Dear Glenn,
Thank you for forwarding Colorado Parks and Wildlife’s (CPW) referral comments to us. We
appreciate CPW taking the time to review the submittal material and provide their comments and
suggestions. We met with Travis Bybee on May 9 to discuss the Nutrient Farm project and follow-up
on the comments. We understand that any type of development has the potential to impact wildlife, and
with the mitigation measures proposed in the Nutrient Farm Planned Unit Development (PUD) Guide
and those additional measures discussed below, we believe that potential impacts will be minimized.
Since the Nutrient Farm PUD is only a zoning request and neither the timing nor the scope of all of the
future potential uses for the property have been finalized at this time, we believe it would be beneficial
to keep in continuous consultation with CPW regarding our current and planned activities for Nutrient
Farm in a contemporaneous fashion, rather than everyone having to prematurely make presumptions
about the future activities. Per our conversation with Mr. Bybee, we all concurred that it would be best
for Nutrient Farm and CPW to meet annually, and also meet prior to submitting any site plan
applications to the County, so that CPW is apprised of our projects and their comments and suggestions
may be incorporated into the design/operation of the specific activity. We believe this open on-going
communication and cooperation will be beneficial to the wildlife in the area and we are glad to add
this to the PUD Guide.
Overall, the organic and biodynamic nature of Nutrient Farm and the Nutrient Farm Impact Analysis
Report are quite complementary to CPW’s suggestions. From an operational nature, we are seeking to
minimize any potential impacts to the environment and wildlife with our project. Nutrient Farm does
not utilize any synthetic chemical pesticides, fertilizers, or transgenic contamination s. In addition,
weed management efforts using mechanical, cultural, and biological controls are underway. Many
efforts are currently being employed on Nutrient Farm to minimize any potential impacts to the
environment and wildlife and many more have been proposed in our Impact Analysis Report related
to both aquatic and terrestrial species which be implemented upon the approval and development of
the Nutrient Farm PUD.
As mentioned during our meeting with Mr. Bybee, Nutrient Farm is far less intensive and less impactful
than the currently allowed Riverbend and Coal Ridge PUDs —either from the perspective of the 123
remaining single-family residential lots that could be built, or of course via the heavy industrial Coal
Nutrient Farm PUD – Colorado Parks and Wildlife Referral Response
Page 2
Ridge mining operation allowance. As noted in the Impact Analysis Report , most of the proposed
Development Areas are concentrated on the valley floor, within previously disturbed areas which
provide minimal environmental services or habitat for wildlife. An application to formally vacate
the Coal Ridge PUD has been submitted to the County and will occur concurrently with the
approval and recordation of the new Nutrient Farm PUD.
This will remove, permanently, the very extensive industrial uses which have been allowed within
that expansive PUD area for a long time. We have been adamant that any discussion of wildlife
impacts must necessarily be viewed through the lens of what is presently allowed, without any
further zoning approval and in many cases with little or no further land use review. From that
perspective, the benefit to wildlife simply by approving this rezoning is really quite extraordinary,
and any additional measures further enhance these benefits.
We do appreciate CPW’s concerns over any potential habitat loss or fragmentation, and we are trying
to assuage these concerns as much as we feasibly can. We want to improve the overall quality of
wildlife habitat on and near the property – it is a fundamental model of our overall operational
plan. Multiple measures will be implemented on Nutrient Farm including those regulating the
following: garbage disposal and storage , compost piles and dumps, fences, pets, bird feeders,
exterior lighting, hours of operation, and a non-toxic weed management plan. (Please see the
proposed PUD Guide Wildlife Protection Measures for details.) A Wildlife Mitigation Plan will
also be developed and implemented in consultation and cooperation with CPW after the review
and approval of the Nutrient Farm PUD.
This Wildlife Mitigation Plan will include specific actions to reduce the impacts to elk and mule
deer on a seasonal basis, and also provide habitat improvement and year-round water sources for
them. (Please see below for details.) We note that this PUD request is only a zoning request, and
no specific uses are proposed at this time. In other words, the PUD only preserves the ability to
submit future site-specific use requests to the County for consideration. Inevitably, zoning itself
does not present tangi ble impacts to wildlife; it is the subsequent development activities and uses
that pose potential impacts.
Accordingly, the best means to squarely address a nd abate these impacts is to address the specific
development activity when it is proposed and hit it head on – the potential impacts caused by such
activities when it is tangibly known when and how such activities will occur. Once the details of
the specific request are finalized, a dditional studies, tests, and specific design recommendations
will be prepared based on the final design and locations of the future land uses and only then will
a formal application be submitted to the County. (I.e., A wetland delineation and Corps permitting
will be required for any improvements near the Colorado River.). Further, as discussed above, we
will be in regular consultation with CPW, which means we can all get ahead of the curve in shaping
any development, use or activity in the most wildlife astute manner before we even submit.
Nutrient Farm PUD – Colorado Parks and Wildlife Referral Response
Page 3
Cumulative Loss of Wildlife Habitat
CPW notes that the Nutrient Farm property will not be lost to wildlife in its entirety, but that the PUD
project will impact existing wildlife habitat – especially elk and mule deer during the winter months.
We understand that with all development and increased human activity there are some potential impacts
to the native species. It also goes without saying that this is a consideration not in any way unique to
Nutrient farm; one need only d rive up and down the major thoroughfares in Garfield County, and
indeed the entire state, to appreciate the breadth of this concern as development continues to expand.
From that vantage point, we feel that our project, which moves away from intensive residential or
industrial development and back to a more agrarian model focused on stewardship of the land, is a step
in the right direction.
Nevertheless, we still realize that no activity or use can avoid having some impact. We want to abate
or mitigate any such impacts as much as we practically can. Thus, in an effort to counter the cumulative
loss of wildlife habitat, as noted, we will meet annually with CPW to discuss the then current and
upcoming activities planned for Nutrient Farm so we may understand any wildlife concerns CPW may
have. We will also meet with CPW prior to submitting any site plan applications to the County, so that
CPW is apprised of our projects and their comments and suggestions may be incorporated into the
design/operation of the specific activity. A Winter Recreational Plan for each specific use proposed
during the winter season will also be developed for site plan review contain ing efforts to minimize and
mitigate any potential impacts to wildlife. For instance, seasonal timing, hours of operation, and
location limitations will be considered and habitat improvements and/or the creation of new habitat
(on or off-site) and the develop ment of new water sources will be considered based on the proposed
activity.
In addition, and as mentioned in our Impact Analysis Report, a Wildlife Mitigation Plan specifically
related to elk and mule deer use of the Nutrient Farm property and surrounding area will be developed
and implemented in cooperation with CPW. We are proposing to specifically call for such a plan
in the PUD and suggest we have a hard date for adoption of that plan, in collaboration with CPW,
after the PUD is established – so we can discern per an adopted PUD plan what is allowed and
how it will be implemented. It will include specific mitigation measures to reduce impacts to elk
and mule deer and provide habitat improvements and year-round water sources for them. These
efforts may include the following:
• Winter timing and activity stipulations to avoid and minimize disturbance to elk and mule deer;
• Use of laydown fencing or gates in some areas to allow for habitat connectivity and allow
wintertime access to pastures;
• Leaving taller stubble heights in pastures for more grazing opportunities;
• Development of wintertime water sources;
• Creation of designated wildlife corridor areas and also designated activity/recreation areas to
usher such uses away from each other ; and
• Assistance with habitat improvements and water source development on neighboring BLM
lands.
Nutrient Farm PUD – Colorado Parks and Wildlife Referral Response
Page 4
In terms of CPW’s additional referral comments and recommendations related to elk and mule deer
habitat, as noted by CPW, Private Open Space Area C, approximately 65.40 acres, will continue to be
open for wildlife use. Only one single-family home exists (the “Farm House”), and is proposed, on the
42.14 acres of Area 2. Some fencing already exists on Area 2 and a limited amount of wildlife friendly
fencing is planned around the home, leaving the rest of the Area 2 accessible. Similarly, a limited
amount of fencing is planned in the Outdoor Adventure Park/Area 8 . Fencing is intended around the
various tracts and runs in the Outdoor Adventure Park, not the entire Area, to protect animals from
these areas and minimize any potential conflicts with the activities there. The fencing in such areas
will not just keep the wildlife out, it will more importantly keep the users in. No perimeter fencing is
planned around Areas 2 or 8, which will help to minimize habitat fragmentation and allow access
through the property, including the Western Working Farm/Development Area 6 , and to the Colorado
River. Thus, wildlife pathways through the property will be provided on a year-round basis connecting
the Hogback to the Colorado River.
We believe that through the mitigation measures proposed in the PUD, Impact Analysis Report, and
the additional agreed upon terms, annual meetings and pre-application meetings, the creation of Winter
Recreational Plans for each winter site plan activity, the preparation and implementation of the Wildlife
Impact Report in cooperation with CPW, and fencing details, habitat fragmentation and/or loss has
been reduced as much as possible. In that light, and particularly given the baseline of where the
incredibly high impact uses that the current PUDs allow, we are confident that there will be no
significant, long-term detrimental impacts to wildlife or their habitat. We point to the Impact Analysis
Report’s findings that state with these measures, the project would not result in significant, long -term
detrimental impacts resulting in reductions in herd size or significant impacts to habitat. (Please refer
to pages 38 and 42 of the Impact Analysis Report for details.) In fact, after a cursory review of other
uses and PUDs in the County, we would proudly hold our wildlife measures in this PUD, and the
extensive approach set forth herein, against any other PUD or development in the region.
Potential for Ungulate Conflict and Game Damage
Thank you for these comments and suggestions related to elk and mule deer. We welcome any
additional comments CPW may have on avoiding potential hay crop damage from the animals.
As suggested, wildlife friendly exclusionary fencing will be constructed around the orchards to keep
mule deer, elk, and bears out of them, and as noted above, wildlife corridors will be provided to allow
wildlife access through the Nutrient Farm property.
The activities planned for the Outdoor Adventure Park will require many future site plan applications
to be submitted to the County for review and approval. Winter activities are planned for portions, not
all, of the Adventure Park Area. At this time, no specific activities have been finalized and we will be
glad to work with CPW during the development of those plans to minimize conflicts with wildlife and
to ensure the safety of our guests. Specifically, prior to any site plan application submitted to Garfield
County for review, we will meet with CPW to obtain their comments and suggestions on the proposed
activity so that they may be integrated into the final design/operation of the request. Based on the final
specific type of activities and their locations, we will consider some sort of winter seasonal timing on
Nutrient Farm PUD – Colorado Parks and Wildlife Referral Response
Page 5
select portions of the property to minimize any potential impacts to wildlife. Similarly, we will consider
some sort of winter seasonal timings for the Western Farm/Area 6.
A Winter Recreational Plan for each specific use proposed during the winter will be developed in the
future for site plan review and incorporate any pertinent actions of the Wildlife Mitigation Plan , which
again will be expressly called for in the PUD. For instance, seasonal, hours of operation, and location
limitations will be considered and as discussed with Mr. Bybee, improvements to existing habitat or
the creation of new habitat on - or off-site and development new water sources will be considered based
on the use. Again, CPW will be consulted with the activity details so that their comments and
recommendations may be incorporated into the activity prior to any formal site plan submittal to the
County. We will also ensure that part of this plan includes corridors, not just for wildlife but for all
activities and recreation in the winter months. In other words, rather than just rely on wildlife corridors,
which are less effective in the scarce winter months, we will also delineate corridors for recreatio n.
This can ensure that the potential for human/wildlife interactions, and the related stressors, is abated
or at the very least greatly curtailed.
Potential for Mountain Lion Conflicts
The Impact Analysis Report is consistent with CPW’s mountain lion recommendations. Educating the
Nutrient Farm community that mountain lions are native residents of the area and how to interact with
them in case of an encounter is important. We will look into the additional suggestions for livestock
protection, particularly during the calving season, through the use of foxlights, guard dogs, or
permanent ranch employees since mountain lions could prey on the livestock.
Potential for Black Bear Conflicts
Black bears and the potential for black bear conflicts were also discussed in the Impact Analysis Report.
Although not currently in CPW’s mapped Black Bear Human Conflict Area, Nutrient Farm will
function as such due to the proposed fruit orchards and residential and agritourism uses. The Impact
Report found that the PUD will have minor to insignificant impacts on bear populations and habitats
and a number of measures are proposed to reduce potential bear problems including those suggested
by CPW—the use of residential bear-proof trash containers, fences around fruit orchards, and
limitation on bird feeders and pets. (Please see page 50 of the PUD Guide and page 34 of the Impact
Analysis Report for specific details.) CPW’s additional recommendations for electric fencing,
foxlights, etc. to protect the growing crops, livestock protection suggestions (similar to those for
mountain lions), the use of bear-resistant trash receptacles/dumpsters with locks on the non-residential
portions of the property and education are appreciated and will also be implemented.
Impacts of Additional Recreation of the Nutrient Farm PUD
We understand that increased recreational activities across the State are impacting wildlife —be it
hunting, fishing, rafting, hiking, skiing, snowmobiling, or other outdoor activities. As discussed in the
Impact Analysis Report, many mitigation measures are proposed and additional ones will be
implemented in Nutrient Farm to help minimize any potential impacts to wildlife.
Nutrient Farm PUD – Colorado Parks and Wildlife Referral Response
Page 6
As requested, w e will also be glad to conduct an annual inspection of the ponderosa pines on the
northeast portion of the property for any new eagle nests. (Per Mr. Bybee, mid-February is the best
time of year for this inspection. We will be glad to add this annual inspection as a mandate in the PUD
Guide too.) No such nests are there currently, but if any are found, we will work with CPW on
mitigation measures and the use of this public trail. For instance, it may be best to install a fence and
gate on the Nutrient Farm property to limit access when needed. However, reflective of the complexity
always associated with these wildlife issues, but because this trail leads to Bureau of Land Management
(BLM) lands further discussions on how best to manage this trail and access should take place, and
BLM has some say in the proper solution. This conundrum vividly reflects the challenges we have with
wildlife, and why we feel the development of a collaborative plan, and regular follow up meetings with
CPW, is the most innovative, flexible, and practical means of ensuring effective wildlife protection
remains in place.
We understand CPW’s concerns about maintaining the solitude of the Vulcan parcel for wildlife. Per
our title commitment research, there are two trail easements of record on the property which are shown
on the proposed PUD Plan Map. One is a 25’ Private Access Easement granted to the BLM (recorded
September 19, 2000 at Book 1208/page 96 ) and the second is an Agreement between Daryl Richards
and the State of Colorado for the use and benefit of the Game and Fish Commission for free public use
of a road across the parcel to fishing and hunting areas. (The road is not described in the Agreement
recorded June 26, 1963 at Book 351/page 211.)
Also, as suggested, we are glad to provide interpretive signage to help educate the community on the
value of the landscape set aside for wildlife and encourage them to stay on established trails.
Boat Ramp/Mooring : In terms of the boat ramp comments, we appreciate those concerns and want to
underscore the minimal use ad impact envisioned with such a ramp . The boat ramp is designed as an
amenity for residents, guests, and the public by providing a minor access from Nutrient Farm and the
lands on the south/eastern side of the Colorado River. The existing Dino Point boat ramp is on the other
side of the River and inaccessible to the Nutrient Farm property. The boat ramp is intended as a separate
amenity west of the tie up/mooring area near the children’s Adventure Farm area. The area behind the
restaurant is only a docking area. This is not meant as a major boat mooring or access facility ; only as
a potential means of minor access limited to the Nutrient Farm area. The very limited parking around
this put in area underscores that vision.
We now understand that the Roundtail Chub is a Colorado species of special concern and is listed as
sensitive species for the Rocky Mountain Region by the United States Forest Service. Nevertheless, as
we have now researched and determined, this segment along the Colorado River is already intensively
used by boats and rafts so functionally, from an impact perspective, no new use will be created.
However, in order to ensure that we minimize and mitigate any potential impacts to the river system,
development of the new boat ramp area will be minimized in scale and operation as much as feasible .
A hydraulic analysis will be prepared so as not to create scour holes and sedimentation. Clean
construction materials (i.e., non-hazardous/chemicals), best management practices, including
temporary erosion control measures, and other construction techniques will be used to minimize
sediment into the River. As suggested by Mr. Bybee, construction will not take place during the spring
spawning season and fall. In addition , Army Corps of Engineers 404 Permit and County approvals
Nutrient Farm PUD – Colorado Parks and Wildlife Referral Response
Page 7
must be obtained and all conditions of approval must be complied with. Once the boat ramp
improvement details are determined, and prior to County site plan submittal, we will meet with CPW
to review the request and obtain their comments and suggestions.
With all these efforts, we believe that the River systems and its water quality will not be degraded.
However, we want to underscore that we acknowledge what adding this use in the PUD allows and
does not allow. We may, per the PUD, merely propose a boat ramp. When we formally apply to
construct it, there will invariably be a myriad of concerns over potential impacts our proposal will have
to address. This will include any silt and sedimentation buildup concerns, impacts to aquatic life, even
potential impacts to otters. We will have to get approval for a ramp via a site specific proposal that will
include a detailed design. By consulting with CPW on the design in preparation of the proposal, we
can modify that design to try to assuage any CPW concerns. At the end of the road, if we are not able
to properly resolve these issues and mitigate such impacts to the satisfac tion of CPW and the County,
the boat ramp will not be approved. We feel strongly that this is the most astute means of dealing with
this issue, rather than trying to address every contingency now based on supposition s and hypotheticals.
In that light, we state now, for the record, that we realize and acknowledge that at the time of the actual
ramp proposal, the onus is flatly upon us to secure approval.
LoVa Trail: Thank you for the LoVa Trail comments. We were previously aware of CPW’s concerns
with the trail alignment especially as it crosses over the River. We are only trying to be good neighbors
and citizens and provide a connection through Nutrient Farm for what seems to be a greatly needed
north-south public trail connection from New Castle to Glenwood Springs, if it is supported and
approved by the multitude of public agencies that must review the same, including CPW. Currently,
the LoVa Trail is shown on the property to run southwest to the northeast adjacent to CR 335 then east
through Area 5/Working Farm/eastern pasture area across the River. We will grant the trail easement
adjacent to CR 335 on Nutrient Farm property and an additional northern easement (an alternative
alignment, if needed) on ce the entire LoVa Trail alignment has been determined. The proper location,
nature, and constriction of this trail is really the auspice of the LoVa Trail group, CPW and others. We
will ensure that the easement we grant is supported by all such stakeholders before the easement is
executed . In other words, this is not our trail, and we are simply supporting it and letting it utilize our
property interests if and when it is accepted, including via CPW. We will be glad to collaborate with
CPW and the trail proponents further on this northern alignment once it leaves the CR 335 alignment.
We want to express our gratitude to Mr. Bybee. He clearly took significant time to thoroughly read the
extensive Nutrient Fam PUD application materials, and provided thoughtful, insightful, and useful
comments; he also made the significant effort of meeting with us in person for an entire morning to
walk through these concerns and explore means of mitigation and resolution. Moreover, he also
supports making the effort to develop a winter management plan with us and further meet with us
annually to walk through the goings on at Nutrient Farm every year. The end result is a collaborative
approach which reflects the incredible potential for public private partnerships to ensure the best
stewardship of the land and its native inhabitants, namely the wildlife that we all appreciate in this
area.
We believe that through the mitigation measures proposed in the PUD, Impact Analysis Report, and
the additional agreed upon terms, annual meetings and pre-application meetings, the creation of Winter
Nutrient Farm PUD – Colorado Parks and Wildlife Referral Response
Page 8
Recreational Plans for each site plan activity, the preparation and implementation of the Wildlife
Impact Report in cooperation with CPW, habitat fragmentation and/or loss has been reduced as much
as possible and there will be no significant, long -term detrimental impacts to wildlife or their habitat.
Perhaps even more crucial, by ensuring that this is a longitudinal, interactive process, we can make the
adjustments that are necessary from year to year as new considerations develop. In closing we would
encourage you to think about the stark contrast here. We ha ve a PUD in place, the Coal Ridge PUD,
which is industrial in nature, for many decades. Such uses are of course an anachronism and an
anathema to the wildlife concerns in the region – as well as the recreational concerns, residential
concerns, etc. In place of that zoning faux pas, which was based on an outdated vision for the land,
we now have a new PUD far more reflective of a modern vision for the area, but also one that is flexible
enough to pivot and deal with issues as they transpire – even if it is decades later.
We believe this is an excellent model for future zoning documents, and we are proud of the effort all
parties have put into this effort. Thus, we are aligned with CPW ’s suggestions as we are seeking to
minimize any potential impacts to the environment and wildlife with our project. We will be glad to
speak to you, Glenn, or Mr. Bybee further about any of these comments.
Regards,
Danny Teodoru , Esq.
Timberline Law
cc: Andy Bruno, Nutrient Holdings
October 1 8, 2024
Glenn Hartmann, Planning Director
Garfield County Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
Re: Referral Comments Responses – Nutrient Farm Planned Unit Development (PUD) (PUDA -05-22 -
8899), Coal Ridge PUD Amendment/Revocation (PUAA-05 -23 -8898), and Riverbend PUD
Amendment (PUAA-05 -23 -8963)
Dear Glenn,
Thank you for your assistance with our three Nutrient Farm related proposals, and we appreciate you
forwarding to us the various referral agency comments that you have received . We appreciate the
agencies taking the time to review our PUD materials and provide their comments and suggestions.
Certain excerpts of referral comments are provided in italics for reference. We have replied to each of
the referral comments below and will be glad to provide additional information if we inadvertently
overlooked a comment or did not address a comment adequately.
Colorado Geological Survey (CGS)
Comment Letter dated October 17, 2023 is for all three applications. The Letter references the submittal
materials and the proposed residential lots and various development areas. It states:
The 18 proposed residential lots shown on the l/1712023 SGM PUD Plan Map in Area I (five
lots), Area 3 (10 lots), Area 4 (two lots), and Area 2 (one lot) do not appear to be exposed to
slope-related hazards. The general recommendations in RJ Engineering & Consulting's Soi ls
and Geohazard Evaluation are valid but preliminary.
CGS would like to review the preliminary plat for proposed new residential lots, when
available, to ensure that proposed lots or building envelopes are set back a sufficient distance
(30 to 40 feet) from the Colorado River 100-year flood hazard limits to m inimize risk of damage
to homes and yards due to erosion, scour, and undercutting.
Additionally, lot-specific subsurface investigation, consisting of drilling, sampling, lab testing
and analysis, will be needed on each lot, once building locations have been identified and prior
to building permit application, to develop site-specific recommendations for foundation(s),
floor system(s), surface and subsurface drainage, pavements, etc.
We take CGS’s comments with great credence and regard . Nonetheless, the fact remains that the reason
that RJ Engineering & Consulting's Soils and Geohazard Evaluation are preliminary is specifically
because at this very preliminary, big picture macro stage of PUD zoning, there are not the type of site
specific considerations at play that subsequent reviews will afford. Zoning does not approve any of
the development activities at issue in the CGS comments in and of itself. It simply sets forth the
mechanism to get to that point at a later time.
Referral Comments Response – Nutrient Farm Applications
Page 2
As an overarching consideration for many of these comments, particularly in relation to the conceptual
residential lots, we would emphasize that all such lots must first be subjected to the scrutiny of the
quite rigorous County subdivision standards, review, and approval; as well as site plan/building permit
etc., before there is any outside residential development on site. Under any circumstances, the future
lots/building envelopes are planned to be located 30’-40’ away from, upslope from and accordingly
well above the Colorado River 100-year flood plain . Even beyond said subdivision review, lot-specific
soil investigations will be conducted for the future homes’ foundation and drainage designs prior to
issuance of a building permit for any home on any lot. Further, any formal subdivision application will
be referred to CGS for review during the referral process. In light of this extensive procedural and
technical safeguard, and the very generic nature of the zoning now propo sed, we believe there are no
more outstanding items at this juncture related to CGS comments which are not otherwise well suited
for site specific review in the future or already addressed in our materials.
Colorado Parks and Wildlife (CPW)
We extend our gratitude to CPW for taking the time to review the Nutrient Fam PUD application
materials, provide thoughtful comments, meet with us in person and work collaboratively to come up
with functional solutions to the issues noted. We are proud of the initially proposed mitigation
measures, the preparation and implementation of the responsive Wildlife Impact Report in cooperation
with CPW, and the additional very significant and contemplative mitigation efforts that we have
developed in consultation with CPW. All such efforts are oriented around abating or mitigating any
concerns over habitat fragmentation and/or loss has been reduced as much as possible and there will
be no significant, long-term detrimental impacts resulting in reductions in herd size or significant
impacts to habitat.
Please refer to the separate letter addressed to Mr. Travis Bybee for more specific details on this issue.
Colorado River Fire Rescue (CRFR)
Mr. Orrin Moon provided referral comments on October 17, 2023 noting that he was still in the midst
of reviewing the material but had questions about the fire protection irrigated water, especially during
the winter months. He stated:
…so far after reviewing pages and pages of information, the only thing that I have found that
I have an issue with is the fire protection irrigation water. The question I have is will this system
be in service year-round? They don't say one way or the other. Irrigation water only runs in
the spring and summer. We can still have fires in the winter. I have not found anything about
seasonal use on the tourist side of the farm. They have made comments that they have met with
me, Yes, a couple of years ago, I told them what I would be looking for. Before I could see the
plans. They also advised that they adhere to my requirements.
I am still working on this referral and going through all the documents. Please let me know
when you need my referral on this project.
We appreciate Chief Moon’s comments. On November 11, 2023 Dave Kotz of SGM met with Chief
Moon reviewing the project and his comments. Additional information was sent to Chief Moon and
we did not receive any additional questions or comments from him. We believe the initial
questions/concerns have been adequately addressed.
Referral Comments Response – Nutrient Farm Applications
Page 3
Once the PUD is developed , fire flow needs will be met through potable and raw water storage or water
supplies and infrastructure sizing. A potable water system with hydrants will be provided as shown on
the water and sewer plan. For those portions of Nutrient Farm served by its own water systems,
multiple dry hydrants connected to the irrigation and recreational water ponds will be installed thought
the property for emergency use by the CRFR. Raw water hydrants can be available year-round if
deemed beneficial in certain areas or for temporary conditions.
Mountain Cross Engineering
Mr. Chris Hale provided referral comments for all three applications on October 17, 2023. “No
comments were generated” for the Coal Ridge PUD Amendment/Revocation and the Riverbend PUD
Amendment, and 20 comments were provided specifically for the Nutrient Farm PUD. Those
comments and our responses have been provided below. Thank you to Mr. Hale for taking the time to
review the submittals’ material and provide comments and suggestions. We believe all have been
adequately addressed.
Specific to the Nutrient Farm PUD:
1. The development will essentially be on a dead-end road with only one access for emergencies. The
Applicant should evaluate interior roadways circulation to allow for alternative routes in cases of
emergency.
While the public road system entails only one road, as it always had since the high density residential
development of Riverbend, Nutrient Farm’s internal public drive system and its private farm roads may
all be used as alternative emergency accesses routes to bypass portions of CR 335 in the case of
emergency. Moreover, Storm King Road in the adjacent Riverbend Subdivision Filing No. 2 extends
into the property and serves as the existing driveway connection for the Farm House in Area 2 on the
eastern portion of the property. This will only be used by the Owner/Developer for direct access to and
from the Farm House to the Eastern Working Farm, not as an alternative public throughway for
everyday use. However, should the fire department/emergency services or the public need it, the
driveway may also serve as emergency access connecting Storm King Road and the existing residences
to the internal public and farm roads and eventually to CR 335.
The proposed PUD will also enhance the means of access to the Colorado River, which can also be a
crucial consideration in an emergency circumstance. In summary then, this proposed development not
only improves the emergency access concerns for its own Property area, but it can also significantly
improve the circumstances for the entire area, on what has always been a baseline challenging logistic.
Moreover, if at some point other public entities are able to implement their plan to build a bridge for
the LoVa Trail across the Colorado River on eastern portion of the property, Nutrient Farm will be glad
to give an emergency access easement for public use across the property in the LoVa Trail corridor and
over this bridge as an alternative means to cross the Colorado River near I -70.
2. The Applicant proposes 12% maximum grade however this is generally too steep for fire and
emergency vehicles. Maximum grade should be limited to 10% especially considering that most of
the roads are proposed to be gravel. Roadway construction plans and profiles should be submitted
to Garfield County for review to obtain grading permits for road construction.
We will be glad to revise the proposed Nutrient Farm PUD Guide text to indicate a 10% maximum
grade for the private roads rather than the proposed 12% maximum grade. (The private roads were the
Referral Comments Response – Nutrient Farm Applications
Page 4
only types of roads proposed to exceed the 10% grade.) With that now offered, we would be remiss
not to note that per Table 7-107 of the County Code, Rural Access Roads, Primitive Roads, Driveways
and Public Lands access roads are all allowed a 12% maximum grade. Most of the roads of higher
grades throughout Nutrient Farms will fall under these categories, and thus will be well within the
allowed scope of the Code. For all potential residential areas, all oriented much closer to CR 335 and
thus on much mo re gentle slopes, the grades will be significantly less than the Code maximums in
place.
3. The Applicant should provide the required CDOT Access permit for increased traffic.
We contacted Mr. Brian Killian, Colorado Department of Transportation (CDOT), on November 1,
2023 and provided our CDOT Level III Traffic Impact Study to him. On November 15, 2023 Mr.
Killian responded to Dan Cokely, SGM, that: CDOT will not require an access permit for this
development.
In the nearly one year since that point in time, both County Planning Staff and the development team
have sought follow up communication with CDOT to ensure there were no additional comments or
concerns. To our knowledge, to date, no party has since received a response from CDOT, either written
or verbal. Under such auspices there is no reasonable course of action but to proceed off the actual,
direct indications that CDOT did in fact provide. Further, there will be ample means for follow up and
additional CDOT input as this development progresses, via the review process in place for each of the
many specific elements of development at Nutrient. This is arguably a much more astute point for any
such input anyhow, as the specifics of each particular phase of development can be specifically
addressed and resolved in much greater detail in a contemporaneous manner.
4. The Vulcan Ditch is proposed to be a potable water source delivered across the river in a
suspended pipeline. The Applicant should better discuss provisions for winter. Typically, ditches
are shut-down during the winter. Is the river crossing proposed to b e used through-out the year?
Are there provisions for heating the pipe to prevent freezing? Alternatively, is the pond to be filled
in the fall to last through the winter? How large will the pond need to be to provide sufficient
volume for potable water and fire storage?
The Vulcan Ditch will consist of buried 24” and 18” fused HDPE pipeline with 3’ min imum cover
capable of deliver ing wintertime flows if needed. The river crossing may consist of an insulated aerial
crossing or an HDD bore. That said, the primary p lan at this time is to use the ponds shown to provide
wintertime water. For perspective on volume, at full-buildout of the PUD Nutrient Farm will need
about 16.2 acre-feet of water for November – March. This equates to an average flow rate of slightly
less than 0.06 cubic feet per second (cfs). A fire event volume could be 1 ,500 gpm for 2 hours which
is 180,000 gallons or 0.55 acre-feet.
Moreover, while irrigation in the winter might be more challenging, farming and thus demand for
irrigation is also quite a b it more challenging in the winter. Accordingly, the plans for wintertime use
ensure that there will be adequate storage even in the hardest of climate conditions, and particularly at
this initial juncture of the project when most of the water usage is farming oriented. If and when the
residential element of this project proceeds, we plan to and have acknowledged that there will need to
be some more centralized water system serving such residential needs.
Referral Comments Response – Nutrient Farm Applications
Page 5
5. The geo-hazard letter suggests that geo-hazards can be mitigated through engineering but stops
short of recommending mitigation measures. Site specific, geotechnical, geo -hazard, and slope
analysis should be conditions of building permits.
Additional site specific, geotechnical, geohazard and slope analysis will indeed be provided in the
future for County review and approval in association with the applicable building permits , as well as
during the future land use review processes that will pertain to each particular element of Nutrient
Farm when that aspect actually moves forward with development. The PUD and the Garfield County
Land Use and Development Code (LUDC) both already call for such analysis at the proper future point
in time. Currently, no final building locations or designs have been prepared ; consequently, there is no
site specific analysis to provide.
6. The site will need to obtain a stormwater permit from the CDPHE for discharges associated with
construction. A copy of the permit should be provided to Garfield County once obtained.
Agreed. A copy of the permit will be provided to the County prior to construction occurring pursuant
to the PUD and meeting the one-acre disturbance threshold .
7. The application materials identify that there are ephemeral drainages that bisect the proposed
PUD. These drainages should be identified on the PUD map and a drainage easement placed on
them to protect them from disturbance.
The two larger ephemeral drainages that cross the land from south to north, draining into the Colorado
River will remain undisturbed with existing crossings in place. Fortunately, the entire Nutrient Farm
property is owned by a single entity, Nutrient Holdings LLC. Nutrient Holdings plans to develop the
Nutrient Farm property as a cohesive community and has no intention of selling off any portions of it
to others to be developed . No development is planned or permitted in the PUD upon or directly adjacent
to such ephemeral drainages. It is also important to stress that t hese are ephemeral drainages with no
wetland or riparian characteristics. They will be integrated into the plans for the future uses and the
grading and drainage plans for those uses and/or structures on the property. Invariably, all PUD
standards and all County Code requirements will be met. In light of such considerations, there is no
practical purpose or function to plating easements on one’s own property. Nevertheless, we are happy
to instill additional language in to the PUD which states that all development in Nutrient Farm shall
avoid the existing ephemeral drainages to the greatest extent practicable and shall adhere to all LUDC
standards related to such disturbance. This should effectively assuage any concerns over such
drainages, even if the property wasn’t owned by a singular entity for a cohesive use.
8. The application materials propose to treat storm water prior to discharge per the Impact Analysis
provided although neither a drainage plan nor an erosion control plan was provided. Site specific
grading and drainage plans for building permits should be co nditions of building permit. A
regional drainage plan should be considered to coordinate drainage and erosion control from
multiple potential building sites.
As suggested, a regional drainage plan will be developed to coordinate drainage and erosion control
on the Nutrient Farm property. This PUD request merely pertains to zoning, and thus future uses . In
other words, it does not provide any direct approvals to allow for any specific uses to be constructed
or operated; rather, only the ability to propose a use in the future. Future uses will be subject to special
review on several levels by the County before they commence. We anticipate that site specific gradi ng
Referral Comments Response – Nutrient Farm Applications
Page 6
and drainage plans will be required by the County for review and approval prior to issuance of any
building permits, and we are glad to abide by this requirement.
9. The noise study proposes that mitigation measures will be in place prior to events. During the first
events that are scheduled, the Applicant should verify the actual sound levels against the
assumptions that were used in the noise study. Mitigation measur es should be verified and/or
revised based on actual noise levels.
It is our intent that any sound emanating from the recreational, entertainment or commercial activities
will be properly mitigated and controlled and noise impacts avoided and abated. This PUD request
does not provide any direct approvals to allow or any specific uses to be constructed or operated; rather,
only the ability to propose a use in the future. Future uses will be subject to special review on several
levels by the County before they commence, reviews that can effectively address sound impacts as
well as a wide array of other impact concerns.
As mentioned in the Narrative, w e wish to be good neighbors and minimize the sound generating from
the property. To that end, our proposed locations for the potential events do and will always take into
consideration the most appropriate spot on Nutrient Farm itself as well as other effective mitigation
measures. For example, the location of the performance center is on the upper western reaches of the
property, far from any residences and naturally shielded by topography. Furthermore, sound modeling
was conducted, and Sound Standards and requirements were drafted into the proposed PUD Guidelines
to protect the surrounding properties. We consulted with sound and noise professionals in setting forth
such standards in the proposed PUD. Any future uses that could possibly generate noise are required
to submit an additional formal application to the County and be reviewed through the Major Impact
Review process (i.e., the Outdoor Music and Entertainment venue and the Motor Sports Center (aka
“OHV Park”). A specific Sound Standards section was included in the PUD Guide which states:
…In order to minimize any potential sound impacts to adjacent properties, future sound studies
shall be provided to the County for review and approval for site specific development or use
requests that could potentially necessitate mitigation means at the time of County review of
those requests.
Such development may include such contemplated uses and the Motor Sports Center and the
Outdoor Music and Entertainment areas….
The sound levels shall meet all applicable County requirements and Colorado Revised
Statutes…
Sound mitigation techniques shall be utilized by the Owner/Developer, as needed, in order to
minimize any potential impacts to adjacent properties; and may be specified as requirements
via any County approval related to such development and uses.
In terms of the Motor Sports Center (aka “OHV Park”), our intent is to provide only 100% electric
vehicles initially at the Motor Sports Center (aka “OHV Park”) that will not create a sound disturbance
to the neighbors. If after future sound testing and modeling, it is found that gasoline vehicles can meet
County/State standards, they may be used.
We believe that with proper sound planning and mitigation, such as varying the speaker intensity,
speaker orientation, the construction of wall/berms/landscaping barriers, hours of operation, natural
and designed shielding and screening, and other mitigation strategies, future outdoor venues and
Referral Comments Response – Nutrient Farm Applications
Page 7
activities can satisfy all County/State sound level requirements and will not be a nuisance to the
surrounding properties. (Please refer to the Report, Impact Analysis Report, narrative, and PUD Guide
for details.) We will be glad to work with the County at the time of site plan review and implementation
to verify the future use specific mitigation measures are working the way they were intended and
modify those mitigation measures if and as needed.
10. The Traffic Study recommends that parking and traffic control be employed for larger events but
does not distinguish between small and large events. The Applicant should provide better
guidelines for distinguishing between small events and those that require traffic control.
The Traffic Impact Study does not differentiate between small or large events but considered 350
individuals as the threshold for the music events in the Proposed Development Land Uses Table on
page 2. (Not all Nutrient Farm Events will have this many persons in attendance). The Traffic Impact
Study recommends that although the CR 335 and Bruce Road intersection and CR 335 accesses are
able to operate adequately during the projected Music Festival traffic volumes, those events should
have either Uniform Traffic Control or Certified Traffic Control supervision . Those controller locales
will be at the CR 335 and Bruce Road and CR 335 and event accesses intersections to provide safe
operations during the peak entry and exiting periods of the events. (Page 1, summary.)
Thus, u nder the Temporary Parking Plan section III. C.3. in the PUD Guide, a Temporary Parking Plan
is discussed and it is noted that a short-term non -permanent temporary parking plan on the Nutrient
Farm property will be implemented for all Nutrient Farm Events, including those with an expected
attendance of 350 persons or more. It also states that for Nutrient Farm Events, either Uniform Traffic
Control or Certified Traffic Control supervision at the County Road 335/Bruce Road intersection, as
well as at all CR 335 access into the property will be provided at peak entry and existing times.
However, later in the PUD Guide, under section III.H.5. Specific Land Use Standards, Nutrient Farm
Events are defined and further regulated. It specifically states, All Nutrient Farm Events with an
expected attendance of 350 persons or more shall comply with the Temporary Parking Plan contained
within this PUD Guide.(Please see pages 19 and 28 of the PUD Guide for details.) We point to this
provision to assuage any concerns over what would transpire in “smaller events. We see the
discrepancy and confusion inadvertently created and the Temporary Parking Plan subsection d. of the
PUD Guide will be revised to clarify and resolve this concern. The new language will indicate that all
Nutrient Farm Events will employ the Temporary Parking Plan but only those Nutrient Farm Events
with an expected attendance of 350 persons or more will utilize the recommended traffic control
measures. The threshold of 350 people is not grabbed from the air ; rather it is consistent with
recommendations and determinations presented in the Traffic Impact Study and it is also similar to the
350 individuals specified in the Garfield County Land Use and Development Code definition of Public
Gatherings.
We believe that threshold trigger of 350 guests is not large compared to other uses or activities, at
Nutrient Farm or throughout the County. For instance, any student school day attendance, football and
basketball events can easily generate well beyond 350 person s or more and do not provide traffic
control supervision , or really any contingency plan whatsoever. A party at an individual home can
have scores of people attend ing without a singular safeguard. Churches, especially during the holiday
seasons, most likely have large attendances and do not provide traffic control supervision. Many bar
and restaurants well exceed 350 patrons over the course of an evening.
Referral Comments Response – Nutrient Farm Applications
Page 8
In rather stark contrast, as noted in the Study, the music events in question have very significant
safeguards to ensure that any notable level of attendance will not degrade the operation of the road and
entry/exit will only take place for a brief period of time. In fact, we naturally hope that our daytime
operations during orchard season etc. will have a significant level of attendees. Yet, these attendees
will likely be during different times than the music events we contemplate. Also, we have much mor e
ample parking than most businesses, and thus we are highly confident that the impacts on traffic and
parking will be quite seamless in any circumstance.
11. The PUD guidelines propose no setback restrictions for porches, decks, slabs, etc. These items are
often constructed and conflict with drainage features or easements that are intended to be in the
setbacks. The Applicant should restrict these items in the setbacks or five feet from the property
line when easements or drainage is anticipated.
The proposed Table 4 of the PUD Guide will be revised to require a 5’ setback from all property lines
for Minor Accessory Improvements. The PUD Guide Table 4 mimics Section 3 -202.F. General
Restrictions and Measurements – Table 3-202: Projections which states there are no restrictions for at-
grade uncovered porch, slab, patio, walk, steps and porches and decks less than 30” in height:
12. The application materials do not provide a water quality analysis nor a four -hour pump test for
the well for the farm house. This should be provided to Garfield County for review.
This PUD application is a zoning request rather than a preliminary subdivision plan. These materials
will be provided as part of the subdivision process as required by Garfield County Land Use and
Development Code.
We understand this comment refers to the Area 5 farmhouse well. In addition to the Working Farm
East, Area 5 is also slated to have a farmhouse. The residential lot in Area 5 may be served by a new
well or it may be served by the Vulcan Ditch. If the Area 5 farmhouse will be served by a well, a well
test will be completed at the time of construction. If the Area 5 Farmhouse is served by a well, Nutrient
Farm will obtain an exempt well permit associated with the existing parcel prior to subdividing that
parcel to create the small 1+ acre Area 5 farmhouse lot. As part of the subdivision process, Nutrient
Farm will be required to submit a four-hour pump test and water quality tests for the Area 5 farmhouse
well.
13. The Applicant should verify that the Riverbend Water and Sewer Company (RWSC) is in good
standing with CDPHE.
Referral Comments Response – Nutrient Farm Applications
Page 9
We have recently contacted RWSC and Colorado Department of Public Health and Environment
(CDPHE) to see what they could tell us. RWSC reports no known issues. Monica Huacuja Espinosa
of CDPHE reports ...the PWSID for RIVERBEND WATER AND SEWER COMPANY is CO0123679
and they have no violations or inspection deficiencies that are currently open and the last violation for
this system was in 2019. SGM checks for wastewater permit number COG590006 revealed only one
exceedance back in 2018. Should Nutrient Farm decide to plat the residential lots, both the water and
sewer systems will have to be operating satisfactorily.
14. The Applicant provides a will serve letter from the RWSC but an agreement still needs to be
negotiated and finalized between the parties. Evidence that the parties have reached an agreement
should be provided.
Should Nutrient Farm decide to plat the residential lots, the agreement will be finalized during that
effort. As mentioned in the PUD Guide, the residential homes in Areas 1, 3, and 4 are planned to
connect to the existing Riverbend Water and Sewar Company (RWSC) facilities and a Will Serve
Letter has been provided confirming capacity and ability to serve those future homes.
It is atypical for any water district to offer a formal will serve letter or a formal inclusion agreement
prior to any actual development being proposed. It is never required to reach that level of formality at
the point in time that zoning is proposed. Thus, it is in part to protect such water districts, as once they
issue a will serve letter, they have committed a portion of their finite water supply to a development
that is no more than merely zoned to potentially allow such uses in the future.
Imagine if any undeveloped area zoned for high density residential mandated a will serve agreement
while such areas remained undeveloped. It would create an unmanageable scenario. Such is thew case
with this PUD. The commitment that we have secured with the RWSC is all they are willing to give
and all that is ever req uired at this juncture (again, simple zoning). This is also directly in line with the
Code provisions on water and sewer at this juncture. Ultimately, if and when we wish to develop the
residential subdivision as planned, we will have to show proof of a committed water supply prior to
recoding a final plat. Of course, this is also what the RWSC letter stipulates.
Ultimately, a formal agreement will be negotiated and finalized with the RWSC, if hopefully the
proposed PUD has been reviewed and approved by Garfield County , and a subdivision proposal or
other land use approval is applied for in association with any development applications/building
permits for uses that plan to utilize the RWSC systems (i.e., subdivision applications.) It would not be
prudent for us or the RWSC to enter into an agreement without County and other referral agency
comments until we better understand capacity and any other requirements related to infrastructure
improvements for any type if system connection, be it one building or 10 homes. If it is later
determined to b e physically or financially unfeasible to connect to the systems, these units must
demonstrate proof of an adequate, legal, and viable alternative water system prior to being constructed.
Such structures, based on any such concerns, may even be modified and/or relocated to other areas in
the PUD or alternative water and sewer systems provided for them in accordance with the standards of
the LUDC and Colorado Law. All submittal requirements and studies will be provided to the County
and disseminated to all agencies including the State Division of Water Resources for review and
approval. (Please see page 6 of the PUD Guide for this same information.)
15. Fire flow storage is inadequate from the water storage tanks of the RWSC by current standards.
The Applicant should verify how this will be addressed.
Referral Comments Response – Nutrient Farm Applications
Page 10
All fire flow needs will be met through potable and raw water storage or water supplies and
infrastructure sizing. Specifically, for those portions of Nutrient Farm served by its own water system,
we will have multiple potable hydrants and dry hydrants connected to the on -site cisterns or irrigation
systems. Moreover, recreational water and detention ponds will be installed throughout property for
emergency use by the CRFR.
The new residences in Development Areas 1, 3, and 4 are planned to connect to the nearby Riverbend
system. Numerous fire hydrants are located throughout the existing Riverbend subdivisions. The
existing Riverbend potable system provides about 50,000 gallons of storage augmented by a 115
gallons per minute (gpm) supply flow from their wells. Should Nutrient Farm decide to plat the
residential lots, the intent is for Nutrient Farm to add a 150,000 gallon potable storage tank to bring
the fire storage component up to municipal standards as new residential lots are platted in Areas 1, 3
and 4 in exchange tap fee credits. New fire hydrants from 8 -inch diameter lines will be placed as
necessary so that each new residential lot is within 250 feet of a hydrant. Ultimately, a functional Code
compliant fire suppression plan will be a mandated element of any such subdivision if and when it is
reviewed.
16. The Onsite Wastewater Treatment System (OWTS) for Areas 6 -2 and 6 -3 will be very large and
require CDPHE approvals. It appears that the RWSC waste water treatment plant (WWTP) is
nearby. The Applicant should discuss if connection to the WWTP is feasible.
Agreed. The OWTS systems will be permitted with CDPHE. The referenced OWTS locations
substantially exceed the 400’ threshold listed in LUDC 7-105 B.2.a. and Nutrient Farm does not
wish to connect these systems to RWSC facilities.
17. The OWTS flows assumes a restaurant that is open for I or 2 meals but with tent and RV camping
nearby and the many uses proposed, it is feasible that the restaurant would also serve breakfast.
The size of the OWTS should be verified based on these flows.
Design flows will be verified/refined prior to design of the system in the future. The scope of allowed
operations of the restaurant will naturally be restrained by the functionality of the systems servicing
the restaurant, including OWTS.
18. There is an OWTS proposed for the swimming pool. Typically, pool disinfection is an issue for
bacterial valuable for a healthy OWTS. The Application should discuss if an OWTS is the best
method for disposing off the pool wastewater or discuss measures to be employed for protection
the OWTS.
Pools will not be drained to OWTS. Any chlorinated pools will be dechlorinated to safe levels before
being drained.
19. The proposed bunkhouses will require approvals from Garfield County and submittals will need
to address adequacy of sewer, water, and traffic.
This is understood and is specifically noted in the PUD Guide as Footnote 4 under Table
1/Development Areas, Private Open Space Tracts and General Land Uses Summary. It states:
Bunkhouses for seasonal and full time agricultural employees and On -Site Employee Housing
units for employes of Nutrient Farm may be constructed in these Areas. These units are not
mandated inclusionary housing under the LUDC, nor shall any provisions of s uch be applied
Referral Comments Response – Nutrient Farm Applications
Page 11
to them, but such housing may be recognized as operative employee housing as a public benefit
accordingly. All necessary applications studies and reports shall be submitted to Garfield
County for review and approval prior to the construction of any of the se units including, but
not limited to, the provision of water and wastewater, vehicle trips, and other infrastructure
improvements. No modification to this PUD Guide shall be required.
Page 2 echoes this requirement for not only the bunkhouses/employe housing, but any future uses
beyond that included in the PUD Guide and shown on the PUD Plan Map:
Any future use or expansion of any uses/buildings beyond that included in this PUD Guide and
shown on the PUD Plan Map shall be reviewed and approved by Garfield County per the
appliable development review and permitting process. All necessary studies and reports,
including any updates to the Nutrient Farm Level III Traffic Impact Study, Water Adequacy
Report for the Proposed Development Central Water Distribution and Wastewater Systems
Report and OWTS Engineering Report shall be submitted to the County for review and
approval. Any additional infrastructure, road improvements, and/or impact fees associated
with the use or expansion shall be remitted to Garfield County at that time.
20. The application materials do not address potable water usage and sewer facilities for the large
events. The Applicant should discuss what is anticipated.
Nutrient Farm is aware the OWTS capacity can be exceeded for these events and will bring in
additional portable restrooms as needed. Water can also be brought in for convenience during larger
events. Formal provisions will be provided in the future applications to allow such uses , and this issue
will be addressed well before any such uses are allowed or take place.
Garfield County Public Health/Environmental Health Department
Mr. Ted White provided a response to Mr. Glenn Hartmann on October 11, 2023 indicating he had
a few questions for Mr. Hartmann regarding the project. We are not aware of any additional
comments from the County’s Public Health/Environmental Department and assume they are
comfortable with the three applications.
Colorado Department of Transportation (CDOT)
As requested by Mr. Brian Killian, the CDOT Level III Traffic Impact Study for Nutrient Farm was
sent directly to him for review on November 1, 20 23 by Dan Cokely, SGM. On November 15, 2023
Mr. Killian responded that: CDOT will not require an access permit for this development. (A copy of
that email has been attached for reference.) Please see the comments above for further thoughts on
CDOT.
US Army Corps of Engineers (Corps)
The Corps responded to the referral request on September 18, 2023 indicating that they did not have
the ability to provide project-specific comments. We take this to mean that since no specific
improvements are proposed or will be approved with this PUD zoning request , they had nothing to
comment on. The response notes that a permit must be obtained for discharge of dredge or fill materials
into jurisdictional waters of the United States which requires such waters to be navigable and
potentially includes rivers, streams, lakes, ponds, wetlands wet meadows, seeps, and some irrigation
ditches. The response suggested a delineation of aquatic resources be prepared.
Referral Comments Response – Nutrient Farm Applications
Page 12
As noted in the PUD Guide and Narrative, the Colorado River runs through the northern portion of the
Nutrient Farm property. Although no formal wetland delineation took place for this PUD request, based
on in -field inspection of the plants and soils, sparce and discontinuous wetland/riparian vegetation exits
along the bank of the Colorado River. No wetlands extend beyond the immediate vicinity of the
Colorado River’s channel. In connection with any future site plan request for any activities or
improvements near the Colorado River, a wetland delineation will be and must be prepared in
accordance with Section 404 of the Federal Clean Water Act regulations , as well as the County Code,
and any applicable permits will be obtained from the Corps and/or County.
Colorado Department of Public Health and Environment (CDPHE)
On September 18, 2023 CDPHE responded via email to Mr. Hartmann about the three applications by
providing two links – one for their general comments and one related to oil and gas. They also stated
that they will con tin ue to review the request to determine if any additional comments are necessary,
and if so, submit them by the referral deadline.
The live links were not available to us and Staff indicated that the links only provide generalized
information. Since no additional referral comments were received , we can only presume that CDPHE
has no concerns with the application.
We note that water and wastewater services will be provided to Nutrient Farm in a variety of ways
through the construction of multiple on-site systems for agricultural, recreation, and commercial uses
or connecting the nearby private RWSC facilities for th e new residential uses. No County or municipal
water or wastewater services are sought. The systems for the homes will be either constructed for that
specific home or be centrally connected to the adjacent public systems. The remainder of the property
will work as one holistic, uniform operation under one Owner/Developer. (The PUD Guide, pages 46
and 47 specifically address the water and wastewater disposal systems for the various Development
Areas in Nutrient Farm.). Any internally operating public water system in the future will invariably
have to comply with the CDPHE guidelines and regulations for a public water system. All wastewater
must meet State and County OWTS standards.
The ultimate water systems’ design and treatment requirements will depend on each water systems’
designation – pub lic or private for the various uses – and inevitably all local and State required drinking
water and water quality and quantity standards will be followed and exceeded. The intent is to start
with private on -site systems and then convert to public water systems as needed when required
operationally. (Please refer to the Water Adequacy Report, Central Water and Distribution and
Wastewater Systems Report, and the Water and Sew er Plan provided in the submittal materials for
details.)
We have been working with Ms. Kate Morell of CDPHE regarding the water program for Nutrient
Farm. Nutrient Farm does not require its own Public Water System at this time. We will of course
continue to do so as the development on Nutrient Farm evolves, and the water use profile evolves along
with that development. This will invariably be an ongoing process, not a snapshot in time at any point.
As noted before, no specific uses are requested or will be allowed with this PUD, rather the PUD is
only a zoning document and future site specific approvals must be obtained from the County for any
specific uses.
Referral Comments Response – Nutrient Farm Applications
Page 13
Colorado Department of Water Resources (CDWR)
Ms. Megan Sullivan from the CDWR provided referral comments for the three applications on July
17, 2024. The comments very astutely note that the PUD application is a zoning request rather than a
preliminary subdivision plan and that not all of the proposed allowed uses may be constructed. As we
discussed with her, additional permitting will be required for each of the individual proposed uses.
No specific concerns regarding our submitted Water Adequacy Report or adverse impacts to
downstream users were raised by CDWR. The existing water rights and the water demands for the
various proposed uses and systems are reviewed and information on the intended well permit for the
residence in the Work Farm East is provided.
CDWR did include a comment about the permitting process for the proposed exempt well for the Area
5 farmhouse:
The applicant should be aware that in order to qualify for an exempt well, at the time of
application and permit issuance the parcel where the well would be located cannot be included
in subdivision of land approved after the Colorado River was determined to be over-
appropriated (May 22, 1981) and, in order to serve more than one single family dwelling, the
parcel must be more than 35 acres in size. If an exempt well permit is obtained and the well is
constructed on a parcel greater than 35 acres before its subdivided, the well could possibly be
allowed to continue to operate under the exempt well permit.
We appreciate this clarification regarding the order of operations of the permitting process. Area 5 is
currently part of Garfield County Parcel ID 212335300081, a 236.939 acre parcel. The proposed Area
5 Farmhouse Well would be the only exempt well on this parcel per the PUD development plan as
proposed. Applicant would apply for an exempt domestic well permit for a parcel of land of 35 acres
or larger (associated with the current ~237 acre parcel) prior to subdividing the parcel to create the
smaller ~1 acre farmhouse lot, should we proceed in that route in the future.
It is our understanding of Senate Bill 20 -155 and Colorado Revised Statutes Section 37 -92-602
(3)(b)(III - IV) that if the land on which the exempt well is subdivided and “the well is used on only a
single parcel of the divided land and remains the only well serving that parcel” and other provisions
are followed, the presumption of no material injury is not lost. A fter subdivision, the Area 5 farmhouse
well would remain the only exempt well on the original parcel. Ultimately, this is all an exercise in
supposition at this time, as the land is not being subdivided, and we are only dealing with the issue of
the overarching PUD zoning for the Property. But the safeguards are surely in place for the future
however the farmhouse well issue plays out.
As CDWR stated, this exempt permitting process will require review to ensure all provisions are met,
and it is therefore not certain whether the exempt well permit can continue with the smaller ~1 acre
parcel after subdivision. As such, Nutrient Farm has prepared for the possibility that augmentation may
be needed for the Area 5 farmhouse well. As stated in the September 2020 Water Supply Report, the
annual consumptive use of in door demands for the Area 5 farmhouse to be supplied by a new well is
0.07 AF. While this new well will likely qualify as an exempt well (would not require augmentation),
Nutrient Farm has conservatively set aside 0.07 AF of Vulcan Ditch HCU credits for this use in the
event that the credits are needed to augment the well uses.
CDWR also noted in its comments letter that in a dry year some of the irrigation uses may need
to be curtailed:
Referral Comments Response – Nutrient Farm Applications
Page 14
During the late irrigation season of dry years, the Canyon Creek physical and legal supply is
sufficient to provide for the peak hour potable demands. However, dry year supply available
for non -potable demands may be limited to the 5.36 cfs in the Vulcan Ditch first priority. This
5.36 cfs is sufficient to meet max day demand but may require some irrigation reductions or
storage to meet peak hour demand.
Nutrient Farm understands in dry years it may have to use storage and/or prioritize its irrigation needs
and will certainly curtail irrigation uses if conditions warrant.
We would like to point out that in these situations, Nutrient Farm also has the legal and physical ability
to divert its Vulcan Ditch rights from their decreed alternate point of diversion from the Colorado River
at the Coal Ridge Pump and Pipeline (Case N o. 84CW349). While Nutrient Farm prefers to take its
Vulcan Ditch water from Canyon Creek (due mainly to the superior water quality of Canyon Creek
over the Colorado River and the lower carbon footprint offered by the gravity fed pipeline from Canyon
Creek over pumping from the Colorado River), Nutrient Farm does have the ability to pump from the
Colorado River when necessary if physical supply is limiting on Canyon Creek. Inevitably, no pun
intended, we will cross that bridge if and when we come to it.
We appreciate Ms. Sullivan’s comments and understand that any future proposed uses will be reviewed
in detail.
Middle Colorado Watershed Council (MCWC)
Middle Colorado Watershed Council (MCWC) provided comments for the Nutrient Farm PUD request
dated July 27, 2023.
We hope that Nutrient Farms will make their best effort to make sure adequate water stays in
canyon Creek during glow flow conditions. The benefits of fish passage structure and ditch
enhancement projects will be reduced if stream connectivity is lost. Reb uilding the Vulcan Ditch
at its historical location with full use of the available water rights could divert instream flows
out of Canyon Creek and impact the creek aquatic ecosystem and the drainage watershed.
MCWC encourages Nutrient Farms to provide voluntary bypass flows of half the water rights
during low flow conditions to mitigate the potential impacts of restarting the Vulcan Ditch.
Full use of the Nutrient Farms' Vulcan Ditch water right at the current h eadgate location has
the potential to dry up and create a connectivity gap in Canyon Creek. During low water year
conditions, Nutrient Farms could consider switching to the existing Coal Ridge Pump and
Pipeline as an alternate point of diversion on the mainstem Colorado.
We appreciate MCWC providing these comments for the Nutrient Farm PUD request and the work
MCWC is doing to protect and enhance the health of the Middle Colorado Watershed for all users and
the environment.
Nutrient Farm has the legal right to divert its full ownership of 8.93 cfs in the Vulcan Ditch, but this
diversion will not – and cannot – occur continuously. While Nutrient Farm has the right to divert this
full amount at any time, it is important to understand that it will not be diverting this full right at all
times, and in fact the pattern of such use is limited by the consumptive use limitations articulated in its
decrees. Case No. W2127 changed the use of the Vulcan Ditch first two priorities and quantified the
historical consumptive use. Of the Vulcan Ditch 440 acre-feet per year of historical consumptive use
quantified in W2127, 393 acre-feet per year is now owned by the Farm and available for use in the
Referral Comments Response – Nutrient Farm Applications
Page 15
Farm’s water supply – completely outside of the PUD or any use or development addressed therein .
The existing water rights and usury rights to the same remain agnostic to the zoning change, and do
not hinge on PUD approval in any way. Nevertheless, the 393 acre-feet annually of consumptive use
limits Nutrient Farm’s depletions, and therefore limits its diversions. If Nutrient Farm were to divert at
the maximum rate of 8.93 cfs, it would only be able to divert for 35 days a year to meet its demands
and reach the consumptive use limitation (the number of days at this rate varies throughout the year -
10.6 days in July, 0.2 days in December, etc.). Alternately, if Nutrient Farm were to divert at a constant
average rate to meet its demands and consumptive use limitation, this would be roughly 2.9 cfs in July,
and 0.05 cfs in December, with an average rate over the year of 0.86 cfs. The actual diversion rate will
reflect a balance of storage and instantaneous diversions to meet demands while staying within decre ed
consumptive use limitations.
In summary, while Nutrient Farm has the legal ability to divert the full 8.93 cfs at any given time, it
will not be diverting that full rate at all times, and in fact cannot divert at a constant 8.93 cfs due to the
decree limitations. The average diversions will be much lower as limited by decree terms and
conditions. What this means is that the full scope of the subject water rights does not and will portend
to create, either conceptually or in practice, a diversion pattern that will compromise the minimum
stream flow at pivotal times.
We appreciated the comments and suggestions for voluntary efforts for Nutrient Farm to undertake to
protect the health of Canyon Creek. Necessarily, any agreements to reduce diversions should be based
on scientific findings of the ecosystem needs and should be a joint effort among the many diverters on
Canyon Creek. If Nutrient Farm alone agrees to leave water in Canyon Creek, there would be no legal
way to keep that water in the stream. Unless there is a collaborative stream management plan and/or
some other agreement among the many users on Canyon Creek to reduce and/or stagger diversions,
other water rights holders can divert water bypassed by Nutrient Farm at the Vulcan Ditch headgate. If
MCWC and other local parties conduct a study to understand ecosystem needs for Canyon Creek and
develop a stream management plan or other local joint effort among Canyon Creek diverters to reduce
or stagger diversions during dry conditions, Nutrient Far m would be happy to participate in such a joint
effort to protect flows in Canyon Creek. We have repeatedly made that commitment and expressed out
concerns for such a logical practical multiparty approach to conservation.
As MCWC stated, Nutrient Farm does also have the legal ability to use Colorado River water as a
backup source if needed (either due to physical supply limitations on Canyon Creek or a future
agreement with other Canyon Creek water users). However, Nutrient Farm intends to use Canyon
Creek as its primary source, and the Colorado River only as a backup source for three main reasons:
A) Canyon Creek has superior water quality (when compared with the Colorado River ) which is
necessary to support the high-quality organic food production which is at the core of Nutrient
Farm’s objectives.
B) Surface water from the Vulcan Ditch will also ultimately provide for potable needs for the two
farm areas, commercial and industrial areas, and recreational areas. When compared with
Colorado River water, the superior water quality from Canyon Creek provides a safer raw water
supply as a starting point prior to treatment. Treatment of Colorado River water to all applicable
potable water standards is costly and energy intensive. Starting with higher quality water for
potable water reduces Nutrient Farm’s overall carbon footprint.
Referral Comments Response – Nutrient Farm Applications
Page 16
C) Canyon Creek water can be delivered via gravity, whereas Colorado River water must be
pumped. Gravity delivery allows Nutrient Farm to operate without pumping and therefore
results in a lower carbon footprint, higher efficiency of use, and a more pragmatic water
program.
We also understand the comments regarding the practicality of utilizing the Vulcan Ditch to serve
domestic uses in the winter months:
MCWC is concerned about the practicality of Vulcan Ditch serving domestic users in their
development during the winter months. Freezing and snowy conditions will make it difficult to
pass relatively small amounts of water through a ditch. Nutrient Farms might consider serving
these needs by drawing from the alluvium of the river from an expansion of one of the existing
wells.
The Vulcan Ditch will consist of buried 24” and 18” fused HDPE pipeline with 3’ minimum cover
capable of delivering wintertime flows if needed. The river crossing may consist of an insulated aerial
crossing or an HDD bore. Plans are to use the ponds shown to provide wintertime water. For
perspective on volume, at full-buildout of the PUD Nutrient Farm will need about 16.2 acre-feet of
water for November – March. This equates to an average flow rate of slightly less than 0.06 cubic feet
per second (cfs).
Case No. W2127 quantified the historical consumptive use of the Vulcan Ditch and furthermore
decreed that these water rights “may hereafter be used for year-round municipal use [emphasis
added].” Consistent with the terms and conditions in the W2127 decree , Nutrient Farm intends to use
its 393 acre-feet of consumptive use year-round, using storage as needed.
MCWC also noted:
MCWC would like to see a detailed plan for construction and permitting for the ditch as it must
cross the highway, river, and railroad tracks.
We will share plans for construction and permitting once completed.
We also want to emphasize that as with many of the comments articulated herein, this issue of water
usage and the minimum stream flows, as well as points of diversion, are really not directly tied to the
PUD, nor in any way incumbent upon zoning approvals. In other words, as noted above, the water
rights we have and the means to utilize those rights, are not tied to our zoning or the uses on the Farm.
They could be utilized right now, for a variety of purposes, including agriculture, which of course is a
quite intensive water use. In fact, rather than the PUD serving as some means of opening up the
floodgates on such water use, it actually helps steer Nutrient into a more collab orative approach and
affords the County a seat at this table as we move forward with each phase of development.
Put another way, the PUD enhances the ability of the public and the County to ensure the best and least
impactful means of using the water in Vulcan Ditch/Canyon Creek. Without the long line of procedural
oversight this zoning document will afford, there really is no formal process at the local level that
allows such comments and communication to proceed with the water user in an ongoing basis. Again,
we are happy to commit to such a collaborative role moving forward , as good neighbors and stewards
of the local environment, but stress it is the PUD that formalized this role, while compromising nothing
in terms of public oversight or restraint.
Referral Comments Response – Nutrient Farm Applications
Page 17
Town of New Castle
We would like to offer our gratitude to the Town of New Castle for taking the time to formally meet
with us on October 17, 2023 during their Town Council meeting to review our Nutrient Farm proposal
and for the Town’s referral comments dated October 23, 2023. As noted in the comments, Nutrient
Farm is located both inside and outside of the Town’s Ur ban Growth Boundary with the entire property
designated on the Town’s Future Land Use Map as Rural Low Density. Rural Low Density is
characterized by Large lot single-family, working ranches/farms, ranchettes, open pastures and rural
qualities…with net densities of 10 or more acres per dwelling unit.
Directly abutting the north -western portion of the property, across the Colorado River, is land
designated as a Planned Urban Center surrounding a Business Campus. Per the Comprehensive Plan,
a wide variety of uses are called for in these areas —retail, services, restaurants, hotels, entertainment,
civic functions, residential, light manufacturing, publishing, research/development, and compatible
trades, artist studios, light industrial activities, and wholesale activities. These areas are to be accessed
via CR 335 and the construction of a new bridge.
In this light, we believe the agricultural nature of Nutrient Farm and its associated uses are squarely
compatible with those uses called for in the Comprehensive Plan. The Town did not contest any of the
proposed Nutrient Farm uses – in fact, they expressed a very supportive demeanor for the project as a
whole. We stressed to the Town that that many additional applications must be submitted to the County
for review before specific uses could be implemented or buildings constructed. The Town requested to
be included in the future referrals for these applications per the existing intergovernmental agreement.
We gladly committed to ensuring that we would the Town copies of our future submittal materials and
meet with them about our requests.
In regard to the traffic study for the County Road 335/I -70 interchange comments, this was addressed
in the Level III Traffic Impact Study prepared for the property by SGM. That study was also made
available to the Town. The Traffic Impact Study concludes that the existing roadway system will
continue to operate safely and at an acceptable level of service with the full development of Nutrient
Farm. As the Traffic Impact Study recommends, all new road intersections will be designed with
acceptable site distances based on 35 mph design (450 feet), site triangles will be developed and
maintained as clear zones, and Uniform Traffic Control or Certified Traffic Control supervision will
be implemented at the CR 335/Bruce Road in tersection and at event accesses on the property from CR
335 to help provide safe operations during the peak entry/exit periods of the entertainment/ music and
arts venues or any other Nutrient Farm Events with an expected attendance of 350 guests or more. (The
Traffic Impact Study noted that this is not required for the CR 335/Bruce Road intersection to operate
adequately—rather, the additional traffic control would only help to provide more organized operations
during these times due to the variable natur e of peak flow rates for such events.)
Based on the full build -out of Nutrient Farm, the CR 335 estimated 2040 total traffic volume is 2,300
vehicle trips per day (vpd) east of Park Drive and 2,800 vpd west of Park Drive. The vpd west of Park
Drive will exceed Minor Collector standards. (The LUDC calls for Major Collector standards at rates
greater than 2501 vpd.) Thus, if the actual scope of development for Nutrient Farm is realized, future
shoulder widening west of Park D rive to Bruce Road could bring CR 335 up to County Major Collector
roadway standards. Also, as per section 4 -203.L.4. of the Land Use and Development Code (LUDC),
estimated calculations of the potential future public road improvement fees in the corridor have been
Referral Comments Response – Nutrient Farm Applications
Page 18
provided. Actual road improvement fees will be remitted at the time of development according to the
LUDC as stated in the Development Agreement.
As to emergency access, we discussed with the Town that Nutrient Farm’s internal public and farm
roads may be used as alternative emergency accesses routes to bypass portions of CR 335. Moreover,
Storm King Road in the adjacent Riverbend Subdivision Filing No. 2 extends into the property and
serves as the existing driveway connection for the Farm House in Area 2 on the eastern portion of the
property. This will only be used by the Owner/D eveloper for direct access to and from the Farm House
to the Eastern Working Farm, not as an alternative public throughway for everyday use. However,
should the fire department/emergency services or the public need it, the driveway may also serve as
emergency access connecting Storm King Road and the existing residences to the internal public and
farm roads and eventually to CR 335.
Also, if other entities eventually build a bridge for the LoVa Trail across the Colorado River on eastern
portion of the property, as long planned, Nutrient Farm will be glad to give an emergency access
easement for public use across the property in the LoVa Trail corridor and over this bridge as an
alternative means to cross the Colorado River near I -70.
Matrix Design Group Comments on behalf of Garfield County
At the County’s request, Matrix Design Group (Matrix) has also provided an independent review the
PUD Guide and Water Adequacy Report for water and wastewater related issues. This is documented
in the five-page September 13, 2024 letter from Robert Krehbiel to Glenn Hartmann. This letter
summarized the PUD application and raised various potential issues.
We believe the cleanest way to address their comments is to list specific issues and provide a response
to each as shown below.
The list below details the water and wastewater issues of significance:
1. Adequate Physical and Legal Water Supply
The PUD reports document an adequate physical and legal supply of water. The Vulcan Ditch
diversion off of Canyon Creek provides a good supply of water. Wells along the Colorado River
provide additional supply. Being located adjacent to the Colorado River provides an abundant
and reliable supply of water. The Colorado Division of Water Resources review of the PUD
documents generally concurred that the water rights could serve the proposed development,
although in a dry year some of the irrigation uses may need to be curtailed.
Matrix notes that the physical and legal supply of water are generally adequate, but echoed CDWR’s
comment that in a dry year some of the irrigation uses may need to be curtailed. We agree the water
rights are adequate to serve the proposed development and will certainly curtail irrigation uses if
conditions warrant. We do want to emphasize that this is the same conundrum that faces all but the
most senior water users due to over-appropriation and climactic variability, particularly in relation to
farming. Nothing in the PUD changes this fundamental reality of water use in the west.
Nutrient Farm understands in dry years it may have to use storage and/or prioritize its irrigation needs
and possibly reduce irrigation. We would like to point out that in these situations, Nutrient Farm also
has the legal and physical ability to divert its Vulcan Ditch rights from their decreed alternate point of
diversion from the Colorado River at the Coal Ridge Pump and Pipeline (Case No. 84CW349). While
Referral Comments Response – Nutrient Farm Applications
Page 19
Nutrient Farm prefers to take its Vulcan Ditch water from Canyon Creek (due mainly to the superior
water quality of Canyon Creek over the Colorado River and the lower carbon footprint offered by the
gravity fed pipeline from Canyon Creek over pumping from the Colorado River), Nutrient Farm does
have the ability to pump from the Colorado River when necessary if physical supply is limiting on
Canyon Creek.
2. Proposed Residential Development
The existing and proposed residential development (1 existing and 18 new plus ADU’s for Areas
1 through 5) appear to have adequate water supply and wastewater treatment. Nutrient Farm
residential developments in Areas 1, 3, and 4 (17 homes plus ADU’s) will be connected to the
existing Riverbend Water Company’s potable water distribution system and wastewater
co llection system. The RWSC currently serves the nearby Riverbend homes, and has a complete
water treatment, distribution, and storage system in place that is already permitted as a public
water supply. The existing Riverbend potable system provides about 50 ,000 gallons of storage
augmented by a 115 gpm supply flow from their wells. The intent is for Nutrient Farm to add
a 150,000 -gallon potable storage tank to bring the fire storage component up to municipal
standards as new residential lots are platted in Areas 1, 3, and 4 in exchange for tap fee credits.
New fire hydrants from 8-inch diameter lines will be placed as necessary so that each new
residential lot is within 250 feet of a hydrant.
The Riverbend HOA’s potable water supply comes from the five Riverbend wells and
wastewater is treated in a centralized wastewater treatment plant. Area 2 is existing with its
own well and onsite wastewater treatment system (OWTS). Area 5 is also proposed to have its
own well and OWTS.
Response: This section adequately describes the proposed residential development. No issues requiring
response are presented.
3. Exempt Well
As the Division of Water Resources pointed out in a letter dated July 17, 2024, these exempt
permits are issued for lots 35 acres and larger and are limited to residential uses only. The
PUD reports clearly note that Area 5 will be a 1 -acre parcel. The development would have to
wo rk with the State to obtain a well permit before the property is subdivided and use the permit
on this small parcel within the limitations of the permit for residential uses only and do not
allow for any commercial uses.
Response: We agree that if the residential unit in Area 5 is pursued, the well will need to be permitted
prior to any subdivision. The well permit would be for residential uses only, no t commercial uses. We
have addressed this issue thoroughly in the CDWR responses provided above.
To reiterate, w e agree the order of operations of obtaining the exempt permit and subdividing the
property will be important, as CDWR has limitations on exempt wells for division of land in over -
appropriated basins. We also understand an exempt well is not guaranteed and have set aside Vulcan
Ditch credits in the event that augmentation is ultimately needed. We also would again emphasize that
no aspect of developing a farmhouse and well for Area 5 hinges on this PUD; it could be applied for
tomorrow.
Referral Comments Response – Nutrient Farm Applications
Page 20
The residential lot in Area 5 will have a farmhouse for which all outdoor demands will be supplied by
the Vulcan Ditch, and only indoor residential demands would be supplied by an exempt well. We would
like to clarify that Area 5 will not be a 1-acre parcel. Area 5 is roughly 56 acres, but the residential lot
within planning Area 5 will be about 1 acre. Per the PUD Narrative, “A minimum 1.00 acre size
residential lot will be located in Development Area 5 in order to accommodate on -site water/well
systems.”
Area 5 is currently part of Garfield County Parcel ID 212335300081, a 236.939 acre parcel. The
proposed Area 5 Farmhouse Well would be the only exempt well on this ~237 acre parcel. Applicant
would apply for an exempt domestic well permit for a parcel of land of 35 acres or larger, associated
with the current ~237 acre parcel. As CDWR stated in its comments letter, If an exempt well permit is
obtained and a well is constructed before the parcel on which the well is located is subdivided, the well
could possibly be allowed to continue to operate under the exempt well permit [emphasis added].
As CDWR stated, this exempt permitting process will require review to ensure all provisions are met,
and it is therefore not certain whether the exempt well permit can continue with the smaller ~1 acre
parcel after subdivision. As such, Nutrient Farm has prepared for the possibility that augmentation will
be needed for the Area 5 farmhouse well. As stated in the September 2020 Water Supply Report, the
annual consumptive use of indoor demands for the Area 5 farmhouse to be supplied by a new well is
0.07 AF. While this new well will likely qualify as an exempt well (would not require augmentation),
Nutrient Farm has conservatively set aside 0.07 AF of Vulcan Ditch HCU credits for this use in the
event that the credits are needed to augment the well uses.
4. Long List of Proposed Public Water Uses and OWTS
Beyond the residential development, the concern is the long list of potential public and
commercial uses for Areas 6… Restaurant, Processing Building, Campground, Swimming
Pool, Laundry, Music Festival, etc. are all intensive uses of water and wastewater l oading…
These uses may be beyond the capacity of OWTS for wastewater disposal.
Response: We agree the large events could exceed OWTS capacity and Nutrient Farm will make use
of temporary portable restrooms as necessary. A public water system will be constructed when triggers
are met. Inevitably, we appreciate this comment as a cautionary note for future challenges, but there
is nothing in this comment that serves as a harbinger for any concern over PUD approval. In other
words, the PUD affords the opportunity to move forward with the review process for each of the
contemplated uses, and robustly address the water and wastewater concerns that actually become
tangible and not theoretical at that time. As the allowed uses actually implemented expand and become
reality over time, there will of course be a heightened scrutiny on each next use to ensure that the
collective impacts of the use, its water consumption and OWTS implications, do not reach a point of
critical mass, so to speak. However, unless and until we hit that point in the future as development
commences, this is all, again, a conceptual cautionary point at this juncture.
5. Water Quality Concerns for a Public Water Supply
…The wells along the Colorado River bank are susceptible to surface water contamination. …
Public water systems need to be tested and monitored regularly to protect the health of the
public. The Nutrient Farm wells proposed as a public water supply may need more treatment
than simple disinfection as a safety precaution.
Referral Comments Response – Nutrient Farm Applications
Page 21
Response: Nutrient Farm will provide appropriate filtration and disinfection and comply with all
CDPHE public water system requirements. CDPHE robustly addresses the treatment expectations for
any public water supply. The threshold for such CDPHE public water regulatory oversight is quite low,
and the standards increase somewhat exponentially as the profile and scope of users increase.
The comment about Colorado River alluvial wells appears to be referencing the five Riverbend Wells
which currently provide potable supply to the Riverbend HOA, as managed by the Riverbend Water
and Sewer Company (RWSC). Nutrient Farm residential developments in Areas 1, 3, and 4 will tie
into RWSC’s existing system. RWSC’s treatment and distribution system is permitted under Public
Water System ID CO0123679. This public water system is and will be tested and monitored in
accordance with its permit. If CDPH E finds the Riverbend Wells to be groundwater under the direct
influence of surface water, appropriate steps will be taken as required by CDPHE.
For areas besides 1, 3, and 4, as public water system triggers are met, Nutrient Farm will construct its
own public water system in accordance with CDPHE regulations .
6. Wastewater and Use of OWTS
Based upon the design loading of the commercial uses, Nutrient Farm should be planning their
own central wastewater treatment plant, or connect to Riverbend or connect to New Castle’s
wastewater treatment plant. The report conceptually designs 10 OWTS systems for Areas 6, 7
and 8. OWTS systems are permitted for up to 2,000 gallons per day. Beyond that is a long,
difficult permitting process. Larger developments were trying to get around the regulations by
proposing a bunch of smaller 2000 gal/day systems, s o the State issued letters clarifying their
position on this matter. The development proposes to treat about 25,000 gallons per day
loading with at least 10 separate OWTS systems.
Response: Noted. The multiple systems proposed comply with WQSA-6 which was developed for this
situation. There is no “trying to get around the regulations,” nor would we ever even contemplate such
an ill-advised approach. Based on the tenor of these comments, we want to take the time to again
emphasize what Nutrient Farm is at its core. It is a biodynamic farm. That very approach to farming
is exercise of never taking the easy way out or getting around standards when it comes to the
preparation of food or the stewardship of the land. The very notion of circumv enting public health
regulations that deal with wastewater is inherently antithetical to the very values and standards that
Nutrient Farm has committed to – not just conceptually but in practice. We do not even use pesticides
and herbicides in large part due to the impacts it can have on our soils, products, and environment.
Would we actually throw such care and caution to the wind when dealing with wastewater?
OWTS systems are generally for residential uses and not recommended for intense hydraulic
and biologic loading associated with commercial uses. OWTS systems are primitive technology
and are allowed for residential uses as a stop-gap measure until they can be connected to a
regional treatment plant. OWTS systems for residential uses generally have a life of 25 -30
years. OWTS systems regularly fail, and often go unn oticed and unmaintained. Commercial
uses would reduce the life spans due to higher strength effluent. Even with the Higher Level of
Treatment from the proprietary Advantex system as described, it is pushing the limits of an
OWTS to treat this much wastewater. The strength of wastewater from commercial uses are
Referral Comments Response – Nutrient Farm Applications
Page 22
variable and difficult to quantify for BOD (biological) loading. The peak hydraulic loading
from event usage is also problematic – very high flows over a short period of time. The
proposed restaurant loading can be high strength with food waste and the oil s/greases that
can clog a system. Restaurant uses will certainly need an oil/water separator. A pool or public
laundry would discharge too much water at one time for an OWTS to handle properly without
saturating the soils.
Response: OWTS Commercial Uses are fully allowed by the State of Colorado , per Reg. 43. All
precautions related to the distinction between residential OWTS and commercial OWTS are also
codified by the state and reflected in design standards for such systems. By means of example but not
limitation, restaurants will require grease traps prior to discharging wastewater flows to final treatment.
We also want to note that this comment myopically focuses on the cumulative effect of commercial
development while somehow extolling the virtues of residential OWTS. To the contrary, it is well
accepted that there is a cumulative impact of concentrated residential OWTS in a specific locale as
well.
Of even more critical nature, this PUD proposal, and its incorporated phasing plan, reflects a long
process of introducing commercial uses to the property, each via its own insular land use review
process. In contrast, a high density residential development utilizing OWTS comes to the fore in one
fell swoop, thus limiting the ability to the review authority to look at the progressive cumulative
impacts of increased OWTS reliance over the course of time. In other words, this PUD , and the
accordant commercial uses proposed, effectively allows us to address this cumulative issue over time.
Further, the OWTS reduction factors shown in the calculations may not be applied correctly with
both 0.8 and 0.7 factors applied. A reduction factor of 0.8 is used in the conceptual designs for
trenches, but a bed configuration is shown with chambers which does not have a reduction
factor. Another reduction factor of 0.7 is shown for chambers. If the soils have more than 35%
rock, no sizing adjustments are allowed for syste ms placed in type “R” soils.
Response: All systems are shown to be trenches with chambers, so the reduction factors apply. It will
not be known if these are R-Type Soils until test pits can be dug and evaluated.
The massive bed of 2,368 chambers for Area 6 probably would not be allowed, and even if it
would be considered, the layout may need to be adjusted. It would be difficult to construct and
maintain a system of this size. Per Regulation 43, the maximum width for a bed must be 12
feet, unless the bed receives effluent meeting Treatment Level 2 quali ty or better (which may
be the case with the Advantex system). The separating distance between beds must be a
minimum of six feet sidewall-to -sidewall.
Response: These are trenches, not beds. This system would need to be permitted by the State due to it
being over 2 ,000 gallons per day (“GPD”) and all components including Advantex and trenches will
be reviewed and scrutinized prior to approval.
7. Stormwater Management
According to the reports, two minor natural drainages cross the land from south to north,
draining into the Colorado River. These are ephemeral drainages with no wetland or
riparian characteristics. The site imperviousness will increase from development due to
roads and rooftops from what once was a formerly undeveloped watershed and will cause
Referral Comments Response – Nutrient Farm Applications
Page 23
more frequent and more rapid stormwater runoff. This increased runoff can unravel
natural drainageways making them unstable and prone to serious erosion. It is
recommended to promote infiltration of stormwater and implement full spectrum
stormwater detention including storage of the water quality capture volume throughout the
development area to control runoff to historic rates. PUD reports do not mention any
proposed stormwater measures such as detention or water quality facilities. More work is
needed to characterize existing and future stormwater runoff flows and consider facilities
to control runoff to historic rates.
Response: Per our response to Mountain Cross, a regional drainage plan will be developed for
approved PUD uses. Protecting Colorado River water quality will be the primary concern.
Moreover, we have proposed PUD language to ensure additional safeguards for these ephemeral
drainage areas.
8. Floodplain
The PUD reports describe the work to identify the existing floodplain and comply with
floodplain regulations. We understand that FEMA has not mapped the floodplain in this area,
but that the best available preliminary data was used to approximate a 100 -year floodplain on
the Colorado River. According to the reports, the developm ent will comply with all applicable
FEMA, National Flood Insurance Program (NFIP), CWCB and Garfield County floodplain
regulations. It appears that no development is proposed within the anticipated 100 -year
floodplain of the Colorado River based upon the O verlay Map. Any proposed earthwork with
the floodplain will need to be documented and shown to not have an adverse impact of
floodplain elevations.
Response: The proposed boat ramp in the western portion of Nutrient Farm (Area 8 North) is the only
development proposed in the floodplain. A future floodplain development permit will be required and
all Garfield County, CWCB, and FEMA regulations will be complied with. We also have to point out
that essentially ALL boat ramps are in flood plains.
9. General Comment: Potential Need for Licensed Operator
In general, the proposed residential development has been sufficiently demonstrated that it can
be served by the water and wastewater infrastructure (Areas 1 through 5). There is concern,
however, about the proposed commercial development (Areas 6 through 8) being served by the
proposed basic water and wastewater systems that do not require a treatment plant operator.
The proposed commercial uses are significant enough at full build -out that they warrant
exploration of process treatment plants for water and wastewater that are regularly operated
and maintained by a licensed professional.
The February 2021 report titled “Nutrient Farm Central Water Distribution and Wastewater Systems ”
(Water and Wastewater Report) recognizes this need and describes Nutrient Farm’s phased approach
to commercial development. The Water and Wastewater Report states, “At such time when commercial
uses are developed, the potable system will eventually meet the various user thresholds defined by the
CDPHE as described in Regulation 11 – Colorado Primary Drinking Water Regulations 5 CCR 1002 -
11 and will become a regulated “Public Water System” (PWS).” As stated in that report, “Nutrient
Farm envisions putting a central water treatment facility online prior to exceeding the PWS user
Referral Comments Response – Nutrient Farm Applications
Page 24
thresholds.” Nutrient Farm will work with CDPHE to meet all relevant regulatory requirements,
including the possible need for a licensed operator. All public water systems have a designated manager
and point of contact for CDPHE. Fortunately, CDPHE will also be involved in all aspects of the OWTS
system. Within this overarching context, we also want to stress the pivotal nature of this project – it is
all one cohesive operation owned and run by one entity which is exceedingly rare in modern times. It
is also a crucial element of this project that extends to all active management concerns, including public
water systems and OWTS systems. The comments above seem to overlook or ignore that fact.
Summary
Thank you again for compiling these referral comments and working with us on our three requests
related to Nutrient Farm. We believe all referral comments have been adequately addressed with these
responses. Please let me know if there is any additional in formation or clarification that I may provide
related to the applications. I will be glad to speak to you.
Regards,
Danny Teodoru, Esq.
Timberline Law
cc: Andy Bruno, Nutrient Holdings