HomeMy WebLinkAboutConditions of PermitCOND ITIONS OF PER MIT
BLRE-02-25-907 1
Ted Vickerman
New 1 ,17 6 sq ft ADU w/ attached garage below
TBD CR 150, Gypsum
Sec 23, Twns 03, RB7 - 186323200099
1) ALL WORK SHALL COMply W|TH THE 201s INTERNATTONAL RESIDENTIAL CODE (l.R.C.)AND 2018
I NTERNATI ONAL EN ERGY CO N SERVATION CODE ( I. E.C.C. )
2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE
ATTACHED "GARFIELD COUNry BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON
PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS
REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
4) ALL EXTERIOR LIGHTING TO BE DOWNCASTAND SHIELDED.
5) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNIry DEVELOPMENT WEBSITE FOR
ADDITIONAL I N FORMATION.
6) OPEN HOLE SOTLS REPORT lS REOUTRED AT FOOTING TNSPECTION AND PRIOR TO ANY CONCRETE
POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR.
2,500 PSF soil bearing.
7) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGINEERTNG FOR BUILDING INSPECTOR AT TIME OF
FRAME INSPECTION. ELEVATION lS OVER 7,000 FT (ENSURE 50 psf SNOWLOAD PER STRUCTURALS)
S) SEPTIC SYSTEM REVIEW / APPROVALS: PRIOR TO BUILDING INSPECTION & CERTIFICATE OF
OCCUPANCY PROVIDE FINAL APPROVAYSIGN.OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH
DEPT.
9) ROAD & BRIDGE DRIVEWAY REVIEW / APPROVALS: PERMIT #GRB24-D-20 PRIOR TO FINAL BUILDING
INSPECTION & CERTIFICATE OF OCCUPANCY PROVIDE FINAL APPROVAL / SIGN-OFF FROM
GARFIELD COUNTY'S ROAD & BRIDGE DEPT. CALL (970) 625-8601 AND HAVE ROAD & BRIDGE SIGN
THE PERMIT INSPECTION CARD.
10) BLOWERDOORTESTTSREOUTRED. MUSTSUBMTTBLOWERDOORTESTREPORTTOGARFIELD
COUNTY COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING
INSPECTION / C,O. FINAL.
i 1) PRESCR|pTtVE PATH USTNG 2018 rECC TABLE R402.1.2 IS CHOSEN FOR ENERGY COMPLIANCE OF
THIS HOME. MANUAL J REPORT ALSO ATTACHED FOR REFERENCE. ALL NEW HOMES TO HAVE
WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (20'15 IRC TABLE m1507.3.3(1)AND
(2)SHOWN ON COVER SHEET.
ae
\
N
N