Loading...
HomeMy WebLinkAboutPlansFound a 3.25 Aluminum Cap on a 2.5" Aluminum Pipe 1.0' Above Ground in a Stone Mound Stamped as Shown 1 w _ 1 1974.25 -� S78 03 00 00 — `ocotwn of Easement — APProxmalloic 5pg55 ' ElectrlcolRecept,on - LEGEND - -- Gravel — Water valve — Found Monument as described [. — Telephone Ped NJ — Well Cy — Water Spigot Existing Conditions Map The Southeast Quarter of the Southeast Quarter Section 12, Township 6 South, Range 89 West of the bth P.M. Garfield County, Colorado Found a 3.25" Aluminum Cap on a 2.5" Aluminum Pipe 0.3' Above Ground in a Stone Mound Stamped as Shown 1 I i I J 35 / Found a 2.5" Brass Cap on a 2" Iron Pipe 0.1' Below Ground Stamped as Shown EL=8374.2' __PND P 250 z � T65 Q S12 Z S13 R89W O C YI PROPERTY DESCRIPTION: The Southeast Quarter of the Southeast Quarter Section 12, Township 6 South, Range 89 West of the 6th P.M. Garfield County, Colorado NOTES: 1. Basis of Bearings: Bearings shown hereon are based on a record bearing of N 78'21'50" W, between the Souteast Quarter Corner Section 12 and the East 1/16 Corner Section 12 and Section 13, both corners being monumented as shown hereon. 2. This map has been prepared pursuant to client request for an Existing Conditions Map. 3. Date of field survey 05/25/2024 4. Units of linear measurements are displayed in US Survey Feet, 5. Vertical Information: Datum: Elevation information shown hereon is based upon GPS observations utilizing OPUS, Geoid 18 to derive the NAVD88 elevation of 8374.2' at the top of a Brass Cap, as shown hereon. Contour Interval: 1 Foot. 6. SGM is not responsible for any changes made to this document after it leaves our possession. Any copy, facsimile, etc., of this document must be compared to the original signed, sealed and dated document to insure the accuracy of the information shown on any such copy, and to insure that no such changes have been made. 7. Any subsurface utilities are not within the scope of this survey. Client/contractor must contact specific utility companies to verify both the location and depth of respective utilities. Additional surveying work may be required to show any such subsurface utility locations on this drawing. SGM will not be responsible for protection of subsurface utilities. 8. Property descriptions shown hereon are based on an original US Department of the Interior Bureau of Land Management Cadastral Survey, September 5, 1997 9. Fences shown hereon, if any, have been shown for general reference and do not necessarily depict limits of ownership. 10, The property shown hereon is subject to all easements, rights —of —way, building setbacks or other restrictions of record, as such items may affect this property. This survey does not represent a title search by this surveyor to determine ownership or to discover easements or other encumbrances of record. All information pertaining to ownership, easement and other encumbrances of record has been taken from the title insurance commitment issued by American Land Title Association, Commitment No. 0604704—C2, having an effective date of May 3rd, 2024. SURVEYOR'S CERTIFICATE: I, R. Fox benton, being a registered Professional Land Surveyor, licensed in the State of Colorado, do hereby certify that this map of existing conditions was prepared by SGM on this date, 06/24/2024, based on site conditions as they existed during a field survey performed 05/25/2024, under my direct supervision and checking and that it is true and correct to the best of my knowledge and belief. R. Fox Benton Colorado PLS # 38792 06/24/24 N4 12 r V I I V- `n h 18 T6S Rbawy 1 oo<-VICINITY MAP- '4' SCALE: 1 i ich =.2000 Feet Graphic Scale 0 40 80 V In U.S. Feet: 1" = 80' N. N CD CO /) CO -0 � �U 9(6 �U) cyi C) L •L X O O 0 U Cl)®p O LO 0) 0) Jco0)� r N Oi L pp CY CC CY G y 0 RS to _0- °c> ��coai L V, G3 S CN 0 ® r 0 v m 0 o 'no U N ° O ° r C d Q N T O C rli v O W Eau c E od— Ut �C ~ U y N - 3 � EY o ° p 3 TE vEa AD ' y i= O TO N ° O O L N U ° jr � N M c ,fJ� ,� o,. O, O O� N •r Z ,]OOO Job No. Maui Built Homes am 1 1924 1 �r j GLENWOOD EPP,INGS _.-- r r1 yx,�.d .Nt a�jy , k J� �J hw E a. ti VICINITY MAP N SCALE _ NOT TO SCALE PROJECT CONTACTS PLANNER/ LANDSCAPE ARCHITECT CIVIL ENGINEER HOLY CROSS ENERGY COMCAST CENTURYLINK CARBONDALE & RURAL FIRE PROTECTION DISTRICT * Know what's helm a C8116efore you dig, qkwp DOUGHLAS PRATTE LAND STUDIO (970) 927-3690 ANTHONY ALFINI ROARING FORK ENGINEERING (970) 618-7073 LIBBY COWLING (970) 510-1350 PAUL BURKE (970) 945-7292 JASON SHARPE (970) 328-8290 MIKE WAGNER (970)-963-2491 --dallbb, AMIL-1111ill � AL—AR-111111I M SITE MAP i"=2o' GRADING PERMIT SET I �I-TOBER 224 PROPERTY LOCATION: OWNER: PARCEL NUMBER: AREA: LEGAL DESCRIPTION: DESCRIPTION TO BE DETERMINED KBBS HOLDINGS LLC 218512402034 36AGRES SECTION: 12 TOWNSHIP: 6 RANGE: 89 SUBDIVISION: LOOKOUT MTN. RANCHES Sheet List Table Sheet Number Sheet Title C1 Cover Sheet C2 Notes Legend & Abbreviations C3 Plan & Profile (1) C4 Pain & Profile (2) C5 Erosion Control P:\2024\63 — LOOKOUT MOUNTAIN EV & TH\04—DWG\O4—SHEETSET\L0OK0UT PLAN & PROFILE.DWG Plotted: 10/10/2024 5:15 PM By: Anthony Ahini a 5$163 z 10110124 o��SS�ONAC�-���� CHECKED BY: AWA DRAWN BY: MAC an 0 JOB #: 2022-63 NOTFOR CONSTRUCTION zw Q p O z } � z z O � � �0-6o ry �LUo O z L1J W u cj-� 00 z w J w Cover Sheet C1 Of 5 GENERAL NOTES: 1. ALL WORK SHALL COMPLY WITH THE MOST RECENT GARFIELD COUNTY ROAD AND BRIDGE STANDARDS. 2. LIMITS OF CONSTRUCTION SHALL BE AS SHOWN ON PLANS. AND LIMITED TO APPROVED ACTIVITY ENVELOPES. 3. TEMPORARY CONSTRUCTION EASEMENTS MAY BE REQUIRED AND ARE TO BE COORDINATED WITH PROPERTY OWNER. 4. THE CONTRACTOR MUST CERTIFY THAT ALL AGGREGATES USED ON THIS PROJECT ARE FREE FROM HAZARDOUS COMPONENTS IN EXCESS OF THE THRESHOLD CONCENTRATIONS ESTABLISHED BY THE EPA. 5. ANY SIGNAGE REMOVED DURING CONSTRUCTION THAT IS NOT SHOWN TO BE ON THE PLANS SHALL BE REPLACED OR RETURNED TO ITS ORIGINAL LOCATION, 6. THROUGHOUT ALL PHASES OF CONSTRUCTION, UNTIL THE FINAL ACCEPTANCE OF THE PROJECT, THE CONTRACTOR MUST KEEP THE WORK SITE CLEAN AND FREE FROM RUBBISH AND DEBRIS. THE CONTRACTOR SHALL ALSO ABATE DUST NUISANCE AS NECESSARY. THE CONTRACTOR HAS 24 HOURS AFTER THE DEPOSIT OF ANY EARTH, GRAVEL OR OTHER EXCAVATED MATERIAL TO REMOVE SUCH DEPOSIT. IN THE EVENT THAT THE EARTH, GRAVEL OR OTHER EXCAVATED MATERIAL IS NOT REMOVED, THE ENGINEER OR OWNER WILL DIRECT SUCH REMOVAL AND THE COST INCURRED SHALL BE DEDUCTED FROM THE BOND. DUST CONTROL WILL ONLY BE REQUIRED IF ADJACENT PROPERTY OWNERS ARE ADVERSELY AFFECTED OR IF DUST ADVERSELY AFFECTS MAINTENANCE OF TRAFFIC DURING THE PROJECT SUCH THAT, IN THE OPINION OF ENGINEER, ADJUSTMENT OF THE CONTROL PROGRAM IS APPROPRIATE. IT IS ANTICIPATED DUST CONTROL WILL BE REQUIRED ON THIS PROJECT. 7. THE CONTRACTOR IS RESPONSIBLE FOR TEMPORARY SURFACES THROUGHOUT THE PROJECT TO MAINTAIN VEHICULAR TRAFFIC AND PROVIDE SAFE PEDESTRIAN ACCESS. THE COST SHALL BE INCIDENTAL TO WORK. 8. CONSTRUCTION DE -WATERING IS TO BE IN ACCORDANCE WITH THE COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT REQUIREMENTS. CONTRACTOR IS RESPONSIBLE FOR ALL ASSOCIATED PERMITTING. 9. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT ALL WORK IS PERFORMED IN ACCORDANCE WITH APPLICABLE STANDARDS AND REGULATIONS AS SET FORTH BY THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA). 10.NO FIELD CHANGES SHALL BE MADE WITHOUT PRIOR WRITTEN APPROVAL OF THE ENGINEER. 11.SUBMITTALS SHALL BE PREPARED FOR ALL MATERIALS TO BE INCORPORATED INTO THE PROJECT AND SENT TO THE ENGINEER FOR REVIEW AND APPROVAL. 12.THE PHYSICAL FEATURES WITHIN THE LIMITS OF THE PROJECT HAVE BEEN SHOWN BASED ON THE BEST AVAILABLE INFORMATION AT THE TIME OF DESIGN, THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THE FEATURES SHOWN. THE CONTRACTOR SHALL REVIEW AND VERIFY EXISTING PHYSICAL FEATURES AND ELEVATIONS OF THE CONDITIONS TO BE ENCOUNTERED DURING CONSTRUCTION. - 13.THE CONTRACTOR SHALL LIMIT ALL WORK AND STORAGE AREAS TO THE PROJECT SITE. ANY WORK INSIDE PUBLIC RIGHT-OF-WAYS WILL REQUIRE APPROVAL FROM THE JURISDICTIONAL AUTHORITY PRIOR TO CONSTRUCTION. USE OF ANY PRIVATE AREAS FOR THIS PROJECT BY THE CONTRACTOR MUST BE APPROVED IN WRITING BY THE PROPERTY OWNER WITH A COPY OF THIS APPROVAL PROVIDED TO THE ENGINEER PRIOR TO USAGE. 14.ALL WORK SHALL BE DONE TO THE LINES, GRADES, SECTIONS, AND ELEVATIONS SHOWN ON THE PLANS UNLESS OTHERWISE NOTED OR APPROVED BY THE ENGINEER. 15.THE ENGINEER SHALL BE NOTIFIED WITHIN 48 HOUR PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION. 16.THE CONTRACTOR SHALL LIMIT CONSTRUCTION ACTIVITIES TO THOSE AREAS WITHIN THE LIMITS OF DISTURBANCE AND/OR TOES OF SLOPE AS SHOWN ON THE PLANS. ANY DISTURBANCE BEYOND THESE LIMITS SHALL BE RESTORED TO ORIGINAL CONDITIONS BY THE CONTRACTOR AT THEIR OWN EXPENSE. 17.THE CONTRACTOR SHALL PROTECT ALL TREES, BUSHES, AND EXISTING IMPROVEMENTS INSIDE AND OUTSIDE THE LIMITS OF WORK UNLESS SPECIFICALLY MARKED FOR REMOVAL OR REPLACEMENT. NO TREES SHALL BE REMOVED OR TRIMMED WITHOUT PRIOR ACKNOWLEDGEMENT OF THE PROPERTY OWNER AND/OR PROJECT ENGINEER, ALL APPLICABLE PERMITS ARE THE RESPONSIBILITY OF THE CONTRACTOR. 18.THE CONTRACTOR SHALL PROTECT THE EXISTING DRAINAGE STRUCTURES AND REROUTE ANY RUNOFF AS NECESSARY DURING CONSTRUCTION ACTIVITIES TO PREVENT EROSION AND DAMAGE. 19.THE PHYSICAL FEATURES REQUIRING REMOVAL OR OBLITERATION WITHIN THE PROJECT SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND BE DISPOSED OF OFF -SITE UNLESS OTHERWISE NOTED. 20.THE CONTRACTOR SHALL HAVE A COPY OF ALL APPLICABLE STANDARDS AND APPROVED CONSTRUCTION PLANS AND SPECIFICATIONS ON SITE AT ALL TIMES. 21.ANY DISCREPANCY WITHIN THESE PLANS SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ENGINEER. 22.ALL SEWER MANHOLES STATION OFFSET CALLOUTS REFERENCE CENTER OF STRUCTURE LOCATION. ELEVATIONS REFERENCE THE MANHOLE LID OR FLOW LINE ON MANHOLES WITH GUTTER INLETS. UTILITY GENERAL NOTES 1. ANY CONTRACTOR -CAUSED DAMAGE TO UTILITY AND/OR SERVICE LINES SHOWN OR NOT SHOWN ON THE PLANS, SHALL BE REPAIRED OR REPLACED AT NO COST TO OWNER OF THE LINE AND SHALL BE ACCOMPLISHED BY THE CONTRACTOR, SUBCONTRACTOR OR AS APPROVED BY THE ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL UTILITY COMPANIES PRIOR TO COMMENCING WORK IN THE PROJECT AREA. LIKEWISE, THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING HIS WORK AND THAT OF THE INVOLVED UTILITIES IN THE PROJECT AREA. 2. UTILITY LINES SHOWN ON THE PLANS ARE LOCATED FROM THE BEST AVAILABLE INFORMATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE VERIFICATION AND PROTECTION OF ALL UTILITIES IN PLACE. 3. THE CONTRACTOR SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO AT 811 A MINIMUM OF TWO BUSINESS DAYS IN ADVANCE OF ANY EXCAVATION OR GRADING. 4. THE CONTRACTOR SHALL PROTECT AND MAINTAIN ALL UTILITIES AND STRUCTURES AFFECTED BY THE WORK. ANY DAMAGE SHALL BE REPAIRED AND RESTORED TO THE SATISFACTION OF THE OWNER AND UTILITY PROVIDER. THE CONTRACTOR SHALL COORDINATE ALL UTILITY RELOCATIONS AS NECESSARY. 5. EXCAVATION AT GAS LINES: TEMPORARY COVER DURING CONSTRUCTION SHALL BE AT LEAST 18 INCHES OVER THE GAS CONDUIT. FINISHED GRADE OVER THE GAS CONDUIT MUST BE AT LEAST TWO FEET AND NO MORE THAN SIX FEET. 6. EXISTING UNDERGROUND TELEPHONE, FIBER AND CABLE TELEVISION. FACILITIES MAY BE LOCATED IN CLOSE PROXIMITY TO THE WORK. THE CONTRACTOR MAY, IF NECESSARY, TEMPORARILY DISPLACE THE CABLES DURING CONSTRUCTION AND REINSTALL THEM IN ACCORDANCE WITH THE APPROPRIATE TELEPHONE, FIBER OR CABLE PROVIDER'S GUIDELINES WITH THEIR PRIOR CONSENT. 7. THE CONTRACTOR SHALL AT THEIR EXPENSE, SUPPORT AND PROTECT ALL UTILITIES, SO THAT THEY WILL FUNCTION CONTINUOUSLY DURING CONSTRUCTION EXCEPT THOSE DESIGNATED TO BE TEMPORARILY SHUT DOWN. THE CONTRACTOR SHALL GET AUTHORIZATION FOR TEMPORARY SERVICE DISRUPTIONS PRIOR TO ANY UTILITY WORK AT LEAST 48 HOURS IN ADVANCE OF THE WORK. CUSTOMERS SHALL BE NOTIFIED ACCORDING TO THE UTILITY PROVIDERS REQUIREMENTS. SHOULD A UTILITY FAIL AS A RESULT OF THE CONTRACTOR'S OPERATIONS, IT WILL BE REPAIRED IMMEDIATELY BY EITHER THE CONTRACTOR OR THE UTILITY PROVIDER AT THE FULL COST OF LABOR AND MATERIALS TO THE CONTRACTOR. 8. ALL VALVE BOXES, CLEANOUTS, MANHOLES, GUY WIRES, SHALL BE ADJUSTED TO FINISHED GRADE. 9. THE CONTRACTOR SHALL FIELD VERIFY THE LOCATION AND ELEVATION OF ALL SANITARY SEWER SERVICES AND WATER SERVICES PRIOR TO CONSTRUCTION. 1 D. TEMPORARY SHORING MAY BE REQUIRED FOR UTILITY INSTALLATION WORK ESPEC--.ALLY IN AREAS CLOSE TO OR IN EXISTING SLOPES. THE CONTRACTOR SHALL MAINTAIN SLOPE/TRENCH STABILITY UNTIL EXCAVATION IS BACKFILLED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING REQUESTED OR REQUIRED SHORING PLANS TO COUNTY AND ENGINEER FOR REVIEW AND APPROVAL PRIOR TO SHORING OPERATIONS. SANITARY SEWER GENERAL NOTES 1. ALL SANITARY SEWER CONSTRUCTION SHALL CONFORM TO THE LATEST GARFIELD COUNTY AND COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT (CDPHE) RULES AND REGULATIONS. 2. INSTALLATION OF NEW SANITARY SEWER IN AREAS WITH WATER MAIN AND SERVICE CROSSINGS MUST COMPLY WITH GARFIELD COUNTY AND CDPHE RULES AND REGULATIONS. 3. CONTRACTOR IS TO OBTAIN STATE DE -WATERING PERMIT IN CASE OF GROUNDWATER IN THE TRENCH. 4. ALL MATERIALS AND WORKMANSHIP SHALL BE SUBJECT TO INSPECTION BY GARFIELD COUNTY. THE COUNTY WILL RESERVE THE RIGHT TO ACCEPT OR REJECT ANY MATERIALS OR WORKMANSHIP THAT DOES NOT CONFORM TO THE COUNTY'S STANDARDS AND SPECIFICATIONS. 5. THE CONTRACTOR MUST NOTIFY THE COUNTY AT LEAST TWO FULL WORKING DAYS PRIOR TO THE START OF SEWER CONSTRUCTION. 3. ALL SEWER MAINS SHALL HAVE A MINIMUM COVER OF 5 FEET. IF GRADE CONFLICTS OCCUR WITH EXISTING UTIUTIES OR OTHER OBSTRUCTIONS THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY. 4. THE CONTRACTOR SHALL MAINTAIN A MINIMUM OF 18 INCHES OF VERTICAL SEPARATION FROM ALL WATER MAIN CROSSINGS. ONE FULL LENGTH OF WATER PIPE MUST BE LOCATED SO BOTH JOINTS WILL BE AS FAR FROM THE SEWER AS POSSIBLE. IF THIS CANNOT BE MET THE ENGINEER SHALL HE NOTIFIED IMMEDIATELY. 5. USE TIE RODS AND MEGALUGS WHERE THRUST BLOCKS CAN'T BEAR ON NATIVE SOIL (MINIMUM TIE. ROD LENGTH IS 20 FEET). 6. ALL PRIVATE SANITARY SERVICES SHALL BE SLOPE AT A MINIMUM OF 1%. 7. ALL SEWER MANHOLES STATION OFFSET CALLOUTS REFERENCE CENTER OF STRUCTURE LOCATION. ELEVATIONS REFERENCE THE MANHOLE LID. WATERLINE GENERAL NOTES: 1. ALL WATERLINE CONSTRUCTION SHALL CONFORM TO THE LATEST CDPHE RULES AND REGULATIONS. 2. INSTALLATION OF NEW WATERLINE IN AREAS WITH SANITARY SEWER MAIN AND SERVICE CROSSINGS MUST COMPLY WITH CDPHE RULES AND REGULATIONS. 3. CONTRACTOR IS TO OBTAIN STATE DEWATERING PERMIT IN CASE OF GROUNDWATER IN THE TRENCH. 4. ALL MATERIALS AND WORKMANSHIP SHALL BE SUBJECT TO INSPECTION BY GARFIELD COUNTY. THE COUNTY WILL RESERVE THE RIGHT TO ACCEPT OR REJECT ANY MATERIALS OR WORKMANSHIP THAT DOES NOT CONFORM TO THE COUNTY'S RULES AND REGULATIONS. 5. THE CONTRACTOR MUST NOTIFY THE COUNTY AT LEAST TWO FULL WORKING DAYS PRIOR TO THE START OF CONSTRUCTION. 6. ALL WATER MAIN PIPES, FITTINGS AND APPURTENANCES SHALL MEET THE CLASS CALLED OUT IN THE PLANS AND SPECIFICATIONS. 7. ALL WATERLINES SHALL HAVE A MINIMUM COVER OF 7 FEET. COVER GREATER THAN THE SPECIFIED MINIMUM MAY BE REQUIRED TO ACCOMMODATE EXISTING GRADES AND AVOID HIGH POINTS IN THE WATERLINE TO A MAXIMUM OF 12 FEET. IF GRADE CONFLICTS OCCUR WITH EXISTING UTILITIES OR OTHER OBSTRUCTIONS, THE PROPOSED WATER MAIN DEPTH CAN BE VARIED PROVIDED THE 7 FOOT MINIMUM COVER IS MAINTAINED. 8. PRECAUTIONS MUST BE TAKEN TO PROTECT WATER LINE PIPE INTERIORS, FITTINGS AND VALVES AGAINST CONTAMINATION. PIPES, FITTINGS AND VALVES SHALL BE KEPT CLEAN AND DRY AT ALL TIMES. A WATER TIGHT PLUG SHALL BE INSTALLED IN THE OPEN END OF THE PIPE AT THE END OF EACH WORKING DAY. 9. WATERLINES WILL BE INSTALLED AT RELATIVELY STRAIGHT LINES BETWEEN FITTINGS EXCEPT WHERE SHOWN OTHERWISE ON THE PLANS. IN NO CASE SHALL THE MAXIMUM JOINT DEFLECTION BE EXCEEDED AS SPECIFIED BY THE PIPE MANUFACTURER. PIPE CURVATURE MAY BE OBTAINED BY JOINT DEFLECTION AS RECOMMENDED AND WARRANTED BY MANUFACTURER. MANUFACTURER'S INSTALLATION GUIDELINES TO BE PROVIDED WITH MATERIALS SUBMITTAL. 10.IF HIGHLY CORROSIVE SOILS ARE ENCOUNTERED, ALL BURIED FITTINGS AND VALVES MUST BE WRAPPED IN 8 MIL POLYWRAP IN AREAS OF HIGH SOIL CONDUCTIVITY. 11.APPROVED THRUST RESTRAINT MECHANISMS ARE MEGALUGS, THRUST BLOCKS AND TIE RODS. CONCRETE THRUST BLOCKS SHALL BE INSTALLED AT ALL HORIZONTAL AND VERTICAL BENDS, TEES, VALVES AND CAPS, ETC. IN ACCORDANCE WITH THE THRUST BLOCK TABLE SHOWN ON THE DETAIL SHEET. FOR CLARITY, THRUST BLOCKS MAY NOT HAVE BEEN SHOWN ON THE DRAWINGS. FITTINGS WITH THRUST BLOCKS SHALL NOT BE BACKFILLED UNTIL THE CONCRETE HAS BEEN GIVEN SUFFICIENT TIME TO CURE. USE TIE RODS AND MEGALUGS WHERE THRUST BLOCKS CAN'T BEAR ON NATIVE SOIL. THE MINIMUM TIE ROD LENGTH SHALL BE 20 FEET. 12.TEN FEET MINIMUM HORIZONTAL SEPARATION SHALL BE MAINTAINED BETWEEN SANITARY SEWER AND WATER MAINS EXCEPT AT SPECIFIED CROSSINGS AND AS IDENTIFIED ON THE PLANS. 13.THE CONTRACTOR SHALL MAINTAIN A MINIMUM OF 18 INCHES OF VERTICAL SEPARATION FROM ALL SANITARY SEWER CROSSINGS. ONE FULL LENGTH OF WATER PIPE MUST BE LOCATED SO BOTH JOINTS WILL BE AS FAR FROM THE SEWER AS POSSIBLE. IF THIS CANNOT BE. MET THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY. 14.FREEZE PROTECTION SHALL BE INSTALLED FOR ALL WATER MAIN AND SERVICES LESS THAN 8 FEET DEEP AND AWAY FROM STORM SEWERS, MANHOLES, VAULTS AND CULVERTS. 15.BLUE IDENTIFICATION TAPE SHALL BE INSTALLED 24 INCHES ABOVE ALL WATER MAINS. 16.ALL TRENCHES SHALL BE COMPACTED TO 95% AS DETERMINED BY AASHTO T-99. WATER REQUIRED FOR MOISTURE CONDITIONING OF BACKFILL MATERIAL SHALL BE OBTAINED FROM AN AUTHORIZED SOURCE. ALL NECESSARY COMPACTION TESTING SHALL BE COMPLETED THROUGH A CERTIFIED SOILS LABORATORY. 17.A COPY OF THE COMPACTION TEST RESULTS SHALL BE PROVIDED TO THE COUNTY AND ENGINEER DURING THE COURSE OF -THE PROJECT. 18.THE CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED WATER LINE TESTING. ALL TESTING SHALL BE COMPLETED IN THE PRESENCE OF THE OWNER'S REPRESENTATIVE. THIS INCLUDES PRESSURE AND LEAKAGE TEST, FLUSHING AND DISINFECTION, BACTERIOLOGICAL TESTS, AND PIPE CONDUCTIVITY CONTINUITY. DISINFECTION OF THE WATER LINE SHALL BE IN ACCORDANCE WITH THE PROCEDURE SET FORTH IN AWWA C651, LATEST EDITION, DISINFECTING WATER MAINS. 19.A PRE -CONSTRUCTION MEETING WITH COUNTY STAFF AND THE ENGINEER WILL BE REQUIRED WITH A MINIMUM OF 48 HOUR NOTICE. 20. ABANDONMENT REQUIREMENTS 20.1. FIRE HYDRANTS AND ASSOCIATED VALVES SHALL NOT BE ABANDONED IN PLACE, BUT SHALL BE REMOVED, HYDRANT BRANCHES SHALL BE PLUGGED AT THE MAIN ACCORDING TO GARFIELD COUNTY STANDARDS. 20.2. COUPLINGS ARE NOT DESIRED. THE CORPORATION VALVE IS TO BE CLOSED AND THE SERVICE CUT AT THE COMPRESSION NUT. TEES SHALL BE PLUGGED AT THE SOURCE WITH AN APPROVED FITTING AND RESTRAINED. INSPECTION BY THE COUNTY IS REQUIRED PRIOR TO BURYING THE WORK. THE CONTRACTOR SHALL NOT OPERATE EXISTING WATERLINE VALVES. CONTRACTOR SHALL NOTIFY THE COUNTY A MINIMUM OF 48 HOURS IN ADVANCE OF ANY SERVICE ABANDONMENT. 20.3. ANY EXISTING WATER MAIN THAT ARE CUT SHALL BE PLUGGED WITH A MECHANICAL JOINT CAP. ANY EXISTING WATER MAIN IN CONFLICT WITH THE NEW WATER MAIN AND/OR WITHIN THREE FEET OF NEW WATER MAIN SHALL BE REMOVED AND DISPOSED OF. COSTS FOR THIS WORK WILL NOT BE PAID FOR SEPARATELY BUT SHALL BE CONSIDERED INCIDENTAL TO THE WATER MAIN WORK. EXISTING WATER LINES THAT ARE TO BE ABANDONED IN PLACE SHALL BE CAPPED AT BOTH ENDS WITH A MECHANICAL JOINT CAP. ALL VALVES ARE TO REMAIN OPEN WITH VALVE BOXES PULLED OFF TWO FEET BELOW GRADE AND FILLED WITH DIRT. 21.SWIVEL TEES MAY BE USED FOR ALIGNING HYDRANT VALVE AND VALVE BOX WITH EXISTING GRADES. 22.ALL PIPING COMPONENTS REQUIRED FOR TIE-INS TO EXISTING WATER LINES MAY NOT BE SHOWN ON THE DRAWINGS. ALL COMPONENTS NECESSARY COMPONENTS WILL BE CONSIDERED INCIDENTAL TO THE WORK AND SHALL BE PROVIDED AS PART OF THE WORK. 23.SOLID SLEEVES AT EXISTING CONNECTION POINTS ARE IMPLIED AND ARE NOT SPECIFICALLY CALLED OUT ON THE PLANS. 24. CONTRACTOR TO VERIFY SIZE OF ALL EXISTING SERVICES AND NOTIFY ENGINEER OF ANY DISCREPANCIES DISCOVERED. EARTHWORK 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LEGAL DISPOSAL OF ANY EXCESS SOIL, DEBRIS AND WASTE MATERIAL OFF OF THE PROJECT SITE. 2. ANY MATERIAL NOT SUITABLE FOR BACKFILL SHALL BE REMOVED FROM THE SITE AND DISPOSED OF, BY AND AT THE EXPENSE OF THE CONTRACTOR. 3. ALL EMBANKMENT MATERIAL REQUIRING COMPACTION WILL CONFORM TO CDOT/ASTM STANDARDS. 4. IF GROUNDWATER IS ENCOUNTERED CONTACT ENGINEER BEFORE PROCEEDING WITH WORK IN AREA OF GROUNDWATER. 5. IF BEDROCK IS ENCOUNTERED CONTACT ENGINEER BEFORE PROCEEDING WITH WORK IN AREA OF BEDROCK. 6. AREAS OF HEAVY VEGETATION, TREES, ROCKS, ETC. MAY NOT ALL BE SHOWN ON THE PLANS. THE CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH THE EXISTING CONDITIONS AND REQUIRED CONSTRUCTION METHODS TO PERFORM THE WORK. CERTAIN AREAS MAY REQUIRE TREE REMOVAL, BOULDER RELOCATION, CLEARING AND GRUBBING, ETC. THAT MAY NOT BE SPECIFICALLY CALLED OUT. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ANY GROUNDWATER ENCOUNTERED DURING CONSTRUCTION AS NECESSARY TO COMPLETE THE WORK. GROUNDWATER SHALL BE PUMPED, PIPED, REMOVED AND DISPOSED OF IN A MANNER WHICH DOES NOT CAUSE FLOODING OF EXISTING STREETS NOR EROSION ON ABUTTING PROPERTIES IN ORDER TO CONSTRUCT THE IMPROVEMENTS SHOWN ON THE PLANS. THE CONTRACTOR IS RESPONSIBLE FOR ANY COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENTAL STORM WATER DISCHARGE OR DE -WATERING PERMITS THAT CORRESPOND WITH THESE ACTIVITIES. 8. ONSITE NATIVE MATERIAL CAN BE USED FOR STRUCTURAL BACKFILL IF APPROVED BY THE GEOTECHNICAL ENGINEER AND SHALL BE SCREENED TO SIX INCH MINUS, PLACED IN TWELVE INCH LIFTS AND COMPACTED TO 95% AS DETERMINED BY AASHTO T-99. 9. STRIPPED TOPSOIL GENERATED ONSITE IS TO BE STOCKPILED AND USED FOR RE -VEGETATION. PAVEMENT NOTES: 1. ASPHALT PRIME COAT NOT REQUIRED UNLESS INDICATED ON THE PLANS. PREPARED BASE COURSES SHALL BE PRIMED AT CONTRACTOR'S EXPENSE IF THE SURFACE HAS DETERIORATED DUE TO TRAFFIC, WEATHER OR TIME LAPSE BETWEEN SURFACE PREPARATION AND PLACEMENT OF BITUMINOUS MATERIALS, SUCH THAT, IN THE OPINION OF THE ENGINEER, USE OF PRIME COAT IS REQUIRED. APPLICATION RATE SHALL BE 0.3 GALS/SQ.YD. 2. BEFORE PLACEMENT OF THE TACK COAT, THE CONTRACTOR SHALL CLEAN THE SURFACE TO RECEIVE TACK COAT AS DIRECTED. CLEANING WILL NOT BE PAID FOR SEPARATELY, BUT WILL BE CONSIDERED INCIDENTAL TO THE WORK. 3. A TACK COAT OF EMULSIFIED ASPHALT (SLOW SETTING) IS TO BE APPLIED BETWEEN PAVEMENT COURSES TO IMPROVE THE BOND. DILUTED EMULSIFIED ASPHALT FOR TACK COAT SHALL CONSIST OF 1 PART EMULSIFIED ASPHALT AND 1 PART WATER. RATES OF APPLICATION SHALL BE DETERMINED BY THE ENGINEER AT THE TIME OF APPLICATION. APPROXIMATE RATE SHALL BE 0.1 GAL./SD.YD. 4. WHEN CONNECTING TO EXISTING PAVEMENT, ASPHALT MILLING IS REQUIRED TO A DEPTH OF 2 INCHES AND A WIDTH OF 24 INCHES. 5. WHERE NEW PAVEMENT IS TO ABUT EXISTING PAVEMENT, THE EXISTING PAVEMENT SHALL BE REMOVED TO A NEAT VERTICAL LINE BY SAW CUTTING PRIOR TO PAVING OPERATIONS. VERTICAL EDGES SHALL NOT REMAIN OVERNIGHT. 5. ANY LAYER OF BITUMINOUS PAVEMENT THAT IS TO HAVE A SUCCEEDING LAYER PLACED THEREON SHALL BE COMPLETED FULL WIDTH BEFORE THE SUCCEEDING LAYER IS PLACED. TRAFFIC CONTROL NOTES: I. A TRAFFIC CONTROL PLAN SHALL BE PROVIDED BY A CERTIFIED TRAFFIC CONTROL SUPERVISOR AND IMPLEMENTED BY A CERTIFIED TRAFFIC CONTROL TEAM. 2. MAINTAIN ACCESS TO RESIDENCES AT ALL TIMES. TEMPORARY CLOSURE WILL BE ALLOWED FOR UTILITY WORK WITH PRIOR COORDINATION AND APPROVAL BY THE OWNER. PROVIDE FOR EMERGENCY ACCESS CONTINUOUSLY. 3. PROVIDE SAFETY CONES, FLAG PERSONS, VERTICAL PANELS WITH BEACONS, SIGNS AND BARRICADES AS NECESSARY TO PROTECT PUBLIC AND WORK SITE. 4. PROVIDE SIGNAGE AS REQUIRED BY OWNER AND JURISDICTIONAL AUTHORITIES. 5. PROVIDE DIRECTIONAL SIGNAGE INCLUDING BUT NOT LIMITED TO ONE-WAY SIGNS AND/OR TRAFFIC SIGNALS DURING CONSTRUCTION. JERSEY BARRIERS MAY BE REQUIRED DURING CONSTRUCTION. 6. ANY SIGNAGE REMOVED DURING CONSTRUCTION SHALL BE REPLACED OR RETURNED TO ITS ORIGINAL LOCATION. 7. ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). 8. THE CONTRACTOR SHALL. FURNISH, INSTALL, AND MAINTAIN TEMPORARY TRAFFIC CONTROL DEVICES NECESSARY THROUGHOUT THE DURATION OF CONSTRUCTION. 9. CONTRACTOR SHALL PROVIDE A SMOOTH TEMPORARY DRIVING SURFACE UNTIL FINAL PAVING IS COMPLETE. ALL TEMPORARY DRIVING SURFACES WILL NOT BE PAID FOR SEPARATELY, BUT WILL BE CONSIDERED INCIDENTAL TO THE WORK. 10.THE CONTRACTOR SHALL CLOSELY MONITOR ACCESS FOR HEAVY CONSTRUCTION EQUIPMENT THROUGH THE PROJECT AND USE TRAFFIC CONTROL AS NEEDED TO ACCOMMODATE CONSTRUCTION ACTIVITY ENTERING AND LEAVING THE PROJECT SITE. LANDSCAPE NOTES: 1. ALL AREAS DISTURBED BY ROAD OR UTILITY CONSTRUCTION SHALL BE FINE GRADED AND RAKED TO REMOVE ALL ROCKS OVER THREE INCHES IN DIAMETER. PLACE TOPSOIL TO A DEPTH OF FOUR INCHES. ON ALL DISTURBED AREAS, 2. PRIOR TO TOPSOIL PLACEMENT, ALL CUT OR FILL SLOPES WILL BE CONTOURED TO BLEND WITH ADJACENT TERRAIN. CONTRACTOR MAY USE VARIOUS SLOPE MOLDING TECHNIQUES TO ENHANCE THE AESTHETIC QUALITY OF THE SLOPE WHILE MAXIMIZING THE REVEGETATION POTENTIAL. ALL CUT AND FILL SLOPES SHALL BE ROUNDED AT THE TOE TO BLEND WITH THE EXISTING TERRAIN. ADDITIONALLY, WHERE SOILS AND STEEPNESS OF SLOPES PERMIT, TERRACES WILL BE CONSTRUCTED TO AID THE REVEGETATION PROCESS. 3. THE CONTRACTOR SHALL PROTECT FROM DAMAGE ALL TREES, BUSHES, AND EXISTING IMPROVEMENTS INSIDE AND OUTSIDE THE LIMITS OF WORK UNLESS NOTED FOR DEMO/REMOVAL. SPECIFIC PROVISIONS ARE SHOWN ON THE PLANS. 4. THE CONTRACTOR SHALL RESTORE ALL DISTURBED LANDSCAPE, HARDSCAPE, AND SNOW MELTED AREAS IN -KIND. 5. THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTION CONSIDERATIONS IN DENSELY VEGETATED AREAS. ALL DAMAGED OR REMOVED VEGETATION SHALL BE REPLACED IN -KIND AT THE EXPENSE OF THE CONTRACTOR. EROSION CONTROL NOTES: 1. THE ULTIMATE RECEIVING WATERS IS THE ROARING FORK RIVER. 2. TOPSOIL THAT IS STRIPPED SHALL BE STOCKPILED, SURROUNDED BY EROSION LOGS AND SEEDED AND MULCHED FOR STABILIZATION. 3. EROSION AND SEDIMENT CONTROLS ARE TO BE INSPECTED EVERY FOURTEEN CALENDAR DAYS OR AFTER EVERY STORM EVENT THAT EQUALS OR EXCEEDS A HALF INCH OF PRECIPITATION. 4. CONTRACTOR IS RESPONSIBLE FOR CHECKING THAT ALL EROSION CONTROL BMPs ARE FREE OF MUD, DIRT, AND DEBRIS. ALL STRUCTURES ARE TO BE CLEANED ONCE DEPOSITED SEDIMENT REACHES ONE THIRD THE HEIGHT OF THE STRUCTURE. 5. ACTUAL LOCATIONS OF ALL EROSION AND SEDIMENT CONTROL MEASURES MAY BE FIELD MODIFIED IF NECESSARY BY ENGINEER OF RECORD AND APPROVED BY GARFIELD COUNTY. 6. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED AFTER THEY ARE NO LONGER NECESSARY (E.G., WHEN AN AREA THAT WAS DISTURBED HAS ACHIEVED 75% RE -VEGETATION). 7. CONSTRUCTION ROAD, STABILIZED ENTRANCE, STAGING AREA, AND PERIMETER EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY SITE GRADING OR EXCAVATION ACTIVITIES. 8. THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL OF SEDIMENT FROM VEHICLES LEAVING THE SITE. 9. STOCKPILED MATERIALS SHALL BE SURROUNDED WITH EROSION LOGS AND WEIGHED DOWN WITH SAND BAGS. 10.ALL DRAINAGE STRUCTURES ARE TO BE PROTECTED BY EROSION CONTROL MEASURES. 11.IF ANY TEMPORARY FLOW LINE IS TO OCCUR DUE TO INTERMITTENT. GRADE CHANGE, CHECK DAMS, SURFACE ROUGHENING AND ADDITIONAL BMPs SHOULD BE IMPLEMENTED. 12.RESURFACING OR REVEGETATION PRACTICES SHALL FOLLOW ALL LAND DISTURBING ACTIVITIES IMMEDIATELY UPON COMPLETION OF SAID ACTIVITIES. IF REVEGETATION PRACTICES ARE DELAYED, FINISHED TOPSOIL GRADE SHALL BE PROTECTED AGAINST WIND AND WATER EROSION WITH TEMPORARY EROSION CONTROL BMPs. 13. WATER SHALL BE USED AS A DUST PALLIATIVE WHERE REQUIRED. LOCATIONS SHALL BE AS ORDERED. THE COST OF WATER SHALL BE INCIDENTAL TO OTHER .BID ITEMS. SWEEPING AND CLEANING ADJACENT STREETS AND SIDEWALKS DURING CONSTRUCTION WILL BE PERFORMED AS NECESSARY AND AS DIRECTED BY THE ENGINEER. SWEEPING, AND DUST MITIGATION WILL BE CONSIDERED INCIDENTAL TO THE WORK. BENCHMARK AND SURVEY CONTROL 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION STAKING OF BOTH HORIZONTAL AND VERTICAL LAYOUT ON THIS PROJECT, COORDINATES ARE REFERENCED W THE COORDINATE LIST SHOWN ON THESE PLANS. THE CONTRACTOR SHALL COORDINATE WITH THE PROJECT ENGINEER FOR INTERPRETATION AND INFORMATION IN STAKING OF THE PROJECT FOR CONSTRUCTION. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PRESERVING ANY MONUMENTS, RANGE POINTS, TIES, BENCHMARKS, AND/OR SURVEY CONTROL POINTS WHICH MAY BE DISTRIBUTED OR DESTROYED BY CONSTRUCTION. SUCH POINTS SHALL BE REFERENCED AND REPLACED WITH APPROPRIATE MONUMENT BY A REGISTERED PROFESSIONAL LAND SURVEYOR AUTHORIZED TO PRACTICE LAND SURVEYING IN THE STATE OF COLORADO. PROPERTY CORNERS WHICH FALL WITHIN NEW CONCRETE FLATWORK SHALL BE DURABLE AND SET FLUSH. THIS SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. EASEMENT LINE EDGE OF PAVEMENT EDGE OF GRAVEL EDGE OF WATER FENCE LINE FIBER OPTIC LINE FLOW LINE FORCE MAIN GAS LINE MAJOR CONTOUR MINOR CONTOUR OVERHEAD ELECTRIC OVERHEAD TELEPHONE PROPERTY LINE RIGHT-OF-WAY SANITARY SEWER & SIZE SANITARY SEWER SERVICE STORM DRAIN PIPE TBC/SIDEWALK/CONCRETE UNDERGROUND ELECTRIC UNDERGROUND TELEPHONE UNDERGROUND CABLE TV WATER LINE & SIZE WATER SERVICE LINE IRRIGATION LINE RAW WATERLINE ROAD CENTER LINE LIMITS OF DISTURBED AREA LEGEND EXISTING PROPOSED - - - ` - - - - - -x -x- x -X -x- --FO---FO- FM F61- E---CI--- -. =T=-=OH==:- 8"S- - -8"S SS - - - SS ---XEL- - -XEL- --T---T ---XN---XN- - -8.,W- - -8..W_ _ -WS - - -WS - IRR---IRR-- RAW- RAW- F0- FO - FM FM- G G 105 -_ 9104 E -0H - - T -OH- - 8"S -SS -SS -- E- E - T T TV N -INS -WS RR -IRR -RAW-RAW- ABC AGGREGATE BASE COURSE AP ANGLE POINT APPROX. APPROXIMATE ASPH. ASPHALT BP BEGINNING POINT BW BOTTOM OF WALL C&G CURB AND GUTTER OF CUBIC FEET ¢ CENTER LINE CMP CORRUGATED METAL PIPE GONG. CONCRETE DW DRIVEWAY EB EAST BOUND EG EXISTING GRADE EOG EDGE OF GRAVEL EL. ELEVATION ELEC. ELECTRIC EP END POINT EGA EDGE OF ASPHALT EX. EXISTING FG FINISHED GRADE PL FLOWLINE FT FEET GB GRADE BREAK GR GUARDRAIL GRAY. GRAVEL HCL HORIZONTAL CONTROL LINE HDPE HIGH DENSITY POLYETHYLENE HP HIGH POINT HER HOT BITUMINOUS PAVEMENT HMA HOT MIX ASPHALT IN INCH INV. INVERT L LEFT LDA LIMITS OF DISTURBED AREA LF LINEAR FEET CABLE BOX CABLE RISER CURB STOP CURB INLET DECIDUOUS TREE ELECTRIC MANHOLE/ METER ELECTRIC TRANSFORMER ELECTRIC SWITCH GEAR ELECTRIC VAULT EVERGREEN TREE FIBER OPTIC RISER FIRE HYDRANT GAS METER GATE VALVE GUY ANCHOR MAILBOX MONUMENT MARKER POWER POLE SANITARY SEWER MANHOLE SOIL BORING LOCATION SIGN SPOT ELEVATION STORM DRAIN MANHOLE STREETLIGHT TELEPHONE MANHOLE ABBREVIATIONS LP LOW POINT MAX. MAXIMUM MH MANHOLE MIN. MINIMUM MSE MECHANICALLY STABILIZED EARTH O/S OFFSET PC POINT OF CURVATURE PCC POINT OF COMPOUND CURVE PRO POINT OF REVERSE CURVE PGL PROFILE GRADE LINE PNT. POINT PRO POINT OF REVERSE CURVATURE PROP. PROPOSED PT POINT OF TANGENCY PVC POINT OF VERTICAL CURVATURE PVI POINT OF VERTICAL INFLECTION PVMT. PAVEMENT R/R REMOVE & REPLACE R RIGHT; RADIUS RAD. RADIAL RCP REINFORCED CONCRETE PIPE REF. REFERENCE ROW RIGHT-OF-WAY SECT. SECTION SF SQUARE FEET SH. SHEET SDMH STORM DRAIN MANHOLE SSMH SEWER MANHOLE STA. STATION SW SIDEWALK SY SQUARE YARD TBC TOP BACK CURB TP TOP OF PIPE TW TOP OF WALL TYP. TYPICAL WE WEST BOUND SYMBOL LEGEND o aoo ,00 II f0 0 C O HATCH L_CE\D ASPHALT DEMO .._RB AND GUTTER DEMO ASPHALT MILL � COLORED CONCRETE C PROPOSED CONCRET- PROPOSED LANDSCAPING CURB RAMP DETECTABLE WARNING PROPOSED ASPHALT V z LJ.J LJJ z m m N � v m � z co m Lu ¢tJo w r = J rn = Z N 0Nom LJ_ c Z r� V V �w Z Iry 0 uf pDO LlC� 163* 10110124 ONAt CHECKED BY: AWA DRAWN BY: MAC JOB #: 2022-63 NOT FOR CONSTRUCTION z w F- O 0 Z > z z 0 F 0-6 0 U F- Lu w 0 H- J ®z LLJ W DO z W J w Notes Legend & Abbreviations C2 Of 5 )\L PROPOSED PRIMARY I fd _ ELECTRIC LINE 0 32�-06-'" - o r / . oj� -- / ABANDONED WELL \V J / CURVE TABLE CURVE RADIUS LENGTH TANGENT CHORD BEARING DELTA C1 125.00' 175.85' 106.01' 161.70' N30-15'16"W 89 36' 11" C2 400.00' 363.81' 195.57' 351.40' N44'30'01"W 52' 06' 41" C3 200.00' 109.52' 56.17' 108.15' N34'07'55"W 31' 22' 29" C4 100.00' 28.61' 14.40' 28.52' N41'37'20"W 16' 23' 39" / E E ,- / - - - PROPOSED PRIMARY - / / ELECTRIC LINE / PROPOSED ELECTRIC POLE ---8aoo - -- / ------------ ------ ----- - - - --- --- -- - ---- - - -- - / EP:33+41.22 - -- -- . -- 8390 -- - -- -- -- - -- E2500602 25 - - ------ -- --------------- --------------------------------- -- ---- --- --- --- -- -- -- --- - aa / n o / / O O k L.P. STA: 10+29.73 H.P. STA: 11+59.10 L.P. ELEV: 8384.19 H.P. ELEV: 8392.04 PVI STA: 10+44.73 PVI STA: 11+44.12 PVI ELEV: 8384.49 PVI ELEV: 8392.44 Y a K: 5.00 K: 5.00 a0 30.0'V 50.00' VC y 8460 m -00 8450 m o+lm +m ° ° - d +'P � � w o.m o °J M 00 +ice + 00 8440 - _ 8430 n v c 8420 >°' w� >m mm 8410 8400 8.00% - 8390 00 8380 1 8370 SCALE HORZ. 1"-2 C 8360 I VERT - 1"-2' C'l C� C9 C9 C9 C9 C ^ C9 C9 W C9 li W ti W li W ti c� w c� W W li W M W W O ti W O LL [n Oe � emD N Of Op � M 10+00 10+50 11+00 11+50 12+00 -2.00% LP. STA 12481.12 L.P. ELEV: 8389.76 PVI STA 12+89.79 PVI ELEV: 8389.53 H.P. STA: 13+79.54 H.P. ELEV: 8394.92 PVI STA: 13+68.83 PVI ELEV: 8395.45 K: 4.76 50.00' VC elm MO 00-in- - - �-F� nri na + M + M >m �mi m K: 3.16 30.00' I nm m m !: !w U > 4 V >m m-- 7.50% 3.007 U c� LL l w li W LL W li W LL W li W N m li N - N = M _ n c 0 Y O O M A N h ry n [O n p N N O Q n l0 N O� N In m Qj M m _ M .` N d: a a rn ri ri m Ci m o m o s ao x 0 ni rn� m m n m M m M W oe n m - m rn m M m � rn M Oe m a, r> rn M m M m M M m M S M Y M x n m M m n m n n m m m m m m m m m m m m m 12+50 13+00 13+50 14+00 14+50 15+00 15+50 L.P. STA: 15+89.91 L.P. ELEV: 8389.02 PVI STA: 16+01.27 PVI ELEV: 8388.48 K: 4.55 50.00' VC N N Nlico of o6 r,00 Nro 0 N� � U U>> m > Ww_ m H.P. STA: 18+35.00 L.P. STA: 18+75.00 H.P. ELEV: 8406.58 L.P. ELEV: 8408.18 PVI STA: 18+20.60 PVI STA: 18+90.00 PVI ELEV: 8405.98 PVI ELEV: 8408.78 K: 7.50 K: 7.50 30.00' VC 30.00' VC ° on° 0� 0000 om 0 It0 O.-t 'nm MO_.. n00 0 0 '0m '0 CO +c +d 00 Li w � >m NCO 8.00%' EXISTING GRADE -. (EG) rn N •`.. � a e0 m m m M m M O M Oe n m M m n � m n m M m M m m m m m m H.P. STA: 21+49.95 H.P. ELEV: 8428.94 PVI STA: 21+34.95 PVI ELEV: 8428.37 K: 7.05 0.00VC inn na rn� rnm o a N +00 +m m �m N N w w N > N� U m WI m EXISTING GRADE (EG) 3.00%- -- i -- - 4.00% JINISHED GRADE--. (FG) FINISHED GRADE I .. (FG) -_ --- -- - __.---��-- -'.-- --__. ---- ----_ - y O c� 2 - LL _, ... LL W li W W Lit ti W LL W W W L� W W W LL. W li W 1i m a m N m m m N m N m O m n "f M M _ _ u] m �m en O m ��i N N ,n m O O N O i O� C ro a m w m m m m m m LINE TABLE LINE BEARING LENGTH L1 N10'02'49"E 20.09' L2 N70'33'22"W 167.58' L3 N18 26'41 "W 79.37' L4 N49'49'09"W 31.54' L5 N33'25'30"W 451.21' 3.75% w a n x m m O w w w M � O O M M a a m m 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 DRIVEWAY PROFILE 8460 8450 8440 8430 8420 8410 8400 8390 8380 8370 8360 8350 N E W 5 GRAPHIC SCALE 0 25 50 IN FEET: i" = 50' Z Lu Lu z AM M N d, �_ z COv m uj Q OV o n �1 =JLD O1 a _ 0 2 Z N N O m IL o Z r n V cc O 1Y �R p,DO E163 �10110/24 CHECKED BY: AWA DRAWN BY: MAC m 3 a a 2 0 v LO N Q O � O JOB #: 2022-63 NOT FOR CONSTRUCTION w z 2 Q 00 z > z_ O � Z) aS 0 V Oz Lu W LL � U � o z 0 W J w Plan & Profile (1) C3 Of 5 + MAIN DRIVEWAY- rn ALIGNMENT ----.. -- �Ox�o-ry^r\ -- ----- ------ ---- -- -- - -- N O �2 w°/ L5 -o C4 - x - - - _ - — — — 15 ESE—E-=E—E—E—E—E—E-41 2. �R9 l ALIGNM \ \ O� ENT 2 �� 0o�� F r � M1 --- - _ +03.14 I O N i� ro M N CO z .--n i s j STA: 31 +95.94 RAD PNT a ' 32 10 Y OO^ O 02 rL' OO,N W O N p M U�� 8450 0 + N 844 M - ----8.00% � e c PVI STA:32+32.31 PVI ELEV:8445.29 Y rn E K:3.00 o LVC:30.00 m + W N 00 0) ?O _ p p M MO Q of ? ? SCALE: 8420 HORZ. 1"=20' — - - VERT: 1"=20' W W W li W li W L� W i - W W li W li W la. W L. W n n 0 n 0 n o n 0 n M n h D n o m m N r N m M O ��'l N h� n �O [O � O � N a d• a a N a N a en a n a n a )n a n a s a d a s a 30+00 30+50 31+00 31+50 32+00 Tiny Home Access PROFILE 32+50 18460 4 --- 8450 — 8440 ---_.__.— ---- 8430 — —f 8420 8410 33+00 9.0% ' ?.0% SUBGRADE DRIVEWAY TYPICAL SECTION SCALE: 1 " = 5' z z � 8" CLASS 6 AGGREGATE 5 ,, BASE COURSE 12" SCARIFIED, MOISTENED & RECOMPACTED NATIVE SOIL OR APPROVED FILL (95% STANDARD PROCTOR DENSITY) TYPICAL RECYCLED ASPHALT DRIVEWAY SECTION SCALE: NITS 24" MIN. UNPAVED PAVED APPROVED W NATIVE o BACKFILL COMPACTED z TO 95% APPROVED E STANDARD NATIVE OR PROCTOR CLASS 6 ABC WATER SERVICE TRENCH SCALE: NTS TYP. SECT. PER PLAN 1 WATER SERVICE PIPE (SEE PLANS) BEDDING: CLASS 6 ABC 4" MIN. BELOW & ABOVE PIPE (95% STD. PROCTOR DENSITY) UNPAVED PAVED 1- I -- TYP. SECT. PER LAN APPROVED Z NATIVE BACKFILL COMPACT 0 TO 95% APPROVED v STANDARD NATIVE OR PROCTOR CLASS 6 ABC " CLASS 6 ABC BEDDING MAT'L 6" MIN. 1 SEP. � O —I (2) 4„ CONDUITS 6" MIN. - (T,P ) 6" MIN. TYPICAL PRIMARY ELECTRIC TRENCH SCALE: NTS N GRAPHIC SCALE 0 15 30 N FEET: 0 Lu Z r1''9 m m V N 7 cO - O ' Lu 3Vo L t` x Q rn DC �o- 2 Z N Oal m N O m L w Z L. u, u c Off ••�163 ��• 10110124 '�p1�S�ONALE�G�� CHECKED BY: AWA DRAWN BY: MAC w- JOB #: 2022-63 NOTFOR CONSTRUCTION z `/) W 0 z ~ o ~ � od 0 w o Z w w � U � Oz w J w Paln & Profile (2) C4 Of 5 P.� WOOD MULCH OR COMPOST TO j HEIGHT OF LOG SEC710N S �+ EROSION LOG � y FLOW _�45� AREA TO BE PROTECTED 12" MIN.- V 2" X 2" STAKES I A. FODS TRACKOUT CONTROL SYSTEM MAT. B. FOOS SAFETY SIGN. C. ANCHOR POINT. D. SILT OR ORANGE CONSTRUCTION FENCE. OR ENTRENCHED INSTALLATION THIS APPLICATION MAY NOT BE USED WITH LOGS SMALLER THAN 12" TRENCH INTO GROUND 4" MINIMUM FLOW TRENCH INTO GROUND 4" MINIMUM 12" MIN. EROSION LOG DETAIL SCALE: NTS TYPICAL MAT LAYOUT VEHICLE TRACKING PAD DETAIL SCALE: NTS MPx SEC77ON ea 45' ET ■001 NOTES: 1. VEHICLE TRACKING PAD TO BE FODS TRACKOUT CONTROL SYSTEM OR APPROVED OTHER. 2. TRACKOUT SYSTEM SHALL BE INSTALLED AT THE CONSTRUCTION ENTRANCE OFF SUMMIT ST. 3.INSTALL TRACKOUT SYSTEM PER MANUFACTURER'S INSTRUCTIONS. EROSION LOG AREA TO BE PROTECTED 2" X 2" STAKES x A s 2 3 GRAPHIC SCALE IN FEET: ######## z ry W Lu CD N d. v m iO z �0 m W ¢ Ov o O= Z N N O m LL K Z r n V u V � z Q O Iry W a 163 _ 10110124 ,r oF`�SS/pNAt�-�G�� CHECKED BY: AWA DRAWN BY: MAC JOB #: 2022-63 NOT FOR CONSTRUCTION zw p O z } � z z O F7- as o W H J O z w w LL Nv U CIL ® z 0 W w Erosion Control C5 Of 5