HomeMy WebLinkAbout9.19 Annual Report 12.02.2024TE
ENERGY PARTNERS
December 2, 2024
Garfield County Building and Planning
Attn: Glenn Hartmann
108 8th Street, Suite 401
Glenwood Springs, CO 81601
TEP Rocky Mountain LLC
1058 County Road 215
Parachute, CO 81635
RE: Land Use Change under Major Impact Review— Resolution 2010-08
2024 Annual Report — PA 41-9 pad location
Township 7 South, Range 95 West, 61h P.M.
Section 9: NE1/4NE1/4
Garfield County, Colorado
Dear Mr. Hartmann:
Per the conditions of approval listed in the Resolution 2010-08 associated with the PA 41-9 pad
location:
9. The Applicant shall be required to submit a report annually, until such time as the well pad is
released from the COGCC reclamation bond, of the extraction andprocessing operation, for staff
review. Upon review of any deficiencies pursuant to conditions of approval or other local, state, or
federalpermits, Staff mayforward the report to the County Commissioners forfull review of the
Special Use Permit.
On the PA 41-9 location, normal operations occurred this year which include the following:
• O5/13/2024 PA 41-9 Pad Pre-emergent/bare ground Treatment
There was no reclamation or workover activity on this pad for 2024. TEP personnel and contractors
continually monitor and maintain production equipment, water removal, and production as needed.
TEP has reviewed the conditions set forth in the Major Impact Review and remains compliant under
th,e conditions of the resolution listed above.
After reviewing this annual report, please call me at (970) 263-27�4 (0) or (970) 36l -2006 (C) if any
additional information is needed.
Sincerely,
TEP Roc �y Mountni
J
Br n S. Ho and
Surface Team Lead — Piceance Basin