Loading...
HomeMy WebLinkAboutOWTS Permit Card Garfield County Public Health 2014 Blake Ave. Glenwood Springs, CO 81601 Phone: (970) 945-6614 ext. 8150 For inspections, call: 970-945-6614 ext. 8150 and call the Design Engineer, if applicable Project Address: 54 Pine St., Carbondale, CO 81652 Parcel No.: 239328409008 Owner Name: Brett & Maura Wamsley Owner Phone: (720) 425-6081 Designed By: CBO, Inc. Designer Phone: (970) 309-5259 Number of Bedrooms: 4 Minimum Tank Capacity: 1,250-gallon Minimum Absorption: 656.25 ft2 OWTS PERMIT KEEP AVAILABLE AT PROJECT SITE Permit Number _SEPT-9125_______________________________ Permit Type X New X Repair X Remodel/addition X Tank only Issue Date _04/10/2025____________________ Expiration Date 04/10/2026_________________ Permit Conditions: This OWTS Permit is approved on the condition of compliance with the report and design as submitted by CBO, Inc. dated January 17, 2025. Changes to the design and permit must be approved by Garfield County Public Health and the designer prior to construction. PRIOR TO INSTALLATION OF OWTS COMPONENTS, A SECOND PROFILE PIT SHALL BE EXCAVATED IN THE AREA OF THE PROPOSED STA AND A REPORT OF SOIL CONDITIONS SHALL BE PROVIDED TO GCPH. The new OWTS will serve a 4-bedroom residence that will result from a remodel. The new OWTS components will consist of a 1,500-gallon septic tank on the CDPHE approved list, set level with access to grade. A new screened high-head pump will be installed in the second chamber of the septic tank. Effluent will be pumped to an automatic distributing valve set at the high point of the system that will distribute effluent to 660 ft2 of STA. The new STA will consist of two 10ft by 33ft unlined sand filter beds, consisting of at least 3 feet of secondary sand media overlain by perforated distribution laterals placed in GeoMat distribution media. Distribution laterals are to be 1 ½ inch Schedule 40 PVC, with 5/32-inch orifices every 3-feet on center and the laterals ending in flushing valves at the distal end. The orifices are to be facing downward with orifice shields. Inspection ports are to be installed at each corner of the bed. Maintain all setbacks and elevations as designed. The existing septic tank will be abandoned in accordance with Garfield County OWTS Regulations. Proof of proper tank abandonment must be provided. To assist in scheduling, please contact Garfield County Public Health (970-945-6614 ext. 8150) to notify the start of OWTS construction. Contact the designer and Garfield County Public Health at least 48 hours prior to requesting final inspection of the installed system prior to backfill. NO OWTS COMPONENT SHALL BE BACKFILLED WITHOUT PRIOR APPROVAL FROM GARFIELD COUNTY PUBLIC HEALTH AND THE DESIGNER. Agreement All installations must comply with all requirements of the Garfield County OWTS regulations including but not limited to the conditions specified above. In consideration of the issuance of the permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location, construction, and erection of the proposed OWTS and associated structures for which this permit is granted. The applicant further agrees that if the above said regulations are not fully complied with in the zoning, location, erection, and construction of the above described OWTS and structure, the permit may then be revoked by notice from the Health Department and immediately become null and void. The issuance of a permit and specifications of terms and conditions therein will not constitute assumption of liability, nor create presumption that the local public health agency or its employees may be liable for the failure or malfunctioning of any system. Permit issuance will not constitute a certification that the system, the equipment used in the system, or any component used for system operation will ensure continuous compliance with the provision of the OWTS Act, the regulations adopted thereunder, or any terms and conditions of a permit. Permit Approval Plans and specifications for the proposed OWTS have been reviewed and are considered satisfactory. Permission is hereby given to the property owner(s) to perform the work indicated in accordance with the Garfield County OWTS Regulation. This Permit will expire 1 year from the date of issuance unless construction on the system has commenced. An "as-built" drawing must be submitted and inspection of the system must be completed by GCPH before final approval of the system will be issued. 04/10/2025 Issued By: Garfield County Environmental Health Department Date