RE: BLRE-03-25-9105 - Brannon residence 253 Shore Dr UNDER REVIEW
Perfect thank youl!
From: john carriere <ajcarriere@gmail.com>
Sent: Wednesday, March 26,2025 4:57 PM
To: Col lee n Wi rth <cwirth @ga ifieldcountyco.gov>
Cc: barehunter@hotmail.com; Alan <alan@woodstoneinc.net>; jeff@ironmountaineng.com
Subject: Re: BLRE-03-25-9105 - Brannon residence 253 Shore Dr UNDER REVIEW
Hel,l,o Cotteen,
Thank you for the l,ist of items. This is John Carriere, the architect. I can respond to items #1 and #2 and
#3 and wil,l, tet Atan Short, the contractor, confirm #3 and respond lo #4.
#1a YES these are the final ptans.
#1b. YES the subject set reftects the current pl.anned scope of work
#2-YES the upper garagel.oft is open to and part of the main garage
and YES this area is 'to be used only for future 'non-habitabl,e garage storage use onty'
#3 - Soits Report mistyped the proposed use - this shou[d have read 'secondary garage'. the tabel, of
'garage' is correct on Figure 1.
Atan and/ or Larry can confirm. (my image markup is betow)
Thanks again for your time and review,
John
lohn Carriere
303-435-4812
-{.It
sq
1
presents our
considerations
Gesrgn rocornmenoanons
on the proposed construction and the
geotecr.lucat engmeenng
cncountercd.
Colleen, this is incorrect, should have read
The proposed
secondary garage (John C.3126125\
a one- or two-story wood-trame structue wrth attached garagebe
with a located as shown on Figure l. Ground will be slab-
on-grado or abovo crawlspace. Groding for tho etrucfures is to bo rolativoly
minor with cut depths about 2 to 5 feet. We assume relatively light loadings,
typical ofthe proposed
Ifbuilding loadings, location or from those described above,
we should be notified to re-evaluate the recommendations contained in this report.
SITE CONDITIONS
The building site was vacant at the time of our freld exploration. The driveway access is offShore
Drive which crosses the upper part ofthe lot. The gnrund surface through the building area is
gently sloping down to the northeast. The Colorado River borders the lot to the north. Vegetation
through the building area consists ofsparse grass and weeds.
FIELD EXPLORATION
The field exploration for the project was conducted on December 17, 2024. Two exploratory
borings were drilled at the locations shown on Figure I to evaluate the subsurface conditions. The
borings were advanced with 4-inch diameter continuous flight augers powered by a truck-mounted
CME-458 drill rig. The borings were logged by a representative of Kumar & Associates.
Samples of the subsoils were taken with l% inch and 2-inch I.D. spoon samplers. The samplers
were driven into the subsoils at various depths with blows from a 140 pound hammer falling 30
Kuma. & Assoclatas, lnc. e Proloct ilo.2{-7-661,
2
1
1
i
I
1
I
,l
t
t
I
i
I
I
I
i
I
t
I
Ii.
;!
I
1
i
I
!
i
I
--l
i
I
t
T
I
1
1
I
\
1
1
I
slrEyrry'
-1
I
\
\
_*!
I
I
"l4it * '"
th;r
i
!
I
I
I
I
{
t
I
On Wed, l4ar 26,2025 at 1:54 PM Cotteen Wirth <cwirth@garfiel,dcountyco.gov> wrote:
BLRE-O3 -25-9105 - BRANNON Riverview Ranch Lot 4
Courtesy Update for BRANNON project team:
Hetto, this is Garfietd County Pl,ans Examiner, CoLl,een Wirth, sharing an update on your buitding
apptication and ptan set review. Have a short l,ist of ctarification items before I move forward with
marking up your OFFICE / FIELD COPY of ptans:
3
I
+
I
,l
II
ElF-r
note is conect
QUESTIONS AS FOLLOWS:
1. ArchitecturaI Sheets G-001 through 4-903 atl. state in the margin under Status: 9b7o GD / Permit
and are dated: 02/2012025.
1.a. Ptease confirm ptans dated 02/2012025 are the finat, finished architectural ptan sets for my
forthcoming ptans examining review and stamping /markups?
1.b. Ptease confirm the subject architecturat set reftects the current ptanned work scope, with NO
design etements shown on the submitted architectural, pl,an sheets'stil,t in progress'of BEING DELETED,
REVISED and / or AMENDED by the owners / project design team? lf this is NOT the case, ptease
expound.
2. A-103 garage toft #21 1 -- with stairs Leading to garage tevet and guards provided for fal,l, hazard
protection -- appears to be open to and part of the attached garage occupancy.
2.a. Do owners intend this attached garage toft to be used onl,y for future 'non-habitabte garage storage
use onty'? or other? lf so, ptease expound on attached garage 'toft' use(s)?
3. Kumar & Associates project 24-7-660 dated December 30,2024, sheet 1 PROPOSED
CONSTRUCTION indicates a detached secondary residence l,ocated as shown on FIGURE 1,
which itlustrates BORING l "garage stab on grade,,.
3.a. For purpose of the current buitding appl,ication, can you pl.ease confirm in writing for the buitding fite
publ,ic records that this adjacent'detached garage'witt NOT inctude any FINISHED HABITABLE
RESIDENTIAL LIVING SPACE NOR A SECONDARY DWELLING UNIT between breaking ground and a
htrilding finat / Certificate of Occupancy for issuod buitding permit BLRE-03-25 gl Ob?
lf the current proiect scope, now or during construction, undergoes re-design to include crea1on of a secondary residence -
THEN be prepared a whole new building permit and lancl use review shall be required, with probabty pRE-AZ2LICAT|ON
CONFERENCE MEETING with County PIanners, and possible subrn r'ssion of a LAND USE CHANGE pERMtT.
4. BuitdingAppl,ication form submitted and receipted on March 3,2025, has a check box indicating
the location was determined to be *EXEMPT'from obtaining a DRIVEWAY PERMIT. As no
DRIVEWAY EXEMPTION letter is found in the submissions, contact Garfietd County Road &
Bridge staff directly at betow contacts. Ask them to provide you with a DRIVEWAY EXEMpTIoN
LETTER.
Garfield County
0298
Road and Bridge
CR 333,A
Rille, CO 8t650
PH: 970.625-8601 Fex: 970-625-8627
Emtll: road{ndbridsc6:e$rficld-eountr',com
Here is the Road & Bridge Dept LINK to hetp facil.itate that exemption request.
4
Drivewa:' " Exe m pt i o n - Re q u e st-Ap p ti c at i o n. pdf
NEXT ACTION STEpS: pl,ease answer items 1-4 as best abte and forward information to me via
emaiI at cwi rthQga rf ie[dcou ntyco.gov
Gotleen Wirth
Buitding Ptans Examiner
Garfiel,d Gounty Gom munity Development
108 8th Street, Suite 401
Gl,enwood Springs, CO 81601
(970) 945-1377 ext1610
cwi rth@ga rf ie td cou ntyco. gov
Staff email, addresses are shifting to end in @garfietdcountyco.gov. However, persona[ names/prefixes
on email addresses witt remain the same. Pl,ease update our contact information domain.
5