Loading...
HomeMy WebLinkAbout1.00 General Application Materials Siting and Land Rights 1800 Larimer Street Denver, CO 80202 September 16, 2024 Sent via email to ghartmann@garfield-county.com and regular mail Glenn Hartmann, Director of Community Development 108 8th Street, Suite 401 Glenwood Springs, CO 81601 RE: McLin Yard – Temporary Use Permit Application Submittal Dear Mr. Hartmann: Public Service Company of Colorado (PSCo), a Colorado corporation conducting business as Xcel Energy, is seeking approval of a Temporary Use Permit (TUP) for the McLin Yard (Yard) from Garfield County, Colorado for the delivery, storage, and distribution of materials to support the 6584 Transmission Line Rebuild Project (Mitchell Creek to Rifle Ute Substations). Xcel Energy will be rebuilding the existing 69 kilovolt (kV) 6584 transmission line from Mitchell Creek Substation to Rifle Ute Substation in Garfield County, Colorado (Project). The Project is located on Bureau of Land Management (BLM) and private land located in Garfield County, City of Glenwood Springs, Town of New Castle, and City of Rifle. Permits required for the Project will be acquired through these entities prior to construction. A Garfield County Location and Extent (L&E) Review application was approved for the portions of the Project located in Garfield County in July 2024. The TUP application applies to utilization of the Yard as a material storage and fly yard. Project representatives met with County Staff on December 6, 2023, for the Pre-Application Conference where PSCo provided information about the Yard and responded to questions from County representatives about the Yard. This TUP application has been prepared per the requirements outlined in the 2023 Pre- Application Conference summary, provided by Garfield County and complies with the Garfield County Land Use Development Code, Sections 4-120 and 7-1301. We look forward to working with you during the permit process. If you need any additional information, please contact me by telephone at (303) 285-6533 or email at Jennifer.L.Chester@XcelEnergy.com or contact Cory Miller at (303) 285-6765 or cory.r.miller@xcelenergy.com or our consultant Brooke Hines with Burns and McDonnell at (720) 592-3402 or email at bahines@burnsmcd.com. Sincerely, Jennifer Chester Xcel Energy Siting & Land Rights, Manager Telephone: (303) 285-6533 Jennifer.L.Chester@XcelEnergy.com TEMPORARY USE PERMIT APPLICATION Guidline Cpcn Word Document Title TEMPORARY USE PERMIT APPLICATION FOR MCLIN YARD GARFIELD COUN TY, COLORADO SEPTEMBER 2024 TEMPORARY USE PERMIT APPLICATION Requirement per Pre-Application Conference Summary Location in Application General Application Materials Application Form Section 2.1 Attachment A Payment of Fees and Payment Agreement Form Section 2.2 Attachment B Narrative Describing the Request Section 2.3 Letter of Authorization Not Applicable Proof of Ownership Section 2.4 Attachment C Recorded Statement of Authority Section 2.5 Attachment D Letter of Permission Section 2.6 Attachment C Names and addresses of property owners within 200 ft. Section 2.7 Attachment E Preapplication Summary Section 2.8 Attachment F Vicinity Map Section 3 Attachment G Description of Applicant Section 4 Temporary Use Description Section 5 Copy of All Previous Approvals Section 6 Impact Analysis Section 7 Compliance with Section 7-1301 Temporary Use Section 8 Attachment K Compliance with Article 7 Standards Section 9 Attachment K Waiver request from 4-202 Section 10 Waiver request from Article 7 Standards Section 10 Requirement per Section 4-120 of the Garfield County Code Location in Application Fees Section 2.2 Attachment B Description of Applicant Section 4 Applicant that is not the Property Owner Section 4.1 Temporary Use Description Section 5 Copy of Previous Relevant Approval Documents Section 6 Impact Analysis and Proposed Mitigation Section 7 Requirement per Section 4-203 of the Garfield County Code Location in Application Professional Qualifications Section 11 General Application Materials TEMPORARY USE PERMIT APPLICATION Application Form Section 2.1 Attachment A Ownership Section 2.4 Attachment C Adjacent Property Owners Section 2.7 Attachment E Fees Section 2.2 Attachment B Project Description Section 5 General Requirements for Maps and Plans Acknowledged Combination of Map and Plan Requirements Not Applicable Applications for Major Projects Not Applicable Vicinity Map Section 3 Attachment G Site Plan Attachment H Grading and Drainage Plan Grading Plan: Submitted Separately Drainage Memo: Attachment I Landscape Plan Landscape Plan: Not Applicable Revegetation Plan: Attachment M Impact Analysis Section 7 Rezoning Justification Report Not Applicable Statement of Appeal Acknowledged Development Agreement Acknowledged Improvements Agreement Not Applicable Traffic Study Section 5 Attachment K Water Supply and Distribution Plan Section 5 Attachment K Wastewater Management and System Plan Section 5 Attachment K Floodplain Analysis Attachment K TEMPORARY USE PERMIT APPLICATION i CONTENTS 1 INTRODUCTION ...................................................................................................... 4 1.1 Regulatory Framework .................................................................................... 4 2 GENERAL APPLICATION MATERIALS .................................................................. 6 2.1 Application Form ............................................................................................. 6 2.2 Application Fee and Payment Agreement Form .............................................. 6 2.3 Narrative Describing the Request ................................................................... 6 2.4 Proof of Ownership ......................................................................................... 6 2.5 Statement of Authority ..................................................................................... 6 2.6 Letter of Permission ........................................................................................ 6 2.7 Names and Addresses of Property Owners Within 200 Feet .......................... 7 2.8 Pre-application Conference Summary ............................................................ 7 3 VICINITY MAP .......................................................................................................... 7 4 DESCRIPTION OF THE APPLICANT ...................................................................... 7 4.1 Applicant That is Not the Property Owner ....................................................... 8 5 TEMPORARY USE DESCRIPTION ......................................................................... 8 5.1 Access Information ........................................................................................ 11 5.2 Duration and Timing of Use ........................................................................... 11 6 COPY OF PREVIOUS APPROVAL DOCUMENTS ................................................ 12 7 IMPACT ANALYSIS AND PROPOSED MITIGATION ............................................ 12 8 COMPLIANCE WITH ARTICLE 7 STANDARDS .................................................... 18 9 CONFORMANCE WITH REVIEW CRITERIA IN SECTION 4-120 ......................... 18 10 WAIVER REQUESTS ............................................................................................. 18 11 PROFESSIONAL QUALIFICATIONS ..................................................................... 18 12 BIBLIOGRAPHY ..................................................................................................... 18 TEMPORARY USE PERMIT APPLICATION ii TABLES Table 1-1: Summary of Land Use Permit Requirements Applicable to the McLin Yard ........................................................................................................... 5 Table 5-1: Approximate Daily Round Trips .......................................................... 10 Table 5-2: Anticipated Yard Schedule ................................................................. 12 Table 7-1: Anticipated Impacts and Mitigation ..................................................... 13 Table 11-1: Professional Qualifications ................................................................. 18 ATTACHMENTS ATTACHMENT A – LAND USE APPLICATION ATTACHMENT B – PAYMENT AGREEMENT FORM ATTACHMENT C – PROOF OF OWNERSHIP-TEMPORARY CONSTRUCTION EASEMENT ATTACHMENT D – STATEMENT OF AUTHORITY ATTACHMENT E – NAMES AND ADDRESSES OF PROPERTY OWNERS WITHIN 200 FEET AND MAP ATTACHMENT F – PRE-APPLICATION CONFERENCE SUMMARY ATTACHMENT G – VICINITY MAP ATTACHMENT H – SITE PLAN ATTACHMENT I – DRAINAGE MEMO ATTACHMENT J – HAUL ROUTE AND ACCESS AND FLIGHT PATH MAPBOOK ATTACHMENT K – COMPLIANCE WITH ARTICLE 7 STANDARDS ATTACHMENT L – COLORADO PARKS AND WILDLIFE COMMENT LETTER ATTACHMENT M – REVEGETATION PLAN TEMPORARY USE PERMIT APPLICATION iii LIST OF ACRONYMS AND ABBREVIATIONS Abbreviation Term/Phrase/Name BLM Bureau of Land Management BMPs Best Management Practices Code Garfield County Land Use and Development Code County Garfield County CPW Colorado Parks and Wildlife CR County Road CUP Conditional Use Permit FAA Federal Aviation Administration I Interstate kV kilovolt L&E Location and Extent Project Rebuild of the existing Mitchell Creek to Rifle Ute 69 kilovolt (kV) transmission line PSCo Public Service Company of Colorado, a Colorado corporation conducting business as Xcel Energy ROW Right-of-way easement SSA Stabilized Surface Area SWMP Stormwater Management Plan TCE Temporary Construction Easement TUP Temporary Use Permit VTC Vehicle Tracking Control TEMPORARY USE PERMIT APPLICATION 4 1 INTRODUCTION Public Service Company of Colorado (PSCo), a Colorado corporation conducting business as Xcel Energy, is requesting a Temporary Use Permit (TUP) for the McLin Yard in Garfield County, which Xcel Energy proposes to utilize for the delivery, storage, and distribution of materials to support the 6584 Transmission Line Rebuild Project (Mitchell Creek to Rifle Ute Substations). This TUP application also applies to Xcel Energy’s proposed utilization of the McLin Yard as a helicopter fly yard. Xcel Energy is proposing to rebuild the existing 69 kilovolt (kV) 6584 transmission line from Mitchell Creek Substation to Rifle Ute Substation in Garfield County, Colorado (Project). The Project is located on Bureau of Land Management (BLM) and private land located in Garfield County, City of Glenwood Springs, Town of New Castle, and City of Rifle. Permits required for the Project will be acquired through these entities prior to construction. A Location and Extent (L&E) permit was approved by Garfield County in July 2024 (LAEA-04-24-9018) for the portion of the Project located in Garfield County. Xcel Energy is requesting the temporary use of the McLin Yard to facilitate delivery, storage, and distribution of materials to support the Project. Ground access to the transmission line right-of-way (ROW) easement, from the McLin Yard, will be utilized where feasible. However, rugged terrain and limited vehicular access to the ROW easement requires Xcel Energy to complete portions of the Project using a small helicopter, such as a Huey or Blackhawk. Therefore, the McLin Yard will also be used as a fly yard for the helicopter to operate out of during construction. This TUP would service the portion of the 6584 Transmission Line between the Newcastle Substation and Rifle Ute Substation (Phase 1). Project representatives met with County staff at the Pre-Application Conference for the TUP, held on December 6, 2023. This request for a TUP was prepared per the requirements of Sections 4-120 and 7-1301 of the Garfield County Land Use and Development Code (Code). 1.1 REGULATORY FRAMEWORK Garfield County land use permit regulations apply to the proposed use of the McLin Yard for helicopter operations and material staging and delivery. A description of the regulatory requirement for the McLin Yard is provided in the following section and in Table 1-1. All required land use, environmental, and construction permits will be obtained prior to the start of and maintained during construction. Pursuant to the Garfield County Land Use and Development Code, this Garfield County TUP application is being submitted for temporary use of the McLin Yard located within unincorporated Garfield County. TEMPORARY USE PERMIT APPLICATION 5 Table 1-1: Summary of Land Use Permit Requirements Applicable to the McLin Yard Jurisdiction Title Trigger Regulatory Reference Status Garfield County Temporary Use Permit A use or activity that may be conducted for up to six (6) months so that it does not become a permanent use Garfield County Land Use and Development Code, Article 4-120 Xcel Energy is complying through this application. TEMPORARY USE PERMIT APPLICATION 6 2 GENERAL APPLICATION MATERIALS 2.1 Application Form The completed Land Use Application form is provided in Attachment A. 2.2 Application Fee and Payment Agreement Form The $250 planning review fee for the TUP Application will be paid upon receipt of an invoice. Attachment B contains the completed Payment Agreement Form. 2.3 Narrative Describing the Request Xcel Energy is requesting a TUP for the McLin Yard within County jurisdiction to support the construction of the Project. The Mclin Yard will be used as a temporary construction yard, a helicopter fly yard, and for material staging. This Yard will be used to stage construction equipment and materials including temporary construction trailers, cranes, and steel poles. This Yard is also necessary for construction crew parking and materials setup. At the end of the construction phase, all equipment will be removed from the McLin Yard, and it will be restored generally consistent with preconstruction conditions, as provided for in the easement agreement. Rutted and disturbed areas will be revegetated. Additional information regarding the McLin Yard use is included in Section 5 of this application. 2.4 Proof of Ownership Xcel Energy has secured an easement agreement with the property owner. A copy of this agreement is provided in Attachment C. 2.5 Statement of Authority A Statement of Authority is provided in Attachment D. 2.6 Letter of Permission The McLin Yard is located on Parcel Number 217913100554 in portions of S13-T6S- R92W and S18-T6S-R91W. The property owners, Brit C., and Sharon T. McLin, have agreed to lease 16 acres of the approximate 73-acre parcel to Xcel Energy for the temporary yard, including a helicopter landing zone. The signed and dated temporary construction easement (TCE) for the Yard is provided in Attachment C. The TCE includes the property owners’ contact information. Express landowner authorization is provided in the TCE, thus, no letter of consent signed by the landowner is included in this TUP application. TEMPORARY USE PERMIT APPLICATION 7 2.7 Names and Addresses of Property Owners Within 200 Feet Names and mailing addresses of surface property owners within a 200-foot radius of the parcel containing the proposed material storage and helicopter fly yard, as determined from the Garfield County Assessor’s records are provided in Attachment E along with a map showing the properties. A written notice by certified mail to the surface owners of record of all adjacent property within a 200-foot radius of the subject parcel will be sent by the applicant according to requirements in Section 4-120.A of the Code. Notice of the temporary use will also be posted in the form of signage on the property 15 days prior to the decision or hearing in accordance with Code Section 4-120.A. 2.8 Pre-application Conference Summary The Pre-Application Conference Summary is provided in Attachment F. 3 VICINITY MAP A Vicinity Map is provided in Attachment G. 4 DESCRIPTION OF THE APPLICANT Xcel Energy is a major U.S. regulated electric and natural gas delivery company that serves approximately 3.7 million electric and 2.1 million natural gas customers across parts of eight Midwestern and Western states. PSCo is a Colorado corporation conducting business as Xcel Energy. Contact information for Xcel Energy and Xcel Energy’s consultant, Burns & McDonnell, is provided below. Applicant Xcel Energy Jennifer Chester Manager, Siting & Land Rights 1800 Larimer Street, Suite 400 Denver, CO 80202 303-285-6533 Jennifer.L.Chester@XcelEnergy.com Consultant Burns & McDonnell Engineering Company, Inc. Brooke Hines Project Manager 9191 S. Jamaica Street TEMPORARY USE PERMIT APPLICATION 8 Englewood, CO 80112 720-592-3402 bahines@burnsmcd.com 4.1 Applicant That is Not the Property Owner Xcel Energy has secured an easement agreement with the property owner. The redacted and signed TCE for the Yard is provided in Attachment C. 5 TEMPORARY USE DESCRIPTION The McLin Yard, located in Garfield County, is situated on the east side of County Road (CR) 311, south of CR 335, and approximately 2 miles southeast of Silt, Colorado. The McLin Yard is located approximately 0.5 miles south of the existing 6584 Transmission Line. A Site Plan showing the layout of the equipment and vehicle traffic control (VTC) points is in Attachment H. The McLin Yard will be used for the delivery, storage, and distribution of materials to support the rebuild Project. Clearing of vegetation and grading will be necessary to level the approximate 2-acre stabilized surface area (SSA) (Attachment H). Best Management Practices (BMPs) will be implemented to control erosion and run-off, reducing stormwater-related impacts to nearby waterbodies. With implementation of BMPs, minimal impacts to existing drainage due to erosion and runoff would occur. A Drainage Memo is included in Attachment I. Any existing drainage structures such as culverts or ditches would be preserved and protected. No wastewater management or water supply will be needed during the proposed temporary use. Portable toilets, handwashing stations, and dumpsters that are contained will be placed in the McLin Yard for sanitation and the McLin Yard will be fenced for security. Wind erosion control BMPs including the application of water or other dust palliatives will be applied to control airborne dust emissions. A spill prevention and response plan will be implemented to prevent and control potential spills of hazardous materials such as fuels, transmission fluid, and petroleum products used in equipment and vehicles. Following completion of construction, Xcel Energy will remove all equipment and any leftover material and restore the McLin Yard generally consistent with preconstruction conditions, and as required by the easement agreement. Materials for the transmission line rebuild are anticipated to be delivered to the McLin Yard beginning in the fall of 2024. Xcel Energy requests that Garfield County accommodate the use period of the McLin Yard to trigger with a pre-construction meeting. Prior to and during construction, deliveries will be made to the McLin Yard from the existing Rising Tides Yard located in Mesa County. When construction begins in Fall 2024, these materials will be transported to certain locations along the ROW easement by flat-bed trucks or semi-trucks and a helicopter. The helicopter will travel to TEMPORARY USE PERMIT APPLICATION 9 and from the staging area to collect construction materials such as poles, conductor, and shield wire and in some cases to long-line crew members to areas that are inaccessible by vehicle. For approximately 30 to 45 days (at incremental periods) during construction, approximately 25 to 35 helicopter trips to and from the McLin Yard could be required each day. Trips leaving the staging area will be taking new materials to the ROW easement. Trips arriving at the staging area will be returning old materials from the ROW easement to be disposed of off-site. These helicopter trips will occur during the typical construction work week, 7 days per week and 12 hours per day. Helicopter activity in the immediate vicinity of the McLin Yard will be approximately 10 to 15 minutes per trip. The helicopter will be stored at the Rifle Airport daily with morning and evening flights from the airport to the Project site. The helicopter will be fueled at a nearby airport. A helicopter, crew truck, helicopter fuel truck and water truck/trailer will be located at the McLin Yard to support helicopter operations. A designated helicopter landing zone is shown in the Site Plan, provided as Attachment H. Any areas requiring helicopter construction methods will follow Federal Aviation Administration (FAA) safety requirements. Xcel Energy and their construction contractor will coordinate with the FAA and Garfield County during helicopter operations and obtain any necessary permits. Xcel Energy and the construction contractor will provide residents with prior notice should temporary evacuation be required. During construction, up to 20 vehicle trips (round trips) to and from the McLin Yard could be required each day. These deliveries will be by semi-truck or other delivery vehicle over the course of the six-month period during construction. Vehicles, equipment, and materials will also be parked and stored during the period of use. Equipment and materials to be stored in the McLin Yard will consist of small cranes, bucket trucks, replacement structure components, material pallets, conductor reels, and other transmission line materials and equipment required for the Project. Table 5-1 details the approximate daily roundtrips from the McLin Yard for each component of construction. TEMPORARY USE PERMIT APPLICATION 10 Table 5-1: Approximate Daily Round Trips Major Construction Tasks Approximate Construction Duration (Weeks) Approximate Daily Passenger Car Trips Approximate Daily Truck Trips by Vehicle Type Approximate Total Daily Roundtrips Approximate Daily Helicopter Trips Foundation Installation (~4 per day) 8 weeks 15 Flatbed trucks 5 Concrete trucks 28 48 25-35 Steel Pole Installation (~4 per day) 8 weeks 10 Flatbed and semi-trucks 10 Bucket trucks 3 Diggers 2 Cranes 2 20 25-35 Conductor/Optical Ground Wire 8 weeks 5 Semi-trucks 10 Crane 1 Aerial Lift 2 15 25-35 The following sections provide additional details regarding temporary use of the parcel for the McLin Yard TEMPORARY USE PERMIT APPLICATION 11 5.1 Access Information As shown on Attachment J, access to the Yard will be via CR 335 and CR 311. These roads will serve as haul routes to the McLin Yard. Private access from CR 311 is included in the authorization from the property owner for the temporary use on the subject parcel and Xcel Energy will secure an access permit from Garfield County, as required. Where road improvements are needed, Xcel Energy will secure the necessary permits to comply with Garfield County regulations including grading, stormwater, and erosion control permits. During construction of the Project, the helicopter will fly over some local roads in Garfield County including County 135, 311, 312, 314, and 315 and possibly other private roads depending on the helicopter flight path for construction of the Project. Some local road closures may be necessary. Traffic Control Plans will be assembled and provided to Garfield County Road and Bridge for approval. A figure showing the likely helicopter flight path is included in Attachment J. Final flight paths and traffic control plans will be based on the final selection and contracting of the helicopter vendor. A final fight plan and traffic control plan will be provided to Garfield County no less than two weeks before construction begins. Road closures will be intermittent and temporary and will occur when a helicopter crosses over the road while carrying material loads or crew members. Closure signage will be installed ahead of construction to notify road users. During construction, flaggers will control traffic based on ground-air communications and minimize closures for periods only necessary to safely cross the roadways. Typical closures will be less than 5-minutes per flight over the roadway. During construction, lane or road closures may be required to allow crews and vehicles to safely access the transmission line pole locations. When road closures are required, Xcel Energy will secure the necessary permits to comply with Garfield County regulations and will provide necessary traffic control plans to Garfield County. 5.2 Duration and Timing of Use Use of the McLin Yard associated with construction is anticipated to begin in the fall of 2024, pending permit approvals. Xcel Energy requests that the six-month duration for use of the Yard trigger upon completion of a pre-construction meeting to be held with County staff. Construction activities, including helicopter operations, are expected to be completed and the rebuild will be put into service by late 2025. Table 5-2 outlines the anticipated schedule for the McLin Yard. TEMPORARY USE PERMIT APPLICATION 12 Table 5-2: Anticipated Yard Schedule Timeline Activity October 2024 Material Deliveries to McLin Yard October 2024 Temporary Access Improvement and Vegetation Management pending a pre-construction meeting with Garfield County. To begin October into Fall 2024 Installation of New Poles To begin Late Fall 2024 Removal of Existing Line To begin Summer 2025 Restoration Late 2025 In Service 6 COPY OF PREVIOUS APPROVAL DOCUMENTS A L&E permit was approved by Garfield County in July 2024 (LAEA-04-24-9018) for the portion of the Project located in Garfield County. As of September 16, 2024, the L&E resolution has not been issued and therefore, a copy of the approval document is not included in this TUP application. 7 IMPACT ANALYSIS AND PROPOSED MITIGATION The McLin Yard is located on a parcel that is zoned Rural. Temporary uses, such as the McLin Yard, are allowed in any zone district pursuant to Section 3-401.D of the Code. Potential impacts resulting from use of the McLin Yard would be temporary and limited to the construction phase. A description of the potential short-term impacts of the McLin Yard to adjacent properties, infrastructure, and the environment and a description of how the impacts will be mitigated so the standards in Section 7-1301 of the Code will be met, is provided in Table 7.1. Additional details describing compliance with the Section 7-1301 standards are provided in Attachment K. TEMPORARY USE PERMIT APPLICATION 13 Table 7-1: Anticipated Impacts and Mitigation Topic Short-term Impacts Best Management Practices Air Quality Air emissions and low-level fugitive dust will occur from the use of mobile construction equipment as materials are delivered to and from the parcel. Dust will be controlled through the application of water to roads and the McLin Yard during activities. Biological Resources Increased noise and equipment movement during material deliveries may temporarily displace mobile wildlife species. Normal wildlife movements are expected to resume after the temporary use has been completed and disturbed areas have been restored in a manner generally similar to preconstruction conditions. If construction is scheduled to occur during raptor breeding season, raptor nest surveys will be conducted prior to construction to determine whether active nests are present near the parcel. Xcel Energy is coordinating with Colorado Parks and Wildlife (CPW) regarding strategies to avoid, minimize, and mitigate adverse effects to wildlife habitats. The comment letter received from CPW is provided in Attachment L. Cultural Resources Adverse impacts are not anticipated. The Unanticipated Discovery Plan for the Project will be followed if archaeological materials or human remains are discovered during use of the McLin Yard. Land Use Adverse impacts are not anticipated. Land use in the surrounding area includes rural residential areas, agricultural resource lands, agricultural production areas, and natural resource areas zoned as Rural. The proposed temporary use is compatible with the designated zoning. Noise Noise from the use of construction equipment and helicopter operations is expected. Construction vehicles and equipment will be maintained in proper operating condition and equipped with manufacturer’s standard noise TEMPORARY USE PERMIT APPLICATION 14 Topic Short-term Impacts Best Management Practices control devices (e.g., mufflers or engine enclosures). Noise will not exceed state noise standards pursuant to Colorado Revised Statutes, Article 12 of Title 25. Natural and Geologic Hazards Adverse impacts are not anticipated. The temporary use is not within any avalanche, landslide, rockfall or alluvial fan hazard areas, and steep slopes are absent. The parcel is free of corrosive or expansive soils and rock and no mudflow or fault areas are present. The temporary use is not anticipated to divert debris flow or floodwaters. Any land disturbed during construction will be restored in a manner generally similar to its condition prior to construction. In the rare event of a fire emergency, Xcel Energy will likely be aware of an issue before the general public or emergency responders. Nevertheless, the public is encouraged to contact Xcel Energy’s emergency number: 800-895-1999 with any concerns or in case of an emergency. Each construction vehicle will be equipped with fire mitigation tools, shovels, a pick axe, portable water cans and fire extinguishers. Additionally, a water truck will be located at the McLin Yard. Xcel Energy will coordinate closely with the local fire department and first responders and consult with them to discuss any concerns within their response area. Xcel Energy offers free online safety training to fire departments and first responders that is based on national standards TEMPORARY USE PERMIT APPLICATION 15 Topic Short-term Impacts Best Management Practices through its Responding to Utility Emergencies Program. Socioeconomic Adverse impacts are not anticipated. Given the relatively small size of the crews needed for construction and the temporary nature of the construction activities, no impacts to availability of public resources and services are anticipated. During construction, revenue may moderately increase for some local businesses, such as restaurants, gas stations, grocery stores, and hotels as well as other local businesses due to spending by Xcel Energy’s contractors or employees. Soils Soil disturbance will result from vegetation clearing and mobile construction equipment traveling to and from the parcel. Xcel Energy will manage any soil impacts on the parcel by strictly adhering to a CDPHE-regulated Stormwater Management Plan (SWMP) and will implement and maintain erosion and sediment control BMPs designed to protect soils and control erosion. Xcel Energy will secure the necessary permits to comply with Garfield County regulations including grading, stormwater, and erosion control permits. A Drainage Memo is included in Attachment I. Toxic and Hazardous Substances Refueling operations may occur onsite. Refueling operations will follow all applicable federal, state, and local regulatory requirements for spill prevention and hazardous material management. Activities will follow BMPs for the management of waste to avoid and minimize effects from potential spills or other releases to the environment. No helicopter fuel will be stored onsite. Transportation Temporary road closures will be needed to accommodate helicopter flight paths. When helicopters are carrying suspended loads and need to fly over a private or county road or TEMPORARY USE PERMIT APPLICATION 16 Topic Short-term Impacts Best Management Practices highway, construction crews will temporarily pause traffic, per FAA requirements. Traffic stops will occur when the helicopter passes overhead with a suspended load; traffic stops are anticipated to last between 5 to 15 minutes depending on the specific work being performed. Breaks will occur during this duration to allow traffic to clear. Vegetation Vegetation removal on the site will be necessary. Measures will be implemented to prevent the spread and introduction of noxious weeds and non-native Disturbed areas will be restored in a manner generally similar to preconstruction conditions and as may be provided for in private agreements. This work may include fence repair, rut removal, decompaction, tilling, seeding, and stabilization measures. A Landscaping Plan is not proposed as part of this application; however, a Revegetation Plan is provided in Attachment M. Visual Resources Temporary visual disturbance will occur during use of the Yard due to use of a helicopter and the presence of vehicles, equipment, and materials. Vegetation on the site will be removed prior to use. The McLin Yard will be fenced for security and visual screening and upon completion of construction, all equipment will be removed, and the McLin Yard will be restored generally consistent with preconstruction conditions. Waste Construction waste and portable temporary bathrooms will be onsite during the construction period. Enclosed containment will be provided for trash disposal. Construction waste, including trash and litter, garbage, other solid waste, petroleum products, and other potentially hazardous materials, will be removed and taken to a disposal facility authorized to accept such materials. Activities will follow BMPs for the management of waste to avoid and minimize effects from potential spills or other releases to TEMPORARY USE PERMIT APPLICATION 17 Topic Short-term Impacts Best Management Practices the environment. Portable temporary bathrooms will be serviced on a regular basis. Water Resources Adverse impacts are not anticipated. No wetlands or other surface waters are located on the parcel. The temporary use will not affect wetlands or other surface waters in the vicinity and is not anticipated to divert debris flow or floodwaters. BMPs will be implemented to reduce stormwater-related impacts to nearby waterbodies in compliance with Colorado Department of Public Health and Environment (CDPHE) regulations. TEMPORARY USE PERMIT APPLICATION 18 8 COMPLIANCE WITH ARTICLE 7 STANDARDS Attachment K details how the McLin Yard conforms with applicable Article 7 Standards, specifically Divisions 1-3 and Section 7-1301. 9 CONFORMANCE WITH REVIEW CRITERIA IN SECTION 4-120 Section 4-120.A of the Code establishes Review Criteria for TUP applications as follows: The Director shall review the Temporary Use Permit application to determine if the application satisfies the applicable standards of Article 7. Attachment K provides the required information to conform with the applicable standards of Article 7 of the Code. 10 WAIVER REQUESTS Xcel Energy is not requesting any waivers from the submittal requirements outlined in Section 4-202 or from the Article 7 Standards. 11 PROFESSIONAL QUALIFICATIONS Table 11-1 details the professional qualifications for preparation and certification of certain documents included in this permit application. Table 11-1: Professional Qualifications 12 BIBLIOGRAPHY Garfield County, 2023. Garfield County Colorado Land Explorer. Accessed December 2023. Available online at: https://maps.garfield-county.com/landexplorer/. Garfield County, 2013. Garfield County Land Use and Development Code. Amended June 19, 2023. Accessed December 2023. Available online at: https://www.garfield-county.com/community-development/land-use-code/. Document Preparer Qualifications - Revegetation Plan - Drainage Memo - Site Plan HDR Engineering Brian Brown Civil Engineer – Project Manager 1670 Broadway, Suite 3400, Denver, CO 80202 Senior Site Civil Project Manager with 28 years of experience in Colorado focused on site civil grading and drainage, erosion control and site revegetation. TEMPORARY USE PERMIT APPLICATION 19 Garfield County. 2020. Comprehensive Plan 2030. Accessed December 2023. Available online at: https://www.garfield-county.com/community- development/filesgcco/sites/12/Garfield-County-Comprehensive-Plan-2030- 2020-Update.pdf. Xcel Energy (Xcel), 2020. 2020 Wildfire Mitigation Plan. Accessed May 2022. Available online at: https://www.xcelenergywildfireprotection.com/wp- content/uploads/2021/05/Xcel Energy_2020-Wildfire-Mitigation-Plan_Rev-1-.pdf. © 2024 Xcel Energy Inc. | Xcel Energy is a registered trademark of Xcel Energy Inc. TRANSMISSION LINE 6584 REBUILD PROJECT ATTACHMENT A: Land Use Application Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (970) 945-8212 www.garfield-county.com LAND USE CHANGE PERMIT APPLICATION FORM TYPE OF APPLICATION Administrative Review Development in 100-Year Floodplain Limited Impact Review Development in 100-Year Floodplain Variance Major Impact Review Code Text Amendment Amendments to an Approved LUCP LIR MIR SUP Rezoning Zone District PUD PUD Amendment Minor Temporary Housing Facility Administrative Interpretation Vacation of a County Road/Public ROW Appeal of Administrative Interpretation Location and Extent Review Areas and Activities of State Interest Comprehensive Plan Amendment Accommodation Pursuant to Fair Housing Act Pipeline Development Variance Time Extension (also check type of original application) INVOLVED PARTIES Owner/Applicant Name: ________________________________________________ Phone: (______)_________________ Mailing Address: ______________________________________________________________________ City: _______________________________________ State: _______ Zip Code: ____________________ E-mail:_______________________________________________________________________________ Representative (Authorization Required) Name:________________________________________________Phone:(______)_________________ Mailing Address: ______________________________________________________________________ City: _______________________________________ State: _______ Zip Code: ____________________ E-mail:_______________________________________________________________________________ PROJECT NAME AND LOCATION Project Name: ____________________________________________________________________________________ Assessor’s Parcel Number: Physical/Street Address: ______________________________________________________________ Legal Description: ______________________________________________________________________ _____________________________________________________________________________________ Zone District: ___________________________________ Property Size (acres): __________________ PROJECT DESCRIPTION REQUEST FOR WAIVERS Submission Requirements The Applicant requesting a Waiver of Submission Requirements per Section 4-202. List: Section: ______________________________ Section: _________________________________ Section: ______________________________ Section: _________________________________ Waiver of Standards The Applicant is requesting a Waiver of Standards per Section 4-118. List: Section: ______________________________ Section: _________________________________ Section: ______________________________ Section: _________________________________ I have read the statements above and have provided the required attached information which is correct and accurate to the best of my knowledge. ______________________________________________________ __________________________ Signature of Property Owner or Authorized Representative, Title Date OFFICIAL USE ONLY File Number: __ __ __ __ - __ __ __ __ Fee Paid: $_____________________________ Existing Use: __________________________________________________________________________ Proposed Use (From Use Table 3-403): ____________________________________________________ Description of Project: TRANSMISSION LINE 6584 REBUILD PROJECT ATTACHMENT B: Payment Agreement Form PAYMENT AGREEMENT FORM GARFIELD COUNTY (“COUNTY”) and Property Owner (“APPLICANT”) ______ ____ ______________________________________________________________________ agree as follows: 1. The Applicant has submitted to the County an application for the following Project: __________________. 2. The Applicant understands and agrees that Garfield County Resolution No. 2014-60, as amended, establishes a fee schedule for each type application, and the guidelines for the administration of the fee structure. 3. The Applicant and the County agree that because of the size, nature or scope of the proposed project, it is not possible at this time to ascertain the full extent of the costs involved in processing the application. The Applicant agrees to make payment of the Base Fee, established for the Project, and to thereafter permit additional costs to be billed to the Applicant. The Applicant agrees to make additional payments upon notification by the County, when they are necessary, as costs are incurred. 4. The Base Fee shall be in addition to and exclusive of any cost for publication or cost of consulting service determined necessary by the Board of County Commissioners for the consideration of an application or additional County staff time or expense not covered by the Base Fee. If actual recorded costs exceed the initial Base Fee, the Applicant shall pay additional billings to the County to reimburse the County for the processing of the Project. The Applicant acknowledges that all billing shall be paid prior to the final consideration by the County of any Land Use Change or Division of Land. I hereby agree to pay all fees related to this application: Billing Contact Person:_____________________________________ Phone: (_____)___________________ Billing Contact Address: ___________________________________________________________________ City: ______________________________________________ State: _______ Zip Code: ________________ Billing Contact Email: _____________________________________________________________________ Printed Name of Person Authorized to Sign: ___________________________________________________ ______ ________________________________ (Signature) (Date) TRANSMISSION LINE 6584 REBUILD PROJECT ATTACHMENT C: Proof of Ownership (Temporary Construction Easement) TRANSMISSION LINE 6584 REBUILD PROJECT ATTACHMENT D: Statement of Authority TRANSMISSION LINE 6584 REBUILD PROJECT ATTACHMENT E: Names and Addresses of Property Owners within 200 feet and Map Landowners within 200 Feet of McLin Yard Parcel Parcel Number Owner Owner Address Legal Description 217913400014 STANEK, PAUL 3490 COUNTY ROAD 311 NEW CASTLE, CO 81647 Section: 13 Township: 6 Range: 92 TR IN THE SE 217913100012 MUSGRAVE, RICHARD R & DONNA L 2920 COUNTY ROAD 311 NEW CASTLE, CO 81647- 9616 Section: 13 Township: 6 Range: 92 Subdivision: MINEOTA RIDGE EST. 3RD. Lot: 9 218118200287 MIDNIGHT STAR BREEDERS LLC PO BOX 957 SILT, CO 81652 Section: 18 Township: 6 Range: 91 A TR IN THE SWSW SEC 7, THE NENW SEC 18. Township: 6 Range: 92 SESE FO SECTION 12, AND NENE OF SECTION 13 217913400011 ALAMENO, MARIANNE T 2980 COUNTY ROAD 311 NEW CASTLE, CO 81647 Section: 13 Township: 6 Range: 92 Subdivision: MINEOTA RIDGE EST. 3RD. Lot: 8 218118200260 1078 ROAD 335 LLC PO BOX 957 SILT, CO 81652 THE SESE SEC 12 & THE NENE SEC 13 6/92. Section: 18 Township: 6 Range: 91 A TR IN THE SWSW SEC 7, THE NENW & LOT 1 SEC 18. EXCEPT A TR OF LAND CONT. 40.583 AC. (36.362 ACRES) 217913200535 GARFIELD COUNTY BOARD OF COUNTY COMMISSIONERS 108 8TH STREET, SUITE 213 GLENWOOD SPRINGS, CO 81601-3360 Section: 13 Township: 6 Range: 92 A TR IN SESW OF SEC 12 & N2 OF SEC 13 Parcel Number Owner Owner Address Legal Description 217912300534 MCPHERSON FAMILY TRUST DATED 2/5/24 2299 COUNTY ROAD 311 NEW CASTLE, CO 81647 Section: 12 Township: 6 Range: 92 A TR IN SESW OF SEC 12 & N2 OF SEC 13 9.988 ACRES 217912300533 R AND S MCPHERSON LIVING TRUST DATED 10/20/2020 2065 COUNTY ROAD 311 NEW CASTLE, CO 81647 Section: 12 Township: 6 Range: 92 A TR IN S2SW OF SEC 12 & THE NENW OF SEC 13. 10.516 ACRES 217912400432 DAWN MARIE SEPARATE PROPERTY TRUST 09/17/2022 597 COUNTY ROAD 335 NEW CASTLE, CO 81647 Section: 12 Township: 6 Range: 92 A TR IN S1/2SE 5.77 ACRES 217912301001 KARSTENSEN, DEAN A LIVING TRUST DTD 01/24/2023 3775 W MINOOKA ROAD MORRIS, IL 60450 Section: 12 Township: 6 Range: 92 Subdivision: RIVERVIEW RANCH SUBDIVISION Lot: 1 AMENDED, AS PER SECOND AMENDED FINAL PLAT RECEPTION NO. 965010 6.757 ACRES 217912401005 BRAMCO LLC PO BOX 737 NEW CASTLE, CO 81647 Section: 12 Township: 6 Range: 92 Subdivision: RIVERVIEW RANCH SUBDIVISION Lot: 5 AMENDED, AS PER SECOND AMENDED FINAL PLAT RECEPTION NO. 965010 7.003 ACRES 217912400509 COLLINS, TODD D & TINA 66 MID VALLEY DRIVE NEW CASTLE, CO 81647- 9656 Section: 12 Township: 6 Range: 92 A TR IN THE SE 1/4 ALSO A TR IN SE OF SEC 12 8.63 ACRES 217912300295 SIMONSON, JEFFEREY S & BRENDA S 2065 COUNTY ROAD 311 NEW CASTLE, CO 81647 Section: 12 Township: 6 Range: 92 TR IN SW 5.81 ACRES Parcel Number Owner Owner Address Legal Description 218128300958 BUREAU OF LAND MANAGEMENT COLORADO RIVER VALLEY FIELD OFFICE 2300 RIVER FRONTAGE ROAD SILT, CO 81652 Section: 28 Township: 6 Range: 91 SEC.17 SWSW SEC.18 LOT 4 SENW, E2SW, SE SEC.19 LOTS 1-3 NE, E2NW, NESW, N2SE SEC.20 SWNE, W2NW, SENW, NWSW, E2SW, W2SE SEC.28 NWNE, W2, S2SE SEC.29 NWNE, E2E2, SWSE SEC.32 E2, NENW SEC.33 SEC.34 N2NW, SWNW, SW 217913400016 BIGGS, DANIEL E & CONNIE M 123 COUNTY ROAD 311 NEW CASTLE, CO 81647 Section: 13 Township: 6 Range: 92 THAT PT OF SWSE, LYING WESTERLY OF THE RIGHT-OF-WASY LINE OF COUNTY RD. 311 36.3 ACRES 218107300259 RIVER ROCK RANCH 1412 LLC 4929 COUNTY ROAD 331 SILT, CO 81652 Section: 7 Township: 6 Range: 91 A TR IN SWSW SEC 7. 6/92 THE SESE SEC 12. 35.001 ACRES 217911400114 DIXON WATER FOUNDATION 4528 COUNTY ROAD 398 DECATUR, TX 76234 Section: 9 Township: 6 Range: 92 LOT 8 (32), PT. LOT 5 (NET .92), PT. OF NWSE (7.09NET) DESC. AS BEING E. OF A LINE WHICH RUNS N & S PARALLEL TO AND DISTANCE OF 1675' FROM E. SEC.LINE E. 630' OF SWSE (NET 19.09), SESE, A TR. OF MEANDER LAND CONT. 16.8AC 217912300468 NICHOLSON, RICHARD E EXEMPT PROPERTY TRUST UDT 08/09/2007NICHOLSON, RICHARD E EXEMPT PROPERTY TRUST UDT 08/09/2007 RYAN , LLC PO BOX 460329, DEPT 909 HOUSTON, TX 77056 Section: 12 Township: 6 Range: 92 A TR IN THE SW4 Parcel Number Owner Owner Address Legal Description 217913400015 FISHER, STEPHEN F & JUDITH A 8482 S MOUNTAIN AIR LANE GOLD CANYON, AZ 85118 Section: 13 Township: 6 Range: 92 TR IN THE SE 14.35 ACRES 217913100554 MCLIN, SHARON T & BRIT C PO BOX 957 SILT, CO 81652 Section: 7 Township: 6 Range: 91 PT. OF LOT 10 (NET 31.87 AC) Section: 18 Township: 6 Range: 91 LOTS 1 (40.26 AC ), 2 (40.30 AC), 3 (40.34 AC), NENW Section: 12 Township: 6 Range: 92 PT. OF SESW (NET 20.41 AC ) & PT. S2SW (NET 46.58 AC) Section: 13 Towns 217912300536 R AND S MCPHERSON LIVING TRUST DATED 10/20/2020 2065 COUNTY ROAD 311 NEW CASTLE, CO 81647 Section: 12 Township: 6 Range: 92 A TR IN SW1/4 OF SEC 12. EXCEPT DESC IN 668/313. 7.26 ACRES 217912300339 SIMONSON, JEFFEREY S & BRENDA S 2045 COUNTY ROAD 311 NEW CASTLE, CO 81647- 9617 Section: 12 Township: 6 Range: 92 TR IN LOTS 7&8 CONT 2.27 AC., ALSO A TR CONT 1.46 A 217913400018 SMITH, ULBERT SHANE & SARAH K 2995 COUNTY ROAD 311 NEW CASTLE, CO 81647 Quarter: SE Section: 13 Township: 6 Range: 92 A PARCEL OF LAND SITUATE IN THE E2 OF SECTION 13 BEING MORE PARTICULARLY DESCRBED IN WD RECEPTION # 876288 217912300467 NICHOLSON, RICHARD E EXEMPT PROPERTY TRUST UDT 08/09/2007 RYAN, LLC PO BOX 460329, DEPT 909 HOUSTON, TX 77056 Section: 12 Township: 6 Range: 92 A TR IN N4. EXCEPT A TR. OF LAND CONT. 4.55 AC +/- AS DESC. IN BDRY LINE ADJ BK 1827/791 AND QCD B 1827/786 AND ALSO SHOWN IN AMD FINAL PLAT OF RIVER VIEW RANCH SUB-DIV. REC # 702964 Parcel Number Owner Owner Address Legal Description 217912401003 GRUENEFELDT, DAN K LIVING TRUST U/A/D 10/9/23 PO BOX 9 NEW CASTLE, CO 81647 Section: 12 Township: 6 Range: 92 Subdivision: RIVERVIEW RANCH SUBDIVISION Lot: 3 AMENDED, AS PER SECOND AMENDED FINAL PLAT RECEPTION NO. 965010 6.371 ACRES 217912401004 BRAMCO LLC PO BOX 737 NEW CASTLE, CO 81647 Section: 12 Township: 6 Range: 92 Subdivision: RIVERVIEW RANCH SUBDIVISION Lot: 4 AMENDED, AS PER SECOND AMENDED FINAL PLAT RECEPTION NO. 965010 6.553 ACRES 217912301002 NILSSON, STEVEN & CHRISTINE 787 CANYON CREEK DRIVE GLENWOOD SPRINGS, CO 81601 Section: 12 Township: 6 Range: 92 Subdivision: RIVERVIEW RANCH SUBDIVISION Lot: 2 AMENDED, AS PER SECOND AMENDED FINAL PLAT RECEPTION NO. 965010 5.608 ACRES 217912401006 BRAMCO LLC PO BOX 737 NEW CASTLE, CO 81647 Section: 12 Township: 6 Range: 92 Subdivision: RIVERVIEW RANCH SUBDIVISION Lot: 6 AMENDED, AS PER SECOND AMENDED FINAL PLAT RECEPTION NO. 965010 10.575 ACRES 0 500 1,000 Feet Surface Mangement Bureau of Land Management Other Federal Legend Proposed Centerline Existing Centerline McLin Yard Township/Range Boundary Parcel Boundary Project: I:\ESP\Projects\XcelEnr\Rebuilds_GIS\ArcGIS_Pro\6584\2024_03_05_New_Castle_Powerpoint_Updates\2024_03_05_New_Castle_Powerpoint_Updates.aprx C O L O R A D OScale: 16,000 Date: 5/1/2024 Data Sources: Burns & McDonnell, Xcel Energy, CDOT, CNHP, Garfield County Cou n t y R o a d 3 3 5 C o u n t y R o a d 3 1 1 Mineota Dr Colo rado R iv er 6S 91W 6S 92W 217913400014 & 217913100012 218118200287 & 217913400011 218118200260 & 217913200535& 217912300534 2 1 7 9 1 2 3 0 0 5 3 3 217912400432 & 217912301001 & 217912401005 217912400509 & 217912300295 218128300958 217913400016 218107300259 217911400114 & 217912300468 217913400015 217913100554 & 217912300536 & 217912300339 217913400018 & 217912300467 & 217912401003 & 217912401004 & 217912301002 & 217912401006 / Project Location Notification Area Map - McLin Yard Xcel Energy Rebuild 6584 Garfield County, Colorado C O L O R A D OTotal Area of Site: 35 Acres Applicant: Xcel Energy 1800 Larimer Street Denver, CO 80202 303-285-6533 Preparer: Burns & McDonnell 9191 S. Jamaica Street Englewood, CO 80112 720-592-3402 TRANSMISSION LINE 6584 REBUILD PROJECT ATTACHMENT F: Pre-application Conference Summary 1 Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (970) 945-8212 www.garfield-county.com PRE-APPLICATION CONFERENCE SUMMARY TAX PARCEL NUMBER: Multiple DATE: 12/15/2023 PROJECT: XCEL Temporary Use Laydown Yards and Helistops OWNERS: Multiple CONTACT/REPRESENTATIVE: Corey Miller, Brooke Hines, Jen Chester, Erica Powell, Braleigh Jay, Melinda Schulze, Sara Crook, Jennifer Harris, Julie Stencel, Michelle Burger, Jose Castro, Brad McCloud, Evan Singleton PRACTICAL LOCATION: prefer address TYPE OF APPLICATION: Temporary Use for Laydown Yards and Helistops ZONING: Mostly Rural COMPREHENSIVE PLAN: Multiple I. GENERAL PROJECT DESCRIPTION Garfield County’s Land Use and Development Code is available here: https://www.garfield- county.com/community-development/land-use-code/ Temporary Use Permits are described in Section 4-120 and Section 7-1303. The following sections of this preapplication conference summary contain general submittal requirements and process outlines. The Director has indicated that he will refer these Temporary Use applications to the Board of County Commissioners for their decision. Applications for a Temporary Use should be submitted at least 60 days prior to the proposed use. Temporary Use Permits are restricted to a 6-month period and cannot be applied for on the same property more than twice in one 12 month period. There are noticing requirements which will include the start date, operating hours, and duration of the uses. Authorization of property owners needs to be included in compliance with 4-120.B.2.a. Recorded Statements of Authority need to be provided for any LLCs, trusts, or similar entities. The applications should directly respond to items found in 4-120.B.5. Impacts on neighboring properties and infrastructure will be taken into account, so the application should address these 2 topics specifically. The application should address Article 7 Standards. Divisions 1-3 and Section 7- 1301 should be specifically addressed. Any previous approvals on a parcel should be included with an application, and the application should demonstrate continued compliance with those approvals. The applications should provide information such as location, site plans, haul routes, helicopter flight paths, hours of operation, start date, duration, uses, site preparation, and site restoration. Stormwater and traffic should be addressed. If hazardous materials will be stored on site, mitigation practices should be provided to address. Wastewater management systems and water supply should also be addressed. Garfield County’s Environmental Health handles vault and haul permits for those types of wastewater systems. XCEL is undertaking multiple rebuilds of transmission lines throughout Garfield County. At this time, three broad phases are anticipated. Each will have laydown yards that double as helistops to facilitate installation of new poles in difficult terrain. Each yard should have a separate application, though staff will coordinate the review of the applications to minimize review times and hearings. Helicopter deliveries involve FAA approvals. The applications should provide information on these approvals and what mitigation activities will be involved to limit hazards to residents. Glenwood Springs - Mitchell Creek Rebuild which currently has an Location and Extent application under review; will have a single laydown/helistop in unincorporated Garfield County on parcel 218505400065. This yard will primarily be used for storage for helicopter delivery. Steep slopes to the south of this site exist, and access is taken from existing private roads/driveways. The application should demonstrate the adequacy of these systems for the proposed uses. This segment is mostly within incorporated Glenwood Springs. It does cross I70 and the Colorado River, though at this time helicopter operations will be north of these barriers. 6584 Mitchell Creel – Rifle Ute Transmission This 25 mile rebuild is scheduled for 2025 and will have 5 staging areas. Each of these laydown yards will also have helicopter activity. This section may be broken up into two small sections. This section is primarily south of I-70. A map is shown on the following pages. The applicant may need to schedule an update to this preapplication conference summary for this area as they approach the 2025 time frame. A variety of different scale of laydown yard are proposed in this section. Each application should provide specific details on the intensity of its uses to allow for the adequate review of possible impacts on infrastructure and neighbors. 6670 Rifle Ute - De Beque Transmission: This rebuild of approximately 32 miles currently has 2 proposed laydown/helistop facilities. This section is mostly north of the I-70. These facilities will primarily be fly yards with no or limited overnight storage. Materials are expected to be delivered to the sites and then taken from the facility to the construction site the same day. A project overview map is provided on the following pages. 3 Figure 2 6584 Mitchell Creel – Rifle Ute Transmission Figure 1 Glenwood Springs - Mitchell Creek Rebuild 4 Figure 3 6670 Rifle Ute - De Beque Transmission: II. COMPREHENSIVE PLAN Compliance with the comprehensive plan should be shown by any application, though for temporary uses the application may want to focus on the lack of long term impacts and limiting longer negative impacts of alternatives. III. REGULATORY PROVISIONS APPLICANT IS REQUIRED TO ADDRESS The following Sections of the Garfield Land Use and Development Code as amended apply to the Application: • Section 4-103 Administrative Review and Section 4-101 Common Review Procedures • Table 4-201 Submission Requirements and Section 4-203 Description of Submittal Requirements. • Section 4-118 and Section 4-202, as applicable. • Article 7 Standards , as applicable IV. SUBMITTAL REQUIREMENTS As a convenience outlined below is a list of information typically required for this type of application. Section 4-120 lists application materials required for temporary uses. The Director may waiver or require additional submittal requirements in accordance with Section 4-120.B. The following list can function as a checklist for your submittal. 5 General Application Materials including the Application Form (signed), payment of Fees and signed Payment Agreement Form (see attached). o A narrative describing the request and related information. o Proof of ownership. o A recorded Statement of Authority is required for any property owned by an LLC or other entity. o A Letter of Authorization is required if an owner intends to have a representative complete the Application and processing. o A Letter of Permission if property owner is not applicant. o Names and mailing addresses of property owners within 200 ft. of the subject property from Assessor’s Office Records. o Copy of the Preapplication Summary needs to be submitted with the Application. Vicinity Map. Description of Applicant (Section 4-120.B.2). Temporary Use Description which includes relevant information related to use, duration, hours, parking, traffic, sanitation, etc. This should specifically address alterations to existing conditions of approval or waivers of standards being sought as part of the temporary use. Copy of all previous approvals. Impact Analysis describing the anticipated impacts to adjacent properties, infrastructure, and environment. At a minimum it should specifically, it shall address vapor, dust, smoke, noise, light, glare, stormwater, other emanations. Impacts on infrastructure, such as roads, water, wastewater, parks, etc., shall also be addressed. The Application should demonstrate compliance with Section 7-1301 Temporary Use The Application should demonstrate compliance with Article 7 Standards, as applicable. The Application should include a waiver request from submittal requirements according to 4- 202, specifically addressing the review criteria for each waiver request. The Application should include any waivers from Article 7 Standards that the applicant wishes to pursue, in accordance with 4-118. Three hard copies and one digital copy (on a USB drive, for example) of the application are required. Both versions should be split into individual sections. Community Development Staff is available to meet with the Applicant to provide additional information and clarification on any of the submittal requirements and waiver requests. V. REVIEW PROCESS The application shall be reviewed in accordance with the procedures set forth in Section 4-120 of the LUDC. Staff will review the application for completeness, and when complete, refer it to appropriate agencies for technical review. A Director’s Determination or BOCC hearing date shall be established 6 once the application has been determined to be technically complete. Staff will create a report to be submitted to the appropriate decision marker for their decision. Public Hearing(s): X No Public Hearing, Directors Decision (with notice per code) Planning Commission X Board of County Commissioners Board of Adjustment Referral Agencies: As necessary. VI. APPLICATION REVIEW FEES Planning Review Fees: $250 Referral Agency Fees: $na Total Deposit: $250(additional hours are billed at hourly rate of $40.50) VII. GENERAL APPLICATION PROCESSING The foregoing summary is advisory in nature only and is not binding on the County. The summary is based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. This summary does not create a legal or vested right. The summary is valid for a six-month period, after which an update should be requested. The Applicant is advised that the Application submittal once accepted by the County becomes public information and will be available (including electronically) for review by the public. Proprietary information can be redacted from documents prior to submittal. Pre-application Summary Prepared by: 12/15/2023 Philip Berry, Planner III Date TRANSMISSION LINE 6584 REBUILD PROJECT ATTACHMENT G: Vicinity Map 0 2,000 4,000 Feet Surface Mangement Bureau of Land Management Other Federal State Local Private Conservation Legend Proposed Centerline Existing Centerline 3 Mile Radius of Project McLin Yard Township/Range Boundary Municipal Areas Project: I:\ESP\Projects\XcelEnr\Rebuilds_GIS\ArcGIS_Pro\6584\2024_03_05_New_Castle_Powerpoint_Updates\2024_03_05_New_Castle_Powerpoint_Updates.aprx C O L O R A D OScale: 1:56,000 Date: 4/26/2024 Data Sources: Burns & McDonnell, Xcel Energy, CDOT, CNHP, Garfield County Silt County Road 250 Grand Ave C o u n t y R o a d 3 1 1 S 1: S 2: / Project Location Vicinity Map - McLin Yard Xcel Energy Rebuild 6584 Garfield County, Colorado C O L O R A D O 6 70 Total Area of Site: 35 Acres Applicant: Xcel Energy 1800 Larimer Street Denver, CO 80202 303-285-6533 Preparer: Burns & McDonnell 9191 S. Jamaica Street Englewood, CO 80112 720-592-3402 TRANSMISSION LINE 6584 REBUILD PROJECT ATTACHMENT H: Site Plan FILE NAME Sheet No. DWG No. MICROFILM No. SCALE CALL UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) AT 811 BEFORE DIGGING. ALLOW MINIMUM 48-HOURS FOR UTILITY LOCATION SERVICES. REV DATE PROJ. No.REVISION DESCRIPTION DWN DSN ENG CHK FILM -SIZE REV East Rifl e Cre e k 13 70 Rifle 6 Garfield Carbonate New Castle Glenwood Springs Material Yard D i v i d e C re ek M i n e o t a D i t c h County Road 335 C o u n t y R o a d 3 1 1 Material Yard 39 6 39 7 39 8 3 9 9 4 0 0 4 0 1 40 2 4 0 3 40 4 0 10 20MILES 0 2,000 4,000FEET LOCATION MAPVICINITY MAP PROJECT AREA REV DATE PROJ. No.REVISION DESCRIPTION DWN DSN ENG CHK FILM FILE NAME SCALE SHEET No.MICROFILM No. SIZE DWG No.REV GENERAL NOTES Material Yard 5 6 70 5660 5650 56 4 0 5 6 3 0 5 6 2 0 5 6 1 0 5 6 0 0 5 5 9 0 5 5 8 0 5 5 7 0 5 5 6 0 5 5 5 0 5 5 4 0 55 3 0 5 5 7 0 55 6 0 55 5 0 5 5 4 0 5 5 3 0 5 5 2 0 568 0 569 0 5 5 2 0 55 10 566 0 5 650 55 1 0 5 65 0 5520 5 520 D i v i d e C r e e k D i v id e C r eek W a r d s a n d R e y n o l d s D i t c h 0 100 200Feet   ¯ C o u n t y R o a d 3 1 1 Material Yard 5 6 70 5660 5650 56 4 0 5 6 3 0 5 6 2 0 5 6 1 0 5 6 0 0 5 5 9 0 5 5 8 0 5 5 7 0 5 5 6 0 5 5 5 0 5 5 4 0 55 3 0 5 5 7 0 55 6 0 55 5 0 5 5 4 0 5 5 3 0 5 5 2 0 568 0 569 0 5 5 2 0 55 10 566 0 5 650 55 1 0 5 65 0 5520 5 520 D i v i d e C r e e k D i v id e C r eek W a r d s a n d R e y n o l d s D i t c h 0 100 200Feet   ¯ C o u n t y R o a d 3 1 1 Material Yard 5 6 70 5660 5650 56 4 0 5 6 3 0 5 6 2 0 5 6 1 0 5 6 0 0 5 5 9 0 5 5 8 0 5 5 7 0 5 5 6 0 5 5 5 0 5 5 4 0 55 3 0 5 5 7 0 55 6 0 55 5 0 5 5 4 0 5 5 3 0 5 5 2 0 568 0 569 0 5 5 2 0 55 10 566 0 5 650 55 1 0 5 65 0 5520 5 520 D i v i d e C r e e k D i v id e C r eek W a r d s a n d R e y n o l d s D i t c h 0 100 200Feet   ¯ C o u n t y R o a d 3 1 1 REV DATE PROJ. No.REVISION DESCRIPTION DWN DSN ENG CHK FILM FILE NAME SCALE SHEET No.MICROFILM No. SIZE DWG No.REV TRANSMISSION LINE 6584 REBUILD PROJECT ATTACHMENT I: Drainage Memo 1 Memo Date: Wednesday, August 14, 2024 Project: 6584 TLine: Mitchell (MITC) - Rifle (UTER) Electric Transmission Line Rebuild - McLin and Murray Staging Areas. To: Garfield County From: Brian Brown – HDR Engineering Subject: Drainage Memo for Staging Yards – Murray and McLin Public Service Company of Colorado (PSCo), a Colorado corporation conducting business as Xcel Energy (Xcel), is proposing to rebuild a 25-mile segment of a 69-kilovolt (kV) overhead transmission line from the Mitchell Creek Substation within the City of Glenwood Springs and unincorporated Garfield County, Colorado to the Rifle Ute Substation in unincorporated Ga rfield County. In support of this line rebuild, Xcel has secured two staging/material yards to store equipment, perform limited equipment assembly, and provide a meeting place for construction crews . The impact to surface drainage at the Murray Yard and the McLin Yard is the focus of this memo. See Site plans submitted in support of this project for a figure that includes location of the line and the Murray and McLin s taging yards. Existing Conditions: The Murray Yard (36 acres) and McLin Yard (15 acres) are both in Garfield County and are undeveloped parcels with varying slopes from gentle to nearly level and vegetation density from sparse (majority of the Murray Yard) to moderately dense (McLin Yard). While both yards have had utility improvements, buried gas and overhead power for Murray and buried irrigation for McLin, neither yard has existing improvements that substantively impact surface stormwater flow or change the surface flow type or direction. Proposed Temporary Conditions: The proposed improvements for both the Murray and McLin Yards will be temporary with the installation of a 2-acre aggregate surfaced Stabilized Staging Area (SSA) at each yard that will be constructed to generally match the existing grades of the site. The SSA is to minimize impacts to water quality by minimizing rutting and uncontrolled surface disturbance that can lead to sediment transport off-site and track out onto adjoining roads. The SSA is temporary and will be removed once construction is complete and the site topsoil will be restored to generally match pre -construction grades. After the 2 seeding and mulch and with adequate moisture and time for germination and vegetation growth, the slopes, soil types, and vegetation cover will generally match the pre -construction conditions. The portion of the Yard outside of the SSA will remain in the pre -construction condition and will be accessed without grading modification. Access will be overland in a manner described as ‘drive and crush’. This limited drive and crush access will temporarily impact surface foliage but generally keeps the plant ’s root structure in place which maintains current soil loss rates (erosion rates) and allows for a rapid rebound of the plant community. This drive and crush approach typically maintains the current surface runoff rates and flow types. Outcome: At the closure of the County Grading Permit and the State Stormwater Management Plan (SWMP) Permit, the site grades and vegetation density will generally match the pre -construction conditions. Therefore, there will be no permanent change to surface drainage within either the Murray Yard nor the McLin Yard compared to pre-construction surface drainage. This project will not permanently change the existing surface water flow paths, overall slopes, impervious surface area, nor time of concentration and therefore will not change the runoff volume, runoff peak, nor conveyance path for either Yard. HDR Engineering Brian Brown, PE CO PE 41644 TRANSMISSION LINE 6584 REBUILD PROJECT ATTACHMENT J: Haul Route and Access and Flight Path Mapbook 217913300223 LESLIE, SCOTT WILLIAM REVOCABLE TRUST 217913300306 LESLIE, LINDA L & FRY, AARON M 217913300743 FERGUSON, CODY G & KARLA C & SMITH, FRANK & CAROLE 217913400011 ALAMENO, MARIANNE T 217913100012 MUSGRAVE, RICHARD R & DONNA L 218118200287 MIDNIGHT STAR BREEDERS LLC 217913200535 GARFIELD COUNTY BOARD OF COUNTY COMMISSIONERS 217913400014 STANEK, PAUL 217912300533 R AND S MCPHERSON LIVING TRUST DATED 10/20/2020 217912300534 MCPHERSON FAMILY TRUST DATED 2/5/24 218128300958 BUREAU OF LAND MANAGEMENT 217913400016 BIGGS, DANIEL E & CONNIE M 217911400114 DIXON WATER FOUNDATION 217913100554 MCLIN, SHARON T & BRIT C 217913400018 SMITH, ULBERT SHANE & SARAH K 217913300010 SMITH, ULBERT SHANE & SARAH K217913300742 SKAKOVSKY, IGOR & ELENA Divi d e C r e e k W a r d s a n d R e y n o l d s D i t c h M i n e o t a D i t c h D I V I D E C R E E K R D MCLIN YARD LZ NEW CASTLE SILT   0 500 1Č000!!0 (!č 1č5Č000 D0!č 8ĥ14ĥ2024 D0 +1.!/č 1.*/ Ē MD+**!((Č !( E*!.#5Č ERIČ CNČ CDO Legend A!// L+0%+* .+) C+1*05 R+ 1( R+10! (%#$0 0$ .%20! A!// L* %*# Z+*! ML%* Y. .!( +1* .5 MAP 1 OF 11 Project: I:\ESP\Projects\XcelEnr\Rebuilds_GIS\ArcGIS_Pro\6584\2024_07_25_HaulRouteUpdates\2024_07_25_HaulRouteUpdates.aprx Layout: McLin Project Components gwbuck  McLin Yard Project Components !( E*!.#5 C%.1%0 6584 M%0$!(( C.!!' 0+ 0! R%ý! R!1%( .ü!( C+1*05Č C+(+. + DIVIDE CREEK RD 407 408 409-DE-T 411-DE 412-DE 413 414415-DE 417-DE 418-DE 419 420 422 424 SILT 217913200535 GARFIELD COUNTY BOARD OF COUNTY COMMISSIONERS 217912300533 R AND S MCPHERSON LIVING TRUST DATED 10/20/2020 217912300295 SIMONSON, JEFFEREY S & BRENDA S 217912301001 KARSTENSEN, DEAN A LIVING TRUST DTD 01/24/2023 217912300534 MCPHERSON FAMILY TRUST DATED 2/5/24 217912200351 UNITED STATES OF AMERICA 217912200350 DB SOLAR LLC 217912100150 PETERSON, BRENT LEWIS & HANNIGAN, SANDRA 217912100148 UNITED STATES OF AMERICA 217912300536 R AND S MCPHERSON LIVING TRUST DATED 10/20/2020 217912300339 SIMONSON, JEFFEREY S & BRENDA S 217912300737 MIDDLETON, GUY 217912300377 NICHOLSON FAMILY TRUST 217911400383 RIVER ROCK RANCH 1412 LLC 217911400114 DIXON WATER FOUNDATION 217912300468 NICHOLSON, RICHARD E EXEMPT PROPERTY TRUST UDT 08/09/2007 217912300736 LOCKE, FREDERICK W & MUTILLO, JEANNE R 217913100554 MCLIN, SHARON T & BRIT C 217912300371 MIDDLETON, GUY GEOFFERY 217912300376 LOCKE, FREDERICK W & MUTILLO-LONG, JEANNE R 217912300001 BRM PROPERTIES LLC 217912300467 NICHOLSON, RICHARD E EXEMPT PROPERTY TRUST UDT 08/09/2007 217912301002 NILSSON, STEVEN & CHRISTINE 217912401003 GRUENEFELDT, DAN K LIVING TRUST U/A/D 10/9/23 Divide C reek Colorado River W a r d s a n d R e y n o l d s D i t c h M i n e o t a D i t c h COLORADO R I VERRD D I V I D E C R E E K R D 406A 407408 409 410 411 412 413 413-A????? 414 415416 417-DE 418 419A 420 421 422A 423 424 NEW CASTLE SILT 6 70 0 500 1Č000ee0 S(ečƫ1č5Č000 D0ečƫ8ĥ14ĥ2024 D0ƫS+1.e/čƫ1.n/ƫĒƫMD+nne((Č e(ƫEne.g5ČƫESIČƫČƫDOT L!#!* .+,+/edƫT.n/)%//%+nƫ+(e E4%/0%ngƫT.n/)%//%+nƫ+(e Ae//ƫL+0%+nƫ.+) +1n05ƫ+d 1(ƫ+10e (%g$0ƫ0$ .%20eƫAe// .+,+/edƫen0e.(%ne E4%/0%ngƫen0e.(%ne 1((ƫS%0e .e(ƫ+1nd.5 MAP 2 OF 11 Project: I:\ESP\Projects\XcelEnr\Rebuilds_GIS\ArcGIS_Pro\6584\2024_07_25_HaulRouteUpdates\2024_07_25_HaulRouteUpdates.aprx Layout: McLin Project Components gwbuck  McLin Yard Project Components e(ƫEne.g5ƫ%.1%0ƫ6584 M%0$e((ƫ.ee'ƫ0+ƫ0eƫ%ýeƫe1%(d .üe(dƫ+1n05Čƫ+(+.d+ RIVE R FRONTAGE RD 424 425 426 427 429 430 432 433 434 435 437 70007 TOOVEY CRESTON JESSECA 700 HERNANDE= ABRAHAM700077 JGVL ENTERPRISES ING 7000 RIVER NEST LLC 700070 SILT TOWN OF 70007 PAPA JOHN C DEBBIE R TRUST 700 GARCIA NOYOLA ADAN BENIGNO GU=MAN SALINAS ALMA RUTH 70000 ASPHALT PAVING CO 70000 SILT ENERGY DEVELOPMENT LLC 70000 RED HORSE LLC 70000 SILT TOWN OF 70000 GOV SILT LLC 70000 R J PROPERTIES LLC 700 SILT TOWN OF 700 RIVER ROCK RANCH  LLC 700 DI;ON WATER FOUNDATION ROW ROW ROW 700007 SILT 70 LLC " 70007 MORALES PEREA HERNAN VALEN=UELA FRANCISCA MILLAN ROW 700000 CAMP COLORADO RIVER LLC 70000 SILT FARMS LLC Risin g S u n D itc h Last Chance D itch Col o r a d o R ive r DRY HO L L OW R D DIVI DE C RE EK R D DIVI D E C R E E K R D 70 424 425426427 428 429 430431432A 433434 435 436437438 NEW CASTLE SILT   0 500 1Č000ee0 S(ečƫ1č5Č000 D0ečƫ8ĥ14ĥ2024 D0ƫS+1.e/čƫ1.n/ƫĒƫMD+nne((Č e(ƫEne.g5ČƫESIČƫČƫDOT L!#!* .+,+/edƫT.n/)%//%+nƫ+(e E4%/0%ngƫT.n/)%//%+nƫ+(e Ae//ƫL+0%+nƫ.+) +1n05ƫ+d 1(ƫ+10e (%g$0ƫ0$ .%20eƫAe// .+,+/edƫen0e.(%ne E4%/0%ngƫen0e.(%ne 1((ƫS%0e .e(ƫ+1nd.5 MAP 3 OF 11 Project: I:\ESP\Projects\XcelEnr\Rebuilds_GIS\ArcGIS_Pro\6584\2024_07_25_HaulRouteUpdates\2024_07_25_HaulRouteUpdates.aprx Layout: McLin Project Components gwbuck  McLin Yard Project Components e(ƫEne.g5ƫ%.1%0ƫ6584 M%0$e((ƫ.ee'ƫ0+ƫ0eƫ%ýeƫe1%(d .üe(dƫ+1n05Čƫ+(+.d+ 395 396 397 399 401 403 404 406 407 408 409-DE-T 411-DE 412-DE 218118200287 MIDNIGHT STAR BREEDERS LLC " 217913200535 GARFIELD COUNTY BOARD OF COUNTY COMMISSIONERS 217912300533 R AND S MCPHERSON LIVING TRUST DATED 10/20/2020 217912400432 DAWN MARIE SEPARATE PROPERTY TRUST 09/17/2022 217912400372 WALLEN, GLEN A 218107302004 BOSWORTH, STACY D & MARK A 217912300295 SIMONSON, JEFFEREY S & BRENDA S 218107302002 TOLLE, RALPH 217912401005 BRAMCO LLC 217912400293 RIFFLE RUN LLC 218107302006 DUBOIS FAMILY LIVING TRUST DTD 03/29/2023 218107302005 LLOYD, KING & PAMELA M 217912301001 KARSTENSEN, DEAN A LIVING TRUST DTD 01/24/2023 217912400628 FREI, FRED FRANCES LIVING TRUST DATED AUGUST 13, 2007 & FREI, JANET SHIRLEY LIVING TRUST DATED AUGUST 13,2007 217912400508 SUMMERS, SHEILA L217912400459 MOLLMAN, DIANA RUTH REVOCABLE TRUST 217912400262 FREI, FRED FRANCIS LIVING TRUST DTD 08-13-07 & & FREI, JANET SHIRLEY LIVING TRUST DTD 8-13-07 217912300534 MCPHERSON FAMILY TRUST DATED 2/5/24 217912400509 COLLINS, TODD D & TINA 217912400433 GROSS, DAN L & LOIS E 217912400373 DANIEL, JOSE P 218107302003 MEADE, DONNA M & WHITSON-O'FLINN, ROBIN M & O'FLINN, SEAN 217912400294 WEBBER FAMILY TRUST 04/18/2022 217912400629 FREI, FRED FRANCES LIVING TRUST DATED AUGUST 13, 2007 & FREI, JANET SHIRLEY LIVING TRUST DATED AUGUST 13,2007 217912200351 UNITED STATES OF AMERICA 217912200350 DB SOLAR LLC 217912100150 PETERSON, BRENT LEWIS & HANNIGAN, SANDRA 217912100148 UNITED STATES OF AMERICA 218107200195 SHORT, CARL MICHAEL 218107302001 EAST ACRES DUBOIS LLC 217912300536 R AND S MCPHERSON LIVING TRUST DATED 10/20/2020 217912300339 SIMONSON, JEFFEREY S & BRENDA S 218107303007 YEVSEYEVA, KRISTINA 217912300377 NICHOLSON FAMILY TRUST 218107300235 WARD, KENNETH 218107300259 RIVER ROCK RANCH 1412 LLC 218107303005 WALKER, TIMOTHY M 217911400114 DIXON WATER FOUNDATION 217912300468 NICHOLSON, RICHARD E EXEMPT PROPERTY TRUST UDT 08/09/2007 218107203008 DAVIS, TYLER & ASHLEY 217913100554 MCLIN, SHARON T & BRIT C 218107303006 BRISCOE, RYAN & LISA 217912300376 LOCKE, FREDERICK W & MUTILLO-LONG, JEANNE R 217912300001 BRM PROPERTIES LLC ROW 217912300467 NICHOLSON, RICHARD E EXEMPT PROPERTY TRUST UDT 08/09/2007 217912401004 LARRY AND SUSIE BRANNON FAMILY TRUST 217912301002 NILSSON, STEVEN & CHRISTINE 217912401006 BRAMCO LLC 217912401003 GRUENEFELDT, DAN K LIVING TRUST U/A/D 10/9/23 C o l or ad o R iv e r W a r d s a n d R e y n o l d s D i t c h Divi de C ree k D I V I D E C R E E K R D COLORADORIVERRD 395 396 397 398 399 400 401 402 403 404405 406 406A 407408 409 410 411 412 413 NEW CASTLE SILT   0 500 1Č000ee0 S(ečƫ1č5Č000 D0ečƫ8ĥ14ĥ2024 D0ƫS+1.e/čƫ1.n/ƫĒƫMD+nne((Č e(ƫEne.g5ČƫESIČƫČƫDOT L!#!* .+,+/edƫT.n/)%//%+nƫ+(e E4%/0%ngƫT.n/)%//%+nƫ+(e Ae//ƫL+0%+nƫ.+) +1n05ƫ+d 1(ƫ+10e (%g$0ƫ0$ .%20eƫAe// .+,+/edƫen0e.(%ne E4%/0%ngƫen0e.(%ne 1((ƫS%0e .e(ƫ+1nd.5 MAP 4 OF 11 Project: I:\ESP\Projects\XcelEnr\Rebuilds_GIS\ArcGIS_Pro\6584\2024_07_25_HaulRouteUpdates\2024_07_25_HaulRouteUpdates.aprx Layout: McLin Project Components gwbuck  McLin Yard Project Components e(ƫEne.g5ƫ%.1%0ƫ6584 M%0$e((ƫ.ee'ƫ0+ƫ0eƫ%ýeƫe1%(d .üe(dƫ+1n05Čƫ+(+.d+ 393 395 396 397 399 218118200287 MIDNIGHT STAR BREEDERS LLC 218118200260 1078 ROAD 335 LLC 217912400372 WALLEN, GLEN A 218107302004 BOSWORTH, STACY D & MARK A 218107302002 TOLLE, RALPH 218107302005 LLOYD, KING & PAMELA M 217912400628 FREI, FRED FRANCES LIVING TRUST DATED AUGUST 13, 2007 & FREI, JANET SHIRLEY LIVING TRUST DATED AUGUST 13,2007 217912400262 FREI, FRED FRANCIS LIVING TRUST DTD 08-13-07 & & FREI, JANET SHIRLEY LIVING TRUST DTD 8-13-07 " 217912400433 GROSS, DAN L & LOIS E 217912400373 DANIEL, JOSE P 218107302003 MEADE, DONNA M & WHITSON-O'FLINN, ROBIN M & O'FLINN, SEAN 218117200086 JOLLEY MESA LLC 218107100951 BUREAU OF LAND MANAGEMENT 218128300958 BUREAU OF LAND MANAGEMENT 218107300235 WARD, KENNETH 218107300259 RIVER ROCK RANCH 1412 LLC 218107303005 WALKER, TIMOTHY M 217913100554 MCLIN, SHARON T & BRIT C ROW CO L O R A D O R I V E R R D 393 394 395 396 397 398 399 400 NEW CASTLE SILT   0 500 1Č000ee0 S(ečƫ1č5Č000 D0ečƫ8ĥ14ĥ2024 D0ƫS+1.e/čƫ1.n/ƫĒƫMD+nne((Č e(ƫEne.g5ČƫESIČƫČƫDOT L!#!* .+,+/edƫT.n/)%//%+nƫ+(e E4%/0%ngƫT.n/)%//%+nƫ+(e Ae//ƫL+0%+nƫ.+) +1n05ƫ+d 1(ƫ+10e (%g$0ƫ0$ .%20eƫAe// .+,+/edƫen0e.(%ne E4%/0%ngƫen0e.(%ne 1((ƫS%0e .e(ƫ+1nd.5 MAP 5 OF 11 Project: I:\ESP\Projects\XcelEnr\Rebuilds_GIS\ArcGIS_Pro\6584\2024_07_25_HaulRouteUpdates\2024_07_25_HaulRouteUpdates.aprx Layout: McLin Project Components gwbuck  McLin Yard Project Components e(ƫEne.g5ƫ%.1%0ƫ6584 M%0$e((ƫ.ee'ƫ0+ƫ0eƫ%ýeƫe1%(d .üe(dƫ+1n05Čƫ+(+.d+ 376 377378379 381-DE-T 383 385 387 388 389 391 393 395 218107302002 TOLLE, RALPH 218117200086 JOLLEY MESA LLC 218107200203 155 FIOU FAMILY RANCH LLLP 218107200195 SHORT, CARL MICHAEL 218107302001 EAST ACRES DUBOIS LLC 218107200104 BAIR, JOSEPH E & DEBRA L JOINT REVOCABLE LIVING TRUST U/A/D 06/21/2023 218107200105 MANERA, CHRISTOPHER 218107100951 BUREAU OF LAND MANAGEMENT 218106400271 GRAY, ALVIE O & SMITH, JACKIE L 218106400180 MCNEEL, RAYMOND & CAROL 218106400064 MOULTON HERITAGE LLC 218106400202 OSAGE FARMS LLC 218107303004 TESKY, CHELSEY & KYLE 218107303003 WHITTEN, QUINN D 218107303007 YEVSEYEVA, KRISTINA 218107203002 GUTIERREZ PAVON, REYES & CARAVEO GONZALEZ, ERICKA 218107300235 WARD, KENNETH ROW 218107303005 WALKER, TIMOTHY M 218107203008 DAVIS, TYLER & ASHLEY 218107303006 BRISCOE, RYAN & LISA 218107203001 MILLER, DAVID J & RENEE T 218107203009 VARGAS, RUBEN & SANCHEZ, GERARDO & ANCHONDO, SEVERO 218106300053 CHENOWETH, LOTTIE TRUST DTD 9/29/93 GABRIEL JOHN CHENOWETH, TRUSTEE ROW 218105300295 COLORADO RIVER LANDING LLC Colora d o R i v e r Lowe r C a c tus V a l l e y D i t c h COL O R A DO R I V E R R D 70 ON-376 ON-376A 377378379 380381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 NEW CASTLE SILT   0 500 1Č000ee0 S(ečƫ1č5Č000 D0ečƫ8ĥ14ĥ2024 D0ƫS+1.e/čƫ1.n/ƫĒƫMD+nne((Č e(ƫEne.g5ČƫESIČƫČƫDOT L!#!* .+,+/edƫT.n/)%//%+nƫ+(e E4%/0%ngƫT.n/)%//%+nƫ+(e Ae//ƫL+0%+nƫ.+) +1n05ƫ+d 1(ƫ+10e (%g$0ƫ0$ .%20eƫAe// .+,+/edƫen0e.(%ne E4%/0%ngƫen0e.(%ne 1((ƫS%0e .e(ƫ+1nd.5 MAP 6 OF 11 Project: I:\ESP\Projects\XcelEnr\Rebuilds_GIS\ArcGIS_Pro\6584\2024_07_25_HaulRouteUpdates\2024_07_25_HaulRouteUpdates.aprx Layout: McLin Project Components gwbuck  McLin Yard Project Components e(ƫEne.g5ƫ%.1%0ƫ6584 M%0$e((ƫ.ee'ƫ0+ƫ0eƫ%ýeƫe1%(d .üe(dƫ+1n05Čƫ+(+.d+ 362 364 365366 367 369 371373375 218108100214 ROTH, JAMIE & CHANDLER 218116300085 JOLLEY MESA LLC 218117200086 JOLLEY MESA LLC 218108200215 FETCHIK, PHILLIP F & MARJORIE F 218107100951 BUREAU OF LAND MANAGEMENT 218105400158 JACE LLC 218104307001 PODMORE, MICHAEL W REVOCABLE LIVING TRUST UAD 04/12/2023 218105400140 240 RIPPY LN LLC 218105400274 SAKIS, BEVERLY 218105400248 KERALSA, LLC 218105400249 SHERICK ENTERPRISES LLC 218105400250 TNS PROPERTY LLC 218105400251 TOUCAN LAND CO RLLLP 218104300016 RAKICH, RICK ANTHONY 218104307036 RAPIDS ON THE COLORADO HOMEOWNERS AASSOCIATION 218105400039 WARREN, BONNIE D 218105400038 DAVIDSON, DANIEL C & LINDSAY J 218105400141 MUSICH, KYLE E & SHANE P 218105400129 GORNICK, JAMES A 218105400208 VOSKUIL, JORDEN 218105300293 HILL, BARBARA L 218104307033 RAPIDS DEVELOPMENT CORPORATION 218104307032 RAPIDS DEVELOPMENT CORPORATION 218104307029 DICKERSON, ROGER G TRUST 218104307004 TNS PROPERTY LLC 218104307006 DE LEON VALADEZ, EUSTOLIA & LEON JOSE 218104307002 JOHNSON, GARY M & DARLENE A 218104307003 COON, BENJAMIN DON & BRUCKER COON, ERICA LESLIE 218104307005 MAULDIN, MELVIN LAWRENCE & JUDY MARIE 218104307008 WITTRIG, R AND C FAMILY REVOCABLE LIVING TRUST DATED 11/4/21 218104307007 DRUMMOND, ANGUS J & HILARY S " ROW 218108100213 BUNCHMAN, MARK R 218105300294 LAIDLAW, TOM F & NAOMI M ROW 218108200142 NADON FAMILY TRUST 04/20/2022 ROW 218105300295 COLORADO RIVER LANDING LLC Lower Cactus Valley Ditch Colorad o R i v e r CO L OR AD O RIVER R D D A N D R G WES T ERN R A I L R O AD6 70 362 363 364 365 366 367 368369 370371 372373 ON-374ON-375 ON-376 NEW CASTLE SILT   0 500 1Č000ee0 S(ečƫ1č5Č000 D0ečƫ8ĥ14ĥ2024 D0ƫS+1.e/čƫ1.n/ƫĒƫMD+nne((Č e(ƫEne.g5ČƫESIČƫČƫDOT L!#!* .+,+/edƫT.n/)%//%+nƫ+(e E4%/0%ngƫT.n/)%//%+nƫ+(e Ae//ƫL+0%+nƫ.+) +1n05ƫ+d 1(ƫ+10e (%g$0ƫ0$ .%20eƫAe// .+,+/edƫen0e.(%ne E4%/0%ngƫen0e.(%ne .e(ƫ+1nd.5 MAP 7 OF 11 Project: I:\ESP\Projects\XcelEnr\Rebuilds_GIS\ArcGIS_Pro\6584\2024_07_25_HaulRouteUpdates\2024_07_25_HaulRouteUpdates.aprx Layout: McLin Project Components gwbuck  McLin Yard Project Components e(ƫEne.g5ƫ%.1%0ƫ6584 M%0$e((ƫ.ee'ƫ0+ƫ0eƫ%ýeƫe1%(d .üe(dƫ+1n05Čƫ+(+.d+ 350 351 352 354 355356-DE 356A-T 357 358359 361 362 218116300085 JOLLEY MESA LLC 218104307001 PODMORE, MICHAEL W REVOCABLE LIVING TRUST UAD 04/12/2023 218104400269 HURST, JOE ELBA & AREA BRADLEY 218104400268 HEMELT, JOSEPH & KYLA 218104300016 RAKICH, RICK ANTHONY 218104307036 RAPIDS ON THE COLORADO HOMEOWNERS AASSOCIATION 218104300125 ALCORN, CLYDE DALE-ESTATE OF 218104200015 MURR FAMILY TRUST 218104200184 VIGIL, CHRISTOPHER TRUST & VIGIL, PATRICIA C TRUST 218104307033 RAPIDS DEVELOPMENT CORPORATION 218104307032 RAPIDS DEVELOPMENT CORPORATION 218104307030 RAPIDS DEVELOPMENT CORPORATION 218109100076 HILTON, GENE R & MARY J 218104307029 DICKERSON, ROGER G TRUST 218104307004 TNS PROPERTY LLC 218104307035 RAPIDS ON THE COLORADO HOMEOWNERS AASSOCIATION 218104307024 RAPIDS DEVELOPMENT CORPORATION 218104307006 DE LEON VALADEZ, EUSTOLIA & LEON JOSE 218104307034 RAPIDS ON THE COLORADO HOMEOWNERS AASSOCIATION 218104307023 FISCHER, JAMES C & KAREN L 218104400071 BRANNAN PROPERTIES, INC & JF&T CO 218104307019 RAPIDS 19 LLC 218104307009 HOLICK, CHRIS 218104307018 SMITH, SHEILA LYNN 218104307017 AQUINNAH CONSTRUCTION LLC " 218104307016 RIVERA, FRANCISCO DE JESUS218104307012 SPENCER CHARLES HOLDINGS LLC 218104307014 RAPIDS DEVELOPMENT CORPORATION 218104400267 GOSS, JOHN ROW 218104307031 RAPIDS DEVELOPMENT CORPORATION 218104307002 JOHNSON, GARY M & DARLENE A 218104307003 COON, BENJAMIN DON & BRUCKER COON, ERICA LESLIE 218104300120 KRUMPFER, DENNIS MICHAEL & SUSAN KATHERINE 218104307005 MAULDIN, MELVIN LAWRENCE & JUDY MARIE 218104307021 RAPIDS DEVELOPMENT CORPORATION 218104307022 RAPIDS DEVELOPMENT CORPORATION 218104307008 WITTRIG, R AND C FAMILY REVOCABLE LIVING TRUST DATED 11/4/21 218104307011 SPENCER CHARLES HOLDINGS LLC 218104100124 QUANTOVATIONS L L C 218104307026 RAPIDS DEVELOPMENT CORPORATION 218104307025 RAPIDS DEVELOPMENT CORPORATION 218104307027 RAPIDS DEVELOPMENT CORPORATION 218104307028 TELLES GUZMAN, JOSE ANGEL & ALICIA & GUZMAN CABRERA, ROSALI 218104307020 ANDRUS, DAVID M & SUZAN M 218104307007 DRUMMOND, ANGUS J & HILARY S 218104307010 EICHER, DENNIS & BALLARD, KARIN W 218104307015 RAPIDS DEVELOPMENT CORPORATION218104307013 MURRAY, EDWARD & CHERRI 218104400270 MCVICKER, JOSEPH ROW 218127100201 STATE OF COLORADO DIVISION OF WILDLIFE ROW ROW Garfield C r ee k Colora do River Ware a n d H i nd s Ditch G A R F I E L D C R E E K R D COLORA D O R IVER R D D A N D R G W ESTE RN R A IL R O AD 6 70 348 349 350 351 352 353 354 355 356-DE357 358 359 360 361 362 363 NEW CASTLE SILT   0 500 1Č000ee0 S(ečƫ1č5Č000 D0ečƫ8ĥ14ĥ2024 D0ƫS+1.e/čƫ1.n/ƫĒƫMD+nne((Č e(ƫEne.g5ČƫESIČƫČƫDOT L!#!* .+,+/edƫT.n/)%//%+nƫ+(e E4%/0%ngƫT.n/)%//%+nƫ+(e Ae//ƫL+0%+nƫ.+) +1n05ƫ+d 1(ƫ+10e (%g$0ƫ0$ .%20eƫAe// .+,+/edƫen0e.(%ne E4%/0%ngƫen0e.(%ne 1((ƫS%0e .e(ƫ+1nd.5 MAP 8 OF 11 Project: I:\ESP\Projects\XcelEnr\Rebuilds_GIS\ArcGIS_Pro\6584\2024_07_25_HaulRouteUpdates\2024_07_25_HaulRouteUpdates.aprx Layout: McLin Project Components gwbuck  McLin Yard Project Components e(ƫEne.g5ƫ%.1%0ƫ6584 M%0$e((ƫ.ee'ƫ0+ƫ0eƫ%ýeƫe1%(d .üe(dƫ+1n05Čƫ+(+.d+ 339 340 341-DE 342 345 346 347 348 218103300248 JUNIPER DRAW LLC 218102300241 ATKINSON, GARY M 218102200269 RUECHEL, JENNIFER & BLAKE " 218102200284 SCHUMACHER, ANDREW & ELIZABETH " 212536400003 STATE OF COLORADO DEPARTMENT OF HIGHWAYS 212331400016 BURNING MOUNTAIN LAND & CATTLE LLC 212331300007 TALBOTT ENTERPRISES, INC 218103206004 APPLE TREE MHC LLC 218103206002 GARDEN SCHOOL DBA LIBERTY CLASSICAL ACADEMY " 218104400267 GOSS, JOHN 218103206001 APPLE TREE MHC LLC ROW ROW 218104400270 MCVICKER, JOSEPH 218103206003 APPLE TREE MHC LLC 218103200006 TALBOTT ENTERPRISES, INC 218127100201 STATE OF COLORADO DIVISION OF WILDLIFE ROW A l k a l i C r e e k AP P L E D R ALKAL I C R E E K R D CO L O RAD O RIV E R R D 70 338 339 340 341 342 343 345 346 347 348 NEW CASTLE SILT   0 500 1Č000ee0 S(ečƫ1č5Č000 D0ečƫ8ĥ14ĥ2024 D0ƫS+1.e/čƫ1.n/ƫĒƫMD+nne((Č e(ƫEne.g5ČƫESIČƫČƫDOT L!#!* .+,+/edƫT.n/)%//%+nƫ+(e E4%/0%ngƫT.n/)%//%+nƫ+(e Ae//ƫL+0%+nƫ.+) +1n05ƫ+d 1(ƫ+10e (%g$0ƫ0$ .%20eƫAe// .+,+/edƫen0e.(%ne E4%/0%ngƫen0e.(%ne .e(ƫ+1nd.5 MAP 9 OF 11 Project: I:\ESP\Projects\XcelEnr\Rebuilds_GIS\ArcGIS_Pro\6584\2024_07_25_HaulRouteUpdates\2024_07_25_HaulRouteUpdates.aprx Layout: McLin Project Components gwbuck  McLin Yard Project Components e(ƫEne.g5ƫ%.1%0ƫ6584 M%0$e((ƫ.ee'ƫ0+ƫ0eƫ%ýeƫe1%(d .üe(dƫ+1n05Čƫ+(+.d+ 301 302 320321 322 323324325326 OM-328330 330A 331 331A-DE 332-DE-T 333 334335 336 337 339 340 218102200285 CHRISTOFFERSEN, NICHOLAS JEFFREY 218102200286 MORENO, DANIA218102200284 SCHUMACHER, ANDREW & ELIZABETH 212331411007 NEW CASTLE MINI STORAGE LLC 212331411009 M&C FATTOR LLC 212331411008 NATIONAL PROPANE, LP 212331400017 NEW CASTLE, TOWN OF 212331400009 NEW CASTLE, TOWN OF 212331300002 NEW CASTLE, TOWN OF 212331400012 212331103017 FOGG, WAVA L & C GARY 212331400013 ROYAL MINI STORAGE, LLC 212331411002 KEITH, FOREST & KELLY 212331400005 NAP COLORADO #2 LLC 212331304001 NEW CASTLE, TOWN OF (SEWAGE PLANT) 212331407002 FERRIN, ROSIE B (ESTATE OF) 212331400016 BURNING MOUNTAIN LAND & CATTLE LLC 212331412002 NEW CASTLE DUBOIS LLC 212331400015 MATA, MARIA A & JUAN & GONZALEZ, JOSE 212331411006 PLATZER FAMILY TRUST212331411004 TRUSFAB, INC 212331304002 NEW CASTLE, TOWN OF212331307001 COLUMBINE MOVING & STORAGE 212331200022 STOREY ENTERPRISES, INC 212331200017 BURNING MOUNTAIN LAND & CATTLE LLC 212331100002 CVR INVESTORS INC " 212536200060 BURNING MOUNTAIN LAND & CATTLE LLC 212331300007 TALBOTT ENTERPRISES, INC ROWROW 212331412001 BLUE BARREL LLC 212331300003 ROW ROW ROW 212331307002 NEW CASTLE, TOWN OF ROW 218103200006 TALBOTT ENTERPRISES, INC 218127100201 STATE OF COLORADO DIVISION OF WILDLIFE 212331100001 NEW CASTLE, TOWN OF 212331200019 GARFIELD COUNTY SCHOOL DISTRICT RE-2 ROW ROW Elk Cr ee kTompkins Di tch A l k ali Cree k Wa r e and H in ds Dit c h Colorado Rive r RODREICK LN ALKALI CREEK RD COLORADO RIVER RD D A N D R G W ESTERN R AILROAD 6 70 332-A-DE 333-DE 334 335336 337 338 339 340 301 302 320 321 322 323 324 325326 OM-327 OM-328OM-329A330 330A 331 NEW CASTLE SILT   0 500 1Č000ee0 S(ečƫ1č5Č000 D0ečƫ8ĥ14ĥ2024 D0ƫS+1.e/čƫ1.n/ƫĒƫMD+nne((Č e(ƫEne.g5ČƫESIČƫČƫDOT L!#!* .+,+/edƫT.n/)%//%+nƫ+(e E4%/0%ngƫT.n/)%//%+nƫ+(e Ae//ƫL+0%+nƫ.+) +1n05ƫ+d S1/00%+n 1(ƫ+10e (%g$0ƫ0$ .%20eƫAe// .+,+/edƫen0e.(%ne E4%/0%ngƫen0e.(%ne 1((ƫS%0e .e(ƫ+1nd.5 MAP 10 OF 11 Project: I:\ESP\Projects\XcelEnr\Rebuilds_GIS\ArcGIS_Pro\6584\2024_07_25_HaulRouteUpdates\2024_07_25_HaulRouteUpdates.aprx Layout: McLin Project Components gwbuck  McLin Yard Project Components e(ƫEne.g5ƫ%.1%0ƫ6584 M%0$e((ƫ.ee'ƫ0+ƫ0eƫ%ýeƫe1%(d .üe(dƫ+1n05Čƫ+(+.d+ 290 291-DE 292293294 295-DE 296297 298 299 300 301 302 320321 322 323 324325 326 218102300267 DUFFY, MICHAEL 218102200285 CHRISTOFFERSEN, NICHOLAS JEFFREY 218102200286 MORENO, DANIA 218102108001 COAL SEAM LLC 218102200284 SCHUMACHER, ANDREW & ELIZABETH 212332305005 CCH PROPERTY LLC 212332305002 FOUR SPRYS INVESTMENTS, LLC 212332400113 BOTTLING GROUP, LLC 212332304004 HURD NEW CASTLE LLC 212332304011 MCDONALDS REAL ESTATE COMPANY 212331411007 NEW CASTLE MINI STORAGE LLC 212331411009 M&C FATTOR LLC 212331411008 NATIONAL PROPANE, LP 212331400017 NEW CASTLE, TOWN OF 212331400009 NEW CASTLE, TOWN OF 212331400012 212331103017 FOGG, WAVA L & C GARY 212332200196 GARFIELD SCHOOL DISTRICT RE-2212332200193 NEW CASTLE, TOWN OF 218102100262 VIGIL, RUBEN & GONZALES VILLEGAS, JUAN 212332305004 MUELLER CONSTRUCTION SERVICES INC 212332305003 MENDOZA, IGNACIO & MARIA LUISA 212331400013 ROYAL MINI STORAGE, LLC 212331411002 KEITH, FOREST & KELLY 212331400005 NAP COLORADO #2 LLC 212332304001 KM CO NEW CASTLE PARTNERS LLC 212332304009 NEW CASTLE, TOWN OF 212331407002 FERRIN, ROSIE B (ESTATE OF) 212332305001 BRAMCO, LLC A COLORADO LIMITED LIABILITY COMPANY 212331400016 BURNING MOUNTAIN LAND & CATTLE LLC 212331412002 NEW CASTLE DUBOIS LLC 212331400015 MATA, MARIA A & JUAN & GONZALEZ, JOSE 212331411006 PLATZER FAMILY TRUST 212331411004 TRUSFAB, INC 212331100002 CVR INVESTORS INC ROW 212332300036 NEW CASTLE, TOWN OF 212332302064 RAWAL, DHANANJAY 212331412001 BLUE BARREL LLC 212332300131 NEW CASTLE, TOWN OF 212332200187 RG LAKOTA II LLC 212332200191 CVR INVESTORS INC 212331300003 ROW ROW ROW ROW 212332300122 NEW CASTLE, TOWN OF 212332302065 NEW CASTLE, TOWN OF 212332222023 NEW CASTLE, TOWN OF ROW 212331412003 GABOSSI, ROC & MARY 218127100201 STATE OF COLORADO DIVISION OF WILDLIFE 212332240003 LAKOTA RIDGE SENIOR APARTMENTS LLLP 212332247007 MALO DEVELOPMENT COMPANY-LAKOTA LLC 212331100001 NEW CASTLE, TOWN OF 212332140001 BURNING MTN FIRE PROTECTION DISTRICT 212332304008 NIELSON, CORY B & JONG OK ROW 212332302066 NEW CASTLE, TOWN OF 212332304010 MC THE IVY NEW CASTLE LLC ROW ROW 212332302062 MEDSKER PARTNERSHIP LLLP Co l o r a d o R i v e r RODREICK LN CASTLE VALLEY BD C AV BUR NIN G MO UNTAINAV I70 O VE RPA S S COLO RAD O R IVE RRD D AND RG W ESTE R N RAIL ROAD 6 70 290 291-DE 292 293 294 295-DE 296 297 298 299 300 301302 320 321 322 323324325326 OM-327 NEW CASTLE SILT   0 500 1Č000ee0 S(ečƫ1č5Č000 D0ečƫ8ĥ14ĥ2024 D0ƫS+1.e/čƫ1.n/ƫĒƫMD+nne((Č e(ƫEne.g5ČƫESIČƫČƫDOT L!#!* .+,+/edƫT.n/)%//%+nƫ+(e E4%/0%ngƫT.n/)%//%+nƫ+(e Ae//ƫL+0%+nƫ.+) +1n05ƫ+d 1(ƫ+10e .%20eƫAe// .+,+/edƫen0e.(%ne E4%/0%ngƫen0e.(%ne .e(ƫ+1nd.5 MAP 11 OF 11 Project: I:\ESP\Projects\XcelEnr\Rebuilds_GIS\ArcGIS_Pro\6584\2024_07_25_HaulRouteUpdates\2024_07_25_HaulRouteUpdates.aprx Layout: McLin Project Components gwbuck  McLin Yard Project Components e(ƫEne.g5ƫ%.1%0ƫ6584 M%0$e((ƫ.ee'ƫ0+ƫ0eƫ%ýeƫe1%(d .üe(dƫ+1n05Čƫ+(+.d+ TRANSMISSION LINE 6584 REBUILD PROJECT ATTACHMENT K: Compliance with Article 7 Standards Garfield County Land Use and Development Code Article 7: Standards DIVISION 1: GENERAL APPROVAL STANDARDS 7-101. ZONE DISTRICT USE REGULATIONS The parcel to be utilized for the McLin Yard is currently zoned as Rural (R). Temporary uses are allowed in any zone district pursuant to Section 3-401.D of the Land Use and Development Code. Article 3 of the Garfield County Land Use and Development Code states that the Rural Zone District is “intended to protect the existing character of the area from uncontrolled and unmitigated residential, commercial and industrial use. The zone district provides for the use of natural resources, recreational development, rural residential, and other uses.” (Garfield County 2023). The McLin Yard will not conflict with the zone district use restrictions, will be used on a temporary basis, and will be restored and returned to its pre-construction use and condition at the end of the Project. 7-102. COMPREHENSIVE PLAN AND INTERGOVERNMENTAL AGREEMENTS The Garfield County Comprehensive Plan was developed for the general purpose of guiding and accomplishing a coordinated and harmonious development of the relevant territory, which, in accordance with present and future needs and resources, will best promote the general welfare of the inhabitants (Garfield County, 2020). The Vision for Garfield County is dedicated to managing and directing growth to dedicated Urban Growth Areas (UGAs) and other areas that can accommodate growth cost effectively, in order to create thriving communities while promoting a diverse, sustainable and healthy economy, protecting wildlife, maintain or improving the quality of our natural environment, and preserving the County’s rural and western heritage (Garfield County, 2020). The proposed temporary use is in support of a transmission line rebuild project that will strengthen existing infrastructure and provide continued reliable energy service to Garfield County, supporting the growth of industrial, commercial, and residential uses in the surrounding areas. The temporary use will support the 6584 Transmission Line Rebuild Project (Project) that will revitalize and strengthen electric infrastructure in Garfield County to meet future demand resulting from development encouraged in the Garfield County Comprehensive Plan. The temporary use will not create any new negative impacts to open space, scenic vistas, public trails, and other recreational opportunities and will preserve these elements in Garfield County. There will be no long-term negative visual impact to the surrounding community resulting from the temporary use because the parcel will be restored in a manner generally similar to preconstruction conditions. Any required environmental permits and approvals will be acquired prior to construction and any conditions of approval, including environmental mitigation measures, will be implemented to protect the natural environment. The temporary use will occur on a previously developed parcel of land, reducing impacts to surrounding land use and resources. No intergovernmental agreements are applicable to the use of the McLin Yard or the Project. 7-103. COMPATIBILITY The nature, scale, and intensity of the proposed temporary use is compatible with surrounding land uses, which include rural residential areas, agricultural resource lands, agricultural production areas, and natural resource areas. Temporary staging areas are routinely sited in Rural areas and the temporary use will occur on a previously developed parcel of land. The surrounding parcels are also zoned Rural. There is an adjacent parcel of public lands administered by the Bureau of Land Management (BLM), however, no direct or indirect impacts to this land from the temporary use are proposed or will occur. 7-104. SOURCE OF WATER This land use will not require an onsite source of water for the temporary use. Some water use from outside sources will be necessary to control dust emissions in the McLin Yard, to service portable toilets, and to provide bottled drinking water to the workforce. 7-105. CENTRAL WATER DISTRIBUTION AND WASTEWATER SYSTEMS Central water distribution and wastewater systems are not required for the temporary use proposed. Portable toilets and hand washing stations will be provided, and water for consumption will be purchased and brought onsite from outside sources to be consumed during construction. 7-106. PUBLIC UTILITIES No public utilities will be required during temporary use of the parcel. The primary use of the parcel will be storage, staging, delivery of materials and equipment, and as a helicopter landing zone for flight operations to support the Project. 7-107. ACCESS AND ROADWAYS Access to the McLin Yard will be from County Roads 335 and 311. No new roads will be created. Where road improvements are needed, Xcel Energy will secure the necessary permits to comply with Garfield County regulations including grading, stormwater, and erosion control permits. Due to its rural location, the roads accessing the parcel have the capacity to efficiently and safely service the additional and temporary traffic that will be generated and will not cause traffic congestion or unsafe conditions. There will be impacts due to increased presence of vehicles, including personal vehicles, delivery trucks and semis, but this impact will be temporary. 7-108. USE OF LAND SUBJECT TO NATURAL HAZARDS The McLin Yard is not located in an area identified with Natural and Geological Hazards, such as falling rock, landslides, snow slides, mud flows, radiation, flooding, or high-water tables. The McLin Yard is being used on a temporary basis and not permanently developed, therefore no elimination or mitigation of potential effects for hazardous conditions are necessary. Once construction has been completed, the McLin Yard will be restored in a manner generally similar to its condition prior to construction and as may be provided for in private agreements. 7-109. FIRE PROTECTION Adequate fire protection will be provided for the McLin Yard by the Colorado River Fire Rescue Protection District. Xcel Energy will coordinate with the Colorado River Fire Rescue Protection District prior to the proposed temporary use. Measures to prevent and control fires during the proposed temporary use will be implemented in accordance with Garfield County and Colorado River Fire Rescue Protection District requirements. Xcel Energy offers free online safety training to fire departments and first responders that is based on national standards through its Responding to Utility Emergencies Program. DIVISION 2: GENERAL RESOURCE PROTECTION STANDARDS 7-201. AGRICULTURAL LANDS It is not anticipated that activities at the McLin Yard will adversely affect agricultural operations, nor is any division or development of land proposed as a part of those activities. Uses within the McLin Yard will be limited to construction support activities. After construction of the transmission line, the McLin Yard will be restored and returned to its pre-construction use. Dogs or other domestic animals that may interfere with livestock will not be permitted on site during temporary use. Any fences and gates present will be protected and left in the condition they are found or repaired as soon as reasonably possible by Xcel Energy and its contractors. Any damage to roads leading into the parcel will be repaired by Xcel Energy, including any fences that may be damaged. Dust control will be implemented during temporary use via water applications to minimize impacts to livestock and crops in the area. 7-202. WILDLIFE HABITAT AREAS Potential impacts to wildlife habitat will be temporary and limited to the parcel and established access roads. Increased noise and equipment movement during material deliveries may temporarily displace mobile wildlife species from the immediate workspace area. These impacts are considered short-term in duration and normal wildlife movements will be expected to resume after the temporary use has been completed and disturbed areas have been restored in a manner generally similar to preconstruction conditions. Changes to species composition, number of threatened and endangered species, species habitat, and the food web are not expected due to the temporary nature of the use. In areas where grading is necessary, Xcel Energy will implement measures to prevent the spread and introduction of noxious weeds and non-native vegetation and revegetate disturbed areas following construction in a manner generally similar to preconstruction conditions. No trees exist on the parcel, however, if construction is scheduled to occur during raptor breeding season, raptor nest surveys will be conducted prior to construction to determine whether active nests are present near the parcel. 7-203. PROTECTION OF WATERBODIES No wetlands or other surface waters are located on the parcel. The temporary use will not affect wetlands or other surface waters in the vicinity and is not anticipated to divert debris flow or floodwaters. Best Management Practices (BMPs) will be implemented to reduce stormwater-related impacts to nearby waterbodies in compliance with Colorado Department of Public Health and Environment (CDPHE) regulations. 7-204. DRAINAGE AND EROSION Xcel Energy will manage any soil impacts on the parcel by strictly adhering to a CDPHE-regulated Stormwater Management Plan (SWMP) and will implement and maintain erosion and sediment control BMPs designed to protect soils and control erosion. Xcel Energy will secure the necessary permits to comply with Garfield County regulations including grading, stormwater, and erosion control permits. Xcel Energy can provide copies of the permits to the County, as necessary, prior to the start of construction. A detailed Grading Plan outlining the improvements needed for the temporary use will be provided, as required. 7-205. ENVIRONMENTAL QUALITY The temporary use is not expected to have a significant impact on environmental quality. No significant wetland impacts are anticipated from the temporary use and water quality will not be impacted because Xcel Energy will implement spill and erosion control prevention and clean up measures in accordance with permits. Soil disturbance will result from vegetation clearing and mobile construction equipment traveling to and from the parcel. However, soil will be stabilized with the implementation of erosion control BMPs. Impacts from air emissions and low-level fugitive dust will be short-term and occur primarily from the use of mobile construction equipment as materials are delivered to and from the parcel. Dust will be controlled through the application of water to roads and the McLin Yard during activities. Emissions and dust resulting from the temporary use will not result in air quality reduction below acceptable levels established by the Colorado Air Pollution Control Division. 7-206. WILDFIRE HAZARDS Xcel Energy’s commitment to reducing wildfire risk is outlined in Xcel Energy’s 2020 Wildfire Mitigation Plan (Xcel, 2020). The McLin Yard is within and surrounded by areas with moderate to high Wildfire Susceptibility Index within the Wildland Urban Interface. The temporary use will not create additional risk for wildfire with the implementation of fire prevention BMPs, including having basic firefighting equipment on site and planning and coordination with the Colorado River Fire Rescue Protection District. Vegetation management may be required as part of the temporary use, thereby reducing fuel for wildfires. Xcel Energy will coordinate with local fire departments and first responders and consult with them to discuss any concerns within their response area. 7-207. NATURAL AND GEOLOGIC HAZARDS The McLin Yard is not located in an area with identified Natural and Geological Hazards. It is not anticipated that the temporary use will have any materially adverse impact to soil, geologic conditions, or natural hazards as the primary use of the parcel will be storage, staging, delivery of materials and equipment, and a helicopter landing zone to support the Project. The temporary use is not within any avalanche, landslide, rockfall or alluvial fan hazard areas, and steep slopes are absent. The parcel is free of corrosive or expansive soils and rock and no mudflow or fault areas are present. The temporary use is not anticipated to divert debris flow or floodwaters. Any land disturbed during construction will be restored in a manner generally similar to preconstruction conditions. 7-208. RECLAMATION Ground disturbance will increase the potential for erosion, such as removal of protective vegetation and exposure to wind and water erosion. Impacts may result from soil disturbance due to construction machinery traveling to and from the parcel and movement of materials, machinery, and vehicles within the parcel. General construction traffic will be limited to designated access roads and the McLin Yard to minimize impacts. BMPs for erosion control will be implemented to minimize erosion and dust emissions resulting from activities associated with the temporary use in accordance with a SWMP. Topsoil will be stockpiled prior to grading for use in reclamation. The areas affected by the temporary use will be reclaimed in accordance with the approved timeline as soon as possible following demobilization to stabilize the area and reduce visual impacts. Reclamation activities will include re-grading to original land contours and placement of topsoil, followed by revegetation with an approved seed mix. A uniform vegetative cover will be established with a density of 70 percent pre-disturbance levels within four growing seasons. Established cover will not include state or Garfield County noxious weeds or alien annual invasive species. A weed management plan will be implemented to control the spread and propagation of listed noxious weeds and invasive species during the temporary use and reclamation activities. DIVISION 3. SITE PLANNING AND DEVELOPMENT STANDARDS 7-301. COMPATIBLE DESIGN Land use in the surrounding area includes rural residential areas, agricultural resource lands, agricultural production areas, and natural resource areas zoned as Rural and public lands managed by the BLM. The proposed temporary use is compatible with the designated zoning. Land within and surrounding the parcel for the McLin Yard is primarily undeveloped and the temporary use will not impact streets, lots, solar access, parking, pedestrian access, and access to common areas. Operations in the McLin Yard will avoid nuisances to adjacent uses. Any dust, odors, gas, fumes, and glare will not be emitted at levels objectionable to adjacent properties. Noise will not exceed state noise standards pursuant to Colorado Revised Statutes, Article 12 of Title 25 or federal regulations governing noise control for aircraft/helicopters. The hours of operations will be 7 days per week and 12 hours per day. The McLin Yard will be enclosed by a fence for security. 7-302. OFF-STREET PARKING AND LOADING STANDARDS No off-street parking or loading standards apply since the proposed temporary use is within an undeveloped rural parcel of land. Parking areas for vehicles and equipment will be confined to designated areas that will not interfere with local traffic or activities within the McLin Yard. All loading and unloading and storage of materials will occur in designated areas on the parcel. The Site Plan provided in Attachment H of the application depicts parking areas. With landowner permission, surface materials may be applied following grading of the parcel to stabilize soils and proper drainage and stormwater BMPs will be applied. 7-303. LANDSCAPING STANDARDS The temporary use will avoid or minimize impacts to vegetation generally as practicable. As discussed in 7-208, the McLin Yard will be reclaimed following use to acceptable standards pursuant to the terms of the agreement with the landowner and as approved by Garfield County. No landscape plan will apply because the parcel does not currently have specific landscaping in place and the parcel will be restored in a manner generally similar to preconstruction conditions according to the landowner agreement conditions and Garfield County requirements. However, a Revegetation Plan is provided in Attachment M. 7-304. LIGHTING STANDARDS For security purposes, lighting at night in the McLin Yard will be necessary during the proposed temporary use. Lighting will be designed to direct light inward and will be shielded such that concentrated rays of light will not shine directly into other properties. Lighting will not create a traffic hazard and will not include flashing or blinking lights. Light sources will not exceed 40 feet in height. 7-305. SNOW STORAGE STANDARDS A designated snow storage area will be included in the proposed temporary use that will not impede traffic or parking. Since the McLin Yard will be within a rural undeveloped parcel, no snow storage will be in parking spaces or off-street parking or loading areas. Adequate drainage will be provided for snow melt within the parcel and no snow melt will be permitted to drain onto adjacent property. 7-306. TRAIL AND WALKWAY STANDARDS The proposed temporary use will not impact any trails or sidewalks linking to public facilities and no safety or maintenance measures will need to be implemented. OTHER PERTIENT STANDARDS DIVISION 13. ADDITIONAL STANDARDS FOR TEMPORARY USES. 7-1301. TEMPORARY USE A. The applicant, or a member of the applicant’s household, has not applied for a permit for the same or similar use more than twice within the prior twelve (12) month period. Xcel Energy has not previously applied for a TUP for the McLin Yard. B. The use does not result in any negative long-term impact to adjacent properties, public infrastructure, or existing environmental conditions. Adjacent Properties The McLin Yard use will not result in any negative long-term impacts to adjacent properties because the McLin Yard will be restored and returned to the original use upon completion of construction of the Project. Impacts will be limited to short-term impacts associated with construction and are not expected to cause a public nuisance. Any dust, odors, gas, fumes, and glare will not be emitted at levels objectionable to adjacent properties. Impacts and proposed mitigation are described below. Air quality: Impacts from air emissions and low-level fugitive dust will be short-term and occur primarily from the use of mobile construction equipment as materials are delivered to and from the parcel. Dust will be controlled through the application of water to roads and the McLin Yard during activities. Emissions and dust resulting from the temporary use will not result in air quality reduction below acceptable levels established by the Colorado Air Pollution Control Division. Noise: Construction vehicles and equipment will be maintained in proper operating condition and equipped with the manufacturer’s standard noise control devices (e.g., mufflers or engine enclosures). Noise will not exceed state noise standards pursuant to Colorado Revised Statutes, Article 12 of Title 25. Helicopters will be operated in accordance with federal regulations pertaining to noise control. Light: For security purposes, lighting at night in the McLin Yard will be necessary during the proposed temporary use. Lighting will be designed to direct light inward and will be shielded such that concentrated rays of light will not shine directly into other properties. Lighting will not create a traffic hazard and will not include flashing or blinking lights. Light sources will not exceed 40 feet in height. Stormwater: Xcel Energy will manage any soil impacts on the parcel by strictly adhering to a CDPHE- regulated Stormwater Management Plan (SWMP) and will implement and maintain erosion and sediment control BMPs designed to protect soils and control erosion. Public Infrastructure Local government services, transportation infrastructure, educational facilities, housing, water (other than trucked-in water for construction), sewage and wastewater treatment, public transportation, existing businesses, and social services are adequate to support the proposed use due to the small size of the construction crew and temporary nature of the construction activities. Given the relatively small size of the crews needed for construction of the Project, no impacts to emergency health care facilities or law enforcement services are anticipated. Roads and Traffic: Access to the parcel will be from Interstate 70 via River Frontage Road and County Roads 335 and 311. No new roads will be created. Where road improvements are needed, Xcel Energy will secure the necessary permits to comply with Garfield County regulations including grading, stormwater, and erosion control permits. Due to its rural location, the roads accessing the parcel have the capacity to efficiently and safely service the additional traffic that will be generated and will not cause traffic congestion or unsafe conditions. There will be impacts due to increased presence of vehicles, including personal vehicles, delivery trucks and semis, but this will be temporary. Water and Wastewater: Central water distribution and wastewater systems are not required for the temporary use proposed. Some water use from outside licensed sources will be necessary to control dust emissions in the McLin Yard, to service portable toilets, and to provide bottled drinking water to the workforce. Portable toilets and hand washing stations will be provided, and water for consumption will be purchased and brought onsite from outside sources to be consumed during construction. Public Parks: The McLin Yard is not located near any public parks and will not cause impacts. There is an adjacent parcel of public lands administered by the Bureau of Land Management (BLM), however, no direct or indirect impacts to this land by the temporary use are proposed or will occur. Existing Environmental Conditions The temporary use is not expected to have a long-term impact on existing environmental conditions. No significant wetland impacts are anticipated from the temporary use and water quality will not be impacted because Xcel Energy will implement spill and erosion control prevention and clean up measures in accordance with permits. Soil disturbance will result from vegetation clearing and mobile construction equipment traveling to and from the parcel. However, soil will be stabilized with the implementation of erosion control BMPs. Impacts from air emissions and low-level fugitive dust will be short-term and occur primarily from the use of mobile construction equipment as materials are delivered to and from the parcel. Dust will be controlled through the application of water to roads and the McLin Yard during activities. Emissions and dust resulting from the temporary use will not result in air quality reduction below acceptable levels established by the Colorado Air Pollution Control Division. C. The use minimized any significant, adverse short-term impact to adjacent properties, public infrastructure, or existing environmental conditions. Short-term impacts are expected to occur during construction and use of the McLin Yard. Impacts and proposed mitigation are discussed above, under Section 7-1301.B and are detailed in Table 7.1 of the application. D. Pedestrian and vehicular traffic associated with the use are not hazardous or conflict with the existing and anticipated traffic in the neighborhood. As discussed above, under Section 7-1301.B, the roads accessing the parcel have the capacity to efficiently and safely service the additional and temporary traffic that will be generated and will not cause traffic congestion or unsafe conditions. E. Utility, drainage, and other necessary facilities to serve the proposed use will be provided. No new or upgraded utilities, drainage or facilities are anticipated to be needed to serve the McLin Yard. Xcel Energy will manage any soil impacts on the parcel by strictly adhering to a CDPHE-regulated Stormwater Management Plan (SWMP) and will implement and maintain erosion and sediment control BMPs designed to protect soils and control erosion. Xcel Energy will secure the necessary permits to comply with Garfield County regulations including grading, stormwater, and erosion control permits. A detailed Grading Plan outlining the improvements needed for the temporary use will be provided, as required. F. The temporary use location protects the public health, safety, welfare, environment, infrastructure, and wildlife resources of Garfield County. Public Health, Safety, and Welfare It is not anticipated that the McLin Yard use will have any impacts to public health, safety or welfare. In order to protect public safety, Xcel Energy will follow FAA regulations and evacuation requirements during helicopter activities. Environment and Infrastructure Impacts to the environment and infrastructure and proposed mitigation are described above, under Section 7-1301.B. Wildlife Resources Potential impacts to wildlife habitat will be temporary and limited to the parcel and established access roads. Increased noise and equipment movement during material deliveries may temporarily displace mobile wildlife species from the immediate workspace area. These impacts are considered short-term in duration and normal wildlife movements will be expected to resume after the temporary use has been completed and disturbed areas have been restored in a manner generally similar to preconstruction conditions. Changes to species composition, number of threatened and endangered species, species habitat, and the food web are not expected due to the temporary use. In areas where grading is necessary, Xcel Energy will implement measures to prevent the spread and introduction of noxious weeds and non-native vegetation and revegetate disturbed areas following construction in a manner generally similar to preconstruction conditions. No trees exist on the parcel, however, if construction is scheduled to occur during raptor breeding season, raptor nest surveys will be conducted prior to construction to determine whether active nests are present near the parcel. TRANSMISSION LINE 6584 REBUILD PROJECT ATTACHMENT L: Colorado Parks and Wildlife Comment Letter Grand Junction (Area 7) Service Center 711 Independent Ave Grand Junction, CO 81505 P 970.255.6100 | F 970.2556111 Heather Dugan, Acting Director, Colorado Parks and Wildlife Parks and Wildlife Commission: Carrie Besnette Hauser, Chair • Dallas May, Vice-Chair • Marie Haskett, Secretary • Taishya Adams Karen Bailey • Betsy Blecha • Gabriel Otero • Duke Phillips, IV • Richard Reading • James Jay Tutchton • Eden Vardy November 2, 2022 Burns & McDonnell 9785 Maroon Circle, STE 400 Centennial, CO 80112 RE: Xcel Transmission Line Rebuild 6584 Dear Ms. Hines, Thank you for the opportunity to provide comments on the proposed Electric Transmission Line Rebuild of the Mitchell Creek to Rifle Transmission Line 6584 Project (Project). Colorado Parks and Wildlife (CPW) has a statutory responsibility to manage all wildlife species in Colorado. This responsibility is embraced through our mission to perpetuate the wildlife resources of Colorado and provide sustainable outdoor recreation opportunities that educate and inspire future generations. CPW fulfills this mission by responding to requests for comments on wildlife impact reports, land use proposals, and consultations through public- private partnerships. CPW understands from the permit application material that Xcel is replacing approximately 30 miles of 115 kV electrical transmission line from the Mitchel Creek substation to the Rifle Substation in Garfield Counties beginning in 2023. Land ownership within this project area includes public, private, and CPW’s Garfield Creek State Wildlife Area. This Project is a part of a large-scale replacement effort in Western Colorado that has reached the end of its serviceable life. Existing wooden poles will be replaced with single, weathered monopoles resulting in fewer structures than what is currently on the landscape. The proposed alignment will follow the existing alignment with minor re-routes proposed near the City of New Castle. The existing 30-50 foot right of way will be expanded to 75 feet to accommodate design upgrades and installation. Expected construction activities could include ground crews, truck support, line-pulling stations, and helicopter operations with material stored on staging areas throughout the project area although not clearly identified in the project materials. The project proponents briefly address necessary vegetation clearing during construction but do not include a reclamation plan. In reviewing the application material, the Project follows the existing alignment through scrub/shrub wildlife habitat. CPW has identified that this project area is located within the following CPW-mapped High Priority Habitats (HPH) with sound, spatial data and scientifically backed Best Management Practices (BMPs). To protect those habitats listed below, CPW recommends the following best management practices to avoid, minimize, and mitigate adverse impacts to sensitive species within the project area while incorporating logically based flexibility to accommodate the project construction because of its community benefit. • Mule deer severe winter range and winter concentration area: part of the overall range where 90% of the individuals are located when the annual snowpack is at its maximum and/or temperatures are at a minimum in the two worst winters out of ten; and the part of the winter range where densities are at least 200% greater than the surrounding winter range. • Project construction managers should pause work if deer are observed within a 400-meter buffer around the construction area, followed by a call to the District Wildlife Manager to discuss alternative plans. • Communication with CPW to evaluate winter pressures, habitat conditions, and weather patterns should occur weekly or as noticed by construction crews or CPW staff. • Elk Winter range and concentration area: part of the overall range where 90% of the individuals are located when the annual snowpack is at its maximum and/or temperatures are at a minimum in the two worst winters out of ten; and the part of the winter range where densities are at least 200% greater than the surrounding winter range. • Project construction managers should pause work if deer are observed within an 800-meter buffer around the construction area, followed by a call to the District Wildlife Manager to discuss alternative plans. • Communication with CPW to evaluate winter pressures, habitat conditions, and weather patterns should occur weekly or as noticed by construction crews or CPW staff. • Native Species Conservation and Sportfish Management Waters: Ephemeral or intermittent streams and rivers serve as aquatic habitats during periods of flowing water and the absence of flowing water. • Should avoid surface occupancy within 500 feet of the ordinary high-water mark. • During construction and operations, the contractor should prioritize erosion control measures identified within the NPDES Permit to minimize off-site and in-channel sediment transport. • Dust suppression should utilize fresh water only. • Implement a Noxious Weed Management Plan to treat topsoil stockpiles and materials at least bi-annually with spot-treatment as needed utilizing a Colorado-cer tified herbicide applicator. • Erosion control measures will be in place before any ground disturbance such as clearing, grubbing, construction, and reclamation; survey work will be exempt. • Traffic crossing the Native Species Conservation or Sportfish Management Waters should be restricted to a single crossing point to minimize damage to the banks and channel bed. • Protect banks and streambeds by incorporating structure or mat reinforcements. • Sediment collection mechanisms will be installed within the stream bed, including dry channels, and along the banks. • Active Bald Eagle Nest or Roost site: defined as groups of individual trees that provide nesting habitat or diurnal or nocturnal perches and are usually the tallest available trees in the wintering area located primarily in riparian habitats. o No permitted or authorized human activities within .5-miles of winter night roost or communal roost site from November 15th to March 15th if there is a direct line of sight to the activity, .25-mile if there is no direct line of sight. o A Nest survey be performed in each project area (half-mile radius) no later than two weeks before initiating construction for each project location to identify potential raptor nests, perching, foraging areas, and winter roosting areas. o Project construction managers should pause work if nesting or roosting behavior is observed within a .25-mile buffer around the location, followed by communicating with the District Wildlife Manager to discuss alternative plans. o Helicopter activity near identified roosting sites should be avoided from November 15th through March 15th to avoid conflicts with roosting raptor activity. • CPW State Wildlife Area - Garfield Creek SWA: privately owned lands offering wildlife-related recreation to the public, paid for by sportspeople and managed under state law by Colorado Parks and Wildlife for the benefit of wildlife and hosts opportunities for the public to participate in hiking, wildlife viewing, wildlife refugia, and hunting. • Garfield Creek SWA serves as a critical wildlife sanctuary following the big game hunting seasons and when snow levels are high. No work will be authorized on or adjacent to Garfield Creek SWA from December 1st to April 30th. • Garfield Creek SWA is used by hunters throughout big and small game hunting seasons, construction crews should be prepared for early morning and late evening traffic for hunters accessing the area in addition to usual daytime traffic. Protecting large landscapes that support such a wide variety of wildlife species and habitats that they utilize can only be accomplished by partnering with other land users, conservation organizations, and agencies. CPW recommends the following general BMPs that protect wildlife resources. • Submit and follow a robust restoration plan with a wildlife-friendly mix of grasses and shrubs to revegetate disturbed areas. • Any clearing, grubbing, or stockpile materials will be managed to prevent sediment transport and may include seeding with cover crops, tackifier application, or mechanical controls. • Noxious weed control will be required through chemical or mechanical treatment in any disturbed area using a Colorado-certified herbicide applicator. • Any cleared vegetation or topsoil will be treated for noxious weeds and stored outside of the Native Species and Sportfish Management Water Buffer zone and include stormwater control measures. • Notifications to pause or alter work will be at the sole discretion of the CPW District Wildlife Manager or Land Use Specialist and may be short or long-term in nature and will be the result of weather conditions or wildlife movement and other observations. • District Wildlife Managers or Land Use Specialists will assess the situation, the impact, and the duration of the disturbance to develop alternative work plans. • Project construction Managers will discuss upcoming weather events that may impact big game movements, accessibility concerns, or damage to the resources with CPW staff. • Elk, deer, and other wildlife may not be hazed or moved off-site. • Work can resume if the presence of big game is not detected for 24 hours. • Dogs will not be allowed at the Project location. • Trash and debris should be removed daily. • Lighting should be capped from above to help reduce night-sky l ight pollution to avoid interference with nocturnal wildlife behavior. • Conduct work during daylight hours to minimize disturbance to wintering elk, deer, and other wildlife that utilize this area. • The flight path for any helicopter work should be kept within the construction easement corridor to reduce additional disturbance as much as possible. Helicopter work should avoid any wildlife spotted in the area and limit sightseeing diversions. • Remove any mud or debris and disinfect equipment, hand tools, pumps and hoses, boots, and other equipment previously used in a river, stream, lake, pond, or wetland before moving the equipment to another water body following the attached aquatic disinfectant protocols: https://cpw.state.co.us/Documents/Research/Aquatic/pdf/Publications/Quaternary- Ammonia-Compound-Disinfection-Protocols.pdf#search=disinfect Colorado Parks and Wildlife commends the project proponent for minimizing new disturbance, acknowledging wildlife in the area, and incorporating timing stipulations for sensitive wildlife species. CPW appreciates the opportunity to review this project application material and provide recommendations to avoid, minimize, and mitigate adverse impacts on wildlife. If there are any questions or needs for additional information, don’t hesitate to contact CPW wildlife managers: Travis Bybee, District Wildlife Manager 970-985-5882, travis.bybee@state.co.us Kirk Oldham, Area Wildlife Manager, 970-255-6178, kirk.oldham@state.co.us Matt Yamashita, Area Wildlife Manager 970-989-8617, matt.yamashita@state.co.us Darren Chacon, Assistant AWM, 970-948-3405 darren.chacon@state.co.us Buddy McNeel, Garfield Creek SWA, 970-984-9872, buddy.mcneel@state.co.us Molly West, Land Use Specialist 970-255-6105 molly.west@state.co.us Sincerely, Kirk Oldham Area Wildlife Manager CC List Darren Chacon, Assistant AWM Buddy McNeel, Garfield Creek SWA Property Technician Julie Mao, Terrestrial Biologist Kendall Bakich, Aquatic Biologist Dani Neumann, Land Use Specialist Glenn Hartmann, Garfield County Senior Planner TRANSMISSION LINE 6584 REBUILD PROJECT ATTACHMENT M: Revegetation Plan 1 Memo Date: Wednesday, August 14, 2024 Project: 6584 TLine: Mitchell (MITC) - Rifle (UTER) Electric Transmission Line Rebuild - McLin and Murray Staging Areas. To: Garfield County , Colorado From: Brian Brown – HDR Engineering, Inc. Subject: Reclamation Plan Public Service Company of Colorado (PSCo), a Colorado corporation conducting business as Xcel Energy (Xcel), must replace the existing transmission line between the Mitchell Creek (MITC) to (UTER) Rifle Substations. This line generally crosses rural undeveloped land. T he new poles will be within the existing transmission easement and accessed via existing private or public roads and existing and new access routes . In support of this line rebuild, Xcel has secured two staging/material yards to store equipment, limited equipment assembly, and staff coordination. As the Garfield County permitting will only cover the staging yards, this R evegetation Plan will only address the staging yards. The erosion control and revegetation of the transmission line will be covered and completed per conditions of the State SWMP permit. See the associated maps and figures that are part of the County submittal for locations and improvements to support this Reclamation Plan. Staging Areas Erosion Control and Reclamation Both staging yards, the McLin Yard and the Murray Yard, are similarly designed with the “show up” portion of the yard aggregate covered and the remainder of the yard unaltered. The “show up” portion of the yard is shown on the SWMP submittal as a Stabilized Staging Area (SSA) and contains crew parking, Conex containers, trailers, etc. There are no substantive grading changes to either yard with the only site ‘grading’ limited to removing and stockpiling topsoil to create the aggregate covered SSA. The McLin and Murray s taging areas typically follow the same sequence of impacts and restoration as spelled out below. • Appropriate Xcel, and construction, and erosion control staff will meet on -site immediately prior to the yard construction/use to review the delineated construction impact limits and verify plan meets intended use or is minor adjustments are needed. If the County requires a pre -construction meeting, this would be the time for such to occur. • Xcel erosion control plan developer, Xcel Energy Environmental Analysist, or erosion control install contractor may collect representative topsoil soil samples for analysis in the SSA footprint. This analysis 2 would focus on the potential for possible soil amendments (primarily nitrogen, phosphorus, and potassium) during seeding. 2-3 samples would be typical for the proposed SSA area. • Erosion control measures per the SWMP are implemented in compliance with permit conditions. This typically includes installation of a vehicle tracking control (VTC), limited fencing to prevent impacts to sensitive areas or existing infrastructure , and perimeter Control Measures (CMs) to minimize sediment transport from the project area. • Creation of a Stabilized Staging Area (SSA). An SSA is an aggregate surfaced area that experiences the highest volume of traffic and turning action. The area is stabilized to minimize disturbance, rutting, and sediment track out. o Delineate SSA as shown on SWMP/Grading Plans. o Strip topsoil within SSA. o Stockpile topsoil immediately upgradient of SSA, install down-gradient erosion control measures, and temporarily seed stockpile. o Place aggregate surfacing. • Deliver and arrange equipment, material, Conex, and trailer s, etc. around site. • Beyond the SSA area, traffic of the yard will be primarily for material drop off and material pickup and limited material assembly. Therefore, the yard will remain in the current vegetated state and access and use of the yard will be drive and crush over existing vegetation. This typically leaves the root zone intact and promotes a faster rebound of revegetat ion after demobilization in low traffic areas. • After construction, remaining material, equipment, trailers, Conex, and fencing will be removed from the site along with removal of the SSA aggregate. • Soil decompaction to be performed in compacted areas, primarily in the SSA area. • The SSA topsoil stockpile is to be placed into aggregate stripped SSA area to depths generally matching the pre-construction grades of area. Topsoil will be prepared to accept seed. Note that the presence of rock in the topsoil will generally match the occurrence of rock typical of the yard. • Areas of drive & crush that experienced rutting disturbing may be seeded and mulched. Rutting is defined as greater than 3” depth or when the rut is deeper than the topsoil depth. Determination of where seeding & mulch will occur in rutted areas will be the responsibility of the erosion control inspector or Xcel Environmental Services with the intent of reestablishing area vegetation. • Soil amendments, if recommended in the SSA, are to be added per soil analytic recommendations via mechanical broadcast or hydraulic application. • Site seed mix is to be spread at appropriate rates given application type, hydraulic, drill, or hand broadcast. The amendment and seed application will vary substantially based on disturbance type site access and soil conditions. In cases of hydraulic appli cation, the seed mix may be applied with the liquid amendment or hand broadcast , but in no case is seed to be mixed and applied with mulch. • Seed and mulch, unless agricultural crop land, will be placed per the conditions of the SWMP permit and the County Grading permit. • Final erosion control cover for seeded areas will vary based on access to disturbance areas. Truck or tracked access areas will have either straw crimp mulch (on grades less than 10 percent and low rock content soil) or a high quality hydraulically applied mulch, i.e. Flexterra HP-FGM or like, on grades exceeding 10 percent or high rock content . Xcel Energy generally does not support using erosion control blankets on this project due to concerns about reduced blanket to soil contact and due to longer life blankets having a high synthetic material content with is a wildlife entrapment hazard. 3 • Xcel Energy will change erosion control inspection schedule from weekly to monthly inspections once initial stabilization measures (seeding and mulching) have been completed. If there are areas of concern identified during the monthly inspection that need to be addressed (i.e. erosion or lack of revegetation growth), the revegetation contractor will return to the site to address identified issues. • Per the required State (SWMP) and local (Grading Permits), Xcel Energy will continue to maintain structural erosion control measures across the project until no longer necessary. These will primarily include down-gradient sediment control logs but may include other control measures. These measures will be removed when no longer required and seed will be hand broadcast in areas where removal has created a disturbance and removed/killed vegetation. • Once site has met plant density cover requirements, Xcel Energy will perform a final post -construction site visit to document final conditions and then Xcel Energy will close SWMP permit with the State. • See the Noxious Weed Report for each yard regarding weed management and treatment during the revegetation period. NOTES: • Xcel Energy’s ability to stabilize disturbed areas with vegetation is dependent on many factors within Xcel Energy control. Unfortunately, favorable moisture conditions for germination and continued growth are beyond Xcel Energy control and a key determinate for revegetation. Xcel Energy anticipates adequate revegetation will take multiple years. Xcel Energy frequently returns to sites multiple times that are in the vegetation growth phase to address areas of erosion and reseed and/or mulch as necessary to promote vegetation stabilization. • Xcel Energy hires a separate third-party company to perform the erosion control installation, maintenance, and revegetation as well as another third-party company to perform regular erosion control inspections. These companies have long standing relationships with Xcel Energy. With this approach, Xcel Energy has trained the installation company and inspection company to meet Xcel Energy’s standards and to stay in compliance with state and local permit conditions which improve the restoration trajectory. Xcel’s practice is to continue inspection and maintenance, both performed by third party contractors, until site revegetation is established. Seed Mix: A seed mix with pollinator species is included in the SWMP Report for each individual yard. Noxious Weed Management Plan 6584 MITCHELL CREEK TO UTE RIFLE TRANSMISSION LINE STAGING AREAS – MCLIN and MURRAY YARDS Garfield County, Colorado August 8, 2024 _______________________________________________________ Prepared for: Xcel Energy PO BOX 840 Denver, Colorado 80201 (720) 963 -3684 _______________________________________________________ Prepared by: HDR, Inc 1670 Broadway, Suite 3400 Denver, CO 80202 _______________________________________________________ Noxious Weed Management Plan | 6584 Transmission Line Staging Areas TOC-i Contents Page No. Section 1. Introduction ............................................................................................................. 1 1.1 Project Description ......................................................................................................... 1 Section 2. Noxious Weed Management Requirements .............................................................. 1 2.1 Presidential Executive Order 13112 —Invasive Species ................................................... 1 2.2 Colorado Noxious Weed Act ........................................................................................... 2 2.3 Garfield County Noxious Weed Management .................................................................. 2 Section 3. Noxious Weed Survey Methods ............................................................................... 3 Section 4. Study Area Description ............................................................................................ 4 4.1 Location ......................................................................................................................... 4 4.2 Topography and Hydrology ............................................................................................. 4 4.3 Land Use ....................................................................................................................... 4 4.4 Climate .......................................................................................................................... 4 4.5 Vegetation and Habitat ................................................................................................... 4 Section 5. Noxious Weed Survey Results ................................................................................. 5 Section 6. Noxious Weed Management .................................................................................... 6 6.1 Noxious Weed Treatment Measures ............................................................................... 7 Section 7. Recommended Management and Mitigation Actions ................................................. 9 Section 8. References............................................................................................................ 10 Appendices Appendix A. Figures Appendix B. Representative Photographs Appendix C. Plant List Appendix D. Noxious Weed Fact Sheets Tables Table 1. Colorado State Noxious Weed Species Observed in the Project Study Area ......... 5 Table 2. Noxious Weed Species Recommended Control Techniques ................................ 8 August 2024 Page 1 Section 1. Introduct ion The Public Service Company of Colorado (PSCo), a Colorado corporation conducting business as Xcel Energy (Xcel), is proposing to rebuild a 25 -mile segment of a 69 -kilovolt (kV) overhead transmission line from the Mitchell Creek Substation to the Ute Rifle Substation on the 6584 Transmission Line (Project). This rebuild is within the City of Glenwood Springs , Town New Castle, City of Rifle, and unincorporated Garfield County, Colorado . Staging areas for the project include the McLin and Murray Yards, which are in unincorporated Garfield County, Colorado. On behalf of Xcel, HDR Engineering, Inc. (HDR) conducted a noxious weed survey for the staging yards. This Noxious Weed Management Plan (Plan) has been prepared to support the installation of prescribed seed mixes, management of noxious weeds, and to comply with federal, state and local requirements regarding noxious weeds in the Project area. 1.1 Project Description The project will utilize multiple staging areas for the overnight storage of equipment and material associated with the transmission line build. All other yards and the transmission line will be permitted separately. The Murray and McLin Yard s are in unincorporated Garfield County and will be associated with the phase 1 build (Appendix A – Project Overview Figure). The McLin and Murray Yards are respectively located southeast and southwest of the town of Silt, Colorado. The 36-acre Murray Yard is located approximately 1 mile west-southwest of the intersection of County Road 3 31 and 346. Access to the yard will be from Chair Bar Road which boarders the north and east perimeter of the staging yard. The McLin Yard is located approximately 0.75 miles southeast of the intersection of County Road 311 and 335. Access to the 15-acre yard McLin Yard will be from County Road 311 . Construction is anticipated to begin in September of 2024 and end January of 202 5. The McLin Yard is located within Section 16 of Township 6 South, Range 92 West and the Murray Yard is located within Section 13 of the same Township and Range of the Public Land Survey System. Section 2. Noxious Weed Management Requirements When present in large numbers, noxious plant species have had considerable impacts to the quality and integrity of natural ecosystems. Noxious weed species can alter fire ecology, successional ecosystem processes, and ecosystem function of the ecosystems they invade. Some species have had such serious economic and biological impacts that their control and management is mandated under Colorado State law (i.e., List A species). Because of the adverse environmental effects of noxious weeds, federal and state governments have issued various orders and regulations regarding noxious weeds. The following are some of the regulations guiding noxious weed management. 2.1 Presidential Executive Order 13112 —Invasive Species Executive Order 13112 , Invasive Species, was issued on February 3, 1999, to prevent the August 2024 Page 2 introduction of invasive species; provide for their control; and minimize the economic, ecological, and human health impacts that result from invasive species. This order directs federal agencies to prevent the introduction of invasive species, control and monitor invasive species, and restore native species and habitats that have been invaded (Federal Register 1999). 2.2 Colorado Noxious Weed Act As defined by the Colorado Department of Agriculture (CDOA), noxious weeds are plants that reduce agricultural productivity, lower real estate values, endanger human health and well -being, and damage scenic values (CDOA 20 24a). The Colorado Noxious Weed Act §§ 35 -5.5-101 through 119, C.R.S. as amended, states that an organized and coordinated effort must be made to stop the spread of noxious weeds. Rules pertaining to administration of the Act include a noxious weed list that designates and classifies noxious weed species into categories for immediate eradication (CDOA 20 24a): • List A contains 24 species of noxious weeds targeted for eradication. If individuals or populations of A List species are found, the local governing body must provide the State Weed Coordinator with mapping that includes information on location and density of the infestatio n. • List B contains 3 5 species that are targeted for eradication, containment, or suppression based upon a given local governing body’s management plan. • List C contains 1 8 species for which the Commissioner of Agriculture, in consultation with the state noxious weed advisory committee, local governments, and other interested parties, will develop and implement into state noxious weed management plans designed to support the efforts of local governing bodies to facilitate more effective integrated weed management on private and public lands. In addition to the three lists, the state maintains a noxious weed species “Watch List”. It contains 19 species that CDOA has determined pose a potential threat to the agricultural productivity and environmental values of the lands of Colorado. It is for advisory and education purposes only and is intended to encourage the collection of information needed to determine if the species should be listed as a noxious weed. 2.3 Garfield County Noxious Weed Management Garfield County adopted a Noxious Weed Management Plan in 2016 to limit the impact of noxious weeds by providing guidelines for managing designated noxious weeds which represent a threat to the continued economic, environmental , and agricultural value of lands in Garfield County (Garfield County 2016). Of the 7 7 plant species considered noxious by the State of Colorado, Garfield County is home to 40 species on this list. The plan provides for the implementation of the Colorado Noxious Weed Act by detailing integrated management options for designated noxious weeds. Options include education, preventive measures, good stewardship, and control techniques. August 2024 Page 3 The intent of the plan is to incorporate th e above-mentioned options that are the least environmentally damaging and are practical, timely and economically feasible. It is the responsibility of all landowners to use integrated methods to manage noxious weeds, and the responsibility of local governing bodies to ensu re that these plants are managed on public and private lands. Garfield County follows the dictates of the CDOAs rules as to which species on the A and B lists must be eradicated, contained , or suppressed and manages those species and the species on its own locally designated list in accordance with the Weed Management Plan . Section 3. Noxious Weed Survey Method s On July 24, 2024, HDR conducted pre-construction noxious weed surveys of the Murray and McLin Yard s, hereafter referred to as the study area to document baseline conditions . Noxious weed surveys were conducted using pedestrian transects, with approximately 50-foot separation, covering the entirety of the two staging yards . For the survey, the term “noxious weed ” includes species listed as noxious by the Colorado Department of Agriculture (CDOA 202 4a). Plant nomenclature for noxious weeds in this report follow the CDOA website . Before field surveys were conducted, the following data sources were reviewed for information on vegetation patterns, topography, and hydrology in the project vicinity: • Aerial Imagery – Recent and historic imagery from 1993 through 2019. • Topographic map – U.S. Geological Survey. • General ecological description of the project area (USDA -NRCS 2022). • National Land Cover Database (NLCD) Land Cover (USGS 202 4). • Colorado Department of Transportation (CDOT ) Noxious Weed Map (CDOT 202 4). • Colorado Natural Heritage Program (CNHP) Noxious Weed Inventory, Mapping, and Monitoring (CNHP 20 16). • Colorado Department of Agriculture’s (CDOA) noxious weed list (Effective October 2020) (CDOA 2024a). • CDOA County Weed Programs (CDOA 202 4b). Using ESRI ArcGIS Field Maps field collection software and a sub-foot geographic positioning system (GPS) technology using an EOSTM Arrow 100 antennae and receiver , noxious weed densities were recorded in four categories: 1-10 individuals, 11-100 individuals,101-999 individuals, and 1000+ individuals. Following the field survey, the spatial data of noxious weed species and densities were illustrated in ArcGIS Pro 3.1.2 for the study area. August 2024 Page 4 Section 4. Study Area Description 4.1 Location The Murray Yard is approximately 36 acres in size and the McLin Yard is approximately 15 acres in size. The study area is found within the Silt, CO U.S. Geological Survey 7.5-minute quadrangle (2019). The approximate decimal degree coordinates for the center of the McLin Yard are 39.530407, -107.610966 and for the center of the Murray Yard are 39.525274, -107.679326 (datum is NAD 83). Please refer to Appendix B for a photolog of the study area. 4.2 Topography and Hydrology The study area is in northwestern Colorado and lies within the Western Range and Irrigated Region Land Resource Region (USDA-NRCS 2022) at an elevation of approximately 5,650 feet. The study area is generally located on barren and highly disturbed rangeland and/ or agricultural fields. The McLin Yard is located directly east of a riparian corridor, which contains Divide Creek as well as two irrigation ditches. However, the McLin Yard does not receive any irrigation from these sources as it is approximately 100 feet upslope from them. The Murray Yard appears to drain to the west into an unnamed drainage that flows into a series of irrigation ditches north of County Road 346. Any flow associated with the Divide Creek to the west of the McLin Yard as well as the unnamed drainage to the west of the Murray Yard eventually joins the Colorado River to the north of the study area. 4.3 Land Use Land uses within and around the study area include s agricultural, livestock grazing, rural residential, and industrial uses. Interstate 70, the Town of Silt, and the Colorado River are located immediately north of the study area. There is oil and gas development throughout the surrounding area. 4.4 Climate Annual precipitation in the study area averages 11.6 inches and annual snowfall is 38.5 inches. Rifle records average annual high temperatures of 64.3 degrees Fahrenheit (˚F) and an average low temperature of 31.2 ˚F (Western Regional Climate Center 20 24). 4.5 Vegetation and Habitat The study area is located within dry and disturbed grassland habitat . Both locations appeared to have been chemically treated for noxious weeds in the recent past with visible wilting observed during the July 2024 survey . Additionally, all observed vegetation appeared to be stressed from lack of irrigation and herbivory by dense grasshopper infestations, which made identification difficult. Species that occur within the McLin Yard include prickly lettuce (Lactuca serriola ), field brome (Bromus arvensis), western wheatgrass (Pascopyrum smithii), Canada horseweed (Erigeron cana densis), kochia (Bassia scoparia), crested wheatgrass (Agropyron cristatum ), smooth brome (Bromus inermis), yellow salsify (Tragopogon dubius), and an unknown mustard August 2024 Page 5 (Brassica sp.). Species that occur within the Murray Yard include big sagebrush (Artemisia tridentata), kochia, greasewood (Sarcobatus vermiculatus), prickly pear (Opuntia sp.), needle- and-thread grass (Hesperostipa comata ), winterfat (Ceratoides lanata ), rubber rabbitbrush (Ericameria nauseosa ), western wheatgrass, crested wheatgrass, Russian thistle (Salsola tragus), four -wing saltbush (Atriplex canescens), and an unknown mustard. Please refer to Appendix C for a consolidated list of plant species observed during the field visit. Section 5. Noxious Weed Survey Results Four listed noxious weed species were observed in the study area during the July 2024 survey. Two of the four noxious weed species documented in the study area are on the CDOA’s List B and two are on List C (Table 1 and Figures 2 & 3 in Appendix A). All observed vegetation appeared to be stressed from lack of irrigation and herbivory by dense grasshopper infestations, which made identification difficult. No new growth was observed aside from prickly lettuce (Lactuca serriola) and field bindweed (Convolvulus arvensis), which were observed within the McLin Yard. The Colorado Department of Agriculture has prepared fact sheets for most state-listed noxious weeds. They feature detailed descriptions and photographs of the plants, as well as integrated management for each species. Noxious weed fact sheets for the four documented listed species are found in Appendix D. Garfield County follows the state’s rules as to which species on Lists A and B must be eradicated, contained , or suppressed and manages those species and the species on its own locally designated list in accordance with the Garfield County Noxious Weed Management Plan (Garfield County 2016). CDOT’s Noxious Weed Map details the locations of List A, B, and C noxious weeds as they occur along the ROW (CDOT 2024). Russian olive (Elaeagnus angustifolia ), hoary cress (Lepidium draba), field bindweed, Russian knapweed (Rhaponticum repens), salt cedar (Tamarix chinensis), musk thistle (Carduus nutans), and Scotch thistle (Onopordum acanthium ) were all documented along the portion of I -70 to the north of the study area. Cheatgrass (Bromus tectorum ) was the most common species identified throughout both Staging Yards. Field bindweed was identified on the east side of the McLin Yard. Small amounts of musk thistle were identified on the northwest side of the Murray Yard. Russian knapweed was identified from the northeast corner down through the center of the Murray Yard . Cheatgrass and field bindweed are designated by the State of Colorado as a List C species and Russian knapweed and musk thistle are List B species. Table 1. Colorado State Noxious Weed Species Observed in the Project Study Area Scientific Name Common Name General Habitat State of CO List Garfield County List Observed in the Study Area Bromus tectorum Cheatgrass Open, upland List C No Yes August 2024 Page 6 areas Carduus nutans Musk thistle Open, upland areas List B Yes Yes Convolvulus arvensis Field bindweed Open, upland areas List C No Yes Rhaponticum repens Russian knapweed Open, upland areas List B Yes Yes Sources: CDOA 2024a; Garfield County 2016 Section 6. Noxious Weed Management Construction activities would expose soils in areas that have been previously disturbed and limited areas that have not been previously disturbed. This disturbance creates a potential for the introduction and spread of noxious weeds in the project area. Noxious weed species that occur in and adjacent to disturbed areas of the project have the potential to spread into areas impacted by use and construction of access roads for construction equipment and use of staging areas. The goal of this plan is to minimize the spread of noxious weeds due to the proposed project’s construction activities. By implementing measures intended to minimize the spread of noxious weeds during construction and minimizing the establishment of new noxious weed populations post construction, the proposed project should minimize new and help reduce existing noxious weed infestations. Xcel and its contractors work to minimize the use of chemicals that are harmful to beneficial insects in their vegetation management practices controlling shrubs, trees, and weed species within their rights-of -way and properties. This includes eliminating the use of neonicotinoids, a class of neuro -active insecticides, which have been found harmful to all invertebrate populations including bee populations and other native pollinators (Xcel Energy Undated). The study area is adjacent to rural residential developments, rangeland, oil and gas operations, and agricultural fields. Due to adjacent roadways and residential properties in the adjacent areas, noxious weed species are expected to continue spread ing throughout the area. Future construction and maintenance activities by Xcel and its contractors have the potential to expose soils creating a potential for the introduction and spread of noxious weeds in the project area. The grading work will be minimized by limiting the disturbance footprint and focus ing on access grading impacts to the uphill side of access routes. Equipment associated with the project activities that may be stored on the McLin and Murray Yards vary based on the pole type and construction approach. Equipment that may be stored or staged on the McLin and Murray Yards includes construction materials, mini -excavators, pick-up trucks, boom trucks, concrete trucks, and trailer puller reels. Weed management priorities are based on the threat noxious weed species found in the project area pose to the overall goal of maintaining the health of the ecosystem. Generally, List A species are the highest priority because they are often the most aggressive species with limited distribution. No species designated as a “List A” species in the Colorado Noxious Weed Act were August 2024 Page 7 identified. List B species are next priority and List C species are generally widespread and are not prioritized. The best technique for controlling most noxious weeds is an integrated approach of chemical, mechanical, and biological controls. Chemical control involves the application of one or more herbicides at the appropriate time of the year (all herbicides should be applied by a certified applicator according to the manufacturer’s directions). Mechanical control usually involves mowing, hand -pulling, or cutting. Biological control is the use of organisms (usually insects, but also livestock) that are deliberately introduced to an area to control weeds. 6.1 Noxious Weed Treatment Measures As part of the weed management program, the following measure s will be implemented to minimize the spread of noxious weeds during the construction activities, as well as during restoration and reclamation efforts until the closure of the Storm Water Management Plan (SWMP). Xcel’s noxious weed management contractor will implement noxious weed control measures in accordance with existing regulations and local requirements. Post-construction control measures can include one or more of the following methods (that may be implemented during restoration activities): • Treatment methods will be based on species-specific and area-specific conditions (e.g., proximity to water or riparian areas, agricultural areas, and time of year) with the Garfield County coordinator being notified prior to noxious weed eradication activities . If areas are not seeded until the following spring, because of weather or scheduling constraints, undesirable vegetation will be eradicated before seeding. • Mechanical methods rely on equipment that can be used to mow or disc weed populations. If such a method is used in areas to be restored, subsequent seeding will be conducted to re -establish a desirable vegetative cover that will stabilize the soils and slo w the potential re -invasion of noxious weeds. • Discing or other mechanical treatments, that would disturb the soil surface within native habitats, will be avoided in favor of an herbicide application, which is an effective means of reducing the size of noxious weed populations as well as preventing the establishment of new colonies. • Herbicide applications will be controlled to minimize the impacts on the surrounding vegetation. In areas of dense infestation, a broader application will be used and a follow - up seeding program will be implemented. Pre-Construction Prior to construction and soil disturbances, Xcel’s noxious weed contr actor shall apply pre - August 2024 Page 8 treatment, both chemical and mechanical to List A and List B noxious weeds in the areas of expected disturbance which includes staging yards, within expected access road disturbance areas, and any other areas identified in the grading permit as to be disturbed. Chemical and mechanical treatment will be in accordance with the specifics listed in Table 2 and until the SWMP is closed. Post-Construction - Phase 1 At the conclusion of construction (Year 1), disturbed areas will be inspected/surveyed for noxious weeds by a qualified weed specialist. The weed specialist will identify areas where the Control Techniques listed in Table 2 following measures shall be implemented. Post-Construction - Phase 2 Following the growing season after construction has been completed (Year 2) and until the project SWMP permit is closed , two noxious weed surveys shall occur yearly: 1. Early season (May-June) for cool-season noxious weeds (e.g., cheatgrass and bindweed). 2. Late season (July-August) for the warm-season noxious weeds (e.g., thistles and knapweeds). Areas of infestations identified in these surveys will determine appropriate treatment and suppression methods. Table 2 presents species-specific recommended control measures which may be implemented. These recommended control measures are from the Colorado Department of Agriculture website (CDOA 2024a). Some of the noxious weed species are widespread and not found in defined populations, therefore treatment will be difficult and may not be prioritized. Treatment will only occur in areas where soil disturbance due to construction occurred. Due to the knapweed plants being dead and dry during the July 2024 survey, identification should be confirmed based on new growth prior to any treatment measures being impl emented. Table 2. Noxious Weed Species Recommended Control Techniques Common Name Chemical Mechanical Biological Russian knapweed Aminopyralid (Milestone), Aminocyclopyrachlor + Chlorsulfuron (Perspective). Most effective if applied in the fall when above- ground stems die back . Cutting or mowing can stress plant and force it to use reserves. Tilling and disking can create root fragments that can sprout. However, repeated deep tillage (1 feet) over 3 years can kill much of the root system. The gall midge, Jaapiella ivannikovi, is a fly that lays eggs in the shoot tips of Russian knapweed. It forms galls that reduce flowering, seed production, and stunts the plants’ growth. This biocontrol will stress the stand of Russian knapweed but will not likely eliminate it. Not available to public. August 2024 Page 9 Downy brome (cheatgrass) Pseudomonas fluorescens D7 inhibits cheatgrass and is currently approved by EPA and Colorado. Mechanical methods are best for residential areas and small infestations. Collect, bag, and dispose of or destroy flowers; seeds can mature and germinate if left. Tilling must be deeper than 6 inches to work. Prescribed fire applied before seed maturity, (late spring or early summer), may kill seeds; the trick is to get green cheatgrass and litter to carry fire and at a hot enough temperature to destroy seeds and seedlings. No approved biological control agents . Musk thistle Aminopyralid (Milestone), Chlorsulfuron (Telar), and Clopyralid (Transline). Apply in spring from rosette through very early flower growth stages. Methods, such as tilling, hoeing and digging, are best for infestations smaller than 0.5 acres. Sever roots below the soil surface during the first year before the plant stores energy, and in the second year before flower production. Mowing, chopping and d eadheading stimulates more flower production; these methods require consecutive years of season-long treatments. All flower buds and heads must be collected, bagged, and disposed of or destroyed. Prescribed fire that results in high soil burn severity damages roots and above ground biomass, but is not recommended due to impacts on desired plants. Trichosirocalus horridus is the only biological control agent available for musk thistle in Colorado. Field bindweed Clarity + 2,4-D Amine, Tordon 22K *this is a Restricted Use Pesticide, and Roundup Ultra *non- selective herbicide, will kill all vegetation* See Application timing on Noxious Weed Fact Sheets. Cutting, mowing, or pulling has a negligible effect unless the plants are cut below the surface in the early seedling stage. The bindweed gall mite, Aceria mahlerbae, has proven to be effective in reducing field bindweed infestations. Source: Colorado Department of Agriculture (2024a). Table 2 - Control Techniques based on recommendation f rom Garfield County Weed Control Manager, Steve Anthony following the CDOA-published control techniques for noxious weeds . Section 7. Recommended Management and Mitigation Actions In addition to the specific management recommendations listed for each species in Table 2, the following mitigation measures are recommended (as appropriate) to minimize the spread of noxious weeds: August 2024 Page 10 • Construction equipment will remain in designated work areas . • The area of ground disturbance will be kept to the minimum necessary. • Minimize imported topsoil during construction. If importing is necessary, use certified weed-free soil. • Equipment will be thoroughly cleaned before entering the staging area, if equipment or trailer are carrying soil or plant materi al, i.e. mud on trailer undercarriage . • Mulches and straw used at the site will be certified weed -free. • Disturbed areas will be seeded after construction though, if the root structure remains intact, contractor may decide to not seed in such areas. • Seed mixes, soil, and other plant material used for revegetation will be free of noxious weed seeds, roots, and other propagules. • Only a Colorado -licensed Supervisor or Certified Operator will apply herbicides. • Herbicides will be applied in accordance with the manufacturer’s instructions. • Broadcast herbicide spraying will be limited to areas of project ground disturbance and at staging areas. • The Garfield County Vegetation Manager will be notified prior to noxious week treatments, as appropriate to the disturbance jurisdiction. At time of the memorandum, this notification would be through the Garfield County Vegetation Manager (Steve Anthony – 970-945-1377 ext. 4305, santhony@garfield -county.com). • Applicable best management practices (BMPs) from the Stormwater Management Plan will be implemented. Section 8. References Colorado Department of Agriculture (CDOA). 202 4a. Noxious Weeds. Available online: https://www.colorado.gov/pacific/agconservation/noxiousweeds and https://drive.google.com/file/d/0Bxn6NtpJWc9JRFE3LW1RWFVXY1E/view?resourcekey=0 -WalETB5Qp3zCjfRnar5t3g . Accessed July 2024. CDOA. 2024b. County Weed Programs. Available online: <https://ag.colorado.gov/conservation/noxious -weeds/county-weed-programs>. Accessed July 2024. Colorado Department of Transportation (CDOT). 202 4. Noxious Weeds Map. Available online: https://cdot.maps.arcgis.com/home/webmap/viewer.html?webmap=ebd39c7a542349c6914 89f5ecb1a1c62#!. Accessed July 2024. Colorado Natural Heritage Program (CNHP). 2016. Survey of Critical Biological Resources: a resurvey and update of Potential Conservation Areas in Garfield County, Colorado. Available online: https://cnhp.colostate.edu/wp - content/uploads/download/documents/2016/Final_Garfield_2016_report.pdf . Accessed July 2024. August 2024 Page 11 Garfield County. 2016. Garfield County Noxious Weed Management Plan. Available online: https://www.garfield -county.com/vegetation -management/filesgcco/sites/29/2019/11/Garfield -County-Noxious-Weed-Management- Plan-Adopted-Feb-2016.pdf . Accessed July 2024. U.S. Department of Agriculture (USDA)- Natural Resources Conservation Service (NRCS). 2022. Land Resource Regions and Major Land Resource Areas of the United States, the Caribbean, and the Pacific Basin. Natural Resources Conservation Service, USDA Handbook 296. U.S. Geological Survey (USGS). 202 4. National Land Cover Database (NLCD). Available online: https://apps.nationalmap.gov/viewer/. Accessed July 2024 . Western Regional Climate Center. 202 4. Climate Summaries. Available online: https://wrcc.dri.edu/Climate/summaries.php . Accessed July 2024. Xcel Energy. Undated. Wildlife and Habitat Protection. Available online: https://www.xcelenergy.com/staticfiles/xe - responsive/Company/Corporate%20Responsibility%20Report/2019%20CRR/2019_Wildlife %20and%20Habitat%20Protection_CRR.pdf . Accessed July 2024. Appendix A. Figures Appendix B Appendix B. Representative Photographs Appendix B Photo 1 Date Taken: July 2024 Bare ground mixed with dead and stressed vegetation on the west side of the McLin Yard. Photo 2 Date Taken: July 2024 Field bindweed (Convolvulus arvensis ) on the east side of the McLin Yard. There appeared to be evidence of chemical weed treatment along roadways and where field bindweed was identified. Photo 3 Date Taken: July 2024 Mosaic of field brome (Bromus arvesis), cheatgrass (Bromus tectorum ), and an unknown mustard throughout the McLin Yard. Note the dried state of all vegetation, which made identification difficult. Appendix B Photo 4 Date Taken: July 2024 Dead big sagebrush (Artemesia tridentata) and stressed vegetation on the north side of the Murray Yard. Photo 5 Date Taken: July 2024 Dead Russian knapweed (Rhaponticum repens) in the northeast corner of the Murray Yard. Photo 6 Date Taken: July 2024 Mix of big sagebrush, cheatgrass, and needle-and-thread grass (Hesperostipa comata) on the south side of the Murray Yard. Appendix C Plant List Appendix C Plant Species Observed in the Project Survey Area During the July 2024 F ield Survey Scientific Name Common Name Noxious weed Indicator* Agropyron cristatum Crested wheatgrass - Artemisia tridentata Big sagebrush - Atriplex canescens Four-wing saltbush - Bassia scoparia Kochia - Brassica sp. Mustard - Bromus arvensis Field brome - Bromus inermis Smooth brome - Bromus tectorum Cheatgrass C Carduus nutans Musk thistle B Ceratoides lanata Winterfat - Convolvulus arvensis Field bindweed C Ericameria nauseosa Rubber rabbitbrush - Erigeron canadensis Horseweed - Hesperostipa comata Needle-and-thread grass - Lactuca serriola Prickly lettuce - Opuntia sp. Prickly pear - Pascopyrum smithii Western wheatgrass - Rhaponticum repens Russian knapweed B Rhus aromatica Fragrant sumac - Sarcobatus vermiculatus Greasewood - Salsola tragus Russian thistle - Tragopogon dubius Yellow salsify - *Source: Colorado Department of Agriculture (202 4a). Appendix D. Noxious Weed Fact Sheets List C Key ID Points 1. Downy leaf blades, sheaths, ligules 2. Glumes are unequal size, lemmas are downy 3. One-sided panicle that droops, red-purple during seed set & senescence 4. Fibrous roots C heatgrass (Bromus tectorum L.) is a winter annual grass in the Poaceae family, also known as downy brome. Mature plants reach up to 24 inches tall. The stems are smooth but the leaf blades and sheath are hairy (downy). The ligules are fringed, short and membra- nous. The culms range from five to 90 cm long, can be prostrate or vertical, and have fine short hairs. Its fibrous roots can be up to 60 inches long, but the majority of root biomass is within first 12 inches of the soil surface. Roots are efficient at absorbing soil moisture, allowing cheatgrass to grow quickly early in season, while other plants are still dormant. Green up can occur twice per season. Cheatgrass has an unique spectral signature during seed set and senescence when it turns reddish purple. During these shoulder growing season events, it is easily detectable from other vegetation with satellite imagery. The flower is a simple one-sided panicle that characteristically flops over and hangs, branches and is open. Spikelets are usually terminal. Usually there are five to many florets; it has perfect flow- ers. The upper and lower glumes are usu- ally unequal in length and shorter than florets; the lower glume ranges from 4 to 14 mm in length and is one veined. The upper glume is three-veined. The plant disarticulates above the glumes. The lemmas are usually downy, narrowly lanceolate with sharp tips and about 9 to 12 mm long. Usually there are five to many lemmas. Awns are usually pres- ent and range from 10 to 18 mm long. It is a prolific seed producer, capable of two seed crops per season. Seeds need to be buried in soil or litter and have fall moisture to germinate. The fall seed crop has greater reproductive success than spring. Seeds lack dispersal anatomy so fall close to parent plants but transport readily with animals, people and equip- ment. Seed longevity is about three years. Both inbreeding and cross breed- ing occur. Cheatgrass is one of the most com- petitive non-natives in the Western US. It thrives in arid, semi arid, and cold environments. Colorado’s high eleva- tion range is not an issue for cheatgrass; plants were recently detected as high as 9,500 feet. It exhibits phenotypic plastic- ity and genetic diversity, making it high- ly adaptable to a variety of conditions, likely due to multiple introductions. Its presence has significant negative impacts throughout the West. Most no- tably, it alters fire regimes and thus engineers a posi- tive fire feedback loop that favors its growth over other plants. This feedback loop is why cheatgrass forms monocultures throughout the West. It is often confused with Japanese brome (Bromus ja- ponicus), which has denser more compact spikelets, shorter awns, and changes from green to gold through the growing season. Ch e a t g r a s s Br o m u s t e c t o r u m L . Cheatgrass Identification and Management ̹ LesŽie Ǥ Mehrhoơǡ Uni˜ersit› oˆ CT © Veronika Johansson, iNaturalist © Priyantha Wijesinghe, iNaturalist ©James Bailey, iNaturalist Rev. 2/19 Colorado Department of Agriculture - Conservation Services 305 Interlocken Parkway Broomfield, CO 80021 (303) 869-9030 www.colorado.gov/ag/weeds List C Ch e a t g r a s s Br o m u s t e c t o r u m L . –egra–ed eed aageme– ecommeda–‹os Effective integrated management means using a variety of eradication methods in the same site along with restoration, prevention of seed production and dispersal, and monitoring. Maintain robust healthy native landscapes. Restore degraded sites. Avoid soil disturbance. Prevent seed production and seed dispersal, e.g. on contaminated equipment. Rest sites until restored. Modify land use practices. Use methods appropriate for the site, including land use practices. C  C Mechanical methods are best for residential areas and small infestations. Mowing and chopping are not recommeded; they leave roots behind, stimulate flower production, disperse seeds, and expand the size of the infested area. Collect, bag, and dispose of or destroy flowers; seeds can mature and germinate if left. Tilling must be deeper than 6 inches to work. Prescribed fire applied before seed maturity, (late spring or early summer), may kill seeds; the trick is to get green cheatgrass and litter to carry fire and at a hot enough temperature to destroy seeds and seedlings. Always combine prescribed fire with cultural methods, timed appropriately, and base it on site conditions and other plants present. Monitoring and adaptive management are critical if prescribed fire is used as a tool for control. C  C Pseudomonas fluorescens D7 inhibits cheatgrass and is currently approved by EPA and Colorado. NOTE: Herbicide recommendations to control cheatgrass in pastures and rangeland are found at: https://goo.gl/ TvWnv9. Rates are approximate and based on equipment with an output of 30 gal/acre. Follow the label for exact rates. Consult local turf and ornamental experts for residential settings. Always read, understand, and follow the label directions. The herbicide label is the LAW! B OO C Sheep and cattle will select green cheatgrass which also affects desired cool-season grasses. Properly managed grazing can improve vigor of desired species and directly reduce cheatgrass. Post-fire grazing management varies depending on site potential and objectives. Currently there are no biological control agents for cheatgrass authorized in Colorado. For more biocontrol information, visit the Colorado Department of Agriculture’s Palisade Insectary website at: www.colorado.gov/ag/biocontrol C Biological soil crust is a soil health indicator of arid and semi arid sites; crusts inhibit cheatgrass seed germination. Aerial spread and cultivate soil crust where it is absent. Aerial and drill seeding bluebunch wheatgrass (Pseudoroegneria spicata) and Sandberg bluegrass (Poa secunda) with vesicular-arbuscular mycorrhizae; these are drought tolerant natives that are highly competitive against cheatgrass but require mycorrhizae. As these grasses establish and cheatgrass wanes slowly introduce additional species such as thickspike wheatgrass (Elymus lanceolatus), winterfat (Krascheninnikovia lanata), yarrow (Achillea millefolium) in the plant interspaces in subsequent years. Be cautious when purchasing seed as cheatgrass is often a contaminate, especially in mixes. Use seed pillows to disperse seeds. © Stacy Litz, Associated Press © Bureau of Land Management© Martin Bernetti, Associated Press © Helena Weed Control, Rocky Mountain Elk Foundation White flower © Mary Ellen Harte, Invasive.org. All other photos © Kelly Uhing. F i e l d b i n d w e e d Leaves are shaped like ar- rowheads. Flowers are funnel-shaped, white to pink, and have two small bracts one inch below the flower base. 1. 2. Identification and Impacts F ield bindweed (Convolvulus arvensis) is a non-native deep- rooted perennial that reproduces from seed and creeping, horizontal roots (rhizomes). Field bindweed stems are prostrate (grows low to the ground) and twining, and grow up to 6 feet long. Leaves are distinguishable by their arrowhead shape. The flowers are bell or trumpet-shaped, white to pink in color, and are about 1 inch long. Field bindweed seeds can remain viable in the soil for up to 40 years. F ield bindweed emerges from its root system in the spring. Flowering occurs from June to September and until the first fall frost. The number of seeds produced per plant ranges from 25 to 300 and seed production is variable depending on environmental conditions. Field bindweed is an extremely difficult noxious weed to control because, in part, of its taproot that may go 20 feet deep into the soil, and which repeatedly gives rise to numerous long rhizomes. F ield bindweed is a problem throughout Colorado. It is one of the most competitive perennial weeds. It is widespread in cultivated areas, pastures, lawns, gardens, roadsides, and waste areas from 4,000 to 8,000 Key ID Points C o n v u l v u l u s a r v e n s i s Field bindweed Identification and Management feet in elevation. T o successfully manage field bindweed, containment and persistence in controlling existing stands are necessary in order to exhaust the root system and deplete the soil seed bank. This weed needs to be continually stressed, forcing it to exhaust root nutrient stores and eventually die. Of all control methods, prevention is most important. Maintain healthy pastures and rangeland and continually monitor your property for new infestations. A healthy cover of desirable perennial plants will assist in discouraging field bindweed establishment. F ield bindweed is designated as a “List C” species on the Colorado Noxious Weed Act. It is required to be either eradicated, contained, or suppressed depending on the local jursidictions managing this species. O n the back of this sheet are field bindweed management recommendations. For more information, visit www.ag.state. co.us/csd/csdhome.html. Or call the State Weed Coordinator at the Colorado Department of Agriculture, Conservation Services Division, 303- 239-4100. List C Species Rangeland, pasture, and riparian site recommendations List C Species CULTURAL Establishment of selected grasses can be an effective cultural control of field bindweed. Contact your local Natural Resources Conservation Service for seed mix recommendations. Maintain healthy pastures and prevent bare spots caused by overgrazing. Bareground is prime habitat for weed invasions. BIOLOGICAL The bindweed gall mite, Aceria mahlerbae, has proven to be effective in reducing field bindweed infestations. This is an option for large infestations. To obtain a mite release, contact the Colorado Department of Agriculture, 970-464-7916. MECHANICAL Cutting, mowing, or pulling has a negligible effect unless the plants are cut below the surface in the early seedling stage. Well-established populations have a large seed bank in the soil that can remain viable for over 40 years. Bindweed mite damage F i e l d b i n d w e e d Integrated Weed Management: Field bindweed requires active management once it is established because of its potential to regenerate rapidly. Even small infestations should be viewed as a serious threat and managed aggressively. Contain and persistently control infestations in order to exhaust the root system and deplete the soil seed bank. Maintain a healthy cover of perennial plants to discourage field bindweed establishment. ht t p : / / w w w . a g . s t a t e . c o . u s / c s d / c s d h o m e . h t m l HERBICIDES : The following are recommendations for herbicides that can be applied to range and pasturelands. Rates are approximate and based on equipment with an output of 30 gallons per acre. Please read label for exact rates. Always read, understand, and follow the label directions. The herbi - cide label is the LAW! M a n a g e m e n t R e c o m e n d a t i o n s HERBICIDE RATE APPLICATION TIMING Clarity + 2,4-D Amine 1 qt./acre or 1 oz/gal water Just after full-bloom and/or fall. DO NOT apply near or under trees/shrubs or where soils have rapid permeability. DO NOT apply when outside temperatures will exceed 85 degrees. Add non-ionic surfactant @ 0.32oz/gal water or 1 qt/100 gal water. Tordon 22K *this is a Restricted Use Pesticide* 1 qt./acre or 1 oz/gal water Just after full-bloom and/or fall. DO NOT apply near or under trees/shrubs or where soils have rapid permeability. Add non-ionic surfactant @ 0.32oz/gal water or 1qt/100 gal water. Roundup Ultra *non-selective herbicide, will kill all vegetation* 4 - 5 qts./acre or 4 - 5 oz/gal water Apply at full-bloom and/or fall. Add non-ionic surfactant @ 0.32oz/gal water or 1qt/100 gal water. Use caution when applying near grasses or other desirable vegetation. Integrated Weed Management recommendations List C Species List B Key ID Points 1. Leaf with white midrib and leaf margins with spines. 2. Pappus with plumose barbed bristles. 3. Wide, stout lance-shaped bracts with spiny tips. M usk thistle Carduus nutans L. is a non-native biennial forb that re- produces solely by seed. During the first year of growth, a rosette forms in spring or fall. During the second year in mid to late spring, the stem bolts, flowers, sets seed, and the plant dies. M usk thistle can grow up to 6 feet tall. The leaves have spines, are waxy, and dark green in color with a prominent light green to white midrib that can be seen from a distance. Leaves are dentately lobed; leaf bases some- times extend down below the point of attachment. The terminal flower heads are purple, large in size (1.5 to 3 inches in diameter) and bend over as if nod- ding. These flower heads are made up of only disk flowers. They are surrounded by numerous, wide and stout lance- shaped, spine-tipped bracts that resem- ble an open pineapple. The pappus has plumose bristles that appear barbed un- der magnification. Musk thistle produces many flower heads. The tallest shoots flower first; lateral shoots develop in leaf axils. A robust plant may produce 100 or more flowering heads. Reproduction is usually via out-crossing through insect pollination, but self-pollination also occurs. Flowers emerge in May through September. Seeds develop shortly after flowers emerge. Flower buds can contain viable seeds from self-pollination. Seeds can mature on severed bud and flower- heads. Seeds remain viable in the soil for up to about 14 years. Seeds can germi- nate and emerge from spring through fall. M usk thistle habitat is found in a variety of environments extend- ing from shortgrass prairie to alpine. It is strongly associated with heavily disturbed sites, where over-use occurs or where site conditions are poor due to land management practices. This includes over-grazed areas, large fires, trails, ditches and roadsides. Infested livestock pasturs suffer from significantly decreased carrying capacity. B ecause musk thistle reproduces solely from seed, the key for suc- cessful management is to prevent seed production. Once flowers emerge and start to produce seed, effective manage- ment options will become limited. Once sites are infested, musk thistle can form dense stands. Prevention, adjusting land management practices, a robust inte- grated treatment plan and restoration are critical to eliminating this species. M usk thistle is designat- ed as a “List B” species in the Colorado Noxious Weed Act. It is required to be eradicated; some popu- lations may be contained or suppressed depending on state regulations. For management directions for each county, refer to the most recent Rule, or visit www.colorado.gov/ag/co- weedcontacts for details. Mu s k t h i s t l e Ca r d u u s n u t a n s L. Musk Thistle Identification and Management 2015 Quarter Quad Survey © Chris Evans, University of IL © Bruce Ackley, OH State University ̹ Les Mehrhoơǡ DiscoverLiˆeǤorg Rev. 11/16 Colorado Department of Agriculture - Conservation Services 305 Interlocken Parkway Broomfield, CO 80021 (303) 869-9030 www.colorado.gov/ag/weeds List B īĞĐƟǀĞ ŝŶƚĞŐƌĂƚĞĚ ŵĂŶĂŐĞŵĞŶƚ ŵĞĂŶƐ ƵƐŝŶŐ Ă ǀĂƌŝĞƚLJ ŽĨ ĞƌĂĚŝĐĂƟŽŶ ŵĞƚŚŽĚƐ ƚŚĂƚ ĂůƐŽ ŝŶĐůƵĚĞƐ ƌĞƐƚŽƌĂƟŽŶ1 ƉƌĞǀĞŶƟŽŶ ŽĨ ƐĞĞĚ ƉƌŽĚƵĐƟŽŶ ĂŶĚ ĚŝƐƉĞƌƐĂů1 ĂŶĚ ŵŽŶŝƚŽƌŝŶŐ͘ DĂŝŶƚĂŝŶ ƌŽďƵƐƚ ŚĞĂůƚŚLJ ŶĂƟǀĞ ůĂŶĚƐĐĂƉĞƐ ĂŶĚ ƌĞƐƚŽƌĞ ĚĞŐƌĂĚĞĚ ƐŝƚĞƐ͘ ǀŽŝĚ ƐŽŝů ĚŝƐƚƵƌďĂŶĐĞ͘ Ɛ ǁŝƚŚ ŵŽƐƚ ďŝĞŶŶŝĂůƐ1 ƉƌĞǀĞŶƚ ƐĞĞĚ ƉƌŽĚƵĐƟŽŶ ŝŶ ƚŚĞ ĮƌƐƚ ĂŶĚ ƐĞĐŽŶĚ LJĞĂƌ ŽĨ ŵƵƐŬ ƚŚŝƐƚůĞ ŐƌŽǁƚŚ͘ WƌĞǀĞŶƚ ƐĞĞĚ ĨƌŽŵ ĚŝƐƉĞƌƐŝŶŐ1 ƐƵĐŚ ĂƐ ŽŶ ĐŽŶƚĂŵŝŶĂƚĞĚ ĞƋƵŝƉŵĞŶƚ͘ ZĞƐƚ ƐŝƚĞƐ ƵŶƟů ƚŚĞLJ ĂƌĞ ĞīĞĐƟǀĞůLJ ƌĞƐƚŽƌĞĚ͘ OŚĂŶŐĞ ůĂŶĚ ƵƐĞ ƉƌĂĐƟĐĞƐ͘ hƐĞ ŵĞƚŚŽĚƐ ĂƉƉƌŽƉƌŝĂƚĞ ĨŽƌ ƚŚĞ ƐŝƚĞ͘ Mu s k t h i s t l e Ca r d u u s n u t a n s L. Integrated Weed Management Recommendations HERBICIDE RATE APPLICATION TIMING Aminopyralid* ;DŝůĞƐƚŽŶĞͿ 6 oz./acre + 0.25% ǀͬǀ ŶŽŶͲŝŽŶŝĐ surfactant ƉƉůLJ ŝŶ ƐƉƌŝŶŐ ƌŽƐĞƩĞ ƚŽ ĞĂƌůLJ ďŽůƟŶŐ ŐƌŽǁƚŚ ƐƚĂŐĞƐ Žƌ ŝŶ ĨĂůů ƚŽ ƌŽƐĞƩĞƐ͘ ΎWƌŽĚƵĐƚ ŶŽƚ ƉĞƌŵŝƩĞĚ ĨŽƌ ƵƐĞ ŝŶ ƚŚĞ ^ĂŶ >ƵŝƐ sĂůůĞLJ͘ OŚůŽƌƐƵůĨƵƌŽŶΎΎ ;dĞůĂƌͿ 1-2.6 oz. product/acre + 0.25% ǀͬǀ ŶŽŶͲŝŽŶŝĐ surfactant ƉƉůLJ ŝŶ ƐƉƌŝŶŐ ĨƌŽŵ ƌŽƐĞƩĞ ƚŚƌŽƵŐŚ ǀĞƌLJ ĞĂƌůLJ ŇŽǁĞƌ ŐƌŽǁƚŚ ƐƚĂŐĞƐ͘ ;OĂŶ ƉƌĞǀĞŶƚ ǀŝĂďůĞ ƐĞĞĚ ĨŽƌŵĂƟŽŶ ŝĨ ĂƉƉůŝĞĚ ŶŽ ůĂƚĞƌ ƚŚĂŶ ƚŚĞ ĮƌƐƚ ǀŝĂďůĞ ŇŽǁĞƌƐ ďĞŐŝŶ ƚŽ ŽƉĞŶ͘Ϳ ΎΎdŚŝƐ ŚĞƌďŝĐŝĚĞ ŚĂƐ ƌĞƐŝĚƵĂů ƐŽŝů ĂĐƟǀŝƚLJ ƚŚĂƚ ǁŝůů ĂīĞĐƚ Ăůů ďƌŽĂĚůĞĂĨ ƐĞĞĚůŝŶŐƐ ŐĞƌŵŝŶĂƟŶŐ ĂŌĞƌ ĂƉƉůŝĐĂƟŽŶ ŚĂƐ ŽĐĐƵƌƌĞĚ͘ OůŽƉLJƌĂůŝĚ ;dƌĂŶƐůŝŶĞͿ0.67-1.33 pints product/acre + Ϭ͘Ϯϱй ǀͬǀ ŶŽŶͲionic surfactant ƉƉůLJ ƚŽ ƌŽƐĞƩĞƐ ƚŚƌŽƵŐŚ ŇŽǁĞƌ ďƵĚ ƐƚĂŐĞ ŝŶ ƐƉƌŝŶŐ1 Žƌ ƚŽ ĨĂůů ƌŽƐĞƩĞƐ͘ © Friends of NV Wilderness Stewardship Team MECHANICAL CONTROL METHODS DĞƚŚŽĚƐ1 ƐƵĐŚ ĂƐ ƟůůŝŶŐ1 ŚŽĞŝŶŐ ĂŶĚ ĚŝŐŐŝŶŐ1 ĂƌĞ ďĞƐƚ ĨŽƌ ŝŶĨĞƐƚĂƟŽŶƐ ƐŵĂůůĞƌ ƚŚĂŶ Ϭ͘ϱ ĂĐƌĞƐ2 ǁĞŝŐŚ ƚŚŝƐ ĂŐĂŝŶƐƚ ŽƚŚĞƌ ƉůĂŶƚƐ ƉƌĞƐĞŶƚ1 ĞĐŽůŽŐLJ ĂŶĚ ƐŝƚĞ ĐŽŶĚŝƟŽŶ͘ ^ĞǀĞƌ ƌŽŽƚƐ ďĞůŽǁ ƚŚĞ ƐŽŝů ƐƵƌĨĂĐĞ ĚƵƌŝŶŐ ƚŚĞ ĮƌƐƚ LJĞĂƌ ďĞĨŽƌĞ ƚŚĞ ƉůĂŶƚ ƐƚŽƌĞƐ ĞŶĞƌŐLJ1 ĂŶĚ ŝŶ ƚŚĞ ƐĞĐŽŶĚ LJĞĂƌ ďĞĨŽƌĞ ŇŽǁĞƌ ƉƌŽĚƵĐƟŽŶ͘ DŽǁŝŶŐ1 ĐŚŽƉƉŝŶŐ ĂŶĚ ĚĞĂĚŚĞĂĚŝŶŐ ƐƟŵƵůĂƚĞƐ ŵŽƌĞ ŇŽǁĞƌ ƉƌŽĚƵĐƟŽŶ2 ƚŚĞƐĞ ŵĞƚŚŽĚƐ ƌĞƋƵŝƌĞ ĐŽŶƐĞĐƵƟǀĞ LJĞĂƌƐ ŽĨ ƐĞĂƐŽŶͲůŽŶŐ ƚƌĞĂƚŵĞŶƚƐ͘ ůů ŇŽǁĞƌďƵĚƐ ĂŶĚ ŚĞĂĚƐ ŵƵƐƚ ďĞ ĐŽůůĞĐƚĞĚ1 ďĂŐŐĞĚ1 ĂŶĚ ĚŝƐƉŽƐĞĚ ŽĨ Žƌ ĚĞƐƚƌŽLJĞĚ2 ƐĞĞĚƐ ǁŝůů ŵĂƚƵƌĞ ĂŶĚ ŐĞƌŵŝŶĂƚĞ ŝĨ ůĞŌ ŽŶ ƚŚĞ ŐƌŽƵŶĚ͘ WƌĞƐĐƌŝďĞĚ ĮƌĞ ƚŚĂƚ ƌĞƐƵůƚƐ ŝŶ ŚŝŐŚ ƐŽŝů ďƵƌŶ ƐĞǀĞƌŝƚLJ ĚĂŵĂŐĞ ƌŽŽƚƐ ĂŶĚ ĂďŽǀĞ ŐƌŽƵŶĚ ďŝŽŵĂƐƐ1 ďƵƚ ŝƐ ŶŽƚ ƌĞĐŽŵŵĞŶĚĞĚ ĚƵĞ ƚŽ ŝŵƉĂĐƚƐ ŽŶ ĚĞƐŝƌĞĚ ƉůĂŶƚƐ͘ &ŝƌĞ ŐĞŶĞƌĂůůLJ ĨĂǀŽƌƐ ŵƵƐŬ ƚŚŝƐƚůĞ ŐĞƌŵŝŶĂƟŽŶ͘ BIOLOGICAL CONTROL METHODS ůƚŚŽƵŐŚ ŚŽƌƐĞƐ1 ĐĂƩůĞ1 ŐŽĂƚƐ ĂŶĚ ƐŚĞĞƉ ŵĂLJ ĞĂƚ ŇŽǁĞƌ ŚĞĂĚƐ ŽŶ Ă ĨĞǁ ƉůĂŶƚƐ1 ƐĞĞĚƐ ƉĂƐƐ ƚŚƌŽƵŐŚ ƚŚĞŝƌ ĚŝŐĞƐƟǀĞ ƚƌĂĐŬƐ ƵŶĂůƚĞƌĞĚ ĂŶĚ ƐƉƌĞĂĚ͘ dŚĞ ůĞĂĨ ĂŶĚ ƐƚĂůŬ ƐƉŝŶĞƐ ĐĂŶ ĐĂƵƐĞ ĚŽŵĞƐƟĐ ůŝǀĞƐƚŽĐŬ ƚŽ ĂǀŽŝĚ ŵĂƚƵƌĞ ŵƵƐŬ ƚŚŝƐƚůĞ͘ dŚƵƐ1 ŵƵƐŬ ƚŚŝƐƚůĞ ĐĂŶ ďĞĐŽŵĞ ĂŶ ͞ŝŶĐƌĞĂƐĞƌ͟ ŝŶ ŽǀĞƌͲŐƌĂnjĞĚ ƐLJƐƚĞŵƐ͘ WƌŽƉĞƌůLJ ŵĂŶĂŐĞĚ ŐƌĂnjŝŶŐ ĐĂŶ ŝŵƉƌŽǀĞ ǀŝŐŽƌ ŽĨ ĚĞƐŝƌĞĚ ƐƉĞĐŝĞƐ ĂŶĚ ŝŶĚŝƌĞĐůƚLJ ƌĞĚƵĐĞ ŵƵƐŬ ƚŚŝƐƚůĞ͘ Trichosirocalus horridus is the only biological ĐŽŶƚƌŽů ĂŐĞŶƚ ĂǀĂŝůĂďůĞ ĨŽƌ ŵƵƐŬ ƚŚŝƐƚůĞ ŝŶ OŽůŽƌĂĚŽ͘ dŚĞ ŽƚŚĞƌ ƐƉĞĐŝĞƐ1 Rhinocyllus conicus, ŝƐ ŶŽƚ ŚŽƐƚ ƐƉĞĐŝĮĐ ĂŶĚ ǁŝůů ĚĂŵĂŐĞ ŶĂƟǀĞ ƚŚŝƐƚůĞƐ1 ĂŶĚ ƚŚĞƌĞĨŽƌĞ ĐĂŶŶŽƚ ďĞ ƌĞůĞĂƐĞĚ ĂƐ ĂŶ ĂŐĞŶƚ ŝŶ OŽůŽƌĂĚŽ͘ &Žƌ ŵŽƌĞ ŝŶĨŽƌŵĂƟŽŶ1 ǀŝƐŝƚ ƚŚĞ OŽůŽƌĂĚŽ ĞƉĂƌƚŵĞŶƚ ŽĨ ŐƌŝĐƵůƚƵƌĞ͛Ɛ Palisade Insectary website at ǁǁǁ͘ĐŽůŽƌĂĚŽ͘ŐŽǀͬĂŐͬďŝŽĐŽŶƚƌŽů͘ CULTURAL CONTROL METHODS DƵƐŬ ƚŚŝƐƚůĞ ŝƐ ŶŽƚ ƚŽůĞƌĂŶƚ ŽĨ ĐŽŵƉĞƟƟŽŶ ĂŶĚ ŶĞĞĚƐ ůŝŐŚƚ ƚŽ ŐĞƌŵŝŶĂƚĞ ƐĞĞĚƐ͘ OƵůƚƵƌĂů ŵĞƚŚŽĚƐ ƐŚŽƵůĚ Ăŝŵ ƚŽ ŵĂŝŶƚĂŝŶ Žƌ ƌĞƐƚŽƌĞ Ă ĐŽŵƉĞƟƟǀĞ ĂƐƐĞŵďůĂŐĞ ŽĨ ĨŽƌďƐ1 ĐŽŽů ĂŶĚ ǁĂƌŵ ƐĞĂƐŽŶ ŐƌĂƐƐĞƐ͘ /ŵƉůĞŵĞŶƚ ǁŚŽůĞ ƐŝƚĞ ƌĞƐƚŽƌĂƟŽŶ ŽĨ ƐŽŝůƐ1 ƉůĂŶƚƐ ĂŶĚ ǁĂƚĞƌ ƌĞŐŝŵĞƐ ǁŚĞƌĞ ƐƚĂŶĚƐ ŽĨ ŵƵƐŬ ƚŚŝƐƚůĞ ĞdžŝƐƚ ǁŚĞƌĞ ŶĞĞĚĞĚ͘ hƐĞ ůŽĐĂůůLJ ĂĚĂƉƚĞĚ ƐƉĞĐŝĞƐ ƚŚĂƚ ĂƌĞ ĞĐŽůŽŐŝĐĂůůLJ ĂƉƉƌŽƉƌŝĂƚĞ ĨŽƌ ƚŚĞ ƐŝƚĞ ƚŽ ŝŵƉƌŽǀĞ ĐŽŵƉĞƟƟǀĞŶĞƐƐ͘ /ŶĐůƵĚĞ ĂŶŶƵĂů ĂƐ ǁĞůů as perennial species. Incorporate soil amendments, soil microbes and mycorrhizal fungi ŝŶ ƌĞƐƚŽƌĂƟŽŶ ĂŶĚ ůĂŶĚ ŵĂŶĂŐĞŵĞŶƚ ĞīŽƌƚƐ͘ DŝŶŝŵŝnjĞ ƐŽŝů ĐŽŵƉĂĐƟŽŶ ĂŶĚ ĚŝƐƚƵƌďĂŶĐĞ1 ĞƐƉĞĐŝĂůůLJ ŝŶ ǁĞƚůĂŶĚƐ ĂŶĚ ŵŽŝƐƚ ƐŽŝů͘ /ƌƌŝŐĂƟŽŶ ĐĂŶ ŝŶĐƌĞĂƐĞ ĐŽŵƉĞƟƟǀĞ ƐƉĞĐŝĞƐ͘ CHEMICAL EKd3 dŚĞ ĨŽůůŽǁŝŶŐ ĂƌĞ ƌĞĐŽŵŵĞŶĚĂƟŽŶƐ ĨŽƌ ŚĞƌďŝĐŝĚĞƐ ƚŚĂƚ ĐĂŶ ďĞ ĂƉƉůŝĞĚ ƚŽ ƉĂƐƚƵƌĞƐ ĂŶĚ ƌĂŶŐĞůĂŶĚ͘ ZĂƚĞƐ ĂƌĞ ĂƉƉƌŽdžŝŵĂƚĞ ĂŶĚ ďĂƐĞĚ ŽŶ ĞƋƵŝƉŵĞŶƚ ǁŝƚŚ ĂŶ ŽƵƚƉƵƚ ŽĨ ϯϬ ŐĂůͬĂĐƌĞ͘ &ŽůůŽǁ ƚŚĞ ůĂďĞů ĨŽƌ ĞdžĂĐƚ ƌĂƚĞƐ͘ ůǁĂLJƐ ƌĞĂĚ1 ƵŶĚĞƌƐƚĂŶĚ1 ĂŶĚ ĨŽůůŽǁ ƚŚĞ ůĂďĞů ĚŝƌĞĐƟŽŶƐ͘ dŚĞ ŚĞƌďŝĐŝĚĞ ůĂďĞů ŝƐ ƚŚĞ >t͊ © Eric Coombs, OR Dept of Agriculture © Norman E. Rees, USDA Ag Research Service List B ,yBlacBlacBlacBlacBlacBlaBlacBlacBlacacBlacBlBlacBBlacBlacaaccacaksk, sk, sk, sk, sk, sk, sk, sk, sk, sk, sk, sk, skkskcalycalycalycalycalycalyalycalycalycalyalyaalalyalal rooroorooooroorooroorooroooooortttttttttttt yyyyyyy© St© St© St©S eveeveeveeveeeeeeeee DeweDeweDeweDewey USy USy USy USUUUU Key ID Points 1. Distinguished from other knapweeds by the flower’s smooth, papery bracts. 2. Roots are brown to black with scaly appearance. 3. Rosettes and lower leaves deeply lobed. 4. Upper leaves are smaller, smooth margined, and not lobed. Russian knapweed (Acroptilon repens) is a non-native, deep-rooted perennial that spreads by aggressive, creeping, horizontal roots (rhizomes) and seeds. The roots are brown to black with a scaly appearance. Russian knapweed can grow up to 3 feet in height. The stems and leaves are covered with short gray hairs. The ƪ‘™‡”•ƒ”‡—”Ǧ•Šƒ’‡†ǡ’‹–‘’—”’Ž‡ in color, and are solitary at the tips of the upper branches. Russian knapweed can be distinguished from other knapweeds by the smooth, papery, rounded bracts that surround the ƪ‘™‡”•Ǥ—••‹ƒƒ’™‡‡†‡‡”‰‡• in early spring after soil temperatures remain above freezing. It produces ƪ‘™‡”•ˆ”‘ —‡–‘—‰—•–ƒ†•‡–• seed in late summer to early fall. The seeds are viable for two to three years. Russian knapweed reproduces primarily from its root system. Buds on the horizontal roots can form adventitious •Š‘‘–•ǡ—‰—•––Š”‘—‰Š–Š‡™‹–‡”ǡ that can grow to become independent plants. Once rosettes emerge in the •’”‹‰ǡ”‡ƒ‹‹‰”‘‘–„—†••Ž‘—‰ŠǦ‘ơ until they develop again in late summer. ††‹–‹‘ƒŽŽ›ǡ”‘‘–ˆ”ƒ‰‡–•…ƒ develop into new plants. Russian knapweed is allelopathic, which means it contains a toxic substance that inhibits the growth of competing plants. This weed may also be toxic to horses resulting in serious injury or possibly death of the animal. Russian knapweed displaces native vegetation and reduces forage values on range and pasturelands. Habitat for Russian knapweed includes roadsides, ditch banks, riparian zones, pastures, rangeland, saline soils, clear cuts, and cropland. It typically invades degraded areas and sites with full sun. TŠ‡‘•–‡ơ‡…–‹˜‡‡–Š‘†‘ˆ…‘–”‘Ž for Russian knapweed is to prevent its establishment through proper land management. Maintain healthy pastures and rangeland and continually monitor your property for new infestations. If Russian knapweed is already established, using an integrated weed management approach proves to „‡‡ơ‡…–‹˜‡Ǥ—••‹ƒƒ’™‡‡†…ƒ„‡ managed with herbicides or biocontrol insects, but long-term control must include planting competitive plant species to occupy bare ground once infested by the weed. Details on the back of this sheet can help to create a management plan compatible with your site ecology. R ussian knapweed is designated as a “List B” species in the Colorado ‘š‹‘—•‡‡†…–Ǥ – is required to be either eliminated, contained, or suppressed depending on the local infestations. For more information, visit www.colorado.gov/ag/ weeds and click on the Noxious Weed Program link or call the State Weed Coordinator at the Colorado Department of ‰”‹…—Ž–—”‡ǡ‘•‡”˜ƒ–‹‘ Services Division, ͵Ͳ͵Ǧͺ͸ͻǦͻͲ͵ͲǤ Ru s s i a n k n a p w e e d Ac r o p t i l o n r e p e n s —••‹ƒƒ’™‡‡† †‡–‹Ƥ…ƒ–‹‘ƒ†ƒƒ‰‡‡– 2008 Quarter Quad Survey Colorado Department of Agriculture - Conservation Services 305 Interlocken Parkway ”‘‘Ƥ‡Ž†ǡ͔͔͖͕͜ ȋ͔͗͗Ȍ͚͜͝Ǧ͔͔͗͝ ™™™Ǥ…‘Ž‘”ƒ†‘Ǥ‰‘˜Ȁƒ‰Ȁ™‡‡†• List B Š‡‘•–‡ơ‡…–‹˜‡…‘–”‘Žˆ‘”—••‹ƒƒ’™‡‡†‹•–‘’”‡˜‡–‹–•‡•–ƒ„Ž‹•Š‡––Š”‘—‰Š’”‘’‡” Žƒ†ƒƒ‰‡‡–Ǥ‹–‡‰”ƒ–‡†™‡‡†ƒƒ‰‡‡–ƒ’’”‘ƒ…Š…ƒ„‡‡ơ‡…–‹˜‡™Š‡†‡ƒŽ‹‰ ™‹–Š—••‹ƒƒ’™‡‡†Ǥ –…ƒ„‡ƒƒ‰‡†™‹–ŠŠ‡”„‹…‹†‡•‘”‹•‡…–•ǡ„—–Ž‘‰Ǧ–‡”…‘–”‘Ž—•– ‹…Ž—†‡’Žƒ–‹‰…‘’‡–‹–‹˜‡’Žƒ–•’‡…‹‡•–‘‘……—’›„ƒ”‡‰”‘—†‘…‡‹ˆ‡•–‡†„›–Š‡™‡‡†Ǥ Ru s s i a n k n a p w e e d Ac r o p t i l o n r e p e n s –‡‰”ƒ–‡†‡‡†ƒƒ‰‡‡–‡…‘‡†ƒ–‹‘• HERBICIDE       ‹‘’›”ƒŽ‹† (Milestone) 5-7 oz/acre ’’Ž›‹–Š‡ˆƒŽŽ™Š‡ƒ„‘˜‡Ǧ‰”‘—†•–‡•†‹‡„ƒ…ƒ†”‘‘– buds are highly susceptible; can also apply in the bud to senes- …‡…‡•–ƒ‰‡•Ǥ††‘Ǧ‹‘‹…•—”ˆƒ…–ƒ–̷͔Ǥ͖͗‘œȀ‰ƒŽ™ƒ–‡”‘” ͕“–Ȁ͕͔͔‰ƒŽ™ƒ–‡”Ǥ ‹‘…›- clopyrachlor + chlorsulfuron (Perspective) 4.75 to 8 oz ’”‘†—…–ȀΪ adjuvant ’’Ž›‹–Š‡ˆƒŽŽ™Š‡ƒ„‘˜‡Ǧ‰”‘—†•–‡•†‹‡„ƒ…ƒ†”‘‘– buds are highly susceptible; can also apply in the bud to se- ‡•…‡…‡•–ƒ‰‡•Ǥ ’‘”–ƒ–ǣ’’Ž‹…ƒ–‹‘•‰”‡ƒ–‡”–Šƒ͙Ǥ͙‘œ ’”‘†—…–Ȁ‡š…‡‡†•–Š‡–Š”‡•Š‘Ž†ˆ‘”•‡Ž‡…–‹˜‹–›Ǥ–”‡ƒ–‹ the root zone of desirable trees and shrubs. Picloram (Tordon 22K *this is a Restricted Use Pesticide*) 1 qt/acre or 1 oz/gal water ’’Ž›‹–Š‡ˆƒŽŽ™Š‡ƒ„‘˜‡Ǧ‰”‘—†•–‡•†‹‡„ƒ…ƒ†”‘‘– buds are highly susceptible; can also apply in spring to bud/early ˆŽ‘™‡”•–ƒ‰‡ƒ†Ȁ‘”ˆƒŽŽ”‘•‡––‡Ǥ††‘Ǧ‹‘‹…•—”ˆƒ…–ƒ–̷ ͔Ǥ͖͗‘œȀ‰ƒŽ™ƒ–‡”‘”͕“–Ȁ͕͔͔‰ƒŽ™ƒ–‡”Ǥ    The following are recommendations for herbicides that can be ƒ’’Ž‹‡†–‘”ƒ‰‡ƒ†’ƒ•–—”‡Žƒ†•ǤŽ™ƒ›•”‡ƒ†ǡ—†‡”•–ƒ†ǡƒ† follow the label directions. Please read label for exact rates. The Š‡”„‹…‹†‡Žƒ„‡Ž‹•–Š‡Ǩ    Mowing several times before the plants bolt stresses Russian knapweed and forces it to use nutrient reserves stored in the root system. However, mowing alone will not eliminate the infestation and it can stimulate shoot sprouting the following year. Mowing combined with a fall herbicide application will enhance control. Tilling and disking can create root fragments that can sprout. However, repeated deep tillage (1 feet) over 3 years can kill much of the root system.    The gall midge, Jaapiella ivannikoviǡ‹•ƒƪ›–Šƒ–Žƒ›•‡‰‰•‹–Š‡ shoot tips of Russian knapweed. It forms galls that reduce ƪ‘™‡”‹‰ǡ•‡‡†’”‘†—…–‹‘ǡƒ†•–—–•–Š‡’Žƒ–•ǯ‰”‘™–ŠǤŠ‹• biocontrol will stress the stand of Russian knapweed but will ‘–Ž‹‡Ž›‡Ž‹‹ƒ–‡‹–ǤŠ‡‘Ž‘”ƒ†‘‡’ƒ”–‡–‘ˆ‰”‹…—Ž–—”‡ ǦƒŽ‹•ƒ†‡ •‡…–ƒ”›ǡͻ͹ͲǦͶ͸ͶǦ͹ͻͳ͸ǡ‹•…—””‡–Ž›‡•–ƒ„Ž‹•Š‹‰–Š‹• biocontrol . It is not yet available to the public.  Maintain healthy pastures and prevent bare spots caused by overgrazing. Bare ground is prime habitat for weed invasions. Establishing sod-forming grasses or vegetation with dense shade …ƒ„‡ƒ‡ơ‡…–‹˜‡…—Ž–—”ƒŽ…‘–”‘Ž‘ˆ—••‹ƒƒ’™‡‡†Ǥ‘–ƒ…– your local Natural Resources Conservation Service for seed mix recommendations. TRANSMISSION LINE 6584 REBUILD PROJECT ATTACHMENT E: Names and Addresses of Property Owners within 200 feet and Map Landowners within 200 Feet of McLin Yard Parcel Parcel Number Owner Owner Address Legal Description 217913400014 STANEK, PAUL 3490 COUNTY ROAD 311 NEW CASTLE, CO 81647 Section: 13 Township: 6 Range: 92 TR IN THE SE 217913100012 MUSGRAVE, RICHARD R & DONNA L 2920 COUNTY ROAD 311 NEW CASTLE, CO 81647- 9616 Section: 13 Township: 6 Range: 92 Subdivision: MINEOTA RIDGE EST. 3RD. Lot: 9 218118200287 MIDNIGHT STAR BREEDERS LLC PO BOX 957 SILT, CO 81652 Section: 18 Township: 6 Range: 91 A TR IN THE SWSW SEC 7, THE NENW SEC 18. Township: 6 Range: 92 SESE FO SECTION 12, AND NENE OF SECTION 13 217913400011 ALAMENO, MARIANNE T 2980 COUNTY ROAD 311 NEW CASTLE, CO 81647 Section: 13 Township: 6 Range: 92 Subdivision: MINEOTA RIDGE EST. 3RD. Lot: 8 218118200260 1078 ROAD 335 LLC PO BOX 957 SILT, CO 81652 THE SESE SEC 12 & THE NENE SEC 13 6/92. Section: 18 Township: 6 Range: 91 A TR IN THE SWSW SEC 7, THE NENW & LOT 1 SEC 18. EXCEPT A TR OF LAND CONT. 40.583 AC. (36.362 ACRES) 217913200535 GARFIELD COUNTY BOARD OF COUNTY COMMISSIONERS 108 8TH STREET, SUITE 213 GLENWOOD SPRINGS, CO 81601-3360 Section: 13 Township: 6 Range: 92 A TR IN SESW OF SEC 12 & N2 OF SEC 13 Parcel Number Owner Owner Address Legal Description 217912300534 MCPHERSON FAMILY TRUST DATED 2/5/24 2299 COUNTY ROAD 311 NEW CASTLE, CO 81647 Section: 12 Township: 6 Range: 92 A TR IN SESW OF SEC 12 & N2 OF SEC 13 9.988 ACRES 217912300533 R AND S MCPHERSON LIVING TRUST DATED 10/20/2020 2065 COUNTY ROAD 311 NEW CASTLE, CO 81647 Section: 12 Township: 6 Range: 92 A TR IN S2SW OF SEC 12 & THE NENW OF SEC 13. 10.516 ACRES 217912400432 DAWN MARIE SEPARATE PROPERTY TRUST 09/17/2022 597 COUNTY ROAD 335 NEW CASTLE, CO 81647 Section: 12 Township: 6 Range: 92 A TR IN S1/2SE 5.77 ACRES 217912301001 KARSTENSEN, DEAN A LIVING TRUST DTD 01/24/2023 3775 W MINOOKA ROAD MORRIS, IL 60450 Section: 12 Township: 6 Range: 92 Subdivision: RIVERVIEW RANCH SUBDIVISION Lot: 1 AMENDED, AS PER SECOND AMENDED FINAL PLAT RECEPTION NO. 965010 6.757 ACRES 217912401005 BRAMCO LLC PO BOX 737 NEW CASTLE, CO 81647 Section: 12 Township: 6 Range: 92 Subdivision: RIVERVIEW RANCH SUBDIVISION Lot: 5 AMENDED, AS PER SECOND AMENDED FINAL PLAT RECEPTION NO. 965010 7.003 ACRES 217912400509 COLLINS, TODD D & TINA 66 MID VALLEY DRIVE NEW CASTLE, CO 81647- 9656 Section: 12 Township: 6 Range: 92 A TR IN THE SE 1/4 ALSO A TR IN SE OF SEC 12 8.63 ACRES 217912300295 SIMONSON, JEFFEREY S & BRENDA S 2065 COUNTY ROAD 311 NEW CASTLE, CO 81647 Section: 12 Township: 6 Range: 92 TR IN SW 5.81 ACRES Parcel Number Owner Owner Address Legal Description 218128300958 BUREAU OF LAND MANAGEMENT COLORADO RIVER VALLEY FIELD OFFICE 2300 RIVER FRONTAGE ROAD SILT, CO 81652 Section: 28 Township: 6 Range: 91 SEC.17 SWSW SEC.18 LOT 4 SENW, E2SW, SE SEC.19 LOTS 1-3 NE, E2NW, NESW, N2SE SEC.20 SWNE, W2NW, SENW, NWSW, E2SW, W2SE SEC.28 NWNE, W2, S2SE SEC.29 NWNE, E2E2, SWSE SEC.32 E2, NENW SEC.33 SEC.34 N2NW, SWNW, SW 217913400016 BIGGS, DANIEL E & CONNIE M 123 COUNTY ROAD 311 NEW CASTLE, CO 81647 Section: 13 Township: 6 Range: 92 THAT PT OF SWSE, LYING WESTERLY OF THE RIGHT-OF-WASY LINE OF COUNTY RD. 311 36.3 ACRES 218107300259 RIVER ROCK RANCH 1412 LLC 4929 COUNTY ROAD 331 SILT, CO 81652 Section: 7 Township: 6 Range: 91 A TR IN SWSW SEC 7. 6/92 THE SESE SEC 12. 35.001 ACRES 217911400114 DIXON WATER FOUNDATION 4528 COUNTY ROAD 398 DECATUR, TX 76234 Section: 9 Township: 6 Range: 92 LOT 8 (32), PT. LOT 5 (NET .92), PT. OF NWSE (7.09NET) DESC. AS BEING E. OF A LINE WHICH RUNS N & S PARALLEL TO AND DISTANCE OF 1675' FROM E. SEC.LINE E. 630' OF SWSE (NET 19.09), SESE, A TR. OF MEANDER LAND CONT. 16.8AC 217912300468 NICHOLSON, RICHARD E EXEMPT PROPERTY TRUST UDT 08/09/2007NICHOLSON, RICHARD E EXEMPT PROPERTY TRUST UDT 08/09/2007 RYAN , LLC PO BOX 460329, DEPT 909 HOUSTON, TX 77056 Section: 12 Township: 6 Range: 92 A TR IN THE SW4 Parcel Number Owner Owner Address Legal Description 217913400015 FISHER, STEPHEN F & JUDITH A 8482 S MOUNTAIN AIR LANE GOLD CANYON, AZ 85118 Section: 13 Township: 6 Range: 92 TR IN THE SE 14.35 ACRES 217913100554 MCLIN, SHARON T & BRIT C PO BOX 957 SILT, CO 81652 Section: 7 Township: 6 Range: 91 PT. OF LOT 10 (NET 31.87 AC) Section: 18 Township: 6 Range: 91 LOTS 1 (40.26 AC ), 2 (40.30 AC), 3 (40.34 AC), NENW Section: 12 Township: 6 Range: 92 PT. OF SESW (NET 20.41 AC ) & PT. S2SW (NET 46.58 AC) Section: 13 Towns 217912300536 R AND S MCPHERSON LIVING TRUST DATED 10/20/2020 2065 COUNTY ROAD 311 NEW CASTLE, CO 81647 Section: 12 Township: 6 Range: 92 A TR IN SW1/4 OF SEC 12. EXCEPT DESC IN 668/313. 7.26 ACRES 217912300339 SIMONSON, JEFFEREY S & BRENDA S 2045 COUNTY ROAD 311 NEW CASTLE, CO 81647- 9617 Section: 12 Township: 6 Range: 92 TR IN LOTS 7&8 CONT 2.27 AC., ALSO A TR CONT 1.46 A 217913400018 SMITH, ULBERT SHANE & SARAH K 2995 COUNTY ROAD 311 NEW CASTLE, CO 81647 Quarter: SE Section: 13 Township: 6 Range: 92 A PARCEL OF LAND SITUATE IN THE E2 OF SECTION 13 BEING MORE PARTICULARLY DESCRBED IN WD RECEPTION # 876288 217912300467 NICHOLSON, RICHARD E EXEMPT PROPERTY TRUST UDT 08/09/2007 RYAN, LLC PO BOX 460329, DEPT 909 HOUSTON, TX 77056 Section: 12 Township: 6 Range: 92 A TR IN N4. EXCEPT A TR. OF LAND CONT. 4.55 AC +/- AS DESC. IN BDRY LINE ADJ BK 1827/791 AND QCD B 1827/786 AND ALSO SHOWN IN AMD FINAL PLAT OF RIVER VIEW RANCH SUB-DIV. REC # 702964 Parcel Number Owner Owner Address Legal Description 217912401003 GRUENEFELDT, DAN K LIVING TRUST U/A/D 10/9/23 PO BOX 9 NEW CASTLE, CO 81647 Section: 12 Township: 6 Range: 92 Subdivision: RIVERVIEW RANCH SUBDIVISION Lot: 3 AMENDED, AS PER SECOND AMENDED FINAL PLAT RECEPTION NO. 965010 6.371 ACRES 217912401004 BRANNON, LARRY AND SUSIE FAMILY TRUST PO BOX 2834 SANTA MARIA, CA 93457 Section: 12 Township: 6 Range: 92 Subdivision: RIVERVIEW RANCH SUBDIVISION Lot: 4 AMENDED, AS PER SECOND AMENDED FINAL PLAT RECEPTION NO. 965010 6.553 ACRES 217912301002 NILSSON, STEVEN & CHRISTINE 787 CANYON CREEK DRIVE GLENWOOD SPRINGS, CO 81601 Section: 12 Township: 6 Range: 92 Subdivision: RIVERVIEW RANCH SUBDIVISION Lot: 2 AMENDED, AS PER SECOND AMENDED FINAL PLAT RECEPTION NO. 965010 5.608 ACRES 217912401006 BRAMCO LLC PO BOX 737 NEW CASTLE, CO 81647 Section: 12 Township: 6 Range: 92 Subdivision: RIVERVIEW RANCH SUBDIVISION Lot: 6 AMENDED, AS PER SECOND AMENDED FINAL PLAT RECEPTION NO. 965010 10.575 ACRES 0 500 1,000 Feet Surface Mangement Bureau of Land Management Other Federal Legend Proposed Centerline Existing Centerline McLin Yard Township/Range Boundary Parcel Boundary Project: I:\ESP\Projects\XcelEnr\Rebuilds_GIS\ArcGIS_Pro\6584\2024_03_05_New_Castle_Powerpoint_Updates\2024_03_05_New_Castle_Powerpoint_Updates.aprx C O L O R A D OScale: 16,000 Date: 5/1/2024 Data Sources: Burns & McDonnell, Xcel Energy, CDOT, CNHP, Garfield County Cou n t y R o a d 3 3 5 C o u n t y R o a d 3 1 1 Mineota Dr Colo rado R iv er 6S 91W 6S 92W 217913400014 & 217913100012 218118200287 & 217913400011 218118200260 & 217913200535& 217912300534 2 1 7 9 1 2 3 0 0 5 3 3 217912400432 & 217912301001 & 217912401005 217912400509 & 217912300295 218128300958 217913400016 218107300259 217911400114 & 217912300468 217913400015 217913100554 & 217912300536 & 217912300339 217913400018 & 217912300467 & 217912401003 & 217912401004 & 217912301002 & 217912401006 / Project Location Notification Area Map - McLin Yard Xcel Energy Rebuild 6584 Garfield County, Colorado C O L O R A D OTotal Area of Site: 35 Acres Applicant: Xcel Energy 1800 Larimer Street Denver, CO 80202 303-285-6533 Preparer: Burns & McDonnell 9191 S. Jamaica Street Englewood, CO 80112 720-592-3402