Brad Mollman < BramcoLLC@Bramcollc.com >
Monday, September 23,2024 4:25 AM
Colleen Wirth
Re: BLRE-O8-24-8874 - BRAMCO LLC pole barn is UNDER REVIEW
Follow up
Flagged
You don't often get email from bramcollc@bramcollc.com. Learn why this is important
Cotleen,
Thank you for your questions regarding the barn. Ruth and I are currently out of town - out of the country actuatty
untit Oct 1 . I apotogize for the stow response. l'm working from an iPad so I appreciate your patience if my
response is messy.
To answer your initiat question, we did have the structure designed to accommodate a habitabte tiving space in the
western 1/3ot thestructure.Wedonotyethaveaftoorptanforthespace. Weareintheprocessof planningfor
that. Our immediate need is the structure itsetf for a g/ farm equipment storage
1.b.)Yes witt be heate ome int ural S S AVA m a ut 50 feet east of the buitding as
ref Iecte ivision drawi ngs
1 .c.LYes it witl be supptied with potable water. The wett for lot 6 is 65 feet away from the NE corner of the barn and
is actualty piped to within 10 feet of the same corner.
1.d.) Yes. I witt send a rate ust compteted) septic desi n from Ca rla Ostberg in a second emai[ fottowing this
one.ca on of the ptumbing witt be in U th re ftoor ptans and o usly before any slab work were
to commence.Jhe barn area witl onty have a smatt bathroom with a utitity sink.
1.e.) Y_es it witt have power and tighrjn€-A2OO amp panel is present adjacent to the wetl and is supptied by an,+
existing Hoty Cross meter pedestat at the county road / driveway entrance.
1.f.) See 1.b. Above
1.s.) Yes -tikety not immediatety. We intend to use bat insulation not spray foam
1.h.)We have no immediate ptans for a re-spn system.
f .i.) The barn itsetf (exctuding future ADU portion ) is s icatty and on
and farm ul ment.
2.a.) The subdivision drawings include a driveway access to this property off of the county road, which was
covered in the subdivision process. lt is currentty a gravet driveway with a gated entrance. We haven't had any
discussion with Road & Bridge.
3.a.) Lots 2 & 3 have new owners and new residences. Lots 1 & 4 are under new ownership and homes are in
design. We are stitt the owners of lots 5 & 6 as Bramco LLC. Att the Lots have a majority portion of the property stitt
in irrigated agricutturat use. I believe that is your question?
I hope l've helped here with my response. Our primary goat is to get the structure constructed and the roof on
before winter, so we can get equipment out of the weather.
Thank you for your hetp.
Brad Mottman
Bramco LLC
aa
\
N
s-
On Sep 19,2024, at 5:09 PM, Co[[een Wirth <cwirth@garfie[d-county.com> wrote:
BLRE-O8-24-8874 apptication 563 CR 335 Riverview Ranch
Lot 6
Courtesy Update for Brad and Ruth Mottman:
l'm in process of reviewing your buitding apptication for the new structure at Riverview
Ranch Lot 6. I want to be sure I'm apptying the correct code sections and pl,acing the
correct stamps on your issued FIELD COPY. To ensure I do so, l'm requesting a written
repty from the owner(s) to confirm a few of the project scope detail,s. Having a written
record from the property owner in the permanent buitding fite is most hetpfut.
frt ADtEtfr^Ttnl.t nt ltrcTtnl'tQ nl't at I rr hrlrA o^n rtE Alrh Dt Itt Fttttr^ I tcE.
1. The buil,ding appl,ication form states "pote barn form farm equipment and
storage". The accompanying subsoiI study prepared by Kumar & Associates says
investigation was for a "barn / ADU". lnasmuch as there is no submitted ftoor
ptans depicting proposed room use(s) in the received btueprints, may I ptease
confirm
1.a. current project is for farm equipment and storage use(s) onty, correct? Not for
proposed ha bita ble tivi ng, cooki ng,"stee pi ng faei Lities, correct?
1 .b. witt the enctosed structure be heated?
1.c. witt the enctosed structure have potabte water supp[ied?
1 .d. witt any ptumbing drain waste and vent piping for future connection(s) to a
private on-site wastewater treatment system be instatted or roughed-into the barn
sLab?
1.e. wil,t the structure have etectric power and tighting?
1 .f. witt the structure have any connection to natural gas or propane?
1.g. witt the enctosed structure be insutated, if so, please expound.
1.h. Do owners intend to votuntarily instal,l, a fire-sprinkter system in the buitding?
f .i. ls the enctosed pote barn intended for any use other than private agricutturaI
use by the tot 6 owners?
2. Does the property have an existing driveway?
2.a.lt proposing to instat[ a new drive or create modifications to an existing access
!rl- A---I:^l-l A^---^r-- h^--t O h,-:l'^IO lne Slte, nave OWnerS Oeerl lf l Cofllfllutlluatloll Wltll \rallletu UUullty nuilu 6. Dtluge
regarding a new driveway permit or driveway exemption letter? Separate permit
may not appty to your project scope - however, if you shoutd happen to have any
recent paperwork from Garfie[d County Road & Bridge, that woutd be usefuI for me
to soan into your fite materiats.
2
3. Looking at Garfietd County GIS Land Exptorer and County Assessor Property
Records for this physicat address location, I believe the lot is currently vacant with
irrigated agricul,turat Land and new current residential. dwel.l.ings on the property. ls
that stitt accurate today?
Many thanks for your care and attention to answer the buitding scope questions. The rest of the
structurat and zoning comptiance review is going rather wett; I have no corrections on the
structuraI engineered stamped drawings atthis time. Thankyou!
Cordiatty,
Golleen Wirth
Buitding Plans Examiner
Garfietd County Community Development
108 8th Street, Suite 401
(970) 945-1 377 ext 1 61 0
cwi rth@ga rf ie [d-cou nty.com