Loading...
HomeMy WebLinkAboutConditions of PermitCONDITION o F PERMI T BLMF-O9-24-8922 DAVID MULLENNEX RELOCATE & SET 1,390 SO FT USED MANUFACTURED HUD HOME ON ENGINEERED FOUNDATION CRAWL SPACE 132 Rusty Spur Trail, Rifle, CO - 212733200373 MANUFACTURED HOUSESARE REGUIATED & INSPECTED BYCOTORADO DEPT. OF HOUSING (C.D.O.H.)ANDALL FACTORY-BUILT RESIDENTIAL STRUCTURES INSTALLED IN GARFIELD COUNTY MUST MEET C.D.O.H. GUIDETINES FOR MANUFACTURE AND INSTALTATION AT THE JOB SITE. (201 8 IECC 'BLOWER DOOR TESTING' ON PREMISES AFTER INSTALIATION SHALL NOT APPLY FOR MANUFACTURED HOME TYPE - A5 CURRENT ENERGY COMPLIANCE FOR STATE OF COTORADO IS TO BE VERIFIED AT THE FACTORY) 1 ) FOUNDATION CRAWL SPACE & EXTERTOR DOOR LANDTNG / STAIRS SHALL COMPLY WITH 2015 l.R.C., 201 8 I.E.C.C. AND MANUFACTURER'S INSTALLATION REOUIREMENTS. 2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REOUIREMENTS AND MANUFACTURER'S I NSTALLATION REOU I REM ENTS. 3) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR ADDITIONAL I N FORMATION. 4) ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BYA COLORADO LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN. s) ELECTRTCAL PERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH.IN APPROVAL, IF ANY, WORK PROPOSED IN UNFINISHED ATTIC. ELECTRICAL FINAL APPROVAL REOUIRED FOR FINAL INSPECTION & CERT. OF OCCUPANCY. 6) pRtoR TO FTNAL BUtLDtNG TNSPECTTON & CERTTFTCATE OF OCCUPANCY, PROVIDE BUILDING INSPECTOR WITH FINAL APPROVAL / SIGN-OFF FROM GARFIELD COUNry'S PUBLIC HEALTH DEPARTMENT FOR INSTALLATION OF THE ON-SITE WASTEWATER TREATMENT SYSTEM. 7) PROPANE FUEL ryPE - SEE ATTACHED PROPANE GUIDE B) PROPERry OWNER SHALL BE FULLY RESPONSIBLE TO ENSURE POTABLE WATER SUPPLIED TO THE RESIDENCE. RESIDENCE SHALL HAVE AN ADEOUATE, RELIABLE, PHYSICAL, LONG-TERM AND LEGAL WATER SUPPLY TO SERVE THE USE. 9) SEE ATTACHED CERTIFICATE OF PERMANENT LOCATION FOR A MANUFACTURED HOME 10) GARFTELD COUNry BUILDING DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING: A. GARFIELD COUNTY BUILDING RESOLUTION AND LOCALLYADOPTED CODE REOUIRES SITES LESS THAN 8,OOO FT ELEVATION TO HAVE MINIMUM 36INCHES FROST DEPTH. FOOTINGS DESIGNED AT 2,OOO PSF, FIELD VERIFY 36 INCH MINIMUM FROST DEPTH & UFERGROUND INSTALLED. OPEN HOLE SOILS REPORT REOUIRED AT FIRST FOOTING INSPECTION B. FOUNDATION C. SEPTIC SYSTEM CONNECTION D. PLUMBING/GAS E. SITE FRAMING, STAIRS, HANDRAILS PER STRUCTURAL ENGINEERS PLANS AND FIELD COPY. F. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY* *NOTE: GARFIELD COUNTY REOUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR $ { \ sq