Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-12-24-9025 B S, LLC New Single-family dwelling w/ attached garage 38 River Park Ln, Carbondale Aspen Glen, FLG 1, Lot F-10 1) ALL WORK SHALL COMply W|TH THE 2015 TNTERNATTONAL RESIDENTIAL CODE (l.R.C.)AND 2018 I NTERNATIONAL EN ERGY CONSERVATION CODE (I.E.C.C.) 2) pROPOSED TMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED lN THE ATTACHED "GARFIELD COUNW BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL PERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) ALL EXTERIOR LTGHTING TO BE DOWNCASTAND SHIELDED. 5) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNry COMMUNITY DEVELOPMENT WEBSITE FOR ADDITIONAL I NFORMATION. 6) OPEN HOLE SOTLS REPORT tS REOUTRED AT FOOTTNG INSPECTTON AND PRIOR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 2,500 PSF soil bearing. 7) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGTNEERING FOR BUTLDTNG INSPECTOR AT TIME OF FRAME INSPECTION. 8) A LOT TMPROVEMENT CERTTFTCATE, SEALED BY A COLORADO LTCENSED SURVEYOR, lS REOUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE IS IN COMPLIANCE WITH THE PLATTED BUILDING ENVELOPE. 9) BLOWER DOOR TEST tS REOUTRED. MUST SUBMIT BLOWER DOOR TEST REPORT TO GARFIELD COUNTY COMMUNIry DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL 1O) PRESCRIPTIVE PATH USING ATTACHED RESCHECK REPORT HAS BEEN CHOSEN FOR ENERGY COMPLIANCE OF THIS HOME DESIGN. MANUAL J REPORT ALSO ATTACHED FOR REFERENCE. ALL NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m1507.3.3(1)AND (2) SHOWN ON COVER SHEET. ,$ .s -\ \ N