Loading...
HomeMy WebLinkAboutHydraulic Elevator Safety Test Report 03.19.25Nmt6; COUNCIt Of GOVERNMENTS ELEVATOR INSPECTION PROGRAM • • Elevator Safety Test o Building Name CRM School- Bar Fork Manufacturer TKE OPS Conveyance # CP'i7m@46f;i,- E Address 500 Holden Way Install Date 3/19/2025 Local Conveyance ID 0 `_S City Carbondale Zip Code 81623 Capacity (lbs) 2,500 Stops 2 Job/Contract # EHC593 ro �5 100 up Rated Speed (fpm) 125 down Inspector Present Yes ❑ No If Yes, inspector signs report Duty VPassenger ❑Freight 7MRL O Freight Class B ❑ C Test Date 3/19/2025 Type of test EZAcceptance ❑ Annual (Cat 1) Witnessed (Cat 1 or 5) ,a Piston Diameter (in) 3" Relief valve setting (psi) Adjustment needed? ❑ Yes 0i No (set at 150% or less of working pressure) Adjustment sealed? (Yes ❑ No � No load working pressure (psi) � � Full load working pressure (psi): 3 W (n NIA performed at acceptance tests only) / Plunger Gripper operational (rated load)? ❑Yes ❑ No (RN/A Cat 1 only) Over -speed valve operational? O(Yes ❑ No (:1 N/A Cat 1 only) All hydraulic system visable: k Yes ❑ No Proper fuses installed? 14 Yes ❑ No Connections tight? K Yes ❑ No Controller clean?OYes [I No Jumpers removed? U(Yes ❑No of yes, sipthe static test a5 ,tom Elapsed time (mint' k N/A(ifstatic Change in car position? ❑ Yes ❑ No If yes, distance (in)�/ 3 m Sf31,C tests are t 5min test not required) O rn Oil loss accounted for? ❑ Yes ❑ No '&N/A NOTE If any oil loss cannot be accounted for, the elevator must be removed from service and the Authority Having Jurisdiction must be noti`ied Stop switches In car: KPass ❑ Fail Pit: rVPass ❑ Fail Top of car: 0( Pass ❑ Fail Directional limits Up: J-Pass ❑ Fail Down: &Pass ❑ Fail Final limits Up: ❑ Pass ❑ Fail�N/A Down: ❑ Pass ElFail',(,N/A aN Low -oil protection Pass El Fail ❑ NIA (Code year 1993) Escape hatch contact Pass El Fail El N/A O Low Pressure switch XPass7 Fad Re -level during manual lowering X Pass [I Fail [I N/A ❑ N/A If cylinder is below stora a tank Code ear 1981 All electrical protective safety devices operate as intended XPass ❑ Fail (Code reference A17 1 2 26 2) Closing force (max. 30 Ibf) ,) 3 Mechanical edge ❑ Pass ❑ Fad 0 N/A Electronic edge It Pass ❑ Fail ❑ N/A 0 C) Closing time (sec) Door monitoring XPass ❑ Fad (❑ N/A prior to 2019) Door guides X Pass ❑ Fad Door restriction XPass ❑ Fail 7 N/A Door interlocks/gate switch )Vass 7Fad Phase I recall K, Pass ❑ Fad ❑ N/A (Code reference 8.6) Fire service signage in place? t5 Yes ❑ No ❑ N/A o Phase II operation rPass ❑ Fad ❑ N/A Remove fire contacts to test fire service N Pass ❑ Fail ❑ NIA rn ro E tv Emergency communication 29 Pass ❑ Fail ❑ N/A Emergency lights i5Pass ❑ Fail -- N/A w O Alarm bell Pass ❑Fail ❑N/A Emergency power operation ❑ Pass ❑ Fail D(N/A Not< Battery lowering (Pass —1 Fail 7 NIA 125° ofreledloadreq.-dateccepi—, O Need to return, Second form v MCP logs updated Yes ❑ No (Per state Pegs 2.3-3-3c) I Test tag installed? NYes - No -C O All Test Requirements ❑ Pass" ❑ Fail 'Pass may be checked only if all items on this test form meet adopted code requirements By signing below I certify all statements are true to the best of my knowledge and that all testing was performed according to current adopted codes. En Mechanic name �- I-NI)l, C, i I Contractor company name Mechanic signature J Date C State license # _ _ ( N at `n Inspector name 7& J I % Inspection cone any name �(�/LL O 4: Inspector signature: Date � / a State license #.G�• �.�8y A,, 6-te r c y6-c of : f,1*0Test Form Revised August 2023 0$6;r.<