20 FT0 NORTH PLAN 0 1010 0 55 VERTICALHORIZONTAL 20 FT 10 FT PROFILE COMBINE RYDEN NO. 2 AND BENSON PIERSON NELSON DIVERSIONS A TS02 B TS02 NOTES: 1.SEE STRUCTURAL PLANS FOR DESIGN OF CONCRETE WALLS. 2.PLACEMENT OF ALL BOULDERS SHOULD BE REVIEWED AND ACCEPTED BY THE ENGINEER. BOULDERS PLACED WITHOUT ENGINEER APPROVAL ARE SUBJECT TO REMOVAL AND REPLACEMENT. 3.CONTRACTOR SHALL WORK IN CLOSE COORDINATION WITH ENGINEER ON IMPLEMENTATION OF PROPOSED CREST ELEVATION. CONTRACTOR SHALL VERIFY CREST ELEVATION WITH ENGINEER PRIOR TO CONSIDERING WORK COMPLETE. 4.CREST ELEVATION ONLY BE MODIFIED SLIGHTLY BUT TOP OF CREST ELEVATION SHALL BE ACHIEVED WITH BOULDERS AT THE TOP (I.E. NOT STREAM SUBSTRATE). 5.CONTRACTOR SHALL LIMIT WORK TO AREA NEEDED TO LIMIT DISTURBANCE. 6.STREAM SUBSTRATE SHALL BE USED AS BASE FOR BOULDERS AND TO FILL ANNULAR SPACES TO ACHIEVE GRADE AT TOP OF BOULDER OR BEDDING. CONTRACTOR TO COORDINATE WITH ENGINEER AS NEEDED. 7.ALL VOIDS BETWEEN BOULDERS SHALL BE BACKFILLED WITH STREAM SUBSTRATE. ROCK SHALL BE COMPACTED WITH AN EXCAVATOR BUCKET OR EQUIVALENT AND WASHED IN TO CREATE AN INTERLOCKING MASS OF BOULDERS AND STREAM SUBSTRATE. ^^^^^^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^^^^ HDPE PIPE HDPE PIPE 5898 5899 5900 5901 5902 58995900 5899 5900 5900 5899 5898 5895 589 4 5896 5897 5895 5894 5896 5897 5898 RYDEN NO. 2 SPLITTER SECTION A RYDEN NO. 2 SPLITTER SECTION B CONCRETE SPLITTER STRUCTURE VOID-FILLED RIPRAP (D50=12"), 2' THICK OPEN DITCH DOWNSTREAM OF SPLITTER BOX FRESNO 30" X 30" SERIES 8200 FABRICATED SLIDE GATE FRESNO 36" X 36" SERIES 8200 FABRICATED SLIDE GATE 1 + 0 0 1 + 4 5 1+00 1+30 EL E V A T I O N , ( F T ) STA. (FT) RYDEN NO. 2 SPLITTER SECTION A 5880 5885 5890 5895 5900 5905 5910 5880 5885 5890 5895 5900 5905 5910 1+00 1+50 EL E V A T I O N , ( F T ) STA. (FT) RYDEN NO. 2 SPLITTER SECTION B 5880 5885 5890 5895 5900 5905 5910 5880 5885 5890 5895 5900 5905 5910 1+00 1+40 13.68' OF 30" HDPE PIPE @ 0.12% 0.2%EXISTING GRADE EXISTING GRADE 30"30" MATCH EXISTING GRADE STA: 1+08.65± EL: 5902.6± STA: 1+11.67 EL: 5902.1 STA: 1+12.67 EL: 5902.1 STA: 1+17.33 EL: 5902.1 STA: 1+18.33 EL: 5902.1 STA: 1+22.99 EL: 5902.1 STA: 1+23.99 EL: 5902.1 STA: 1+23.99 EL: 5891.0 STA: 1+22.99 EL: 5892.0 STA: 1+18.33 EL: 5892.0 STA: 1+17.33 EL: 5891.0 STA: 1+17.33 EL: 5896.8 STA: 1+11.67 EL: 5896.8 STA: 1+12.67 EL: 5897.8 STA: 1+17.33 EL: 5897.8 INV EL: 5892.97 INV EL: 5898.30 INV EL: 5898.30 INV EL: 5898.28 INV EL: 5898.28 INV EL: 5898.28 STA: 1+11.67 EL: 5902.1 STA: 1+12.67 EL: 5902.1 STA: 1+17.33 EL: 5902.1 STA: 1+18.33 EL: 5902.1 STA: 1+18.33 EL: 5896.8 STA: 1+18.33 EL: 5891.0 STA: 1+11.67 EL: 5891.0 STA: 1+11.67 EL: 5896.8 FRESNO 30" X 30" SERIES 8200 FABRICATED SLIDE GATE PROPOSED GRADE PROPOSED GRADE LIMITS OF GROUND SURVEY MANHOLE STEP, (TYP.) VOID-FILLED RIPRAP (D50 = 12"), 2' THICK AND 5' LONG GRATE CONCRETE SHOWN SUPERIMPOSED FOR REFERENCE, SEE SECTION A FRESNO 30" X 30" SERIES 8200 FABRICATED SLIDE GATE GRATE JBH/DTL JBH/DTL SDS 4/26/2024 SHOWN MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 3-BUSINESS DAYS IN ADVANCE CENTER OF COLORADO OR CALL UTILITY NOTIFICATION 1-800-922-1987 811 CALL COLORADO NO.BY DATE COMMENTS SCALE DETAIL CHECK DESIGN Pl o t D a t e / T i m e : 0 4 / 2 5 / 2 0 2 4 , 0 8 : 2 5 : 3 5 P M ; G : \ W W E \ 2 1 1 - 0 2 0 \ 0 2 0 \ C A D \ 0 2 _ D W G S \ X S X X - S E C T I O N S . D W G - X S 0 2 - P R O J 2 SHEET NO. JOB NO. REVISION NO. DATE DESCRIPTIONWRIGHT WATER ENGINEERS, INC. GLENWOOD SPRINGS, CO 81602 (970)945-7755 FAX(970)945-9210 818 COLORADO AVE. P.O. BOX 219 DRAFT NOT FOR CONSTRUCTION BID SET 4/26/2024 4/26/2024 SECTIONS 211-020.020 ---- XS02 COMBINE RYDEN NO. 2 AND BENSON PIERSON NELSON DIVERSIONS 0 5 10 FT5 NORTH PLAN 0 0 VERTICALHORIZONTAL 55 2.52.510 FT 5 FT PROFILE NOTES: 1.SEE STRUCTURAL PLANS FOR DESIGN OF CONCRETE FLOW SPLITTER STRUCTURES. ^^^^^^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^^^^ STANDARD 60" CDOT CONCRETE MANHOLE30" HDPE STRAIGHT ALIGNMENT TO EXISTING DITCH 5' SECTION OF 30" STEEL PIPE RYDEN NO. 2 SPLITTER SECTION A RYDEN NO. 2 SPLITTER SECTION B CONCRETE SPLITTER STRUCTURE VOID-FILLED RIPRAP (D50=12"), 2' THICK OPEN DITCH DOWNSTREAM OF SPLITTER BOX FRESNO 30" X 30" SERIES 8200 FABRICATED SLIDE GATE FRESNO 36" X 36" SERIES 8200 FABRICATED SLIDE GATE 1 + 0 0 1 + 4 5 1+00 1+30 EL E V A T I O N , ( F T ) STA. (FT) RYDEN NO. 2 SPLITTER SECTION A 5880 5885 5890 5895 5900 5905 5910 5880 5885 5890 5895 5900 5905 5910 1+00 1+50 EXISTING GRADE 30" 1' COVER MATCH EXISTING GRADE STA: 1+08.65± EL: 5902.6± STA: 1+11.67 EL: 5902.1 STA: 1+12.67 EL: 5902.1 STA: 1+17.33 EL: 5902.1 STA: 1+18.33 EL: 5902.1 STA: 1+18.33 EL: 5896.8 STA: 1+11.67 EL: 5896.8 STA: 1+12.67 EL: 5897.8 STA: 1+17.33 EL: 5897.8 INV EL: 5898.30 INV EL: 5898.30 FRESNO 30" X 30" SERIES 8200 FABRICATED SLIDE GATE LIMITS OF GROUND SURVEY STANDARD 60" CDOT CONCRETE MANHOLE 30" HDPE TO EXISTING DITCH RETURN TO EXISTING GRADE 5' SECTION OF 30" STEEL PIPE FRESNO 36" X 36" SERIES 8200 FABRICATED SLIDE GATE JBH/DTL JBH/DTL SDS 4/26/2024 SHOWN MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 3-BUSINESS DAYS IN ADVANCE CENTER OF COLORADO OR CALL UTILITY NOTIFICATION 1-800-922-1987 811 CALL COLORADO NO.BY DATE COMMENTS SCALE DETAIL CHECK DESIGN Pl o t D a t e / T i m e : 0 4 / 2 5 / 2 0 2 4 , 0 8 : 2 5 : 4 7 P M ; G : \ W W E \ 2 1 1 - 0 2 0 \ 0 2 0 \ C A D \ 0 2 _ D W G S \ X S X X - S E C T I O N S . D W G - X S 0 3 - P R O J 2 SHEET NO. JOB NO. REVISION NO. DATE DESCRIPTIONWRIGHT WATER ENGINEERS, INC. GLENWOOD SPRINGS, CO 81602 (970)945-7755 FAX(970)945-9210 818 COLORADO AVE. P.O. BOX 219 DRAFT NOT FOR CONSTRUCTION BID SET 4/26/2024 4/26/2024 SPLITTER STRUCTURE BID ALTERNATE 211-020.020 ---- XS03 COMBINE RYDEN NO. 2 AND BENSON PIERSON NELSON DIVERSIONS 0 5 10 FT5 NORTH PLAN 0 0 VERTICALHORIZONTAL 55 2.52.510 FT 5 FT PROFILE NOTES: 1.SEE STRUCTURAL PLANS FOR DESIGN OF CONCRETE FLOW SPLITTER STRUCTURES.