Loading...
HomeMy WebLinkAboutOwners Reply-Scope of WorkCr? {,Pn7ba*(a, Ountr Colleen Wirth ve From: Sent: To: Subject: Follow Up Flag: Flag Status: Brad Mollman < BramcoLLC@Bramcollc.com > Monday, September 23,2024 4:25 AM Colleen Wirth Re: BLRE-O8-24-8874 - BRAMCO LLC pole barn is UNDER REVIEW Follow up Flagged You don't often get email from bramcollc@bramcollc.com. Learn why this is important Cotleen, Thank you for your questions regarding the barn. Ruth and I are currently out of town - out of the country actuatty untit Oct 1 . I apotogize for the stow response. l'm working from an iPad so I appreciate your patience if my response is messy. To answer your initiat question, we did have the structure designed to accommodate a habitabte tiving space in the western 1/3ot thestructure.Wedonotyethaveaftoorptanforthespace. Weareintheprocessof planningfor that. Our immediate need is the structure itsetf for a g/ farm equipment storage 1.b.)Yes witt be heate ome int ural S S AVA m a ut 50 feet east of the buitding as ref Iecte ivision drawi ngs 1 .c.LYes it witl be supptied with potable water. The wett for lot 6 is 65 feet away from the NE corner of the barn and is actualty piped to within 10 feet of the same corner. 1.d.) Yes. I witt send a rate ust compteted) septic desi n from Ca rla Ostberg in a second emai[ fottowing this one.ca on of the ptumbing witt be in U th re ftoor ptans and o usly before any slab work were to commence.Jhe barn area witl onty have a smatt bathroom with a utitity sink. 1.e.) Y_es it witt have power and tighrjn€-A2OO amp panel is present adjacent to the wetl and is supptied by an,+ existing Hoty Cross meter pedestat at the county road / driveway entrance. 1.f.) See 1.b. Above 1.s.) Yes -tikety not immediatety. We intend to use bat insulation not spray foam 1.h.)We have no immediate ptans for a re-spn system. f .i.) The barn itsetf (exctuding future ADU portion ) is s icatty and on and farm ul ment. 2.a.) The subdivision drawings include a driveway access to this property off of the county road, which was covered in the subdivision process. lt is currentty a gravet driveway with a gated entrance. We haven't had any discussion with Road & Bridge. 3.a.) Lots 2 & 3 have new owners and new residences. Lots 1 & 4 are under new ownership and homes are in design. We are stitt the owners of lots 5 & 6 as Bramco LLC. Att the Lots have a majority portion of the property stitt in irrigated agricutturat use. I believe that is your question? I hope l've helped here with my response. Our primary goat is to get the structure constructed and the roof on before winter, so we can get equipment out of the weather. Thank you for your hetp. Brad Mottman Bramco LLC aa \ N s- On Sep 19,2024, at 5:09 PM, Co[[een Wirth <cwirth@garfie[d-county.com> wrote: BLRE-O8-24-8874 apptication 563 CR 335 Riverview Ranch Lot 6 Courtesy Update for Brad and Ruth Mottman: l'm in process of reviewing your buitding apptication for the new structure at Riverview Ranch Lot 6. I want to be sure I'm apptying the correct code sections and pl,acing the correct stamps on your issued FIELD COPY. To ensure I do so, l'm requesting a written repty from the owner(s) to confirm a few of the project scope detail,s. Having a written record from the property owner in the permanent buitding fite is most hetpfut. frt ADtEtfr^Ttnl.t nt ltrcTtnl'tQ nl't at I rr hrlrA o^n rtE Alrh Dt Itt Fttttr^ I tcE. 1. The buil,ding appl,ication form states "pote barn form farm equipment and storage". The accompanying subsoiI study prepared by Kumar & Associates says investigation was for a "barn / ADU". lnasmuch as there is no submitted ftoor ptans depicting proposed room use(s) in the received btueprints, may I ptease confirm 1.a. current project is for farm equipment and storage use(s) onty, correct? Not for proposed ha bita ble tivi ng, cooki ng,"stee pi ng faei Lities, correct? 1 .b. witt the enctosed structure be heated? 1.c. witt the enctosed structure have potabte water supp[ied? 1 .d. witt any ptumbing drain waste and vent piping for future connection(s) to a private on-site wastewater treatment system be instatted or roughed-into the barn sLab? 1.e. wil,t the structure have etectric power and tighting? 1 .f. witt the structure have any connection to natural gas or propane? 1.g. witt the enctosed structure be insutated, if so, please expound. 1.h. Do owners intend to votuntarily instal,l, a fire-sprinkter system in the buitding? f .i. ls the enctosed pote barn intended for any use other than private agricutturaI use by the tot 6 owners? 2. Does the property have an existing driveway? 2.a.lt proposing to instat[ a new drive or create modifications to an existing access !rl- A---I:^l-l A^---^r-- h^--t O h,-:l'^IO lne Slte, nave OWnerS Oeerl lf l Cofllfllutlluatloll Wltll \rallletu UUullty nuilu 6. Dtluge regarding a new driveway permit or driveway exemption letter? Separate permit may not appty to your project scope - however, if you shoutd happen to have any recent paperwork from Garfie[d County Road & Bridge, that woutd be usefuI for me to soan into your fite materiats. 2 3. Looking at Garfietd County GIS Land Exptorer and County Assessor Property Records for this physicat address location, I believe the lot is currently vacant with irrigated agricul,turat Land and new current residential. dwel.l.ings on the property. ls that stitt accurate today? Many thanks for your care and attention to answer the buitding scope questions. The rest of the structurat and zoning comptiance review is going rather wett; I have no corrections on the structuraI engineered stamped drawings atthis time. Thankyou! Cordiatty, Golleen Wirth Buitding Plans Examiner Garfietd County Community Development 108 8th Street, Suite 401 (970) 945-1 377 ext 1 61 0 cwi rth@ga rf ie [d-cou nty.com 3